Paul Vincent Gonzaga
- Listed as
- architect, authorized agent-others, designer
- Firm
- Vincent Gonzaga Architect
- Based in
- San Francisco
- On San Francisco permits
- Sep 2015 to May 2026
39 permits since 2000 (architect on 38 permits, authorized agent-others on 1 permit, designer on 1 permit): 31 completed, 4 in progress, 1 never finaled, 3 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 13, 2026 | In progress issued Jun 2026 | 2140 Sutter St | Pro-Construction | to comply with nov 202538778 at 4/fl to remove (e) plumbing fixtures and door. infill door opening and provide (n) attic access. 3/fl legalize (e) window infill at bathroom. add a (n) closet. 1/fl- legalize (e) window replacement in kind not visible from streetDetails
to comply with nov 202538778 at 4/fl to remove (e) plumbing fixtures and door. infill door opening and provide (n) attic access. 3/fl legalize (e) window infill at bathroom. add a (n) closet. 1/fl- legalize (e) window replacement in kind not visible from street | $2,600 |
| Nov 7, 2025 | In progress filed Nov 2025, not yet issued | 812 Guerrero St | Corkcon Llc | rev to pa# 2025-0428-5356: to comply with notice of correction from building inspector, indicate height and elevations of (n) fire rated wall at property line and provide a wall detail to comply with nov 201767431 item #2.Details
rev to pa# 2025-0428-5356: to comply with notice of correction from building inspector, indicate height and elevations of (n) fire rated wall at property line and provide a wall detail to comply with nov 201767431 item #2. | $4,268 |
| Oct 9, 2025 | Completed final sign-off Sep 2026 | 551 Alvarado St | Alward Const. Co Inc A Ca Corp | revision to pa # 2023-0322-4205 s1. 3rd fl master bedroom closet add washer & dryer. flip bathroom fixtures and relocate door to mechanical closet. add steam shower equipment to master bathroom showerDetails
revision to pa # 2023-0322-4205 s1. 3rd fl master bedroom closet add washer & dryer. flip bathroom fixtures and relocate door to mechanical closet. add steam shower equipment to master bathroom shower | $2,500 |
| Sep 26, 2025 | Completed final sign-off May 2026 | 74 Prospect Av | Barry O Mahony Construction | revision to pa# 202508193407: at (e) second floor bedrooms, remove (e) closets and fireplace. (n) bathroom, closets, doors, fixtures, and finishes.Details
revision to pa# 202508193407: at (e) second floor bedrooms, remove (e) closets and fireplace. (n) bathroom, closets, doors, fixtures, and finishes. | $102,491 |
| Aug 19, 2025 | Completed final sign-off May 2026 | 74 Prospect Av | Barry O Mahony Construction | at existing 2nd floor bathroom, remove existing closet and enlarge existing bathroom. install new fixtures and finishes. non load bearing wall, no structural work.Details
at existing 2nd floor bathroom, remove existing closet and enlarge existing bathroom. install new fixtures and finishes. non load bearing wall, no structural work. | $29,000 |
| Jul 24, 2025 | Completed final sign-off Aug 2025 | 4799 Mission St | John O'donovan | revision to pa# 202502130286: per electrical inspector document e) outlets, illumicated exit sign, bugeye fixtures, junction box for illumincated signage & general lighting to remain in front of tenant space (interior). document e) gfci outlet in toilet room for remainDetails
revision to pa# 202502130286: per electrical inspector document e) outlets, illumicated exit sign, bugeye fixtures, junction box for illumincated signage & general lighting to remain in front of tenant space (interior). document e) gfci outlet in toilet room for remain | |
| Apr 21, 2025 | Expired or cancelled expired Sep 2026 | 551 Alvarado St | Alward Const. Co Inc A Ca Corp | rev to permit 202303224205-s1. per correction notice, repair dryrot at (e) front stairs, railings and walkway including crumbled foundation. (e) stair configuration, dimensions and trim details to not change and to match (e). new rat slab and area drains under repaired exterior walkway & at (e) pit.Details
