James Hin
- Listed as
- authorized agent-others, contractor
- Firm
- Galaxy Building Construction
- Based in
- San Francisco
- On San Francisco permits
- Jul 2008 to Sep 2026
103 permits since 2000 (contractor on 103 permits, authorized agent-others on 2 permits): 61 completed, 8 in progress, 27 never finaled, 7 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
Showing the 100 most recent of 103.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 5, 2026 | In progress filed Sep 2026, not yet issued | 665 Colby St | Galaxy Building Construction | erect new 1-story type vb detached adu in rear yard.Details
erect new 1-story type vb detached adu in rear yard. | $85,000 |
| Jun 29, 2026 | In progress issued Aug 2026 | 2800 Balboa St | Galaxy Building Construction | unit b: convert portion of the (e) rear ground floor unit (unit b) into a garage and convert unit b into studioDetails
unit b: convert portion of the (e) rear ground floor unit (unit b) into a garage and convert unit b into studio | $50,000 |
| Aug 8, 2025 | In progress issued Aug 2025 | 665 Colby St | Galaxy Building Construction | revision to pa # 202405061438: enlarge office by relocating the proposed partition wall at 2nd fl. revise windows to vinyl frame per plan. revise rear building exterior finish from shingle siding to hardie plank.Details
revision to pa # 202405061438: enlarge office by relocating the proposed partition wall at 2nd fl. revise windows to vinyl frame per plan. revise rear building exterior finish from shingle siding to hardie plank. | $7,500 |
| Apr 14, 2025 | In progress issued May 2025 | 30 Jules Av | Galaxy Building Construction | rev to pa # 202407035778: propose (n) bath & (n) ac system @ 1/f. relocate laundry to garage @ 1/f. (n) skylightat 2/f kitchen, reconfigure (n) bath & closet @ 2/f. replace front window @ 2/f. change windows at rear to single hung. relocate shear wall @ rear to exterior.Details
rev to pa # 202407035778: propose (n) bath & (n) ac system @ 1/f. relocate laundry to garage @ 1/f. (n) skylightat 2/f kitchen, reconfigure (n) bath & closet @ 2/f. replace front window @ 2/f. change windows at rear to single hung. relocate shear wall @ rear to exterior. | |
| Mar 24, 2025 | Completed final sign-off Apr 2025 | 39 Bannan Pl | Galaxy Building Construction | revision to pa 2024-0326-8620 construction revision for 39 brannan, 2nd fl with 4 additional windows replacement. infill opening. window replacement at bathroom and chaning from propsed casement window to single hung windowDetails
revision to pa 2024-0326-8620 construction revision for 39 brannan, 2nd fl with 4 additional windows replacement. infill opening. window replacement at bathroom and chaning from propsed casement window to single hung window | $4,000 |
| Feb 14, 2025 | Completed final sign-off Mar 2025 | 2019 23rd Av | Galaxy Building Construction | to obtain final inspection for work approved under pa#2021-0723-5020 all work is complete.Details
to obtain final inspection for work approved under pa#2021-0723-5020 all work is complete. | |
| Sep 10, 2024 | In progress issued Sep 2024 | 665 Colby St | Galaxy Building Construction | infill light well and convert roof deck into relocated (n) kitchen and convert (e) kitchen into (n) bedroom located at 3rd floorDetails
infill light well and convert roof deck into relocated (n) kitchen and convert (e) kitchen into (n) bedroom located at 3rd floor | $10,000 |
| Jul 3, 2024 | In progress issued Jul 2024 | 30 Jules Av | Galaxy Building Construction | 1/f: relocate & remodel (e) laundry room & (e) bathroom. remodel playroom & add (n) bedroom. reconfigure interior staircase. 2/f: convert left rear bedroom into master suite. relocate one (e) bedroom, (e) dining, & (e) living room. relocate & remodel (e) kitchen & (e) bathroom. new deck.Details
1/f: relocate & remodel (e) laundry room & (e) bathroom. remodel playroom & add (n) bedroom. reconfigure interior staircase. 2/f: convert left rear bedroom into master suite. relocate one (e) bedroom, (e) dining, & (e) living room. relocate & remodel (e) kitchen & (e) bathroom. new deck. | $200,000 |
| May 6, 2024 | In progress issued May 2024 | 665 Colby St | Galaxy Building Construction | 1st/f:convert storage space to living space to include 3 bedroom/ 2baths 2nd fl (994 sf new habitable). 2nd/f: add 1 office, 1 bed room and 1 bath, 3 rd fl: add 1 bed room and 1 bathr reconfigiure master bed layout, skylight, windowsDetails
1st/f:convert storage space to living space to include 3 bedroom/ 2baths 2nd fl (994 sf new habitable). 2nd/f: add 1 office, 1 bed room and 1 bath, 3 rd fl: add 1 bed room and 1 bathr reconfigiure master bed layout, skylight, windows | $60,000 |
| Jan 31, 2024 | Completed final sign-off Mar 2025 | 2019 23rd Av | Galaxy Building Construction | as built revision 201808308786 & 202107235020. add two skylights and replace two front windows on second fl. update (e) skylights and door swings (first fl). reconfigure first floor bathroom and rear stucoo to hardiboard. (no new fixtures)Details
as built revision 201808308786 & 202107235020. add two skylights and replace two front windows on second fl. update (e) skylights and door swings (first fl). reconfigure first floor bathroom and rear stucoo to hardiboard. (no new fixtures) | $15,000 |
