Mark Topetcher
- Listed as
- architect, authorized agent-others, designer, engineer, pmt consultant/expediter
- Firm
- Topetcher Architectural
- Based in
- San Francisco
- On San Francisco permits
- Aug 2001 to Oct 2026
469 permits since 2000 (architect on 445 permits, authorized agent-others on 22 permits, engineer on 6 permits, designer on 1 permit, pmt consultant/expediter on 1 permit): 291 completed, 52 in progress, 68 never finaled, 58 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 469.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 1, 2026 | In progress filed Oct 2026, not yet issued | 738 Elizabeth St | revision to pa# 202010106301 for a kitchen renovation. changes include updated window and door configuration of rear of house.Details
revision to pa# 202010106301 for a kitchen renovation. changes include updated window and door configuration of rear of house. | ||
| Oct 1, 2026 | In progress filed Oct 2026, not yet issued | 4307 17th St | merging the window and door to the 3rd floor roof deck into a bi-part door, no change to existing continuous header. replace additional window in kind. ***deck legalization under permit #202507312078 that needs to be paid for prior to issuance of this permit***Details
merging the window and door to the 3rd floor roof deck into a bi-part door, no change to existing continuous header. replace additional window in kind. ***deck legalization under permit #202507312078 that needs to be paid for prior to issuance of this permit*** | $10,000 | |
| Aug 21, 2026 | In progress filed Aug 2026, not yet issued | 2660 California St | addition of a new garage with interior stair access below the existing basement level and front yard setback with(n) curbcut;interior renovations @ 2nd fl.to reconfigure four befrooms & 2 baths,2 ensuite baths & laundry;reconfigure 3rd fl family room,study,office guest room & add half bath.Details
addition of a new garage with interior stair access below the existing basement level and front yard setback with(n) curbcut;interior renovations @ 2nd fl.to reconfigure four befrooms & 2 baths,2 ensuite baths & laundry;reconfigure 3rd fl family room,study,office guest room & add half bath. | $400,000 | |
| Jul 9, 2026 | In progress filed Jul 2026, not yet issued | 546 Ellsworth St | 1/f: remodel garage & to include addition of full bath and 2 bedrooms. 2/f: remodel (e) bathrooms & kitchen and replace front stairs. 3/f: add primary bedroom, closet & bathroom. foundation under seperate permit # 202604239965.Details
1/f: remodel garage & to include addition of full bath and 2 bedrooms. 2/f: remodel (e) bathrooms & kitchen and replace front stairs. 3/f: add primary bedroom, closet & bathroom. foundation under seperate permit # 202604239965. | $120,000 | |
| Jul 7, 2026 | In progress issued Aug 2026 | 913 Florida St | Tolentino Construction & Restoration Inc | reconfiguration of kitchen, living/dining areasand bath; add new en suite bath, all at 2nd floor; convert 1st floor to conditioned space with family room, bedroom and bath. infill of gorund level lightwell.Details
reconfiguration of kitchen, living/dining areasand bath; add new en suite bath, all at 2nd floor; convert 1st floor to conditioned space with family room, bedroom and bath. infill of gorund level lightwell. | $250,000 |
| Jun 30, 2026 | In progress issued Jul 2026 | 428 15th Av | Bianchi-Tillett Developers Inc | revision to pa# 202204071831. permeation grouting to stabilize subsoil, adjacent property work at 430 15th ave ref pa# 202606304326. similarly the matt slab foundation along the property line w/ 426 15th ave, has been modified by the eor to avoid undermining.Details
revision to pa# 202204071831. permeation grouting to stabilize subsoil, adjacent property work at 430 15th ave ref pa# 202606304326. similarly the matt slab foundation along the property line w/ 426 15th ave, has been modified by the eor to avoid undermining. | $20,000 |
| Jun 30, 2026 | In progress issued Jul 2026 | 430 15th Av | Bianchi-Tillett Developers Inc | permeation grouting below (e) foundation to stabilize sandy soil for property, adjacent excavation on 428 15th ave ref pa# 202606304320Details
permeation grouting below (e) foundation to stabilize sandy soil for property, adjacent excavation on 428 15th ave ref pa# 202606304320 | $20,000 |
| Jun 24, 2026 | In progress issued Aug 2026 | 7650 Geary Bl | the scope of work at unit #1 2nd fl - reconfiguring kitchen area and creating a new bedroom; renovate two (e) baths; units #2 1/f - bath & kitchen renovations.Details
the scope of work at unit #1 2nd fl - reconfiguring kitchen area and creating a new bedroom; renovate two (e) baths; units #2 1/f - bath & kitchen renovations. | $75,000 | |
| Jun 18, 2026 | In progress issued Jun 2026 | 262 Lexington St | Blue Bend Construction Inc | revision to bpa#202006118454 to include the reconfiguration of meter cabinets at the south elevation per pg&e requirment; reconfigure entry area at the first floor; retain (e) exterior rear deck and stair.Details
revision to bpa#202006118454 to include the reconfiguration of meter cabinets at the south elevation per pg&e requirment; reconfigure entry area at the first floor; retain (e) exterior rear deck and stair. | |
