Christopher Jones
- Listed as
- architect, authorized agent-others, designer
- Firm
- Rachel Malchow Architect Inc.
- Based in
- San Francisco
- On San Francisco permits
- Aug 2013 to Sep 2023
38 permits since 2000 (architect on 36 permits, authorized agent-others on 2 permits, designer on 1 permit): 22 completed, 2 in progress, 8 never finaled, 6 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 19, 2023 | In progress issued Jun 2024 | 1431 31st Av | Handyman Heroes Inc. | new rear deck with stairs & 1hr fire rated walls along property line up to 42" above single level deck,new doors accessing deck & finishes on 2nd level.Details
new rear deck with stairs & 1hr fire rated walls along property line up to 42" above single level deck,new doors accessing deck & finishes on 2nd level. | $90,000 |
| May 19, 2023 | In progress issued Jul 2024 | 221 San Jose Av | Roman Hunt | to comply with complaint 202200247 new rear yard fence and gates at poplar street 6ft fenceDetails
to comply with complaint 202200247 new rear yard fence and gates at poplar street 6ft fence | $1,000 |
| Sep 9, 2022 | Completed final sign-off Jul 2025 | 1431 31st Av | Handyman Heroes Inc. | revision to 202109178620. change to sidelights on exterior door, small slop sink added, change to door hinge, side swingDetails
revision to 202109178620. change to sidelights on exterior door, small slop sink added, change to door hinge, side swing | |
| Sep 2, 2022 | Completed final sign-off Dec 2023 | 1231 44th Av | Edenavow Construction & Design | remodel exsting rear stairs with code complaint stairs & deck. new 1-hr fire rated wall along property line.Details
remodel exsting rear stairs with code complaint stairs & deck. new 1-hr fire rated wall along property line. | $150,000 |
| Jul 21, 2022 | Never finaled issued Aug 2022, no final | 334 Holladay Av | Handyman Heroes Inc. | revision to bpa#202110261147, relocation of closet door/wall, replacing/removing windows & doors.Details
revision to bpa#202110261147, relocation of closet door/wall, replacing/removing windows & doors. | |
| May 3, 2021 | Completed final sign-off Oct 2021 | 1231 44th Av | Green Group Remodeling Inc | remove closet in living room. enlarge door opening at bedroom closet.Details
remove closet in living room. enlarge door opening at bedroom closet. | $2,500 |
| Jan 6, 2021 | Never finaled issued Apr 2022, no final | 293 Cumberland St | Current Construction | structural change: foundation west wall. new relocated bath, bararea, fireplace, plumbing, electrical, hvac, general remodel throughout.Details
structural change: foundation west wall. new relocated bath, bararea, fireplace, plumbing, electrical, hvac, general remodel throughout. | $200,000 |
| Dec 31, 2019 | Expired or cancelled cancelled Jan 2026 | 3376 18th St | ti. from retail with cafe space to bakery with retail. bakery is for "takeout" only. no seating is provided. new plumbing for wash wave, prep and hand sink. (n) type 2 hood above electrica ove. new display/front retail counter. new gyp bd. ceiling over exposed truses and new skylight shafts.Details
ti. from retail with cafe space to bakery with retail. bakery is for "takeout" only. no seating is provided. new plumbing for wash wave, prep and hand sink. (n) type 2 hood above electrica ove. new display/front retail counter. new gyp bd. ceiling over exposed truses and new skylight shafts. | $50,000 | |
| Oct 15, 2019 | Completed final sign-off May 2020 | 67 Jordan Av | Itu Construction | interior remodel: relocate bathroom on 2nd level to enlarge kitchen. combine 1/2 bath with full bath, remodel master bathroom & closet on 3rd level. remove all plaster & rplce with gypsum board. all nw elect., plmg, & mech ducts throughout. replace single pane windows at side & rear. n/a for maherDetails
interior remodel: relocate bathroom on 2nd level to enlarge kitchen. combine 1/2 bath with full bath, remodel master bathroom & closet on 3rd level. remove all plaster & rplce with gypsum board. all nw elect., plmg, & mech ducts throughout. replace single pane windows at side & rear. n/a for maher | $200,000 |