| Jul 18, 2023 | Expired or cancelled expired Feb 2026 | 407 Wilde Av | Galaxy Building Construction | revision to approved pa# 201811135654. relocate kitchen to family room. add new window.Details
revision to approved pa# 201811135654. relocate kitchen to family room. add new window. | $15,000 |
| Oct 13, 2022 | Completed final sign-off Jun 2024 | 343 08th St | Galaxy Building Construction | ti to an vacant ground floor commercial space to become new restaurant at 343 08th street.Details
ti to an vacant ground floor commercial space to become new restaurant at 343 08th street. | $100,000 |
| Jan 21, 2022 | Completed final sign-off Feb 2023 | 630 Joost Av | Galaxy Building Construction | 1 bathroom remodel, no reparition. replace 6 front windows with wood windows integral og lugs, 3 rear windows. in-kind.Details
1 bathroom remodel, no reparition. replace 6 front windows with wood windows integral og lugs, 3 rear windows. in-kind. | $18,000 |
| Jan 3, 2022 | In progress issued Feb 2026 | 266 Connecticut St | Galaxy Building Construction | rear horizontal & vertical addition. remodel/reconfig (e) sdf to add 1 new unit. add new 6 bathrms. remove (e) kitchen & replace w/new for lower unit. add kitchen & living spaces for upper unit. expand garage. add roof deck. alter front & rear of bldg w/new facade. n flat roof. upgrade foundation.Details
rear horizontal & vertical addition. remodel/reconfig (e) sdf to add 1 new unit. add new 6 bathrms. remove (e) kitchen & replace w/new for lower unit. add kitchen & living spaces for upper unit. expand garage. add roof deck. alter front & rear of bldg w/new facade. n flat roof. upgrade foundation. | $1,168,850 |
| Dec 7, 2021 | Never finaled issued Jan 2022, no final | 160 23rd Av | Galaxy Building Construction | interior remodel: remove wall betweem dining room and kitchen, wall between dining room/living room. new steel beam at unit 162. 2nd floor only. kitchen remodel.Details
interior remodel: remove wall betweem dining room and kitchen, wall between dining room/living room. new steel beam at unit 162. 2nd floor only. kitchen remodel. | $35,000 |
| Sep 3, 2021 | Never finaled issued Sep 2021, no final | 162 23rd Av | Galaxy Building Construction | remodel (1) full bath w/(e) shower pan, remodel 1-1/2 bath, update electrical wiring, add insulation @ exterior wall, add recess lighting, replace drywall for wiring/insulation. non structural. lights per cec 150.0kDetails
remodel (1) full bath w/(e) shower pan, remodel 1-1/2 bath, update electrical wiring, add insulation @ exterior wall, add recess lighting, replace drywall for wiring/insulation. non structural. lights per cec 150.0k | $35,000 |
| Jul 23, 2021 | Expired or cancelled expired Mar 2025 | 2019 23rd Av | Star Light Construction Inc., Galaxy Building Construction | alternate permit process horizontal addition at rear of existing two stories residential building. to comply with board of appeals no. 21-019: revised horizontal addition pa# 201808308786 remove 5x5 corner at north rear of 2nd floor.Details
alternate permit process horizontal addition at rear of existing two stories residential building. to comply with board of appeals no. 21-019: revised horizontal addition pa# 201808308786 remove 5x5 corner at north rear of 2nd floor. | |
| Apr 29, 2021 | Expired or cancelled expired Feb 2026 | 407 Wilde Av | Galaxy Building Construction | reference complaint # 202174786; remodel kitchen cabinet,replace rotten cabinets.Details
reference complaint # 202174786; remodel kitchen cabinet,replace rotten cabinets. | $5,000 |
| Sep 30, 2020 | Completed final sign-off Sep 2022 | 259 Crescent Av | Galaxy Building Construction | renewal recommencement completion of work approved under #201801128595 & 201811155960. work 45% completeDetails
renewal recommencement completion of work approved under #201801128595 & 201811155960. work 45% complete | $52,250 |
| Dec 10, 2019 | Never finaled issued Feb 2020, no final | 7719 Geary Bl | Galaxy Building Construction | unit #3: interior remodel. convert living room to one office and add antoher office (total of 2), and one bath. remodel kitchen. convert master bedroom to office and smaller master bedroom. all work in unit #3 (top floor unit).Details
unit #3: interior remodel. convert living room to one office and add antoher office (total of 2), and one bath. remodel kitchen. convert master bedroom to office and smaller master bedroom. all work in unit #3 (top floor unit). | $10,000 |
| Nov 25, 2019 | Completed final sign-off Nov 2020 | 2407 Clement St | Galaxy Building Construction | 2nd & 3rd floor: replace all window in kind with double pane windows, visible from the street to be wood windows. all others to be vinyl. update existing electrical line & fixtures at 3rd floor unit. relayout fixtures at the existing 3rd floor bathroom & add new full bath on 3rd floor.Details
2nd & 3rd floor: replace all window in kind with double pane windows, visible from the street to be wood windows. all others to be vinyl. update existing electrical line & fixtures at 3rd floor unit. relayout fixtures at the existing 3rd floor bathroom & add new full bath on 3rd floor. | $30,000 |
