Houman Sharif
- Listed as
- architect, authorized agent-others
- Firm
- Mem Architecture
- Based in
- San Francisco
- On San Francisco permits
- Aug 2006 to Sep 2026
49 permits since 2000 (architect on 48 permits, authorized agent-others on 1 permit): 28 completed, 6 in progress, 1 never finaled, 14 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 4, 2026 | In progress issued Sep 2026 | 3323 Pacific Av | Louis Ptak Construction Inc | revision to bpa: 2026.0707.4632 - update to shed floor structure.Details
revision to bpa: 2026.0707.4632 - update to shed floor structure. | |
| Aug 13, 2026 | In progress issued Sep 2026 | 2850 Broadway | Black Mountain Development | revision to bpa: 202606253925 - removal of structural steel post at main and upper floors. (grid 3b and 4b) reframing of walls at upper level (grid 1c and 2c)Details
revision to bpa: 202606253925 - removal of structural steel post at main and upper floors. (grid 3b and 4b) reframing of walls at upper level (grid 1c and 2c) | |
| Jul 7, 2026 | In progress issued Aug 2026 | 3323 Pacific Av | Louis Ptak Construction Inc | revision to 202504184800. updates to remodel of backyard, deck and shed interior.Details
revision to 202504184800. updates to remodel of backyard, deck and shed interior. | $60,000 |
| Jun 25, 2026 | In progress issued Jul 2026 | 2850 Broadway | Black Mountain Development | remodel kitchen & bathrooms, remodel courtyard & new landscaping. related electrical & plumbing will be performed. no change of use, no floor area added, no facade change.Details
remodel kitchen & bathrooms, remodel courtyard & new landscaping. related electrical & plumbing will be performed. no change of use, no floor area added, no facade change. | $185,000 |
| Aug 15, 2025 | In progress issued Jan 2026 | 3323 Pacific Av | Louis Ptak Construction Inc | revision to pa# 202504184800 including: voluntary seismic improvements in accordance with chapter 12 of 2022 sfbc. addition of residential hydraulic elevator in the existing shaft.Details
revision to pa# 202504184800 including: voluntary seismic improvements in accordance with chapter 12 of 2022 sfbc. addition of residential hydraulic elevator in the existing shaft. | $350,000 |
| Apr 18, 2025 | In progress issued May 2025 | 3323 Pacific Av | Louis Ptak Construction Inc | interior remodel of (e) house: including limited finish replacement, wall reconfiguration, and limited structural improvements, remodel of back yard and deck, limited window replacments.Details
interior remodel of (e) house: including limited finish replacement, wall reconfiguration, and limited structural improvements, remodel of back yard and deck, limited window replacments. | $850,000 |
| Dec 23, 2021 | Completed final sign-off Nov 2023 | 470 Pacific Av | Plant Construction Co, Lp | renovation to (e) dining rm, relocate bar with ada compliant seating area. relocate bathrooms.Details
renovation to (e) dining rm, relocate bar with ada compliant seating area. relocate bathrooms. | $190,000 |
| Dec 7, 2020 | Expired or cancelled expired Aug 2023 | 2312 Pacific Av | Dlc Construction | int. remodel: replace kit. cabinets, appliances, all bath finishes. relocate master bath and closet, replacing 1 (e) staircase w/ (n) set of stairs & railing. (n) finish throughout. replacing (e) lighting w/ (n) led lights, outlets & switching to comply w/ codes. (n) waterproofing on 2 ext. decks.Details
int. remodel: replace kit. cabinets, appliances, all bath finishes. relocate master bath and closet, replacing 1 (e) staircase w/ (n) set of stairs & railing. (n) finish throughout. replacing (e) lighting w/ (n) led lights, outlets & switching to comply w/ codes. (n) waterproofing on 2 ext. decks. | $100,000 |
| Mar 3, 2020 | Completed final sign-off Apr 2021 | 2121 Webster St | Black Mountain Development | unit 801 gph1 - revision to pa 2018-0827-8429 providing not accessible/adaptable bathroom on 2nd floor of the unit as not required by codeDetails
unit 801 gph1 - revision to pa 2018-0827-8429 providing not accessible/adaptable bathroom on 2nd floor of the unit as not required by code | |
| Jan 30, 2020 | Expired or cancelled cancelled Jan 2026 | 1232 Sanchez St | changing (e) stair and railing to make code compliant, replacing (e) entry door and side lightDetails
changing (e) stair and railing to make code compliant, replacing (e) entry door and side light | $15,000 | |