| May 7, 2026 | In progress issued Sep 2026 | 657 Arguello Bl | Abbeyside Construction Inc | horizontal addition and new 3rd flr expanision; expansion of conditined living space to 1/f with new bedroom, bath, exercise & media room; reconfigure 2/f with living/dining, kitchen, bath & study; & new 3/f with 3-bedrooms & 2-baths.Details
horizontal addition and new 3rd flr expanision; expansion of conditined living space to 1/f with new bedroom, bath, exercise & media room; reconfigure 2/f with living/dining, kitchen, bath & study; & new 3/f with 3-bedrooms & 2-baths. | $400,000 |
| May 7, 2026 | In progress filed May 2026, not yet issued | 674 Oak St | conversion of unconditioned space & a portion of unit # 2 @ 1st floor level to a new adu. reconfiguration of 2nd floor stair area within unit# 2 and reconfiguration of openings @ east wall of 1st floor. adu will be added under the state adu program.Details
conversion of unconditioned space & a portion of unit # 2 @ 1st floor level to a new adu. reconfiguration of 2nd floor stair area within unit# 2 and reconfiguration of openings @ east wall of 1st floor. adu will be added under the state adu program. | $75,000 | |
| May 1, 2026 | In progress issued Jun 2026 | 2547 20th Av | Tolentino Construction & Restoration Inc | reno to reconfigure kitchen, dining and bedrm areas; add 1 new en-suite bath and 1 1 half bath; and reconfigure existing bath all @ 2nd fl; add new interior stair connecting 1st and 2nd fl; and expanding living space @ 1st fl level w/family room; bedroom, bath & office; add 4 new skylightsDetails
reno to reconfigure kitchen, dining and bedrm areas; add 1 new en-suite bath and 1 1 half bath; and reconfigure existing bath all @ 2nd fl; add new interior stair connecting 1st and 2nd fl; and expanding living space @ 1st fl level w/family room; bedroom, bath & office; add 4 new skylights | $300,000 |
| Apr 24, 2026 | In progress issued May 2026 | 3779 25th St | Prime Construction & Renovation Inc. | the scope of work includes an interior remodel of unit #3779 at second floor level; kitchen and existing bath reconfiguration; and a new en suite bath serving the primary bedroom.Details
the scope of work includes an interior remodel of unit #3779 at second floor level; kitchen and existing bath reconfiguration; and a new en suite bath serving the primary bedroom. | $225,000 |
| Apr 13, 2026 | In progress issued Apr 2026 | 559 Gates St | renovations to reconfigure living, dining, and kitchen areas and bath. add bedroom all at 1st fl. add bath at 2nd fl, add new interior stair connecting first floor and basement, expand living space to basement w family room, office, and bath.Details
renovations to reconfigure living, dining, and kitchen areas and bath. add bedroom all at 1st fl. add bath at 2nd fl, add new interior stair connecting first floor and basement, expand living space to basement w family room, office, and bath. | $300,000 | |
| Apr 10, 2026 | In progress issued Apr 2026 | 215 Missouri St | Gngc Builders Inc | revision to pa# 202503031389: to provide further renovation of existing kitchen and existing second floor bathroom.Details
revision to pa# 202503031389: to provide further renovation of existing kitchen and existing second floor bathroom. | $60,000 |
| Apr 8, 2026 | In progress issued Sep 2026 | 3929 17th St | remove existing railing and install new railing with proper height per code. install metal staircase. install proper flashing and waterproofing. per boa decision: 25-048-3929Details
remove existing railing and install new railing with proper height per code. install metal staircase. install proper flashing and waterproofing. per boa decision: 25-048-3929 | $4,500 | |
| Feb 27, 2026 | Completed final sign-off Oct 2026 | 770 Natoma St | Brady Construction Inc | recommencement and completion of work approved under pa#: 201808308752.Details
recommencement and completion of work approved under pa#: 201808308752. | $100,000 |
| Feb 25, 2026 | Completed final sign-off Sep 2026 | 2011 Filbert St | Patrick J. Corkery Gen. Contr. | addition of 2 roof skylights serving an office on 2nd/f, no structuralDetails
addition of 2 roof skylights serving an office on 2nd/f, no structural | $2,000 |
| Feb 25, 2026 | In progress filed Feb 2026, not yet issued | 1904 Golden Gate Av | Tip Managers Inc | expansion of conditioned living space from lower unit 1 to the existing 1st fl to include a new primary bedroom, bath, laundry; addition on new interior stairs, renovation of kitchen and bath at unit 1, addition of 2nd bath 3rd fl, renovate kitchen and baths upper unit 2 ref 202505277283Details
expansion of conditioned living space from lower unit 1 to the existing 1st fl to include a new primary bedroom, bath, laundry; addition on new interior stairs, renovation of kitchen and bath at unit 1, addition of 2nd bath 3rd fl, renovate kitchen and baths upper unit 2 ref 202505277283 | $100,000 |
| Feb 19, 2026 | In progress filed Feb 2026, not yet issued | 161 09th Av | add 2 adus @ unoccupied 1st flr storage & garage area under local planning code section 207.1 includes voluntary seismic upgrade. (e) garge door removed. renovation of the 2 (e) units @ 2nd & 3rd floors. renovation of the kitchen & addition of 1 (n)bedrm. & bath rm @ each unit.Details