| Oct 22, 2019 | Never finaled issued Oct 2019, no final | 569 Bright St | Galaxy Building Construction | obtain final inspection on 201607071769. all work is completeDetails
obtain final inspection on 201607071769. all work is complete | |
| Oct 22, 2019 | Never finaled issued Oct 2019, no final | 475 Arch St | Galaxy Building Construction | to obtain final on 201408204278. all work is complete.Details
to obtain final on 201408204278. all work is complete. | |
| Oct 17, 2019 | Completed final sign-off Feb 2020 | 38 Teddy Av | Shao Fat Construction Inc, Galaxy Building Construction | revise pa# 2019-0927-2990: to comply with nbov# 201979741, 201991611, add smoke detector, fix space heater within unit.Details
revise pa# 2019-0927-2990: to comply with nbov# 201979741, 201991611, add smoke detector, fix space heater within unit. | $2,000 |
| Sep 27, 2019 | Completed final sign-off Feb 2020 | 38 Teddy Av | Galaxy Building Construction | repair and replace water damage drywall 8x20 ft, not facing the front street. it is west side of building. add james hardie siding on top of (e) plywood siding. repair leak at 2nd level roof patio sliding door. smoke detector replacement. add electrical outlet for water heater blower.Details
repair and replace water damage drywall 8x20 ft, not facing the front street. it is west side of building. add james hardie siding on top of (e) plywood siding. repair leak at 2nd level roof patio sliding door. smoke detector replacement. add electrical outlet for water heater blower. | $8,000 |
| Aug 28, 2019 | Completed final sign-off Mar 2020 | 715 Garfield St | Galaxy Building Construction | remodel bathroom & kitchen, add recessed lights, smoke detectors, in-kindDetails
remodel bathroom & kitchen, add recessed lights, smoke detectors, in-kind | $50,000 |
| Jun 3, 2019 | Completed final sign-off Apr 2022 | 2191 39th Av | Galaxy Building Construction | remodel 2nd floor bathroom, and upgrade wiring through out the house, add lights and electrical panel upgrade. replce laundry sink @ basement.Details
remodel 2nd floor bathroom, and upgrade wiring through out the house, add lights and electrical panel upgrade. replce laundry sink @ basement. | $18,000 |
| Feb 28, 2019 | Completed final sign-off Jun 2019 | 187 College Av | Galaxy Building Construction | replace kitchen cabinet in-kind, (1) bath tub, (1) kitchen sink & reconnect gas range, no change of (e) floor planDetails
replace kitchen cabinet in-kind, (1) bath tub, (1) kitchen sink & reconnect gas range, no change of (e) floor plan | $28,000 |
| Feb 8, 2019 | Completed final sign-off Jun 2019 | 470 Grove St | Galaxy Building Construction | remodel (1) bathroom. shower pan, sink replacement.Details
remodel (1) bathroom. shower pan, sink replacement. | $15,000 |
| Jan 4, 2019 | Never finaled issued Jan 2019, no final | 678 09th Av | Galaxy Building Construction | comply with nov 201803971 add smoke detectors and add outlet and some light in unit #2. patch drywall and close up wall after wiring. repair flue pipeDetails
comply with nov 201803971 add smoke detectors and add outlet and some light in unit #2. patch drywall and close up wall after wiring. repair flue pipe | $7,000 |
| Dec 10, 2018 | Completed final sign-off Oct 2019 | 238 Alma St | Galaxy Building Construction | fire seal around recessed lighting enclosure at the top floor unit 238. electrical bonding @ tankless water heater. 100 amp sub panel replacement. all work at unit 238.Details
fire seal around recessed lighting enclosure at the top floor unit 238. electrical bonding @ tankless water heater. 100 amp sub panel replacement. all work at unit 238. | $7,000 |
| Nov 15, 2018 | Completed final sign-off Sep 2022 | 259 Crescent Av | Galaxy Building Construction | revision to pa 2018-01128595 foundation replacement. structural work on 2nd floor; enlarge garage length to accomodate a compact carDetails
revision to pa 2018-01128595 foundation replacement. structural work on 2nd floor; enlarge garage length to accomodate a compact car | $35,000 |
| Nov 14, 2018 | Never finaled issued Nov 2018, no final | 2800 Balboa St | Galaxy Building Construction | remodel unit a, b and c kitchen (3), bathroom (3). upgrade 200 amp main panel.Details
remodel unit a, b and c kitchen (3), bathroom (3). upgrade 200 amp main panel. | $40,000 |
| Nov 13, 2018 | Expired or cancelled expired Feb 2026 | 407 Wilde Av | Galaxy Building Construction | legalization of dwelling unit @ 1st flr per ord# 43-14 & planning code section 207.3. (n) adu included kitchen, bedrooms & baths.Details
legalization of dwelling unit @ 1st flr per ord# 43-14 & planning code section 207.3. (n) adu included kitchen, bedrooms & baths. | $15,000 |
| Oct 15, 2018 | Completed final sign-off Jun 2019 | 187 College Av | Galaxy Building Construction | open walls to upgrade electrical throughout unit: patch drywall after rewiring at upper unit. meter panel upgrade, replce furance in-kind.Details
open walls to upgrade electrical throughout unit: patch drywall after rewiring at upper unit. meter panel upgrade, replce furance in-kind. | $10,000 |