| Jun 26, 2019 | Completed final sign-off May 2022 | 2740 Green St | Peninsula Custom Homes Inc, Dowbuilt Inc. | revision to app#201606281059 by reducing the scope of work including no rrof deck, no new staircase and no change to north side windows. infill extg lightwell on east side. update structural drawings.new sprinkler system and new led lighting thoughout. n/a for maherDetails
revision to app#201606281059 by reducing the scope of work including no rrof deck, no new staircase and no change to north side windows. infill extg lightwell on east side. update structural drawings.new sprinkler system and new led lighting thoughout. n/a for maher | |
| May 24, 2019 | Expired or cancelled cancelled Feb 2024 | 2701 Broadway | addition of a roof deck (ref: 2016-002764 prv) on (e) building. installation of (n) spiral stair to roof & skylight. limited sprinkle work per building department's pre-app meeting result.**maher n/a**Details
addition of a roof deck (ref: 2016-002764 prv) on (e) building. installation of (n) spiral stair to roof & skylight. limited sprinkle work per building department's pre-app meeting result.**maher n/a** | $350,000 | |
| May 10, 2019 | Completed final sign-off Feb 2022 | 1000 03rd St | Black Mountain Development | #1602 - interior remodel of (e) condo units and addition of fire rated door btwn 2 units (#1603).Details
#1602 - interior remodel of (e) condo units and addition of fire rated door btwn 2 units (#1603). | $650,000 |
| May 10, 2019 | Completed final sign-off Feb 2022 | 1000 03rd St | Black Mountain Development | #1603 - interior remodel of (e) condo units and addition of fire rated door btwn 2 units.Details
#1603 - interior remodel of (e) condo units and addition of fire rated door btwn 2 units. | $650,000 |
| Apr 25, 2019 | Completed final sign-off Jan 2022 | 2121 Webster St | Black Mountain Development | unit 804 (gph4): interior fitout of (e) shell, ref approved bpa#201311222660, relocating (e) stair, new interior partitions, all new finishes, sprinkler/mechanical systems under seperate permit.Details
unit 804 (gph4): interior fitout of (e) shell, ref approved bpa#201311222660, relocating (e) stair, new interior partitions, all new finishes, sprinkler/mechanical systems under seperate permit. | $2,000,000 |
| Apr 24, 2019 | Completed final sign-off Oct 2019 | 600 Montgomery St | Hathaway Dinwiddie Co. | 21st fl. tenant improvement: convert (e) conference room to (4) new private offices, renovate (e) wellness room, design build plumbing, mechanical & electrical drawings includedDetails
21st fl. tenant improvement: convert (e) conference room to (4) new private offices, renovate (e) wellness room, design build plumbing, mechanical & electrical drawings included | $200,000 |
| Apr 24, 2019 | Completed final sign-off Oct 2019 | 600 Montgomery St | Hathaway Dinwiddie Co. | 20th fl: tenant improvement; convert (2) (e) conference rooms to (5) new private offices, create (n) confernce room in existing waiting areaDetails
20th fl: tenant improvement; convert (2) (e) conference rooms to (5) new private offices, create (n) confernce room in existing waiting area | $400,000 |
| Mar 26, 2019 | Expired or cancelled expired Jan 2023 | 1032 Broadway | Art Of Construction Inc, Phase 2 Builders | interior renovation of extg living and dining room to repair water damage. removing one set of stairs, removal of 2 wood burning fire places. reface extg kitchen cabinets. reconfiguring 2 bathrooms upstairs. new led lighting in modified areas. no change to exterior. n/a for maherDetails
interior renovation of extg living and dining room to repair water damage. removing one set of stairs, removal of 2 wood burning fire places. reface extg kitchen cabinets. reconfiguring 2 bathrooms upstairs. new led lighting in modified areas. no change to exterior. n/a for maher | $100,000 |
| Feb 13, 2019 | Completed final sign-off Mar 2025 | 2898 Vallejo St | Ashbury Gen Constructing & Eng | revision to pa# 2017-0223-9944s. infill of (e) lightwell on 4th flr, east side. new elevator. ** maher n/a**Details
revision to pa# 2017-0223-9944s. infill of (e) lightwell on 4th flr, east side. new elevator. ** maher n/a** | |
| Jul 20, 2018 | Completed final sign-off Jan 2019 | 600 Montgomery St | Hathaway Dinwiddie Co. | tenant improvements converting e space to 4 new offices. n/a for maherDetails
tenant improvements converting e space to 4 new offices. n/a for maher | $75,000 |
| Jun 5, 2018 | Completed final sign-off Oct 2019 | 1170 Sacramento St | Nob Hill Construction | 14th floor - interior remodel of (e) condo unit.14a no load bearing walls to be modified. replacing (e) finishes, plumbing fixtures, new lighting, new cabinet work.Details