rev to permit 202303224205-s1. per correction notice, repair dryrot at (e) front stairs, railings and walkway including crumbled foundation. (e) stair configuration, dimensions and trim details to not change and to match (e). new rat slab and area drains under repaired exterior walkway & at (e) pit. | $20,000 |
| Feb 13, 2025 | Completed final sign-off Aug 2025 | 4799 Mission St | John O'donovan | to comply with nov #202299059 at (e) ground fl vacant commercial tenant space; remove (e) stair & infill at fl opening, remove abandoned ductwork & infill ceiling openings with 2 hour fire rated constructionDetails
to comply with nov #202299059 at (e) ground fl vacant commercial tenant space; remove (e) stair & infill at fl opening, remove abandoned ductwork & infill ceiling openings with 2 hour fire rated construction | $5,400 |
| Oct 24, 2024 | Completed final sign-off Mar 2025 | 2645 Ocean Av | Saunders Construction Inc | revision to pa 202308235012 per senior building inspector, document change to form c, indicating 20% reached with parking paving & removal of walkway repaving from form c & scope of workDetails
revision to pa 202308235012 per senior building inspector, document change to form c, indicating 20% reached with parking paving & removal of walkway repaving from form c & scope of work | $5,160 |
| Oct 17, 2024 | In progress issued Mar 2025 | 506 11th Av | to comply w/ nov# 202180480: remove (e) unpermitted enclosed deck & bathroom at rear convert (e) unpermitted enclosed deck & bathroom at rear convert (e) closet to (n) bathroom (n) horiz additon at rear containing (n) bedroom and (n) office (n) rear deck and stairDetails
to comply w/ nov# 202180480: remove (e) unpermitted enclosed deck & bathroom at rear convert (e) unpermitted enclosed deck & bathroom at rear convert (e) closet to (n) bathroom (n) horiz additon at rear containing (n) bedroom and (n) office (n) rear deck and stair | $150,000 | |
| Sep 20, 2024 | Completed final sign-off Jan 2025 | 1983 34th Av | Cut Once Construction | revision to pa# 202311030096, (n) glass block window at rear wall, not visible from street. remove & replace (e) laundry sink in (e) garage.Details
revision to pa# 202311030096, (n) glass block window at rear wall, not visible from street. remove & replace (e) laundry sink in (e) garage. | $1,500 |
| Sep 3, 2024 | Completed final sign-off Sep 2025 | 1475 Church St | John O'donovan | revision to pa 202304135708 r1 due to as built conditions, retain a portion of shear wall and extendDetails
revision to pa 202304135708 r1 due to as built conditions, retain a portion of shear wall and extend | $2,292 |
| Apr 4, 2024 | Completed final sign-off Mar 2026 | 740 Tennessee St | Urbnbuild Inc | deferred mechanical & electrical for garage exhaust. reference pa#202402125716.Details
deferred mechanical & electrical for garage exhaust. reference pa#202402125716. | $24,000 |
| Feb 12, 2024 | Completed final sign-off Mar 2026 | 740 Tennessee St | Urbnbuild Inc | to comply w/motion 0474:remove mechanical, electrical & plumbing equipment, conduit & pipes at north yard & relocate to interior. relocate outdoor heat pump units to roof deck. reduce & relocate elec. meters at north yard in enclosure. relocate wall & door at ground floor stair to basement.Details
to comply w/motion 0474:remove mechanical, electrical & plumbing equipment, conduit & pipes at north yard & relocate to interior. relocate outdoor heat pump units to roof deck. reduce & relocate elec. meters at north yard in enclosure. relocate wall & door at ground floor stair to basement. | $300,000 |
| Nov 3, 2023 | Completed final sign-off Jan 2025 | 1983 34th Av | Cut Once Construction | remove (e) ground fl single story rear addition & build (n) ground floor single story addition setback from side property lines. legalize wall & door at ground fl garage. legalize ground fl as-built condition including bathroom that differs from completed pa# 8806345 r1. ref complaint # 202310496.Details
remove (e) ground fl single story rear addition & build (n) ground floor single story addition setback from side property lines. legalize wall & door at ground fl garage. legalize ground fl as-built condition including bathroom that differs from completed pa# 8806345 r1. ref complaint # 202310496. | $42,572 |