| Aug 30, 2018 | Expired or cancelled cancelled Feb 2025 | 2019 23rd Av | Star Light Construction Inc., Galaxy Building Construction | horizontal & vertical addition. addition to the rear of (e) 2-story buildingDetails
horizontal & vertical addition. addition to the rear of (e) 2-story building | $150,000 |
| Aug 6, 2018 | Completed final sign-off Nov 2018 | 1655 Mission St | Galaxy Building Construction | unit #1043: remodel bathroom - retile, replace fixtures in kindDetails
unit #1043: remodel bathroom - retile, replace fixtures in kind | $15,000 |
| May 9, 2018 | Completed final sign-off Jan 2020 | 647 Duncan St | Galaxy Building Construction | replace 2 furnace & duct 40'; upgrade 200 amp amin panel & replace concrete slab at garage at electrical conduct trenchDetails
replace 2 furnace & duct 40'; upgrade 200 amp amin panel & replace concrete slab at garage at electrical conduct trench | $20,000 |
| Apr 18, 2018 | Completed final sign-off May 2019 | 110 Sagamore St | Galaxy Building Construction | add (1) ada bathroom for barber shop on ground floor per plan. add (1) entertainment room, (1) bathroom, (1) employee resting room, (1) employee bathroom on the ground fl per plan. (entertainment room fro dwelling unit above. employee resting room for commercial unit).Details
add (1) ada bathroom for barber shop on ground floor per plan. add (1) entertainment room, (1) bathroom, (1) employee resting room, (1) employee bathroom on the ground fl per plan. (entertainment room fro dwelling unit above. employee resting room for commercial unit). | $68,000 |
| Mar 2, 2018 | Never finaled issued Mar 2018, no final | 26 Prescott Ct | Galaxy Building Construction | remove old electrical panel woodden enclosure and rebuilt 4'x8' plywood behind it. new electrical main panel, relocate hose bibb water valve to other side of garage patch and repair drywall at walls.Details
remove old electrical panel woodden enclosure and rebuilt 4'x8' plywood behind it. new electrical main panel, relocate hose bibb water valve to other side of garage patch and repair drywall at walls. | $8,500 |
| Feb 27, 2018 | Completed final sign-off May 2019 | 1518 Irving St | Galaxy Building Construction | tenant improvement, convert (b) vacant ground flr space (m) into tea shop (b) occupancy.Details
tenant improvement, convert (b) vacant ground flr space (m) into tea shop (b) occupancy. | $120,000 |
| Dec 28, 2017 | Completed final sign-off Oct 2019 | 89 Stanyan Bl | Galaxy Building Construction | convert (e) space on 1st floor to a bedroom, 2 full bathrooms and a family room.Details
convert (e) space on 1st floor to a bedroom, 2 full bathrooms and a family room. | $58,000 |
| Dec 18, 2017 | Completed final sign-off Sep 2019 | 4147 26th St | Galaxy Building Construction | title 24 plan, install 2 furnance, ductwork. 2 flu pipe and electrical lighting and electrival panelsDetails
title 24 plan, install 2 furnance, ductwork. 2 flu pipe and electrical lighting and electrival panels | $30,000 |
| Dec 18, 2017 | Completed final sign-off Apr 2018 | 1038 Girard St | Galaxy Building Construction | remodel (1) kitchen and (2) bathrooms. electrical wiring upgrade. repair drywall and replace (1) furnaceDetails
remodel (1) kitchen and (2) bathrooms. electrical wiring upgrade. repair drywall and replace (1) furnace | $38,000 |
| Sep 27, 2017 | Completed final sign-off Jan 2019 | 1448 Union St | Galaxy Building Construction | to comply with physical inspection report # cc-8206. n/a maherDetails
to comply with physical inspection report # cc-8206. n/a maher | $20,000 |
| Aug 29, 2017 | Completed final sign-off Jan 2018 | 2455 39th Av | Galaxy Building Construction | remove the partition wall between the kitchen and the dining room to integrate into one space. add wall to close off an existing entry way to the kitchen near the stair landing. open an entry to the kitchen way from the hallwayDetails
remove the partition wall between the kitchen and the dining room to integrate into one space. add wall to close off an existing entry way to the kitchen near the stair landing. open an entry to the kitchen way from the hallway | $10,000 |
| Aug 2, 2017 | Never finaled issued Aug 2017, no final | 197 Joost Av | Galaxy Building Construction | remodel 1 kitchen, 2 bathrooms, add lighting, and outlets, replace 4 windows, and 1 patio door in kind @ rear ground floor units, all work done @ basement unitDetails
remodel 1 kitchen, 2 bathrooms, add lighting, and outlets, replace 4 windows, and 1 patio door in kind @ rear ground floor units, all work done @ basement unit | $60,000 |
| Jul 12, 2017 | Completed final sign-off Oct 2019 | 89 Stanyan Bl | Galaxy Building Construction | remodel (2) bathrooms, (1) kitchen, rewire electrical, replace plubming pipes, redrywall, add insulation, electrical main panel @ garage.Details
remodel (2) bathrooms, (1) kitchen, rewire electrical, replace plubming pipes, redrywall, add insulation, electrical main panel @ garage. | $65,000 |
| Jul 12, 2017 | Never finaled issued Jul 2017, no final | 373 07th Av | Galaxy Building Construction | kitchen remodel: replace cabinets, open wall and cieling to update electrical, replace tile floro and replace bedroom door. no changes to wall locations.Details