14th floor - interior remodel of (e) condo unit.14a no load bearing walls to be modified. replacing (e) finishes, plumbing fixtures, new lighting, new cabinet work. | $350,000 |
| Mar 8, 2018 | Expired or cancelled cancelled Jan 2026 | 34 Presidio Tr | Dijeau Poage Construction Inc. | interior remodel of extg recreation room and home theater. no exterior work proposed. removal of a portion of concrete wall and portion of brick chimney. new wet bar at recreation room . lower level rec room & theater approved under app#9618211. n/a for maherDetails
interior remodel of extg recreation room and home theater. no exterior work proposed. removal of a portion of concrete wall and portion of brick chimney. new wet bar at recreation room . lower level rec room & theater approved under app#9618211. n/a for maher | $150,000 |
| Nov 29, 2017 | Never finaled issued Feb 2018, no final | 3756 Jackson St | Superb Builders Inc **See Notes** | replace (e) front facade windows and doors. replacing with custom wood iwndows with true divided lites.Details
replace (e) front facade windows and doors. replacing with custom wood iwndows with true divided lites. | $50,000 |
| Nov 8, 2017 | Completed final sign-off Jul 2021 | 1232 Sanchez St | Caruso Construction Inc. | revision to 201609127441, change to basement floor plan layout and rear windowDetails
revision to 201609127441, change to basement floor plan layout and rear window | |
| Oct 12, 2017 | Completed final sign-off Mar 2019 | 1200 California St | Baxter Construction | #12c: interior remodel, removing & replaxing finishes, including kitchen & bathrooms. maher naDetails
#12c: interior remodel, removing & replaxing finishes, including kitchen & bathrooms. maher na | $500,000 |
| Oct 10, 2017 | Completed final sign-off May 2018 | 3756 Jackson St | Superb Builders Inc **See Notes** | revision to pa 2016-1116-2870 & 2017-0303-0621 - delete lightwell infill & lowering of bsmt; delete moment frame; delete uprgrade of elevator, delete bi-fold doors to rear yard. remodel 0f (e) home/office w/1 (n) bath, french doors to rear & window replacement. add 1 (n) bath @ 2nd fl. add 1 (n)Details
revision to pa 2016-1116-2870 & 2017-0303-0621 - delete lightwell infill & lowering of bsmt; delete moment frame; delete uprgrade of elevator, delete bi-fold doors to rear yard. remodel 0f (e) home/office w/1 (n) bath, french doors to rear & window replacement. add 1 (n) bath @ 2nd fl. add 1 (n) | |
| Jul 31, 2017 | Completed final sign-off Apr 2018 | 2448 Fillmore St | Dlc Construction | tenant improvements for retail use. new lighting and interior finishes, ada compliant bathroom. new kitchenette with /sink. new hvac improvements.Details
tenant improvements for retail use. new lighting and interior finishes, ada compliant bathroom. new kitchenette with /sink. new hvac improvements. | $100,000 |
| Jun 13, 2017 | Expired or cancelled cancelled Jun 2018 | 2737 Divisadero St | horizontal addition of lower 3 floors toward backyard, lowering the backyard & basement floor level to create 10'-0" ceiling height. change (e) office to new guest room.Details
horizontal addition of lower 3 floors toward backyard, lowering the backyard & basement floor level to create 10'-0" ceiling height. change (e) office to new guest room. | $250,000 | |
| Apr 7, 2017 | Completed final sign-off Apr 2021 | 3778 Clay St | Clayton Timbrell & Co | remodel master bathroom & closets, remodel kid's bath on 2/f, add laundry room in attic, new waterproofing on east deck on top floor, replace selected windows & doors facing back & side yard, reroofing & new exterior painting. n/a ordinance #155-13Details
remodel master bathroom & closets, remodel kid's bath on 2/f, add laundry room in attic, new waterproofing on east deck on top floor, replace selected windows & doors facing back & side yard, reroofing & new exterior painting. n/a ordinance #155-13 | $250,000 |
| Mar 3, 2017 | Completed final sign-off May 2018 | 3756 Jackson St | Caruso Construction Inc. | ground flr: convert (e) home/office to be new sitting area; add 2 new bathrooms at basement level, lower concrete flr to rear yard. rear yard- lower grade to align w/new basement flr. waterproofing repair ar front facade. upgrade (e) elevator maher naDetails
ground flr: convert (e) home/office to be new sitting area; add 2 new bathrooms at basement level, lower concrete flr to rear yard. rear yard- lower grade to align w/new basement flr. waterproofing repair ar front facade. upgrade (e) elevator maher na | $250,000 |