add 2 adus @ unoccupied 1st flr storage & garage area under local planning code section 207.1 includes voluntary seismic upgrade. (e) garge door removed. renovation of the 2 (e) units @ 2nd & 3rd floors. renovation of the kitchen & addition of 1 (n)bedrm. & bath rm @ each unit. | $475,000 | |
| Feb 12, 2026 | In progress issued Sep 2026 | 527 Noe St | Tip Managers Inc | expansion of conditioned living space from lower unit 529 to the existing basement to include a new bedroom, bath, and guest room. addition of new interior stairs. renovation of kitchen and bath and add 2nd bath at 1/f. renovate kitchen and bath at upper unit 527.Details
expansion of conditioned living space from lower unit 529 to the existing basement to include a new bedroom, bath, and guest room. addition of new interior stairs. renovation of kitchen and bath and add 2nd bath at 1/f. renovate kitchen and bath at upper unit 527. | $300,000 |
| Feb 10, 2026 | In progress issued Feb 2026 | 342 Pierce St | recommencement and completion of work approved under pa#: 201809241205.Details
recommencement and completion of work approved under pa#: 201809241205. | $29,000 | |
| Dec 30, 2025 | In progress issued Aug 2026 | 452 Fair Oaks St | Abbeyside Construction Inc | rev 202504174627- relocate unit 454 from 2nd fl to 1st fl & reconfigure it w/ 2 bedrooms and 2 baths; expanding unit 452 into 2nd fl and reconfigure w/ 3 bedrooms and 3 baths, study , library & kitchen; (n) front door @ 1st fl. unit 454 - (n) rear landscape stair to yard....Details
rev 202504174627- relocate unit 454 from 2nd fl to 1st fl & reconfigure it w/ 2 bedrooms and 2 baths; expanding unit 452 into 2nd fl and reconfigure w/ 3 bedrooms and 3 baths, study , library & kitchen; (n) front door @ 1st fl. unit 454 - (n) rear landscape stair to yard.... | |
| Dec 23, 2025 | Expired or cancelled withdrawn May 2026 | 2011 Filbert St | construct rear 1-story, type 5b accessory building - office/exercise room with full bathroom as part of unit #1.Details
construct rear 1-story, type 5b accessory building - office/exercise room with full bathroom as part of unit #1. | $50,000 | |
| Dec 18, 2025 | In progress issued Apr 2026 | 442 44th Av | Velero Inc | expansion of condtioned living space to the 1st floor to include new bedrooms, bath, & family room; infill below existing 2nd floor bedroom. new interior stair connection & the renovation & reconfiguration of the existing bath, removing existing wall between kitchen & dining room & installDetails
expansion of condtioned living space to the 1st floor to include new bedrooms, bath, & family room; infill below existing 2nd floor bedroom. new interior stair connection & the renovation & reconfiguration of the existing bath, removing existing wall between kitchen & dining room & install | $250,000 |
| Nov 20, 2025 | In progress issued Dec 2025 | 359 Lexington St | Continuum Construction | revision to permit 202503273136. revise scope - reconfiguring the kitchen, dining room, bathroom, and laundry in unit 359 on 3/f.Details
revision to permit 202503273136. revise scope - reconfiguring the kitchen, dining room, bathroom, and laundry in unit 359 on 3/f. | |
| Nov 12, 2025 | In progress issued Nov 2025 | 3095 21st St | application for technical infeasibility due to constraints of 3 exterior stairs at the entry way. new power door operator will be installed at the (e) entrance to suppletment the (e) conditions. ref # abe201902054913Details
application for technical infeasibility due to constraints of 3 exterior stairs at the entry way. new power door operator will be installed at the (e) entrance to suppletment the (e) conditions. ref # abe201902054913 | $2,000 | |
| Nov 5, 2025 | Completed final sign-off Sep 2026 | 1460 Waller St | Tip Managers Inc | revision to 201901251261 to maintain existing 4th level with 3 beds and 2 baths. reconfigure kitchen and bath layout throughout. ref 202503071829.Details
revision to 201901251261 to maintain existing 4th level with 3 beds and 2 baths. reconfigure kitchen and bath layout throughout. ref 202503071829. | $75,000 |
| Oct 14, 2025 | In progress issued May 2026 | 108 Chattanooga St | Tip Managers Inc | rear horiz. addition & infill @ 2nd & 3rd flrs; expansion of conditioned living space to 1st flr toliving space to the 1st flr to include guest/exercise rm & bath; reconfigure rear kitchen & dining areas & convert full bath to powder rm @ 2nd fl; renova & reconfigure 3rd flr bedrms & bath to add.Details
rear horiz. addition & infill @ 2nd & 3rd flrs; expansion of conditioned living space to 1st flr toliving space to the 1st flr to include guest/exercise rm & bath; reconfigure rear kitchen & dining areas & convert full bath to powder rm @ 2nd fl; renova & reconfigure 3rd flr bedrms & bath to add. | $300,000 |
| Oct 6, 2025 | Completed final sign-off Jan 2026 | 735 Haight St | Petru Construction Inc | change of use from retail to barbershop. limited ada upgrade of unisex restroom to include relocating restroom for full ada compliance and convert (e) restroom to an auxuilary washroom.Details
change of use from retail to barbershop. limited ada upgrade of unisex restroom to include relocating restroom for full ada compliance and convert (e) restroom to an auxuilary washroom. | $26,000 |
| Oct 6, 2025 | Completed final sign-off Feb 2026 | 4117 Cesar Chavez St | E. N. A Construction Inc. | rev to pa# 2023-0519-8161: to reflect structural rev for the sky light at the 3rd fl bath.Details
