Permit GraphShortlistSan Francisco building permits since 2000

Matthew Usebeck

License
C33171
Architect or Civil engineer: both boards write C before the number, and the roles on the permits do not settle which
About the two boards
Look the license up with the state (Architects Board)
Look up C33171 at the Board for Professional Engineers
Listed as
architect, engineer
On San Francisco permits
Apr 2012 to Nov 2026

17 permits since 2000 (architect on 16 permits, engineer on 1 permit): 4 completed, 11 in progress, 1 never finaled, 1 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records

Worked with

Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.

Contractors
Novo Construction Inc (7), Ap- Build Inc (3), Clune Construction Company L P
Engineers
Aditya Paranjape (4), Jose Herrera (4), Paul Littler (2), Brandon Elliott, James Gonek, Sean Turner

Where they worked

One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Nov 10, 2026In progress
filed Nov 2026, not yet issued
500 Terry A Francois Bllevel 3: revision to pa #202507029993 for combined storage rooms 318 and 319 to create group b objective lab. door at room 319 to be removed and infilled
Details
Permit
202611100623

level 3: revision to pa #202507029993 for combined storage rooms 318 and 319 to create group b objective lab. door at room 319 to be removed and infilled

Open the permit page

Jul 10, 2026Expired or cancelled
withdrawn Aug 2026
1350 Howard Stexpansion of (e) restroom, addition of (n) accessible shower, relocation of plumbing fixtures, demolition of non-load bearing wall, and associated accessibility upgrades.
Details
Permit
202607104824

expansion of (e) restroom, addition of (n) accessible shower, relocation of plumbing fixtures, demolition of non-load bearing wall, and associated accessibility upgrades.

Open the permit page

$65,000
Feb 25, 2026In progress
filed Feb 2026, not yet issued
500 Terry A Francois Bl(1) wall mounted internally illuminated logo sign.
Details
Permit
202602256504

(1) wall mounted internally illuminated logo sign.

Open the permit page

$2,500
Feb 25, 2026In progress
filed Feb 2026, not yet issued
500 Terry A Francois Bl(1) wall mounted internally illuminated logo sign.
Details
Permit
202602256505

(1) wall mounted internally illuminated logo sign.

Open the permit page

$2,500
Feb 3, 2026In progress
issued Feb 2026
500 Terry A Francois BlNovo Construction Inc3rd/f revision to 202507029993: revised phone pod locations
Details
Permit
202602035163
Permit issued
Feb 20, 2026

3rd/f revision to 202507029993: revised phone pod locations

Open the permit page

Feb 3, 2026In progress
issued Feb 2026
500 Terry A Francois BlNovo Construction Inclevel 2 revision to pa#: 202506269604. revised (e) phone pod locations.
Details
Permit
202602035161
Permit issued
Feb 20, 2026

level 2 revision to pa#: 202506269604. revised (e) phone pod locations.

Open the permit page

Dec 17, 2025In progress
filed Dec 2025, not yet issued
500 Terry A Francois Bl2/fl-ref ti 202506269604- (n) horizontal exit @ (e) tenant space
Details
Permit
202512172077

2/fl-ref ti 202506269604- (n) horizontal exit @ (e) tenant space

Open the permit page

$126,111
Oct 14, 2025In progress
issued Feb 2026
500 Terry A Francois BlNovo Construction Incground floor ti work includes refresh of tenant spaces north and main lobby and full ti to suite soth main lobby. partitions, fixtures and finishes and associated mep
Details
Permit
202510147300
Permit issued
Feb 24, 2026

ground floor ti work includes refresh of tenant spaces north and main lobby and full ti to suite soth main lobby. partitions, fixtures and finishes and associated mep

Open the permit page

$5,263,755
Jul 2, 2025In progress
issued Aug 2025
500 Terry A Francois BlNovo Construction Inc3rd floor: interior alteration of existing tenant space, including light touch alterations, including finishes, fixture and equipment. mep included.
Details
Permit
202507029993
Permit issued
Aug 26, 2025

3rd floor: interior alteration of existing tenant space, including light touch alterations, including finishes, fixture and equipment. mep included.