| Nov 16, 2016 | Completed final sign-off May 2018 | 3756 Jackson St | Caruso Construction Inc. | infillinh the west lightwell on the ground floor to add an enclosed storage room maher naDetails
infillinh the west lightwell on the ground floor to add an enclosed storage room maher na | $15,000 |
| Sep 12, 2016 | Completed final sign-off Apr 2019 | 34 Presidio Tr | Dijeau Poage Construction Inc. | replace existing west balcony with an enlarged balcony. new land/hardscaping throughout. new wood french doors to match e door profiles at east facadeDetails
replace existing west balcony with an enlarged balcony. new land/hardscaping throughout. new wood french doors to match e door profiles at east facade | $25,000 |
| Jul 13, 2016 | Completed final sign-off May 2017 | 34 Presidio Tr | Forma Construction | master suite interior remodel of master bedroom, closet, bath. removal of e master suite fireplace and replacement with new direct vent gas fireplace. provide 2 new wood windows facing lightwell and not facing public right of wayDetails
master suite interior remodel of master bedroom, closet, bath. removal of e master suite fireplace and replacement with new direct vent gas fireplace. provide 2 new wood windows facing lightwell and not facing public right of way | $100,000 |
| Jun 28, 2016 | Completed final sign-off May 2022 | 2740 Green St | Peninsula Custom Homes Inc | revision to pa 201205160630 by reducing the scope - reduction include no basement expansion, no new staircase & no new roof deck & its access to the roof deck. sprinkler system at new area per nfpa13r. n/a for maher ordinance no. 155-13Details
revision to pa 201205160630 by reducing the scope - reduction include no basement expansion, no new staircase & no new roof deck & its access to the roof deck. sprinkler system at new area per nfpa13r. n/a for maher ordinance no. 155-13 | |
| Mar 18, 2016 | Expired or cancelled withdrawn Jul 2016 | 765 Clementina St | separation of residence from business (art activity). expansion of living space on 2nd fl to accomodate residential dwelling unit. limited changes to exterior facade. interior remodel & upgrade. (n) bathroom & kitchenDetails
separation of residence from business (art activity). expansion of living space on 2nd fl to accomodate residential dwelling unit. limited changes to exterior facade. interior remodel & upgrade. (n) bathroom & kitchen | $75,000 | |
| Feb 29, 2016 | Expired or cancelled withdrawn Apr 2017 | 2898 Vallejo St | Details
| $200,000 | |
| Oct 20, 2015 | Completed final sign-off Dec 2015 | 1774 Beach St | Matarozzi/Pelsinger Builders Inc. | revision to app#201509106627. repair and replace waterproofing of deck over living space. new wood clad on extg parapet walls. new floor finish pavers on pedestal. new gas pipe, removable windscreen, planters,with irrigation and wall lighting. replace extg door. replace stucco on parapet & blockingDetails
revision to app#201509106627. repair and replace waterproofing of deck over living space. new wood clad on extg parapet walls. new floor finish pavers on pedestal. new gas pipe, removable windscreen, planters,with irrigation and wall lighting. replace extg door. replace stucco on parapet & blocking | $5,000 |
| Oct 16, 2015 | Expired or cancelled withdrawn Oct 2015 | 1774 Beach St | Matarozzi/Pelsinger Builders Inc. | revision to appl #201509106627 - roof deck remodeling, repair water damage, waterproofing, blocking in parapet wall; add pavers on pedestals & privacy screen - mirrors on metal frame, gas line for fire pit, lights + electrical outlets. n/a maher ordinanceDetails
revision to appl #201509106627 - roof deck remodeling, repair water damage, waterproofing, blocking in parapet wall; add pavers on pedestals & privacy screen - mirrors on metal frame, gas line for fire pit, lights + electrical outlets. n/a maher ordinance | $5,000 |
| May 11, 2015 | Expired or cancelled expired Jan 2020 | 2898 Vallejo St | Ashbury Gen Constructing & Eng | renovate (e) sfd. no change in use. addition @ bsmt 2 & bsmt 1. 1st fl: remodel of kitchen, add 2 bath. 2nd fl: remodel of kitchen, powder rm, living rm. 3rd fl: remodel of 3 baths, master bed & closet. 4th fl: remodel 1 bath. change 1 property line window on east side with new fire rated window.Details
renovate (e) sfd. no change in use. addition @ bsmt 2 & bsmt 1. 1st fl: remodel of kitchen, add 2 bath. 2nd fl: remodel of kitchen, powder rm, living rm. 3rd fl: remodel of 3 baths, master bed & closet. 4th fl: remodel 1 bath. change 1 property line window on east side with new fire rated window. | $1,500,000 |
| Dec 5, 2014 | Completed final sign-off Apr 2017 | 188 Minna St | Black Mountain Development | merge unit# 25c & 25d into one unit. demo interior walls. replace all interior doors, add shades, redo interior finishes, update flooring, upgrade tile, paint interior, redo lighting. all approved by hoa. life safety deferred.Details
merge unit# 25c & 25d into one unit. demo interior walls. replace all interior doors, add shades, redo interior finishes, update flooring, upgrade tile, paint interior, redo lighting. all approved by hoa. life safety deferred. | $850,000 |
| Dec 5, 2014 | Completed final sign-off Apr 2017 | 188 Minna St | Black Mountain Development | administration permit for unit merger. unit# 25c & unit# 25d. all the work done under pa# 2014-1205-3145Details
administration permit for unit merger. unit# 25c & unit# 25d. all the work done under pa# 2014-1205-3145 | |
| Jul 16, 2014 | Expired or cancelled cancelled Mar 2017 | 308 Laurel St | ground floor addition of 55 sf facing back yard.Details
ground floor addition of 55 sf facing back yard. | $40,000 | |
| Jan 28, 2013 | Expired or cancelled cancelled Nov 2022 | 2500 Broadway | enlarging the (e) garage door opening & modifying the driveway as neccessary. new garage door. no change to (e) curb cutDetails
enlarging the (e) garage door opening & modifying the driveway as neccessary. new garage door. no change to (e) curb cut | $12,000 | |
| Aug 8, 2012 | Expired or cancelled expired Dec 2014 | 765 Market St | 38 Degress North Latitude Builders Inc. | unit 37d only -apply additional sheetrock to walls & ceiling of master bedroom include installation of sound proof window system to provide additonal sound isolation, no exterior work.Details
unit 37d only -apply additional sheetrock to walls & ceiling of master bedroom include installation of sound proof window system to provide additonal sound isolation, no exterior work. | $7,000 |
| May 16, 2012 | Expired or cancelled expired Aug 2021 | 2740 Green St | interior remodel. replace windows. extension of existing 4th floor into the existing deck. new roof deck and access to roofdeck. new interior staircase. new skylight over staircase.Details
interior remodel. replace windows. extension of existing 4th floor into the existing deck. new roof deck and access to roofdeck. new interior staircase. new skylight over staircase. | $1,200,000 | |
| Apr 3, 2012 | Completed final sign-off Sep 2013 | 2500 Broadway | Upscale Construction Inc. | horizontal addition to the back side of the house (facing back yard) @ 1st level. addition will be into the (e) deck by enclosing space between decks on 1st & 2nd floors. new wood windows & doors @ the new area & extension of 1st floor deck.Details
horizontal addition to the back side of the house (facing back yard) @ 1st level. addition will be into the (e) deck by enclosing space between decks on 1st & 2nd floors. new wood windows & doors @ the new area & extension of 1st floor deck. | $75,000 |
| Mar 14, 2012 | Completed final sign-off Sep 2013 | 2500 Broadway | Upscale Construction Inc. | excavate and install foundation waterproofing/preforated pipe/sandtrap and the perforated pipe to existing sewer line after sand trapDetails
excavate and install foundation waterproofing/preforated pipe/sandtrap and the perforated pipe to existing sewer line after sand trap | $12,000 |
| Feb 24, 2012 | Completed final sign-off Oct 2012 | 765 Market St | 38 Degress North Latitude Builders Inc. | unit 35g new interior remodel: new kitchen, new bathrooms, new floor finishes (carpet, hardwood & stone), new cabinetry, new framing, new dry wall, new plumbing & electrical, no load bearing walls will be effected or altered, no exterior work, new plaster. fire sprinkler plan to be separate permit.Details
unit 35g new interior remodel: new kitchen, new bathrooms, new floor finishes (carpet, hardwood & stone), new cabinetry, new framing, new dry wall, new plumbing & electrical, no load bearing walls will be effected or altered, no exterior work, new plaster. fire sprinkler plan to be separate permit. | $119,860 |
| Aug 16, 2006 | Completed final sign-off Jul 2007 | 556 Funston Av | interior remodel in 2nd & 3rd floor, changing windows at back of house in 2nd floor & replacing 2 windows in the 3rd level.Details
interior remodel in 2nd & 3rd floor, changing windows at back of house in 2nd floor & replacing 2 windows in the 3rd level. | $85,000 |