rev to pa# 2023-0519-8161: to reflect structural rev for the sky light at the 3rd fl bath. | $1,000 |
| Sep 8, 2025 | In progress issued Jun 2026 | 2660 California St | Tip Managers Inc | structural remodel (e) basement to create 512 sq. ft. conditioned living space to include a (n) exercise/play room and bath. reconfigure (e) stairs to basement, renovate and reconfigure (e) 1st floor kitchen area with (n) rear door opening and relocate powder room.Details
structural remodel (e) basement to create 512 sq. ft. conditioned living space to include a (n) exercise/play room and bath. reconfigure (e) stairs to basement, renovate and reconfigure (e) 1st floor kitchen area with (n) rear door opening and relocate powder room. | $125,000 |
| Sep 4, 2025 | In progress issued Sep 2025 | 431 Connecticut St | revision to pa # 2022-1115-6560. internal reconfiguration of unit b on 2nd fl with same number of rooms; reconfigured bath and stair to basement at unit a at 1st fl. no change to fixturesDetails
revision to pa # 2022-1115-6560. internal reconfiguration of unit b on 2nd fl with same number of rooms; reconfigured bath and stair to basement at unit a at 1st fl. no change to fixtures | ||
| Sep 4, 2025 | Completed final sign-off Jun 2026 | 1460 Waller St | Tip Managers Inc | the replacement of (e) rear decks and stair at second and third floors.Details
the replacement of (e) rear decks and stair at second and third floors. | $75,000 |
| Aug 21, 2025 | In progress filed Aug 2025, not yet issued | 2240 Bush St | expansion of conditioned living space from unit 2240 to the 1st floor to include a new bedroom, bath, & media room; opening the kitchen to the adjacent room with new internal stair connecting to the lower floor; a metal inkind stair replacement of the existing rear exterior wood stairs.Details
expansion of conditioned living space from unit 2240 to the 1st floor to include a new bedroom, bath, & media room; opening the kitchen to the adjacent room with new internal stair connecting to the lower floor; a metal inkind stair replacement of the existing rear exterior wood stairs. | $300,000 | |
| Aug 14, 2025 | Completed final sign-off Nov 2025 | 1029 Jackson St | Tip Managers Inc | to obtain final inspection for work approved under 202312112276 and 202406063913. all work is completeDetails
to obtain final inspection for work approved under 202312112276 and 202406063913. all work is complete | |
| Aug 4, 2025 | In progress issued Aug 2025 | 847 Haight St | Amador General Construction Inc | revision to pa# 202504043766, foundation from (e) brick to new concrete.Details
revision to pa# 202504043766, foundation from (e) brick to new concrete. | $30,000 |
| Jul 30, 2025 | In progress issued Aug 2025 | 3929 17th St | Affordable Construction | renovation of existing kitchen and renovation of powder room. replace kitchen window sand door to roof deckDetails
renovation of existing kitchen and renovation of powder room. replace kitchen window sand door to roof deck | $75,000 |
| Jul 28, 2025 | Completed final sign-off Nov 2025 | 1029 Jackson St | Tip Managers Inc | revision to pa #202406063913 omitting roof deck and basement door.Details
revision to pa #202406063913 omitting roof deck and basement door. | |
| Jun 10, 2025 | Completed final sign-off Nov 2025 | 1756 Union St | E. N. A Construction Inc. | revision to 202310279686. reconfigure meter cabinet location at 1st flDetails
revision to 202310279686. reconfigure meter cabinet location at 1st fl | $1,250 |
| Apr 4, 2025 | Completed final sign-off Dec 2025 | 2955 Jackson St | Aurora Builders | reconfiguration of the 3rd fl to create a new bedroom, relocate existing bath, renovate primary bath and renovate ground floor bathDetails
reconfiguration of the 3rd fl to create a new bedroom, relocate existing bath, renovate primary bath and renovate ground floor bath | $185,000 |
| Apr 4, 2025 | In progress issued Jul 2025 | 847 Haight St | scope of work includes the renovation and reconfiguration of kitchen and adjacent spaces and the reconfiguration of windows at the rear 2nd floorDetails
scope of work includes the renovation and reconfiguration of kitchen and adjacent spaces and the reconfiguration of windows at the rear 2nd floor | $50,000 | |
| Mar 27, 2025 | In progress issued May 2025 | 359 Lexington St | Continuum Construction | 1/fl- (n) bathroom and interior stairs for unit 361 to first floor. remodel and reconfig of (e) kitchen, livng and dining and bathroom area in unit 359. (n) window and door openings at rear elevation. replacmeent in kind of (e) exterior egress stairs, and reconfig 8 windows and doors at rear.Details
1/fl- (n) bathroom and interior stairs for unit 361 to first floor. remodel and reconfig of (e) kitchen, livng and dining and bathroom area in unit 359. (n) window and door openings at rear elevation. replacmeent in kind of (e) exterior egress stairs, and reconfig 8 windows and doors at rear. | $88,000 |
| Mar 26, 2025 | In progress issued Jul 2025 | 215 Missouri St | Gngc Builders Inc | rear horizontal addtion @ the 1st & 2nd floors consisting of a new primary bedroom with bath; reconfiguring the (e) ensuite bedroom; 2nd fl expansion with a new family room & new roof deck with spiral stair to rear yard and widening of (e) garage doorDetails
