Block 1382, lot 030
160 23rd Ave
- City’s use
- Multi-Family Residential
- Built
- 1922
- Stories
- 2
- Units
- 3
- Rooms
- 3 bathrooms
- Building
- 5,360 sq ft
- Lot
- 2,996 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
9 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 7, 2021 | Never finaled issued Jan 2022, no final | 160 23rd Av | Galaxy Building Construction | interior remodel: remove wall betweem dining room and kitchen, wall between dining room/living room. new steel beam at unit 162. 2nd floor only. kitchen remodel.Details
interior remodel: remove wall betweem dining room and kitchen, wall between dining room/living room. new steel beam at unit 162. 2nd floor only. kitchen remodel. | $35,000 |
| Sep 3, 2021 | Never finaled issued Sep 2021, no final | 162 23rd Av | Galaxy Building Construction | remodel (1) full bath w/(e) shower pan, remodel 1-1/2 bath, update electrical wiring, add insulation @ exterior wall, add recess lighting, replace drywall for wiring/insulation. non structural. lights per cec 150.0kDetails
remodel (1) full bath w/(e) shower pan, remodel 1-1/2 bath, update electrical wiring, add insulation @ exterior wall, add recess lighting, replace drywall for wiring/insulation. non structural. lights per cec 150.0k | $35,000 |
| Jul 28, 2008 | Never finaled issued Jul 2008, no final | 160 23rd Av | Adullam Dba County Roofing Co | reroofingDetails
reroofing | $9,800 |
| Jun 15, 2007 | Never finaled issued Jun 2007, no final | 160 23rd Av | street spaceDetails
street space | ||
| May 24, 2007 | Completed final sign-off Jul 2007 | 160 23rd Av | Jjj & K Inc./Dba: Alexander Company | replace 11 windows size for size at front.Details
replace 11 windows size for size at front. | $16,769 |
| Mar 30, 2007 | Completed final sign-off Dec 2007 | 160 23rd Av | P H Construction And Painting | remodel of kitchen & bathroom in house keeping unit. no structural change. kitchen: at least 50% lighting wattage must be fluorescent. bathoorm: fluorescent or controlled by motion sensor. no window replacement.Details
remodel of kitchen & bathroom in house keeping unit. no structural change. kitchen: at least 50% lighting wattage must be fluorescent. bathoorm: fluorescent or controlled by motion sensor. no window replacement. | $40,000 |
| Mar 8, 2007 | Completed final sign-off Dec 2007 | 160 23rd Av | P H Construction And Painting | two kitchen and two bathrooms remodel. no structural work. min 50% of kitchen light wattage shall be flourescent. flourescent or occupany sensor in bathroom.Details
two kitchen and two bathrooms remodel. no structural work. min 50% of kitchen light wattage shall be flourescent. flourescent or occupany sensor in bathroom. | $10,000 |
| Apr 20, 2006 | Completed final sign-off Apr 2006 | 160 23rd Av | to comply with his nov #200564964 for final window sign off top floor unit #160/repair leaking extg wndw onlyDetails
to comply with his nov #200564964 for final window sign off top floor unit #160/repair leaking extg wndw only | $1,200 | |
| May 19, 2005 | Never finaled issued May 2005, no final | 160 23rd Av | street space and sidewalk permitDetails
street space and sidewalk permit |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Galaxy Building Construction (2), P H Construction And Painting (2), Adullam Dba County Roofing Co, Jjj & K Inc./Dba: Alexander Company
- Engineers
- Kevin Brown
- Authorized agent-otherss
- Shawn Chi (2)
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.