| Aug 23, 2023 | Completed final sign-off Mar 2025 | 2645 Ocean Av | a voluntary strengthening of the building wallsDetails
a voluntary strengthening of the building walls | $148,500 | |
| Mar 22, 2023 | In progress issued Feb 2024 | 551 Alvarado St | Alward Const. Co Inc A Ca Corp | (n) vertical & horizontal addition @ grd flr, legalize unauthorized dwelling unit & convert portion to (n) garage. reconfigure rooms @ 2nd flr. raise portion of roof & convert (e) attic to 3rd flr. convert portion of (e) crawlspace to (n) basement.Details
(n) vertical & horizontal addition @ grd flr, legalize unauthorized dwelling unit & convert portion to (n) garage. reconfigure rooms @ 2nd flr. raise portion of roof & convert (e) attic to 3rd flr. convert portion of (e) crawlspace to (n) basement. | $925,000 |
| Nov 9, 2022 | Completed final sign-off Apr 2024 | 118 Commonwealth Av | rev to pa# 2002-0430-5268 (recommenced under approved permit 2022-0516-4302) revise interior partition layout at 1st fl, 2nd fl & 3rd fl, revise approved spiral stair per site conditons, at 1st fl, replace (e) french doors and sidelights to rear yard and (e) window with (n) full-lite doorDetails
rev to pa# 2002-0430-5268 (recommenced under approved permit 2022-0516-4302) revise interior partition layout at 1st fl, 2nd fl & 3rd fl, revise approved spiral stair per site conditons, at 1st fl, replace (e) french doors and sidelights to rear yard and (e) window with (n) full-lite door | $300,000 | |
| Aug 2, 2022 | Never finaled issued May 2023, no final | 30 Cabrillo St | at (e) g/f: remove (e) non-structural partitions, doors & fixtures. (n) parttions, doors, fixtures & cabinets for (n) bedroom, powder room & media room. rmeove (e) window & replace with (n) to rear yard. replace (e at lightwell in-kind , not visible from streeet. (351 sf)Details
at (e) g/f: remove (e) non-structural partitions, doors & fixtures. (n) parttions, doors, fixtures & cabinets for (n) bedroom, powder room & media room. rmeove (e) window & replace with (n) to rear yard. replace (e at lightwell in-kind , not visible from streeet. (351 sf) | $50,000 | |
| Mar 18, 2022 | Completed final sign-off Nov 2022 | 740 Tennessee St | Urbnbuild Inc | revision to pa# 201901311775. interior only. remove elevator from scope of work. (n) laundry rooms at floor 2 & 4. (n) toilet room at basement. stair revisions due to site conditions.Details
revision to pa# 201901311775. interior only. remove elevator from scope of work. (n) laundry rooms at floor 2 & 4. (n) toilet room at basement. stair revisions due to site conditions. | $10,000 |
| Jun 24, 2020 | Completed final sign-off Sep 2023 | 75 Industrial St | Adam Lewis Construction Company | new structural insulated panel walls and ceilings. ref app#201712217098Details
new structural insulated panel walls and ceilings. ref app#201712217098 | $20,000 |
| Dec 31, 2019 | Completed final sign-off Dec 2023 | 75 Industrial St | Adam Lewis Construction Company | revision to approved pa #201805310549. revise size of (n) storage room, add (n) packaging room and revise entry to (n) toilet room. (n) level concrete slab over (e) ramp. area of work is s-2 and accessory b occupancy use.Details
revision to approved pa #201805310549. revise size of (n) storage room, add (n) packaging room and revise entry to (n) toilet room. (n) level concrete slab over (e) ramp. area of work is s-2 and accessory b occupancy use. | $40,000 |
| Apr 22, 2019 | Expired or cancelled expired Apr 2023 | 60 13th St | Teutonic Construction Inc | new commercial kitchen in new shipping container with new ramp and platform to access commercial ktichen. no change of use or occupancy groupDetails
new commercial kitchen in new shipping container with new ramp and platform to access commercial ktichen. no change of use or occupancy group | $82,948 |
| Mar 26, 2019 | Completed final sign-off Sep 2019 | 2029 Market St | Adam Lewis Construction Company | at (e) ground floor commercial tenant space, provide (n) power door operator to comply with accessible business entrance program (abe ordinance 51-16). project scope consists of barrier removal only.Details