rear horizontal addtion @ the 1st & 2nd floors consisting of a new primary bedroom with bath; reconfiguring the (e) ensuite bedroom; 2nd fl expansion with a new family room & new roof deck with spiral stair to rear yard and widening of (e) garage door | $275,000 |
| Mar 12, 2025 | In progress issued Jun 2025 | 262 Lexington St | Blue Bend Construction Inc | alter-site 202006118457 (admininstrative permit) to conform to dbi reqs that (e) 2-unit building to retain r-3 occupancy after the addition of an adu. no change to the design or any other issued site permit documenation other than proposed buiding occupancy and unit count informaton on sheet a.Details
alter-site 202006118457 (admininstrative permit) to conform to dbi reqs that (e) 2-unit building to retain r-3 occupancy after the addition of an adu. no change to the design or any other issued site permit documenation other than proposed buiding occupancy and unit count informaton on sheet a. | |
| Mar 10, 2025 | In progress issued Jun 2025 | 1942 Leavenworth St | Maximo Construction | expansion of conditioned living space from the 2nd fl unit to the 1st fl. (n) bedroom, bathroom & laundry. (n) internal stair connecting to lower fl. at 2nd fl reconfigure & open the kitchen to adjacent living room & add (n) bathDetails
expansion of conditioned living space from the 2nd fl unit to the 1st fl. (n) bedroom, bathroom & laundry. (n) internal stair connecting to lower fl. at 2nd fl reconfigure & open the kitchen to adjacent living room & add (n) bath | $200,000 |
| Jan 23, 2025 | Completed final sign-off May 2025 | 2460 Sutter St | Gorman Construction | replacement in kind of front exterior stair treads and risers and the addition of new waterproof barrier below. door leaf replacement inkind of 2 sets of flush wood exterior doors withlites at ajdacent main entryDetails
replacement in kind of front exterior stair treads and risers and the addition of new waterproof barrier below. door leaf replacement inkind of 2 sets of flush wood exterior doors withlites at ajdacent main entry | $30,000 |
| Jan 7, 2025 | In progress issued Feb 2025 | 806 22nd St | De Jong Construction | the scope of work is to supplement the existing permit #201808137232 to add lighting to vacant commercial space.Details
the scope of work is to supplement the existing permit #201808137232 to add lighting to vacant commercial space. | $5,000 |
| Dec 24, 2024 | Expired or cancelled cancelled Jun 2025 | 2011 Filbert St | alter site pa 202101202957 per ab-032: revise to extend the proposed construction to front property line & eliminate previously shown front setback. adding 864 sq ft, previously noted 2 hr ext walls to 1 hr; reconfigure interior layout of units; revise ext elevation openings;Details
alter site pa 202101202957 per ab-032: revise to extend the proposed construction to front property line & eliminate previously shown front setback. adding 864 sq ft, previously noted 2 hr ext walls to 1 hr; reconfigure interior layout of units; revise ext elevation openings; | $60,000 | |
| Nov 7, 2024 | Completed final sign-off Jul 2026 | 26 Cervantes Bl | expansion of conditioned living space to the 1/f to include (n) family room, guest room, exercise/study & 2 bathrooms.Details
expansion of conditioned living space to the 1/f to include (n) family room, guest room, exercise/study & 2 bathrooms. | $250,000 | |
| Oct 9, 2024 | In progress issued Feb 2025 | 1408 Golden Gate Av | revision permit pa#: 202209122282 to reflect reduced scope of structure, work and reduced openings at living and dining area.Details
revision permit pa#: 202209122282 to reflect reduced scope of structure, work and reduced openings at living and dining area. | ||
| Sep 27, 2024 | Completed final sign-off Aug 2026 | 804 22nd St | Cary Wing Plumbing & Fire Protection Inc | revision to pa# 201808137232 to provide sprinklers as per nfpa 13. previously 13r to 13Details
revision to pa# 201808137232 to provide sprinklers as per nfpa 13. previously 13r to 13 | |
| Sep 16, 2024 | Completed final sign-off Jan 2025 | 3929 17th St | V N General Building Construction | scope of work includes the replacement of (e) windows at front facade and removal of (e) cement composition siding and restoration of original wood siding and trim. (n) 36 inc wood gate and fence at bottom of exterior stairs. no work at interior.Details
scope of work includes the replacement of (e) windows at front facade and removal of (e) cement composition siding and restoration of original wood siding and trim. (n) 36 inc wood gate and fence at bottom of exterior stairs. no work at interior. | $25,000 |
| Sep 10, 2024 | Expired or cancelled cancelled Nov 2024 | 359 Lexington St | (n)bath at 1st/f n) interior stairs at unit 361 to 1st/f. renovation & reconfiguration of e) kitchen/l10/& bath area at unit 359. n)window & door openings at rear elevation. in-kind replacement of e) rear exterior egress stair. new guardrail 2nd flDetails
(n)bath at 1st/f n) interior stairs at unit 361 to 1st/f. renovation & reconfiguration of e) kitchen/l10/& bath area at unit 359. n)window & door openings at rear elevation. in-kind replacement of e) rear exterior egress stair. new guardrail 2nd fl | $87,300 | |