Open the permit page

$4,790,589
Jul 1, 2025In progress
issued Oct 2025
500 Terry A Francois BlNovo Construction Inc4th fl: interior alteration at existing tenant space including light touch alterations, including finishes, fixtures, equipment. mep included.
Details
Permit
202507019977
Permit issued
Oct 1, 2025

4th fl: interior alteration at existing tenant space including light touch alterations, including finishes, fixtures, equipment. mep included.

Open the permit page

$4,322,847
Jun 26, 2025In progress
issued Aug 2025
500 Terry A Francois BlNovo Construction Inc2/fl: interior alteration of existing tenant spaces\. light touch alteration includes finishes, fixtures, equipment.
Details
Permit
202506269604
Permit issued
Aug 26, 2025

2/fl: interior alteration of existing tenant spaces\. light touch alteration includes finishes, fixtures, equipment.

Open the permit page

$4,203,710
Jun 18, 2025In progress
issued Aug 2025
500 Terry A Francois BlNovo Construction Inc5/fl: interior alteration of existing tenant spaces at the existing fifth floor. including finishes, fixtures and equipment.
Details
Permit
202506188988
Permit issued
Aug 27, 2025

5/fl: interior alteration of existing tenant spaces at the existing fifth floor. including finishes, fixtures and equipment.

Open the permit page

$11,634,224
Jun 10, 2021Completed
final sign-off Jul 2022
560 Mission StClune Construction Company L Pinterior tenant demo & improvement of (e) office space, new partitons, ceilings, restrooms, ducts. fire alarm and sprinkler under sep permits.
Details
Permit
202106102112
Permit issued
Aug 24, 2021
Final sign-off
Jul 13, 2022

interior tenant demo & improvement of (e) office space, new partitons, ceilings, restrooms, ducts. fire alarm and sprinkler under sep permits.

Open the permit page

$2,511,150
Oct 2, 2019Completed
final sign-off Mar 2021
115 Sansome StAp- Build Increv to pa# 201907196346; work includes additon of shower
Details
Permit
201910023278
Permit issued
Oct 4, 2019
Final sign-off
Mar 17, 2021

rev to pa# 201907196346; work includes additon of shower

Open the permit page

$5,000
Jul 19, 2019Completed
final sign-off Dec 2019
115 Sansome StAp- Build Incti on 3rd fl. interior work only. work invluces, new constuction of walls, plumbing fixtures, millwork & associated mep & sprinkler work. no coffee bar, self service coffee only
Details
Permit
201907196346
Permit issued
Sep 20, 2019
Final sign-off
Dec 9, 2019

ti on 3rd fl. interior work only. work invluces, new constuction of walls, plumbing fixtures, millwork & associated mep & sprinkler work. no coffee bar, self service coffee only

Open the permit page

$850,000
May 17, 2019Completed
final sign-off Oct 2019
115 Sansome StAp- Build Inc#300: non-structural demo of existing office space on 3rd fl only. no exterior work. per ab-017.(to remain vacant until adaa features restored.).since the lowered ceiling is being demoed,under separate appl. sprinkler contractor must immediately relocate the sprinklers to the concrete ceiling above
Details
Permit
201905171008
Permit issued
May 21, 2019
Final sign-off
Oct 24, 2019

#300: non-structural demo of existing office space on 3rd fl only. no exterior work. per ab-017.(to remain vacant until adaa features restored.).since the lowered ceiling is being demoed,under separate appl. sprinkler contractor must immediately relocate the sprinklers to the concrete ceiling above

Open the permit page

$20,000
Apr 19, 2012Never finaled
issued Apr 2012, no final
845 Market Strevision to pa #2012.02.15.4210 - revise ceiling detail.
Details
Permit
201204198680
Permit issued
Apr 19, 2012

revision to pa #2012.02.15.4210 - revise ceiling detail.

Open the permit page

$5,000