| Aug 14, 2019 | Completed final sign-off Dec 2019 | 2939 Webster St | Timber-Rock Craftsmen | rev to permit# 201905221391 revised location of (n) bathroom & relocated kitchen, increased skylight size, remodel & relocated kitchen window an added sun tunnel to bathrooomDetails
rev to permit# 201905221391 revised location of (n) bathroom & relocated kitchen, increased skylight size, remodel & relocated kitchen window an added sun tunnel to bathrooom | |
| Aug 7, 2019 | Completed final sign-off Mar 2020 | 647 Bosworth St | Handyman Heroes Inc. | to compy w/ accessible buisiness entrance, ordinance, 51-16;proposed (n) bell, ada singnage for curbside service for abe programDetails
to compy w/ accessible buisiness entrance, ordinance, 51-16;proposed (n) bell, ada singnage for curbside service for abe program | $2,500 |
| Jun 12, 2019 | Expired or cancelled expired Nov 2023 | 663 Haight St | Ashbury Gen Constructing & Eng | change of use from limted restaurant to flexible retail (limited restaurant/retail) t.i. improvement: new built in bench & retail displays, new lighting & paint through out, 20% ada upgrades per d.a. checklistDetails
change of use from limted restaurant to flexible retail (limited restaurant/retail) t.i. improvement: new built in bench & retail displays, new lighting & paint through out, 20% ada upgrades per d.a. checklist | $15,000 |
| May 22, 2019 | Completed final sign-off Dec 2019 | 2939 Webster St | Timber-Rock Craftsmen | replace one front window with an aluminum clad wood interior window.Details
replace one front window with an aluminum clad wood interior window. | $500 |
| May 22, 2019 | Completed final sign-off Dec 2019 | 2939 Webster St | Timber-Rock Craftsmen | 3rd level interior remodel to relocate bedroom and living area. removal of partitions bathroom remodel and add master closet. replace 1 front window. remove 1 rear window and enlarge 1 rear windowDetails
3rd level interior remodel to relocate bedroom and living area. removal of partitions bathroom remodel and add master closet. replace 1 front window. remove 1 rear window and enlarge 1 rear window | $100,000 |
| Apr 3, 2019 | Never finaled issued Apr 2019, no final | 221 San Jose Av | Roman Hunt | rev to pa# 201805229778 & 201802201682; relocation of laundry & tenant storage, slight reduction of front adu to accomodate the (n) 1 hr rated gas cabinet for (e) & (n) meters on first floor.Details
rev to pa# 201805229778 & 201802201682; relocation of laundry & tenant storage, slight reduction of front adu to accomodate the (n) 1 hr rated gas cabinet for (e) & (n) meters on first floor. | |
| Jan 18, 2019 | Completed final sign-off Dec 2019 | 3829 25th St | Ho Bok Construction | revision to app#201805250220. infill of lightwell to create new master bath, new skylights to both bathrooms and replacement of all windows and doors with glazing. replace fauDetails
revision to app#201805250220. infill of lightwell to create new master bath, new skylights to both bathrooms and replacement of all windows and doors with glazing. replace fau | $20,000 |
| Nov 9, 2018 | Completed final sign-off Jan 2020 | 3015 25th Av | correction of n.o.v. #201843331 for an unauthorized dwelling unit. adu per ordinance# 95-17, create 1 accessory dwelling unit (adu) on 1st level within (e) building envelope.Details
correction of n.o.v. #201843331 for an unauthorized dwelling unit. adu per ordinance# 95-17, create 1 accessory dwelling unit (adu) on 1st level within (e) building envelope. | $25,000 | |
| Sep 5, 2018 | Completed final sign-off Apr 2019 | 153 Country Club Dr | Handyman Heroes Inc. | demo (e) spces on 1st fle of sfd. proposed new stiar to access new bedroom and bathroom on the 1st flr. relocation of the (e) w/h and new hvac unit. removal of side door w/creating new vestibule btw garage & stairDetails
demo (e) spces on 1st fle of sfd. proposed new stiar to access new bedroom and bathroom on the 1st flr. relocation of the (e) w/h and new hvac unit. removal of side door w/creating new vestibule btw garage & stair | $50,000 |