| Jul 25, 2024 | Expired or cancelled withdrawn Sep 2025 | 107 Mendosa Av | renovation & reconfiguration of 2 (e) 3rd fl baths. 1 new window added at rearDetails
renovation & reconfiguration of 2 (e) 3rd fl baths. 1 new window added at rear | $75,000 | |
| Jul 2, 2024 | Completed final sign-off Jun 2025 | 4846 17th St | D3 Construction | renovation and reconfiguration of the existing kitchen at the 2nd floor, the removal of wall between kitchen and dining area and the replacement and reconfiguration of existing doors at the existing 2nd floor rear roof deck.Details
renovation and reconfiguration of the existing kitchen at the 2nd floor, the removal of wall between kitchen and dining area and the replacement and reconfiguration of existing doors at the existing 2nd floor rear roof deck. | $75,000 |
| Jun 6, 2024 | Expired or cancelled expired Nov 2025 | 1029 Jackson St | Tip Managers Inc | remodel unit 1029 to include reconfig 3 bedrooms, 2 bathrooms w/living room, dining room and kitchen areas. unit 1031 reconfig 4 bedrooms, 3 bathrooms, family, living, dining rooms and kitchen area. no exterior work. revision to pa 201112070243Details
remodel unit 1029 to include reconfig 3 bedrooms, 2 bathrooms w/living room, dining room and kitchen areas. unit 1031 reconfig 4 bedrooms, 3 bathrooms, family, living, dining rooms and kitchen area. no exterior work. revision to pa 201112070243 | $50,000 |
| Jun 5, 2024 | In progress issued Jul 2024 | 1042 Jackson St | to comply with nov# 202417913: comply with interanl audit: legalize windows: add platform: add garage door with main door.Details
to comply with nov# 202417913: comply with interanl audit: legalize windows: add platform: add garage door with main door. | $2,500 | |
| May 15, 2024 | Completed final sign-off Nov 2024 | 2610 Greenwich St | Ayala Builder's And Company Inc | revisioin to 202312223013 to reconfigure rear wall for enlarged opening. add shear wall to exist partition at basement per struct. dwg. (n) f.b window in rearDetails
revisioin to 202312223013 to reconfigure rear wall for enlarged opening. add shear wall to exist partition at basement per struct. dwg. (n) f.b window in rear | $1,000 |
| May 2, 2024 | Completed final sign-off Aug 2025 | 1969 08th Av | revision permit to pa# 202111152327: to reflect as built conditions of garage roof with overhanging eaves.Details
revision permit to pa# 202111152327: to reflect as built conditions of garage roof with overhanging eaves. | ||
| Apr 24, 2024 | In progress issued Jun 2024 | 2486 22nd Av | D3 Construction | renovate and reconfigure of kitchen and bedrm areas; remodel (e) bathroom & add additional bath and new door to rear yard at the 2nd fl; new interior stair case between levels. legalize two full baths at first flr. replace 13 windows in kindDetails
renovate and reconfigure of kitchen and bedrm areas; remodel (e) bathroom & add additional bath and new door to rear yard at the 2nd fl; new interior stair case between levels. legalize two full baths at first flr. replace 13 windows in kind | $250,000 |
| Apr 9, 2024 | In progress filed Apr 2024, not yet issued | 305 Divisadero St | application for technical infeasability for the abe #201812283571 for installation of a power door operator to the business entry for compliance with the mandatory disablity access improvement program.Details
application for technical infeasability for the abe #201812283571 for installation of a power door operator to the business entry for compliance with the mandatory disablity access improvement program. | $1,500 | |
| Mar 14, 2024 | Completed final sign-off Mar 2024 | 3238 Sacramento St | change of occupancy at the 1st fl. convert existing commercial space into a family/media room as an extension of the single family residential use at the upper two floors. no construction proposed.Details
change of occupancy at the 1st fl. convert existing commercial space into a family/media room as an extension of the single family residential use at the upper two floors. no construction proposed. | ||
| Mar 14, 2024 | Completed final sign-off Nov 2025 | 1756 Union St | E. N. A Construction Inc. | revision to permit 202310279686. structural framing revisions based on existing conditions. removal of existing masonry fireplace at front (3 levels). all interior work.Details
revision to permit 202310279686. structural framing revisions based on existing conditions. removal of existing masonry fireplace at front (3 levels). all interior work. | $1,000 |
| Jan 3, 2024 | Completed final sign-off Feb 2025 | 719 Spruce St | Alfa Building Solutions Inc | convert 1/f of unit #1 into a new adu utilizing the ca. state adu program per gov. code sec. 65852.2; adu will have (n) kitchen, living-eating area, sleeping alcove & bath. unit will retain (e) windows & (e) sep. electric heat source. note: this work is in addition to approved pa# 202310108258Details
convert 1/f of unit #1 into a new adu utilizing the ca. state adu program per gov. code sec. 65852.2; adu will have (n) kitchen, living-eating area, sleeping alcove & bath. unit will retain (e) windows & (e) sep. electric heat source. note: this work is in addition to approved pa# 202310108258 | $5,000 |