kitchen remodel: replace cabinets, open wall and cieling to update electrical, replace tile floro and replace bedroom door. no changes to wall locations. | $25,000 |
| Jul 12, 2017 | Completed final sign-off Oct 2019 | 91 Stanyan Bl | Galaxy Building Construction | remodel (1) kitchen, (2) bathrooms, rewire electrical, replace rotten plumbing pipes, redrywall, add insulationDetails
remodel (1) kitchen, (2) bathrooms, rewire electrical, replace rotten plumbing pipes, redrywall, add insulation | $65,000 |
| May 31, 2017 | Completed final sign-off May 2018 | 369 07th Av | Galaxy Building Construction | remodel bathrooms for two units only, 369 and 373 07th ave. replace sinks, toilets, bathtubs, floor tiles and wall tiles, fan ventilationDetails
remodel bathrooms for two units only, 369 and 373 07th ave. replace sinks, toilets, bathtubs, floor tiles and wall tiles, fan ventilation | $10,000 |
| Apr 7, 2017 | Never finaled issued Apr 2017, no final | 758 33rd Av | Galaxy Building Construction | replace and remodel two bathrooms. repair water leak at master bath shower. replace rotten plywood. retile and replace toilets and vanity at two bathroomsDetails
replace and remodel two bathrooms. repair water leak at master bath shower. replace rotten plywood. retile and replace toilets and vanity at two bathrooms | $22,000 |
| Apr 7, 2017 | Completed final sign-off Oct 2018 | 645 Duncan St | Galaxy Building Construction | core drill concrete slab at garage for electrical main panel. add 1-4x8 ply to wall with 5/8 sheetrock for electrical panel. electrical panel will attach to wood frame wall, install 3 furnace with duct work, core drill for gas main on concrete slabe\Details
core drill concrete slab at garage for electrical main panel. add 1-4x8 ply to wall with 5/8 sheetrock for electrical panel. electrical panel will attach to wood frame wall, install 3 furnace with duct work, core drill for gas main on concrete slabe\ | $2,000 |
| Dec 15, 2016 | Expired or cancelled expired Dec 2025 | 2046 Mission St | Galaxy Building Construction | for mechanical, electrical & plumbping permit. reference building permit app#201412294640Details
for mechanical, electrical & plumbping permit. reference building permit app#201412294640 | $80,000 |
| Sep 28, 2016 | Completed final sign-off May 2017 | 1002 Vicente St | Galaxy Building Construction | interior renovation (electrical, plumbing, mechanicial upgrades), replace windows at southside (aluminum clad/wood) 12, add 1 addition bathroom in unit #1002 and #1004Details
interior renovation (electrical, plumbing, mechanicial upgrades), replace windows at southside (aluminum clad/wood) 12, add 1 addition bathroom in unit #1002 and #1004 | $80,000 |
| Jul 7, 2016 | Never finaled issued Jul 2016, no final | 569 Bright St | Galaxy Building Construction | remodel kitchen and 1 bathroom, 1 powder room and redny wall, add insulation. add outlets and lights at 2nd floor.Details
remodel kitchen and 1 bathroom, 1 powder room and redny wall, add insulation. add outlets and lights at 2nd floor. | $28,000 |
| Mar 25, 2016 | Completed final sign-off Jul 2018 | 3109 24th St | Galaxy Building Construction | mechanical permit for ti - ref pa 2014 0520 6274: new type 1 hood, exhaust fan, new make up air. maher naDetails
mechanical permit for ti - ref pa 2014 0520 6274: new type 1 hood, exhaust fan, new make up air. maher na | $5,000 |
| Feb 12, 2016 | Completed final sign-off Jun 2017 | 562 37th Av | Galaxy Building Construction | unit #2 - to comply w/nov #201692651 & 201696671 - remodel kitchen & bathroom, replace 2 rear windows in kind same size & same opening. relocate fuse panel. repair heater.Details
unit #2 - to comply w/nov #201692651 & 201696671 - remodel kitchen & bathroom, replace 2 rear windows in kind same size & same opening. relocate fuse panel. repair heater. | $22,000 |
| Feb 12, 2016 | Completed final sign-off Jun 2017 | 562 37th Av | Galaxy Building Construction | unit #4 - remodel kitchen & bathroom, replace 2 windows in kind, same size & same opening. relocate fuse panel. no change to layout.Details
unit #4 - remodel kitchen & bathroom, replace 2 windows in kind, same size & same opening. relocate fuse panel. no change to layout. | $22,000 |
| Feb 11, 2016 | Never finaled issued Mar 2016, no final | 167 Brussels St | Galaxy Building Construction | revision to appl #200807176988 - 1st flr - change part of bedroom to home office, new hallway at garage. 2nd flr: relocate kitchen & living & bath rooms. cahnge living & nook to bedrooms, new shed (100 sf) at rear yard.Details
revision to appl #200807176988 - 1st flr - change part of bedroom to home office, new hallway at garage. 2nd flr: relocate kitchen & living & bath rooms. cahnge living & nook to bedrooms, new shed (100 sf) at rear yard. | $100 |
| Feb 10, 2016 | Completed final sign-off Jun 2016 | 1663 20th Av | Galaxy Building Construction | convert a media room to add bathroom & bedroom, one entertainment room, one storage room on 1/f per plan. fill in beneath 2nd floor.Details
convert a media room to add bathroom & bedroom, one entertainment room, one storage room on 1/f per plan. fill in beneath 2nd floor. | $8,000 |