| Aug 30, 2018 | Completed final sign-off Mar 2019 | 1643 46th Av | Trick Woodworks | enlarge kitchen by removing bedroom. remodel of partition, adding electrical, plumbing, new countertop and finishes.Details
enlarge kitchen by removing bedroom. remodel of partition, adding electrical, plumbing, new countertop and finishes. | $50,000 |
| Jul 3, 2018 | Completed final sign-off Nov 2018 | 1583 Sanchez St | (n) service bell & signage for curbside service for abe program. to comply with accessible business entrance ordinance 51-16.Details
(n) service bell & signage for curbside service for abe program. to comply with accessible business entrance ordinance 51-16. | $200 | |
| Jul 3, 2018 | Expired or cancelled cancelled Jan 2021 | 2033 Baker St | Flanagan Construction | remodel bathroom, remove (e) clawfoot tub and replace with (n) shower. replace (e) window with (n) window to fit wi/in (e) opening & only visible within lightwell. no modification or infills to walls, exisitng layout remains unchanged.Details
remodel bathroom, remove (e) clawfoot tub and replace with (n) shower. replace (e) window with (n) window to fit wi/in (e) opening & only visible within lightwell. no modification or infills to walls, exisitng layout remains unchanged. | $15,000 |
| Jun 12, 2018 | Completed final sign-off Oct 2018 | 201 West Portal Av | Treaty Construction | remodel of (e) hair salon by enlarging adjacent space. removal of wall, new electrical & plumbingDetails
remodel of (e) hair salon by enlarging adjacent space. removal of wall, new electrical & plumbing | $10,000 |
| May 22, 2018 | Never finaled issued Apr 2019, no final | 221 San Jose Av | Roman Hunt | per ordinance# 162-16, creat (1) adu @ 1st level within (e) bldg envelope by removing (1) parking spot. add bicycle parking @ storage work conrrespongs w/ soft story permit # 2018/0214/1300. pa# 2018/0220/1682 for (2) rear adu units which need a variance.Details
per ordinance# 162-16, creat (1) adu @ 1st level within (e) bldg envelope by removing (1) parking spot. add bicycle parking @ storage work conrrespongs w/ soft story permit # 2018/0214/1300. pa# 2018/0220/1682 for (2) rear adu units which need a variance. | $50,000 |
| Feb 22, 2018 | Completed final sign-off Nov 2018 | 783 22nd Av | Success Construction ***See Notes*** | new rear deck and stairsDetails
new rear deck and stairs | $15,000 |
| Feb 22, 2018 | Never finaled issued Apr 2018, no final | 1931 15th St | J A K Construction | revision to 201712116023 relocating proposed bathroom, partitions, millwork & electricalDetails
revision to 201712116023 relocating proposed bathroom, partitions, millwork & electrical | |
| Feb 20, 2018 | Never finaled issued Apr 2019, no final | 221 San Jose Av | Roman Hunt | add units per rd 162-16. create 2 (n) adu units on 1st flr within existing building envelope. work corresponds with soft story permit# 201802141300.Details
add units per rd 162-16. create 2 (n) adu units on 1st flr within existing building envelope. work corresponds with soft story permit# 201802141300. | $150,000 |
| Dec 11, 2017 | Completed final sign-off Dec 2018 | 1931 15th St | J A K Construction | interior remodel including new partitions, powder rm, hvac, bath remodel 4th level. structural work in garage. new patio door at rear of buildingDetails
interior remodel including new partitions, powder rm, hvac, bath remodel 4th level. structural work in garage. new patio door at rear of building | $95,000 |
| Nov 17, 2017 | Completed final sign-off Jun 2019 | 3012 Cesar Chavez St | Kilrea Construction Inc. | new 1st floor rear addition to infill under extg structural to create new master bedroom suite. new furnace and water heater to be located in garage. new deck above a portion of addition with new spiral stair access. bedroom to have direct access to public way.Details