| Dec 22, 2023 | In progress filed Dec 2023, not yet issued | 1914 Lawton St | application for approval of equivalent facilitation request abe# 202208313642. installation of power door operator to business entry for compliance w/ mandatory disability access programDetails
application for approval of equivalent facilitation request abe# 202208313642. installation of power door operator to business entry for compliance w/ mandatory disability access program | $3,500 | |
| Dec 22, 2023 | In progress filed Dec 2023, not yet issued | 924 Valencia St | installation of power door operator to this business entry for compliance with the mandatory disability access improvement program. abe #202002061813.Details
installation of power door operator to this business entry for compliance with the mandatory disability access improvement program. abe #202002061813. | $3,500 | |
| Dec 22, 2023 | In progress filed Dec 2023, not yet issued | 920 Valencia St | installation of power door operator to this business entry for compliance with the mandatory disability access improvement program. abe #202002192103.Details
installation of power door operator to this business entry for compliance with the mandatory disability access improvement program. abe #202002192103. | $3,500 | |
| Dec 1, 2023 | In progress filed Dec 2023, not yet issued | 2714 San Bruno Av | to comply with accessible business entrance program ord. 51-16. ref abe 202001241267. technical infeasability request and installation of a power door operator to the business entry.Details
to comply with accessible business entrance program ord. 51-16. ref abe 202001241267. technical infeasability request and installation of a power door operator to the business entry. | $2,500 | |
| Nov 30, 2023 | Completed final sign-off Feb 2024 | 2261 16th Av | Robert Hauser Construction | construct small 30 sqft deck in place of side stairs not visable from the street revision to pa# 202310178853Details
construct small 30 sqft deck in place of side stairs not visable from the street revision to pa# 202310178853 | |
| Oct 27, 2023 | Completed final sign-off Nov 2025 | 1756 Union St | E. N. A Construction Inc. | 3/f unit 1758: reconfigure kithcen & dining areas, adding 2nd bath for primary bedrm, suite & new laundry area; 2/f unit 1756: remodel kitchen area and the addition of 2nd bath; unit 1754: a infill area at 1/f level under an existing 2nd flr rm to add new unconditioned laundry area.Details
3/f unit 1758: reconfigure kithcen & dining areas, adding 2nd bath for primary bedrm, suite & new laundry area; 2/f unit 1756: remodel kitchen area and the addition of 2nd bath; unit 1754: a infill area at 1/f level under an existing 2nd flr rm to add new unconditioned laundry area. | $275,000 |
| Oct 27, 2023 | Completed final sign-off Jul 2025 | 3615 Sacramento St | technical infeasibility for abe# 201806260756. scope of work is installation of power door operator to the business entry for compliance with mandatory disability access improvement program.Details
technical infeasibility for abe# 201806260756. scope of work is installation of power door operator to the business entry for compliance with mandatory disability access improvement program. | $2,000 | |
| Oct 20, 2023 | Completed final sign-off Feb 2024 | 85 Manor Dr | Valex Construction | reconfiguration of (e) 3/f bathroom w/addition of tub/toiletDetails
reconfiguration of (e) 3/f bathroom w/addition of tub/toilet | $28,000 |
| Oct 13, 2023 | In progress filed Oct 2023, not yet issued | 4039 Balboa St | comply with abe 202310108859. the scope of work is the installation of a power door operator to the business entry for compliances with the mandatory disability access improvement program.Details
comply with abe 202310108859. the scope of work is the installation of a power door operator to the business entry for compliances with the mandatory disability access improvement program. | $2,000 | |
| Oct 10, 2023 | Completed final sign-off Feb 2024 | 719 Spruce St | Alfa Building Solutions Inc | removal of existing spiral stairs at unit#1 connecting the 1st & 2nd flrs. the existing unit#1 area at the 1st flr will remain as a separate media room and be maintained as a part of unit#1.Details
removal of existing spiral stairs at unit#1 connecting the 1st & 2nd flrs. the existing unit#1 area at the 1st flr will remain as a separate media room and be maintained as a part of unit#1. | $2,000 |
| Oct 10, 2023 | In progress filed Oct 2023, not yet issued | 2133 Union St | application for technical infeasibility for the abe 202002182087. the scope of work is the installation of a power door operator to the business entry for compliance with the mandatory disability access improvement program.Details
application for technical infeasibility for the abe 202002182087. the scope of work is the installation of a power door operator to the business entry for compliance with the mandatory disability access improvement program. | $2,000 | |
| Sep 29, 2023 | Never finaled filed Sep 2023, never issued | 4031 Balboa St | to comply with accessible business entrance program per ordinance 51-16. install power door operator to business entry for compliance with the mandatory disable access improvement program. abe# 201912099548.Details
to comply with accessible business entrance program per ordinance 51-16. install power door operator to business entry for compliance with the mandatory disable access improvement program. abe# 201912099548. | $2,000 | |