| Dec 31, 2015 | Completed final sign-off Feb 2016 | 2455 39th Av | Galaxy Building Construction | remodel split bathroom to 1 full bathroom and 1 half bathroomDetails
remodel split bathroom to 1 full bathroom and 1 half bathroom | $12,000 |
| Dec 16, 2015 | Completed final sign-off Dec 2016 | 3165 Washington St | Galaxy Building Construction | replace water heater and add electrical for water heater ignitor. re-drywall the water damaged dyrwall behind the water heater leak.Details
replace water heater and add electrical for water heater ignitor. re-drywall the water damaged dyrwall behind the water heater leak. | $2,000 |
| Dec 31, 2014 | Completed final sign-off Jan 2017 | 200 Bright St | Galaxy Building Construction | change occupant from (e) barbar shop to group r-3 residential unit. approved variance case# 2013.1410v. construct 2 new bedrooms, 1 new kitchen, 1 new bathroom, relocate 1 bathroom. 2 storages. add furnance.Details
change occupant from (e) barbar shop to group r-3 residential unit. approved variance case# 2013.1410v. construct 2 new bedrooms, 1 new kitchen, 1 new bathroom, relocate 1 bathroom. 2 storages. add furnance. | $70,000 |
| Dec 29, 2014 | Expired or cancelled expired Dec 2025 | 2046 Mission St | Galaxy Building Construction | g/f -convert (e) retail space to full service restaurant; mep & kitchen hood, shop front signage under separate permit.Details
g/f -convert (e) retail space to full service restaurant; mep & kitchen hood, shop front signage under separate permit. | $80,000 |
| Dec 18, 2014 | Completed final sign-off Jan 2022 | 21 Scotia Av | Galaxy Building Construction | repartition basement existing bedroom #3 into bedroom #3 and #4; relocate (e) basement bathrm & add one new bathrm; relocate laundry area & water heater;add 1 new wine storage rm & 1 new furnace & build new deck/stair at backyardDetails
repartition basement existing bedroom #3 into bedroom #3 and #4; relocate (e) basement bathrm & add one new bathrm; relocate laundry area & water heater;add 1 new wine storage rm & 1 new furnace & build new deck/stair at backyard | $30,000 |
| Dec 2, 2014 | Completed final sign-off Dec 2014 | 70 Derby St | Galaxy Building Construction | to comply with nov# 201486771. to remove lean to shed located at front of bldg. one story.Details
to comply with nov# 201486771. to remove lean to shed located at front of bldg. one story. | $500 |
| Nov 3, 2014 | Completed final sign-off Jan 2022 | 21 Scotia Av | Galaxy Building Construction | remodel kitchen & bathroom on 2nd floor. replace steel plumbing with copper. rewire old wiring to romex, replace garage broker sewer line.Details
remodel kitchen & bathroom on 2nd floor. replace steel plumbing with copper. rewire old wiring to romex, replace garage broker sewer line. | $12,000 |
| Oct 22, 2014 | Completed final sign-off May 2016 | 3224 22nd St | Galaxy Building Construction | install grease exhaust and make-up air systems for restaurant remodeling. ul 300 suppression system under sep. permit. reference to bpa 201406188748.Details
install grease exhaust and make-up air systems for restaurant remodeling. ul 300 suppression system under sep. permit. reference to bpa 201406188748. | $21,000 |
| Oct 20, 2014 | Never finaled issued Feb 2015, no final | 167 Brussels St | Galaxy Building Construction | revision to appl #2008.0717.6988 - open new exterior side door @ garage next to stair; relocate door @ 1st flr; new bathroom @ first (garage ) flr; new skylight @ dining @ 2nd flr; new skylight & door @ master bathroom.Details
revision to appl #2008.0717.6988 - open new exterior side door @ garage next to stair; relocate door @ 1st flr; new bathroom @ first (garage ) flr; new skylight @ dining @ 2nd flr; new skylight & door @ master bathroom. | $10,000 |
| Sep 23, 2014 | Completed final sign-off Mar 2017 | 1907 Lyon St | Galaxy Building Construction | excavare from 7'-3" to 7'-6" basement ceiling height. infill light court & add bedrm, home office & full bath. replace window @ front. 1st fl-add powder rm. remove wall. 2nd fl-infill light well remodel master bath. add skylights to each bath.Details
excavare from 7'-3" to 7'-6" basement ceiling height. infill light court & add bedrm, home office & full bath. replace window @ front. 1st fl-add powder rm. remove wall. 2nd fl-infill light well remodel master bath. add skylights to each bath. | $40,000 |
| Aug 22, 2014 | Never finaled issued Sep 2014, no final | 2827 California St | Galaxy Building Construction | #10c- install new mechanical system for tenant improvement for a new restaurant. ref. pa# 201310219829. n/a ordinance #155-13Details
#10c- install new mechanical system for tenant improvement for a new restaurant. ref. pa# 201310219829. n/a ordinance #155-13 | $68,000 |
| Aug 20, 2014 | Never finaled issued Aug 2015, no final | 475 Arch St | Galaxy Building Construction | one story horizontal addition to (e) 2 stories building. create roof deck above new addition & connect (e) 2nd floor bedroom.first floor addition includedDetails
one story horizontal addition to (e) 2 stories building. create roof deck above new addition & connect (e) 2nd floor bedroom.first floor addition included | $30,000 |
