22 permits since 2000 (architect on 20 permits, engineer on 1 permit, pmt consultant/expediter on 1 permit): 18 completed, 3 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 21, 2021 | Completed final sign-off Apr 2022 | 221 04th St | Agbayani Construction Corp. | revision to pa# 201902193223. inspector requireded scope of work to include connection detail of handrail at middle support at stair "g" in zone 3.Details
revision to pa# 201902193223. inspector requireded scope of work to include connection detail of handrail at middle support at stair "g" in zone 3. | $10,000 |
| Feb 19, 2019 | Completed final sign-off Feb 2022 | 221 04th St | Agbayani Construction Corp. | perform selective building envelope repairs on the museum, including expansion joint repairs, partial reroof and roof repairs, waterproofing and cladding repairsDetails
perform selective building envelope repairs on the museum, including expansion joint repairs, partial reroof and roof repairs, waterproofing and cladding repairs | $2,000,000 |
| Jan 26, 2018 | Completed final sign-off Jan 2019 | 900 Lombard St | comply with planning code enforcement case 12102enf to legalize e 7'2 height wall fronting jones st and cover previously exposed brick with stucco at the gr fl along jones and lombard, on chimney and remove e unpermitted parapets at the rear of 2nd fl and on roofDetails
comply with planning code enforcement case 12102enf to legalize e 7'2 height wall fronting jones st and cover previously exposed brick with stucco at the gr fl along jones and lombard, on chimney and remove e unpermitted parapets at the rear of 2nd fl and on roof | $1,500 | |
| Aug 23, 2017 | Never finaled issued Aug 2017, no final | 750 Howard St | S C Anderson Group International Inc. | scope of work: selective waterproofing repairs at e crescent pond. work includes remove ex heavily corroded damaged strucural steel angle support and replace with hot dipped galvaized steel angel as req below the existing crescent pond concrete slab and existing corrugated steel decking. new steelDetails
scope of work: selective waterproofing repairs at e crescent pond. work includes remove ex heavily corroded damaged strucural steel angle support and replace with hot dipped galvaized steel angel as req below the existing crescent pond concrete slab and existing corrugated steel decking. new steel | $1,000,000 |
| Jun 9, 2015 | Completed final sign-off Nov 2016 | 5 Burnett Ave North Av | Unlimited Construction | #2:repair the dry rot on the exterior deck which includes replacing the deck joists and decking surface. construction to be in like-kind configuration. work also includes replacing the extg deck guardrail to meet bldg code requirement.Details
#2:repair the dry rot on the exterior deck which includes replacing the deck joists and decking surface. construction to be in like-kind configuration. work also includes replacing the extg deck guardrail to meet bldg code requirement. | $5,500 |
| Jun 9, 2015 | Never finaled issued Jul 2015, no final | 1 Burnett North Av | Unlimited Construction | repair the dry rot on the exterior deck which includes replacing the deck joists and decking surface. construction to be in like-kind configuration. work also includes replacing the extg deck guardrail to meet bldg code requirement.Details
repair the dry rot on the exterior deck which includes replacing the deck joists and decking surface. construction to be in like-kind configuration. work also includes replacing the extg deck guardrail to meet bldg code requirement. | $4,000 |
| Oct 28, 2014 | Completed final sign-off Nov 2014 | 115 San Felipe Av | Steven A. Schneider | revision to pa#201308083899 as built plans, change storage room to half bathroom as directed by dist. inspector.Details
revision to pa#201308083899 as built plans, change storage room to half bathroom as directed by dist. inspector. | |
| Apr 11, 2014 | Completed final sign-off Aug 2015 | 1535 Oak St | (front building) existing exit passageway in main building to be fire rated 1-rh. and windened to 3'-0". relocate existing electrical meters to the parking garage. exit passageway to be fully sprinklered. fire sprinklers to be installed under separate permit. rear bldg see p/a#201308083897Details
(front building) existing exit passageway in main building to be fire rated 1-rh. and windened to 3'-0". relocate existing electrical meters to the parking garage. exit passageway to be fully sprinklered. fire sprinklers to be installed under separate permit. rear bldg see p/a#201308083897 | $25,000 | |
| Aug 8, 2013 | Completed final sign-off Nov 2014 | 115 San Felipe Av | Jack Scott & Associates | replace existing deck and concrete walkway at rearDetails
replace existing deck and concrete walkway at rear | $27,000 |
| Aug 8, 2013 | Completed final sign-off Aug 2015 | 1535 Oak St | Douglas Gower Dba Mesa Construction | (rear bldg)covert/legal(e)struc currently permitted as a garage into(1)res'd unit.add a new stairwy.new stair enclosure&(n)roof deck incl 1-hr rated guardrail along the prop line, new steel cable guardrails. new res'd unit to be fully sprinkler under sep permit.frt bldg see 2014-0411-3016.Details
(rear bldg)covert/legal(e)struc currently permitted as a garage into(1)res'd unit.add a new stairwy.new stair enclosure&(n)roof deck incl 1-hr rated guardrail along the prop line, new steel cable guardrails. new res'd unit to be fully sprinkler under sep permit.frt bldg see 2014-0411-3016. | $100,000 |
| Jul 24, 2013 | Completed final sign-off Aug 2013 | 1541 Polk St | Marchetti Construction Inc. | revision to 201210162155. revise restroom to comply with ada requirementsDetails
revision to 201210162155. revise restroom to comply with ada requirements | $5,000 |
| Sep 12, 2012 | Completed final sign-off Aug 2014 | 750 Howard St | Hathaway Dinwiddie Co. | revision to 2012.06.22.3226: continuation of water proofing and expansion joints repairs.Details
revision to 2012.06.22.3226: continuation of water proofing and expansion joints repairs. | $500,000 |
| Jul 20, 2012 | Expired or cancelled withdrawn Jan 2014 | 2222 Market St | Marchetti Construction Inc. | remodel & addition to beck's motor lodge. new horizontal addition of 564 sq. ft. @ front of building & a fence wall enclosure & vehicular entrance. replace (e) elevator for ada accessibility to the back of bldg. remodel (e) rooms including bathrooms for accessibility.Details
remodel & addition to beck's motor lodge. new horizontal addition of 564 sq. ft. @ front of building & a fence wall enclosure & vehicular entrance. replace (e) elevator for ada accessibility to the back of bldg. remodel (e) rooms including bathrooms for accessibility. | $3,660,000 |
| Feb 10, 2012 | Completed final sign-off Feb 2013 | 750 Howard St | Hathaway Dinwiddie Co. | demo only: selective demolition of extg stone. repairs and replacement under seperate permit. install protective barricade around work area.Details
demo only: selective demolition of extg stone. repairs and replacement under seperate permit. install protective barricade around work area. | $25,000 |
| Jul 7, 2011 | Completed final sign-off Oct 2011 | 85 02nd St | Field Construction Inc. | tenant improvement approx 200 sq ft on 2nd floor. convert 2 workstations to private offices & add 2 workstations at extg storage/file area.Details
tenant improvement approx 200 sq ft on 2nd floor. convert 2 workstations to private offices & add 2 workstations at extg storage/file area. | $59,365 |
| May 27, 2011 | Completed final sign-off Aug 2011 | 85 02nd St | Field Construction Inc. | 3rd floor tenant improvement of existing office - converting workstations to 2 private offices. mep & lfs under separate permit;includes lightingDetails
3rd floor tenant improvement of existing office - converting workstations to 2 private offices. mep & lfs under separate permit;includes lighting | $37,767 |
| Apr 6, 2011 | Completed final sign-off May 2012 | 391 Sutter St | 4th floor-t.i., 2470 sq ft of office. m.e.p & fire alarm safety under seperate permitDetails
4th floor-t.i., 2470 sq ft of office. m.e.p & fire alarm safety under seperate permit | $70,000 | |
| Aug 12, 2009 | Completed final sign-off Dec 2018 | 1731 Powell St | R L H Fire Protection Inc, West Builders Inc. | per sf planning motion 17797 permitting the conversion of existing theater to mix use building with residential condominiums at the four upper floors. commercial units on 1st floor and 1 subterranean floor as parking garage with 27 parking spaces.full bar & restaurant&commercial space.Details
per sf planning motion 17797 permitting the conversion of existing theater to mix use building with residential condominiums at the four upper floors. commercial units on 1st floor and 1 subterranean floor as parking garage with 27 parking spaces.full bar & restaurant&commercial space. | $7,500,000 |
| Nov 8, 2007 | Completed final sign-off Apr 2010 | 50 08th St | remove exist wall & floor tiles and replacement new tiles in all guest bathrooms. convert 8 guest bathrooms for compliance with t-24 accessible rooms to a total of 12 accessable rooms. relocate sprinklers & smoke detectors under seperate permit.Details
remove exist wall & floor tiles and replacement new tiles in all guest bathrooms. convert 8 guest bathrooms for compliance with t-24 accessible rooms to a total of 12 accessable rooms. relocate sprinklers & smoke detectors under seperate permit. | $1,800,000 | |
| Oct 25, 2006 | Never finaled issued May 2007, no final | 88 05th St | demolition of non-historic tenant interior, raised floors, suspended ceilings, partition walls and electrical runs associated with these elements.Details
demolition of non-historic tenant interior, raised floors, suspended ceilings, partition walls and electrical runs associated with these elements. | $729,000 | |
| Jan 24, 2006 | Completed final sign-off May 2006 | 20 Osceola Ln | D Kelly Construction Inc. | repaoir exterior 2 decks, repace 4 damaged windows, front and rear replace windows in kind or better size and quality decks 50 sf each.Details
repaoir exterior 2 decks, repace 4 damaged windows, front and rear replace windows in kind or better size and quality decks 50 sf each. | $11,415 |
| May 19, 2005 | Completed final sign-off Jan 2006 | 201 03rd St | oti-1, 7th floor, el, me, ls, sp.Details
oti-1, 7th floor, el, me, ls, sp. | $35,000 |