| Sep 29, 2023 | Completed final sign-off Aug 2024 | 2139 18th Av | Gorman Construction | include the additionof a new bath within existing unfinished 1st fl and new partition separating existing garage from existing rear storage areaDetails
include the additionof a new bath within existing unfinished 1st fl and new partition separating existing garage from existing rear storage area | $25,000 |
| Sep 20, 2023 | Completed final sign-off Nov 2023 | 3692 Folsom St | revision to pa 202209082100 includes updated t-24 calculationsDetails
revision to pa 202209082100 includes updated t-24 calculations | ||
| Sep 14, 2023 | Never finaled filed Sep 2023, never issued | 841 Webster St | legalize & convert( e) undocumented rear dwelling unit into an adu utilizing ca. state adu program as per government code section 65852.2; consisting of two bedrooms with bath, kitchen, living/eating area.no work at front structureDetails
legalize & convert( e) undocumented rear dwelling unit into an adu utilizing ca. state adu program as per government code section 65852.2; consisting of two bedrooms with bath, kitchen, living/eating area.no work at front structure | $50,000 | |
| Sep 11, 2023 | Completed final sign-off May 2026 | 735 Haight St | to comply with abe program per ord 51-16. abe 202002142045. application for technical infeasibility. installation of power door operator to the business entry for compliance w/ mandatory disability access improvement programDetails
to comply with abe program per ord 51-16. abe 202002142045. application for technical infeasibility. installation of power door operator to the business entry for compliance w/ mandatory disability access improvement program | $2,000 | |
| Aug 15, 2023 | In progress issued May 2025 | 2610 Greenwich St | Ayala Builder's And Company Inc | new adu @(e)basement as per oridnance #95-17 as per gov'mt code section 65852.2 for state.mandated adu program & infilling space @ the rear of the basement level under (e)1st fl habitable space.(n)adu will contain lving/dining sleeping,kitchen & (1)bathDetails
new adu @(e)basement as per oridnance #95-17 as per gov'mt code section 65852.2 for state.mandated adu program & infilling space @ the rear of the basement level under (e)1st fl habitable space.(n)adu will contain lving/dining sleeping,kitchen & (1)bath | $75,000 |
| Jul 26, 2023 | Never finaled filed Jul 2023, never issued | 1253 Guerrero St | replacement in kind of ront porch stairs as required, match all existing materials and architectural details. stair will not affect public right of way.Details
replacement in kind of ront porch stairs as required, match all existing materials and architectural details. stair will not affect public right of way. | $20,000 | |
| Jul 17, 2023 | Never finaled issued Aug 2023, no final | 259 Divisadero St | replace of (e) garage door at basement #259.Details
replace of (e) garage door at basement #259. | $10,000 | |
| Jul 12, 2023 | Completed final sign-off Jun 2024 | 812 Steiner St | repair of existing wood siding in-kind at existing dormer at the south sideDetails
repair of existing wood siding in-kind at existing dormer at the south side | $1,000 | |
| Jun 23, 2023 | Completed final sign-off Aug 2023 | 968 Page St | revision to pa 2022-0526-5085 as per building inspectors directions to document as built conditions at kitchen and bathDetails
revision to pa 2022-0526-5085 as per building inspectors directions to document as built conditions at kitchen and bath | ||
| Jun 20, 2023 | Completed final sign-off Jun 2023 | 115 Hearst Av | scope of work is for documentation purpose only to establish legal use as 4 unit, r-2 occupancy. the determination is based on a review of city records and a site visit. no work under this permit.Details
scope of work is for documentation purpose only to establish legal use as 4 unit, r-2 occupancy. the determination is based on a review of city records and a site visit. no work under this permit. | ||
| Jun 14, 2023 | Expired or cancelled expired Jul 2026 | 530 Divisadero St | application for technician infeasibility for abe # 201812283568. intall a power foor operator to business entry with mandatory disability access improvement program 51-16Details
application for technician infeasibility for abe # 201812283568. intall a power foor operator to business entry with mandatory disability access improvement program 51-16 | $2,000 | |
| Jun 6, 2023 | Expired or cancelled expired Jul 2026 | 339 Divisadero St | to comply with accessible business entrance program, technical infeasibility/equivalent facilitation ord 51-16. abe#201812283567. install power door operator to entry for compliance w/the mandatory disability access improvement programDetails
to comply with accessible business entrance program, technical infeasibility/equivalent facilitation ord 51-16. abe#201812283567. install power door operator to entry for compliance w/the mandatory disability access improvement program | $2,000 | |
| May 22, 2023 | Completed final sign-off Nov 2023 | 859 35th Av | Prime Construction & Renovation Inc. | addition of new bathroom @ (e) study/guestroom @ 3/fDetails
addition of new bathroom @ (e) study/guestroom @ 3/f | $25,000 |
| May 19, 2023 | