Block 1439, lot 014
369 07th Ave
- City’s use
- Multi-Family Residential
- Built
- 1906
- Stories
- 2
- Units
- 4
- Rooms
- 4 bathrooms
- Building
- 3,400 sq ft
- Lot
- 3,611 sq ft
- Zoning
- RM1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
22 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 21, 2025 | Completed final sign-off Mar 2025 | 369 07th Av | install second handrials at front interior stairs. add 3 extra lights on back stairs. to comply with nov 202432221.Details
install second handrials at front interior stairs. add 3 extra lights on back stairs. to comply with nov 202432221. | $2,000 | |
| Dec 31, 2024 | Completed final sign-off Dec 2025 | 369 07th Av | to obtain final inspection for work approved under pa# 2019-0712-5818 all work is completeDetails
to obtain final inspection for work approved under pa# 2019-0712-5818 all work is complete | ||
| Aug 7, 2023 | Completed final sign-off Mar 2024 | 371 07th Av | replace siding on left side @ rear of house, replace four interior entry doors.sidings not visible from street. doors to be replaced in existing openings.Details
replace siding on left side @ rear of house, replace four interior entry doors.sidings not visible from street. doors to be replaced in existing openings. | $28,000 | |
| Jan 10, 2023 | Completed final sign-off Mar 2024 | 375 07th Av | Allied Teamwork Construction Co | remodel (e) (1) kitchen. replace countertop, cabinets, and sink, like kind remodel.Details
remodel (e) (1) kitchen. replace countertop, cabinets, and sink, like kind remodel. | $15,000 |
| Jun 6, 2022 | Completed final sign-off Mar 2024 | 375 07th Av | remodel bathroom: replace sink, toilet, tub, floor tiles, wall tiles, fan ventilation. one bathroom windows, 3 living room window on the side (not visible to street). total of 4 windows u-.30 maxDetails
remodel bathroom: replace sink, toilet, tub, floor tiles, wall tiles, fan ventilation. one bathroom windows, 3 living room window on the side (not visible to street). total of 4 windows u-.30 max | $15,000 | |
| Dec 15, 2021 | Never finaled issued Dec 2021, no final | 371 07th Av | renew pa# 202012161112. recommencement and completion of work approved under pa# 202012161112Details
renew pa# 202012161112. recommencement and completion of work approved under pa# 202012161112 | $10,000 | |
| Dec 16, 2020 | Never finaled issued Dec 2020, no final | 371 07th Av | replace kitchen cabinets, in kind. remodel bathroom, in kind. replace 4 windows non street facing. 3 in living room, 1 bathroom. replace 2 bedroom doors and 2 closet doors. all in kind. no change in location. replace 1 bathroom door.Details
replace kitchen cabinets, in kind. remodel bathroom, in kind. replace 4 windows non street facing. 3 in living room, 1 bathroom. replace 2 bedroom doors and 2 closet doors. all in kind. no change in location. replace 1 bathroom door. | $20,000 | |
| Jul 12, 2019 | Never finaled issued Aug 2019, no final | 369 07th Av | replace extg rear stairs and landing in kind. upper units to remain occupied, maintain required egress. replace stair treads one at a time.Details
replace extg rear stairs and landing in kind. upper units to remain occupied, maintain required egress. replace stair treads one at a time. | $1,000 | |
| Nov 2, 2018 | Completed final sign-off Mar 2019 | 375 07th Av | Olive Construction Corp | front window replacement. 12 window replacement from aluminum to clad wood marvin same size. front dy rot siding repair and paint. rear stairs dry rot, repair, porch repair. windows to be double hung.Details
front window replacement. 12 window replacement from aluminum to clad wood marvin same size. front dy rot siding repair and paint. rear stairs dry rot, repair, porch repair. windows to be double hung. | $45,000 |
| Nov 1, 2018 | Completed final sign-off Nov 2018 | 369 07th Av | Tom Lee Roofing Inc. | re-roofingDetails
re-roofing | $25,100 |
| Jun 4, 2018 | Never finaled issued Jun 2018, no final | 373 07th Av | replace plaster on #373 whole unit w/5/8" typw x gyp board. install insulation, repair back stairs to comply nov 201853921 #3 work less than 50% stair in common areaDetails
replace plaster on #373 whole unit w/5/8" typw x gyp board. install insulation, repair back stairs to comply nov 201853921 #3 work less than 50% stair in common area | $20,000 | |
| Apr 13, 2018 | Completed final sign-off Mar 2019 | 369 07th Av | renew for final 201604225531. allwork is completeDetails
renew for final 201604225531. allwork is complete | ||
| Apr 3, 2018 | Completed final sign-off Mar 2019 | 375 07th Av | replace broken wall furnaceDetails
replace broken wall furnace | $1,500 | |
| Feb 20, 2018 | Expired or cancelled cancelled Nov 2018 | 369 07th Av | replace 12 front windows to wood double hungDetails
replace 12 front windows to wood double hung | $6,000 | |
| Jul 12, 2017 | Never finaled issued Jul 2017, no final | 373 07th Av | Galaxy Building Construction | kitchen remodel: replace cabinets, open wall and cieling to update electrical, replace tile floro and replace bedroom door. no changes to wall locations.Details
kitchen remodel: replace cabinets, open wall and cieling to update electrical, replace tile floro and replace bedroom door. no changes to wall locations. | $25,000 |
| May 31, 2017 | Completed final sign-off May 2018 | 369 07th Av | Galaxy Building Construction | remodel bathrooms for two units only, 369 and 373 07th ave. replace sinks, toilets, bathtubs, floor tiles and wall tiles, fan ventilationDetails
remodel bathrooms for two units only, 369 and 373 07th ave. replace sinks, toilets, bathtubs, floor tiles and wall tiles, fan ventilation | $10,000 |
| May 1, 2017 | Completed final sign-off Apr 2018 | 373 07th Av | Art Potts Dba A & J Doors | replace 2 garage sectional roll up doors and one opener - no structural changesDetails
replace 2 garage sectional roll up doors and one opener - no structural changes | $3,938 |
| Apr 22, 2016 | Expired or cancelled expired Mar 2019 | 369 07th Av | replace 28 windows on the side & the back, replace 4 back doors, replace 1 bathroom tile at tub surround only.Details
replace 28 windows on the side & the back, replace 4 back doors, replace 1 bathroom tile at tub surround only. | $9,000 | |
| Dec 28, 2007 | Completed final sign-off Jan 2008 | 369 07th Av | nov# 200736361. repair rear stairs less than 50%. 1 post, 1 stringer & various bracing. install new handrails.Details
nov# 200736361. repair rear stairs less than 50%. 1 post, 1 stringer & various bracing. install new handrails. | $500 | |
| May 23, 2006 | Completed final sign-off Jun 2006 | 369 07th Av | repair stairs-deck to comply with nov 200669556 less than 50% repairDetails
repair stairs-deck to comply with nov 200669556 less than 50% repair | $1,500 | |
| Jul 6, 2005 | Completed final sign-off Jul 2005 | 369 07th Av | A A A General Roofing Co | reroofingDetails
reroofing | $8,800 |
| Apr 12, 2004 | Completed final sign-off Jun 2004 | 369 07th Av | repair stairs and deck comply w/nov (corrective action only )200448444Details
repair stairs and deck comply w/nov (corrective action only )200448444 | $1,500 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Galaxy Building Construction (2), A A A General Roofing Co, Allied Teamwork Construction Co, Art Potts Dba A & J Doors, Olive Construction Corp, Tom Lee Roofing Inc.
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.