at (e) ground floor commercial tenant space, provide (n) power door operator to comply with accessible business entrance program (abe ordinance 51-16). project scope consists of barrier removal only. | $2,500 |
| May 31, 2018 | Completed final sign-off Dec 2023 | 75 Industrial St | Adam Lewis Construction Company | change of use of portion of (e) ground flr area from industrial agriculture to wholesale sales with accessory office space from cannabis distribution. install new partitions, new doors & new toilet room. mech/plm/ele/lighting/sprinklerslife safety under sep permit maher naDetails
change of use of portion of (e) ground flr area from industrial agriculture to wholesale sales with accessory office space from cannabis distribution. install new partitions, new doors & new toilet room. mech/plm/ele/lighting/sprinklerslife safety under sep permit maher na | $40,000 |
| Mar 21, 2018 | Completed final sign-off Jan 2023 | 527 Howard St | change of use.at(e)grd floor commercial tenant space.change of use fr medical cannabis dispensary to cannabis retail. no chg of occupancy grp. no proposed demo or (n)constr. drawings show work previously approv under 2017-09-20-9121 & 2017-10-11-0942.Details
change of use.at(e)grd floor commercial tenant space.change of use fr medical cannabis dispensary to cannabis retail. no chg of occupancy grp. no proposed demo or (n)constr. drawings show work previously approv under 2017-09-20-9121 & 2017-10-11-0942. | ||
| Mar 21, 2018 | Completed final sign-off Oct 2022 | 2414 Lombard St | change of use. at (e) ground flr commercial tenant space, change of use from medical cannabis dispensary to cannabis retail. no change of occupancy group. no proposed demolition or (n) construction.Details
change of use. at (e) ground flr commercial tenant space, change of use from medical cannabis dispensary to cannabis retail. no change of occupancy group. no proposed demolition or (n) construction. | ||
| Mar 16, 2018 | Completed final sign-off Oct 2022 | 2029 Market St | at (e) ground flr commercial tenant space, change of use from medical cannabis despensary to cannabis retail. no change of occupancy group. no proposed demolition or (n) construction.Details
at (e) ground flr commercial tenant space, change of use from medical cannabis despensary to cannabis retail. no change of occupancy group. no proposed demolition or (n) construction. | ||
| Mar 16, 2018 | Expired or cancelled expired Apr 2023 | 60 13th St | Advanced Design General Contractor | abatement of nov#20183671, remove (e)mezzanine, bar & ground fl toilet with shower. legalize laundry sink, water heater, and second fl toilet room & kitchenette. convert portion of (e) 2nd fl area to accessory office use and accessory occupancy group b.Details
abatement of nov#20183671, remove (e)mezzanine, bar & ground fl toilet with shower. legalize laundry sink, water heater, and second fl toilet room & kitchenette. convert portion of (e) 2nd fl area to accessory office use and accessory occupancy group b. | $39,577 |
| Jan 22, 2018 | Completed final sign-off Oct 2018 | 120 Cortland Av | Sasso Construction Inc. | at (e) 1st fl: rmeove (e) partition between (e) kitchen & (e) dining rm; relocate kitchen & dining room; rmeove and replace floor tile in (e) bathroom & (e) toilet rm. 2nd fl: add door to (e) study; replace (e) door to (e) bar; remove (e) bar and replace with (n) bathroom & (n) hallway;Details
at (e) 1st fl: rmeove (e) partition between (e) kitchen & (e) dining rm; relocate kitchen & dining room; rmeove and replace floor tile in (e) bathroom & (e) toilet rm. 2nd fl: add door to (e) study; replace (e) door to (e) bar; remove (e) bar and replace with (n) bathroom & (n) hallway; | $199,250 |
| Dec 21, 2017 | Completed final sign-off Sep 2023 | 75 Industrial St | Adam Lewis Construction Company | revision to pa #201612144986. remove (e) interior partitions. remove (e) concrete stair-on-grade & replace with (n) metal stair. add walls and doors. add (n) lighting. add (n) mechanical system, (n) electrical outlets and lighting. (n) liquid co2 storage and distribution system.Details
