Patricia Isabel Solis
- Listed as
- architect
- Firm
- Patricia Solis Architect
- Based in
- Sf
- On San Francisco permits
- Jul 2005 to Aug 2026
14 permits since 2000 (architect on 14 permits): 5 completed, 4 in progress, 4 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 10, 2026 | In progress issued Sep 2026 | 525 05th St | Clw Builders Inc | revision 202212309578- includes (n) kitchen hood (ul710b) for the convection oven, and relocate of the fire suppression system for the type 1 hoodDetails
revision 202212309578- includes (n) kitchen hood (ul710b) for the convection oven, and relocate of the fire suppression system for the type 1 hood | $50,000 |
| May 14, 2025 | In progress issued Jun 2025 | 693 Vermont St | Yerba Buena Engineering & Construction | relocate one 5-unit mobile shower trailer to (e) playground at downtown high school for purpose of servicing onsite emergency family shelter. trade permits for plumbing and electrical. trailer has stub outs, will be connected on-site.Details
relocate one 5-unit mobile shower trailer to (e) playground at downtown high school for purpose of servicing onsite emergency family shelter. trade permits for plumbing and electrical. trailer has stub outs, will be connected on-site. | $250,000 |
| Apr 3, 2025 | In progress issued May 2025 | 301 Van Ness Av | modernization of passenger traction elevators #6 and #7 and related mechanical and electrical upgrades. fire sprinker and fire alarm to be modfiifed as required by sffd project to provide accessible path of travel from storage entry door to evleator #2Details
modernization of passenger traction elevators #6 and #7 and related mechanical and electrical upgrades. fire sprinker and fire alarm to be modfiifed as required by sffd project to provide accessible path of travel from storage entry door to evleator #2 | $2,200,000 | |
| Mar 5, 2024 | In progress issued Mar 2025 | 1419 Bryant St | build out of unoccupied 3/f shell spaces, including selective demo and reconfiguration of (e) lighting, plumbing, hvac and fire sprinklers for tie-in to (e) building systems. 3/f north shell space to include new storage, restrooms, lockers, conference room and electrical room. south shell to includeDetails
build out of unoccupied 3/f shell spaces, including selective demo and reconfiguration of (e) lighting, plumbing, hvac and fire sprinklers for tie-in to (e) building systems. 3/f north shell space to include new storage, restrooms, lockers, conference room and electrical room. south shell to include | $2,924,895 | |
| Dec 27, 2022 | Never finaled issued Aug 2023, no final | 1610 Geary Bl | Plant Construction Co, Lp | *priority processing* japantown peace plaza: site improvements of (e) public outdoor plaza over parking structure.waterproofing plaza deck,historic pagoda structure seismic retrofit,paving,outdoor furnishings,grading,drainage/plumbing,irrigation,planting,storage shed,decorative walls,plaza lights.Details
*priority processing* japantown peace plaza: site improvements of (e) public outdoor plaza over parking structure.waterproofing plaza deck,historic pagoda structure seismic retrofit,paving,outdoor furnishings,grading,drainage/plumbing,irrigation,planting,storage shed,decorative walls,plaza lights. | $18,800,000 |
| Nov 17, 2020 | Completed final sign-off Mar 2021 | 1419 Bryant St | Clark Construction Group Ca Lp | this is a minor revision to (e) permit. changing occupancy of 1 room from a-3 to b. see sheet a0.22 (revision to 201512034127)Details
this is a minor revision to (e) permit. changing occupancy of 1 room from a-3 to b. see sheet a0.22 (revision to 201512034127) | |
| Jun 5, 2017 | Completed final sign-off Sep 2018 | 321 Ashton Av | Winwin Construction Inc | revision to 201612215528, retaining wall height reducedDetails
revision to 201612215528, retaining wall height reduced | |
| Dec 21, 2016 | Completed final sign-off Sep 2018 | 321 Ashton Av | interior renovation to (e) sfd to include addition of 200 sf of conditioned space at lower level, structural upgrades and interior improvements. there will be 5 (n) windows and sliding door added to the ext. south and rear facade.Details
interior renovation to (e) sfd to include addition of 200 sf of conditioned space at lower level, structural upgrades and interior improvements. there will be 5 (n) windows and sliding door added to the ext. south and rear facade. | $160,000 | |
| Jan 14, 2010 | Never finaled issued Feb 2010, no final | 1647 Valencia St | for compliance with oshpd 3 licensing requirements for a new tenant for community medical clinicDetails
for compliance with oshpd 3 licensing requirements for a new tenant for community medical clinic | ||
| Nov 10, 2009 | Completed final sign-off May 2010 | 165 Capp St | Amone Corp | to complete and obtain final inspection for work approved under pa #200712211123.Details
to complete and obtain final inspection for work approved under pa #200712211123. | $9,000 |
| Jul 1, 2008 | Completed final sign-off Oct 2008 | 3126 16th St | renovation of (e) non accessible storefront entry to create new accessible entry in an existing commerical space. new concrete ramp, accessible door, and storefront window replacementDetails
renovation of (e) non accessible storefront entry to create new accessible entry in an existing commerical space. new concrete ramp, accessible door, and storefront window replacement | $15,000 | |
| Mar 6, 2008 | Never finaled issued Mar 2008, no final | 3801 Mission St | revision to pa# 2007/01/24/2403/ for installation of power door operator for front entry door per ad-012Details
revision to pa# 2007/01/24/2403/ for installation of power door operator for front entry door per ad-012 | $2,000 | |
| Dec 21, 2007 | Never finaled issued Dec 2007, no final | 165 Capp St | barrier removal under sec. 1134b2.1 ex 3. identification of biohazard closet. lowering of counters at reception area on second floor. install accessible lever hardware at rooms 25a, 25b, and 26 on second floor. new sign.Details
barrier removal under sec. 1134b2.1 ex 3. identification of biohazard closet. lowering of counters at reception area on second floor. install accessible lever hardware at rooms 25a, 25b, and 26 on second floor. new sign. | $9,000 | |
| Jul 22, 2005 | Expired or cancelled cancelled Dec 2007 | 3124 Washington St | horizontal addition to (e)6 unit 8,000 res.bldg.proposed completed project will be 14883 s.f total basemt expandes to incl 8 parkg sp 3 units expandes <20% of their (e) fl area. add elevator, trash chute. basemt lvl type i, upper type v,upper unit incl attic.Details
horizontal addition to (e)6 unit 8,000 res.bldg.proposed completed project will be 14883 s.f total basemt expandes to incl 8 parkg sp 3 units expandes <20% of their (e) fl area. add elevator, trash chute. basemt lvl type i, upper type v,upper unit incl attic. | $900,000 |