| Aug 14, 2014 | Never finaled issued Aug 2014, no final | 2293 Mission St | Galaxy Building Construction | m.e.p. drawings for approved app#201311262884Details
m.e.p. drawings for approved app#201311262884 | |
| Jun 18, 2014 | Completed final sign-off May 2016 | 3224 22nd St | Galaxy Building Construction | t.i. project- existing food service restaurant to become a carry-out japanese food service restaurant, enlarge entry door and relocate restroom to comply ada requirement.Details
t.i. project- existing food service restaurant to become a carry-out japanese food service restaurant, enlarge entry door and relocate restroom to comply ada requirement. | $72,000 |
| May 13, 2014 | Completed final sign-off Dec 2014 | 245 Pierce St | Galaxy Building Construction | 3rd floor - convert existing closet to bathroom, adding sink, toilet & shower with plumbing, adding lights & exhaust fan.Details
3rd floor - convert existing closet to bathroom, adding sink, toilet & shower with plumbing, adding lights & exhaust fan. | $20,000 |
| Mar 12, 2014 | Never finaled issued Mar 2014, no final | 70 Derby St | Galaxy Building Construction | to comply with complaint #201267762 & 201228721. re-tile 5 bathrooms, replace plumbing fixtures in kind at same location. replace em lights (12), repair window silk, sash.Details
to comply with complaint #201267762 & 201228721. re-tile 5 bathrooms, replace plumbing fixtures in kind at same location. replace em lights (12), repair window silk, sash. | $8,000 |
| Feb 25, 2014 | Completed final sign-off Aug 2014 | 1500 Church St | Galaxy Building Construction | voluntary ada upgrade. install automatic door with push button on extg side door and reverse restroom door swing.Details
voluntary ada upgrade. install automatic door with push button on extg side door and reverse restroom door swing. | $5,000 |
| Nov 26, 2013 | Completed final sign-off Nov 2014 | 2293 Mission St | Galaxy Building Construction | apply for change of use permit from extg retail space to restaurant. comply with complaint #201333513 (m.e.p. under separate permit)Details
apply for change of use permit from extg retail space to restaurant. comply with complaint #201333513 (m.e.p. under separate permit) | $190,000 |
| Oct 21, 2013 | Never finaled issued Oct 2013, no final | 2293 Mission St | Galaxy Building Construction | revision to app#201308023413. upgrade extg front entrance and add 2 bathrooms to ada accessible.Details
revision to app#201308023413. upgrade extg front entrance and add 2 bathrooms to ada accessible. | $30,000 |
| Oct 21, 2013 | Completed final sign-off Jul 2015 | 2827 California St | Galaxy Building Construction | convert vacant commercial space to new full service japanese restaurant. tenant improvement work only. including commercial kitchen dining and bar. ** maher: compliance with ordinance no# 155-13 not required **Details
convert vacant commercial space to new full service japanese restaurant. tenant improvement work only. including commercial kitchen dining and bar. ** maher: compliance with ordinance no# 155-13 not required ** | $120,000 |
| Sep 27, 2013 | Never finaled issued Oct 2013, no final | 352 14th St | Galaxy Building Construction | revision to pa# 2012-1031-3231/s1-construct new 2hr shaft for kitchen exhaust grease duct in lieu of 2hr fire wrap.Details
revision to pa# 2012-1031-3231/s1-construct new 2hr shaft for kitchen exhaust grease duct in lieu of 2hr fire wrap. | $1,200 |
| Aug 27, 2013 | Completed final sign-off Oct 2013 | 167 Paris St | Galaxy Building Construction | 500 sq.ft. replace and repair rotten siding at back of the building and patch 10'x15' roof cement with roofing, patch and paint @ rear sidingDetails
500 sq.ft. replace and repair rotten siding at back of the building and patch 10'x15' roof cement with roofing, patch and paint @ rear siding | $2,000 |
| Aug 27, 2013 | Never finaled issued Oct 2013, no final | 352 14th St | Galaxy Building Construction | add revision sheet fs-2 by health department to pa#201210313231. for health documentation only.Details
add revision sheet fs-2 by health department to pa#201210313231. for health documentation only. | |
| Aug 26, 2013 | Never finaled issued Sep 2013, no final | 184 Ofarrell St | Galaxy Building Construction | convert extg cashier counter into baverage bar. upgrade front door to comply ada requirement.Details
convert extg cashier counter into baverage bar. upgrade front door to comply ada requirement. | $10,000 |
| Aug 20, 2013 | Completed final sign-off Jan 2014 | 1254 34th Av | Galaxy Building Construction | work for unit 1254 ground floor area only. adding new laundry room and new storage room. and new furnace for ground floor playroom.Details
work for unit 1254 ground floor area only. adding new laundry room and new storage room. and new furnace for ground floor playroom. | $20,000 |
| Aug 2, 2013 | Never finaled issued Aug 2013, no final | 2293 Mission St | Galaxy Building Construction | recommencent and completion work approved under pa # 200807308032.Details
recommencent and completion work approved under pa # 200807308032. | $40,000 |
| Aug 2, 2013 | Never finaled issued Aug 2013, no final | 2293 Mission St | Galaxy Building Construction | to obtain a final inspection for work already approved under pa# 200207262415, all work is complete.Details
to obtain a final inspection for work already approved under pa# 200207262415, all work is complete. | |
| Apr 23, 2013 | Completed final sign-off Apr 2014 | 165 Brussels St | Galaxy Building Construction | to obtain final inspection for work approved under pa 200807176984; all work is completeDetails
to obtain final inspection for work approved under pa 200807176984; all work is complete | $60,000 |
| Mar 28, 2013 | Completed final sign-off Jan 2015 | 200 Bright St | Galaxy Building Construction | remodel 1 kitchen and 2 bathrooms and laundry room at 1st floor. rewire the kitchen, 2 bathrooms, 3 bedrooms. replace kitchen sink, bathroomsinks and laundry room plumbing. replace 2 furnace and repolace sewer line at 1st floor. install furnace and ductwork.Details
remodel 1 kitchen and 2 bathrooms and laundry room at 1st floor. rewire the kitchen, 2 bathrooms, 3 bedrooms. replace kitchen sink, bathroomsinks and laundry room plumbing. replace 2 furnace and repolace sewer line at 1st floor. install furnace and ductwork. | $25,000 |
| Aug 13, 2012 | Never finaled issued Aug 2012, no final | 385 Taylor St | Galaxy Building Construction | resize and alter store front and upgrade front door to comply with ada requirementsDetails
resize and alter store front and upgrade front door to comply with ada requirements | $10,000 |
| Feb 11, 2011 | Never finaled issued Feb 2011, no final | 639 Clement St | Galaxy Building Construction | replace floor tiles at dining area (400 sf)Details
replace floor tiles at dining area (400 sf) | $2,000 |
| Nov 22, 2010 | Completed final sign-off Mar 2011 | 1268 Grant Av | Galaxy Building Construction | add partition wall to enclosed the bar use area & restore as wait station use only at 2nd floor.Details
add partition wall to enclosed the bar use area & restore as wait station use only at 2nd floor. | $800 |
| Oct 13, 2010 | Completed final sign-off Dec 2010 | 2029 Market St | Galaxy Building Construction | replace cooking equipment. 5 chinese woks, 2 deep fryers, 1 6 burner stove, replace e leighting, repair e con flooring, paint concrete flooring with non skid paintDetails
replace cooking equipment. 5 chinese woks, 2 deep fryers, 1 6 burner stove, replace e leighting, repair e con flooring, paint concrete flooring with non skid paint | $50,000 |
| May 13, 2010 | Completed final sign-off Aug 2010 | 27 Lakeshore Dr | Galaxy Building Construction | remodel bathroom, change sink toilet, tile, add fan, replace tub into a shower, change window from 36" hx 30" w to 16"h x 30" w which is not visible from street.Details
remodel bathroom, change sink toilet, tile, add fan, replace tub into a shower, change window from 36" hx 30" w to 16"h x 30" w which is not visible from street. | $9,439 |
| Jan 25, 2010 | Completed final sign-off Feb 2010 | 1268 Grant Av | Galaxy Building Construction | show (e) path of travel plan to obtain entertainment permit per entertainment commission.Details
show (e) path of travel plan to obtain entertainment permit per entertainment commission. | $1,000 |
| Nov 13, 2009 | Completed final sign-off Dec 2009 | 55 05th St | Galaxy Building Construction | per correction notice dated 10-16-09-obtain permit to show (e) path of travel & add occupant load sign inside (e) restaurant areaDetails
per correction notice dated 10-16-09-obtain permit to show (e) path of travel & add occupant load sign inside (e) restaurant area | $1,000 |
| Jan 22, 2009 | Completed final sign-off Mar 2009 | 219 Curtis St | Galaxy Building Construction | 2nd floor remodel kitchen & bathroom & power room including upgrade electrical outlet at kitchen & bathroom area & upgrade plumbing.Details
2nd floor remodel kitchen & bathroom & power room including upgrade electrical outlet at kitchen & bathroom area & upgrade plumbing. | $15,000 |
| Jan 22, 2009 | Completed final sign-off Jul 2009 | 1675 Clay St | Galaxy Building Construction | repair & replace hollow bricks 2x3 patition wall behind electrical main panel w/ 2x6 wall, replace sewer pipe from garage over to house trap. upgrade (e) 100 apm svc panel to 400 amp with 13 meters. sheetrock the 2x6 wall (new)Details
repair & replace hollow bricks 2x3 patition wall behind electrical main panel w/ 2x6 wall, replace sewer pipe from garage over to house trap. upgrade (e) 100 apm svc panel to 400 amp with 13 meters. sheetrock the 2x6 wall (new) | $7,000 |
| Jan 12, 2009 | Completed final sign-off Mar 2009 | 219 Curtis St | Galaxy Building Construction | replace plywood wall & drywall w/ 5/5 xypex garage ceiling & add insulation r rated. upgrade main electrical service panel to 125 amps & replace rusted steel water supply line with cooper pipe @ garage basement level. open wall for electrical panel installation / wiring. repatch & sheetrock drywall.Details
replace plywood wall & drywall w/ 5/5 xypex garage ceiling & add insulation r rated. upgrade main electrical service panel to 125 amps & replace rusted steel water supply line with cooper pipe @ garage basement level. open wall for electrical panel installation / wiring. repatch & sheetrock drywall. | $7,000 |