revision to pa #201612144986. remove (e) interior partitions. remove (e) concrete stair-on-grade & replace with (n) metal stair. add walls and doors. add (n) lighting. add (n) mechanical system, (n) electrical outlets and lighting. (n) liquid co2 storage and distribution system. | |
| Oct 27, 2017 | Completed final sign-off Aug 2023 | 75 Industrial St | provide electrical service upgrade. installation of a new outdoor rated main switchboard and pg&e transformer pad at the southwest end of the building.Details
provide electrical service upgrade. installation of a new outdoor rated main switchboard and pg&e transformer pad at the southwest end of the building. | $32,500 | |
| Oct 11, 2017 | Completed final sign-off Oct 2018 | 527 Howard St | Adam Lewis Construction Company | at (e) ground floor commercial tenant space of 4 story commercial & residential building. alter (e) mechanical system. 3 new penetrations & wall caps for mechanical systems @ (e) ground floor rear wall. ** maher: n/a **Details
at (e) ground floor commercial tenant space of 4 story commercial & residential building. alter (e) mechanical system. 3 new penetrations & wall caps for mechanical systems @ (e) ground floor rear wall. ** maher: n/a ** | $20,000 |
| Sep 20, 2017 | Completed final sign-off Oct 2018 | 527 Howard St | Adam Lewis Construction Company | interior ti of (e) mcd at ground floor in an (e) 4 story commercial building. remove interior non-structural partitions, doors, millwork and plumbing fixtures. install new partitions, doors and millworkDetails
interior ti of (e) mcd at ground floor in an (e) 4 story commercial building. remove interior non-structural partitions, doors, millwork and plumbing fixtures. install new partitions, doors and millwork | $214,719 |
| Dec 14, 2016 | Completed final sign-off Sep 2023 | 75 Industrial St | Adam Lewis Construction Company | remove (e) interior partitions, doors, millwork, mezzanine and stair. install (n) partitions and doors for plant nursery. maher naDetails
remove (e) interior partitions, doors, millwork, mezzanine and stair. install (n) partitions and doors for plant nursery. maher na | $250,000 |
| Apr 15, 2016 | Completed final sign-off Jan 2017 | 2029 Market St | R 3 Builders Inc. | at extg ground floor commercial tenant space, remove extg non structural interior partitions, doors, plumbing fixtures, light fixtures and millwork. under ab-017Details
at extg ground floor commercial tenant space, remove extg non structural interior partitions, doors, plumbing fixtures, light fixtures and millwork. under ab-017 | $10,000 |
| Dec 7, 2015 | Completed final sign-off Feb 2017 | 101 Clement St | Isidore Mahon Dba Izzy Construction | change of use from retail to medical service (chiropractor office), install new partitions and doors in existing g/f tenant space. no mechanical or plumbing work, existing flooring, ceiling and lighting to remain.Details
change of use from retail to medical service (chiropractor office), install new partitions and doors in existing g/f tenant space. no mechanical or plumbing work, existing flooring, ceiling and lighting to remain. | $11,500 |
| Nov 20, 2015 | Completed final sign-off Jan 2017 | 2029 Market St | R 3 Builders Inc. | change of use. from a-2 (restaurant) to b,m (medical cannabis dispensary). remove interior non-structural partitions, doors, millwork and plumbing fixtures. install new partitions, doors and millwork.Details
change of use. from a-2 (restaurant) to b,m (medical cannabis dispensary). remove interior non-structural partitions, doors, millwork and plumbing fixtures. install new partitions, doors and millwork. | $684,000 |
| Sep 11, 2015 | Completed final sign-off Sep 2016 | 1500 Pacific Av | Hon's Construction Inc. | revision to app#201306179713. provide power door operator at extg entry door. add cabinetry and sink. correct plans to show extg toilet room configuration and tank type toilet at new toilet room.Details
revision to app#201306179713. provide power door operator at extg entry door. add cabinetry and sink. correct plans to show extg toilet room configuration and tank type toilet at new toilet room. | $1,500 |