new 1st floor rear addition to infill under extg structural to create new master bedroom suite. new furnace and water heater to be located in garage. new deck above a portion of addition with new spiral stair access. bedroom to have direct access to public way. | $100,000 |
| Apr 18, 2017 | Expired or cancelled cancelled Mar 2019 | 2598 Folsom St | Cookline Construction Inc | change of use from grocery retail to limited restaurant. interior remodel to include (n) partitions, fixtures & equipment. no exterior/facade work to be done.Details
change of use from grocery retail to limited restaurant. interior remodel to include (n) partitions, fixtures & equipment. no exterior/facade work to be done. | $200,000 |
| Apr 12, 2017 | Never finaled issued Dec 2018, no final | 2598 Folsom St | construction of new recessed exterior cabinet for new natural gas meter in existing exterior wallDetails
construction of new recessed exterior cabinet for new natural gas meter in existing exterior wall | $1,200 | |
| Jan 27, 2017 | Expired or cancelled cancelled Jan 2026 | 701 Haight St | All Food Service Installations | department of public health requested new sink refrigerators and approved finishes in extg basement storage 1 prep area.Details
department of public health requested new sink refrigerators and approved finishes in extg basement storage 1 prep area. | $2,900 |
| Jan 24, 2017 | Never finaled issued May 2017, no final | 419 Hearst Av | Bach Construction, Inc. | remodel (e) girls and boys toilets to include ada stalls. add 1 unisex ada stall for adult use.Details
remodel (e) girls and boys toilets to include ada stalls. add 1 unisex ada stall for adult use. | $15,000 |
| Dec 8, 2016 | Completed final sign-off Oct 2018 | 2555 Webster St | Kilrea Construction Inc. | new larger roof deck to replace small deck. access to use (e) elevator & stair penthouse.Details
new larger roof deck to replace small deck. access to use (e) elevator & stair penthouse. | $50,000 |
| Sep 19, 2016 | Completed final sign-off Nov 2016 | 2550 41st Av | Rudolph Commercial Interiors Inc, Rci | mep for previously approved pa 2016-0729-3713 (remodel existing multipurpose room to incorporate a relocated library and new classroom)Details
mep for previously approved pa 2016-0729-3713 (remodel existing multipurpose room to incorporate a relocated library and new classroom) | $20,000 |
| Jul 29, 2016 | Completed final sign-off Nov 2016 | 2550 41st Av | Rudolph Commercial Interiors Inc, Rci | remodel (e) multipurpose room to be reduced in size and incorporating space for relocate library. f/a and mep deferred, lighting & t24 under seperate permitDetails
remodel (e) multipurpose room to be reduced in size and incorporating space for relocate library. f/a and mep deferred, lighting & t24 under seperate permit | $10,000 |
| Jan 26, 2016 | Expired or cancelled cancelled Jan 2026 | 18 Lansing St | e live/work condo remodel to add 1 full bath on 1st fl and infill e opening between mezzanine and lower level. modification to stair and openings at bedroom loft mezzanine areaDetails
e live/work condo remodel to add 1 full bath on 1st fl and infill e opening between mezzanine and lower level. modification to stair and openings at bedroom loft mezzanine area | $10,000 | |
| Nov 8, 2013 | Completed final sign-off May 2014 | 1760 Pacific Av | Bashland Inc. Dba Bashland Builders | unit #8-renovation to (e) kitchen, master bathroom, guest bathroom & wet bar including replacement of (e) plumbing fixtures, finishes, cabinetry & light fixtures. carpet to be replaced & wood floors to be refinished to match newDetails
unit #8-renovation to (e) kitchen, master bathroom, guest bathroom & wet bar including replacement of (e) plumbing fixtures, finishes, cabinetry & light fixtures. carpet to be replaced & wood floors to be refinished to match new | $75,000 |
| Aug 22, 2013 | Completed final sign-off Oct 2013 | 3376 18th St | to comply with nov 201274481. demo permit to remove unpermitted work and some extg partitions and equipment.Details
to comply with nov 201274481. demo permit to remove unpermitted work and some extg partitions and equipment. | $6,270 |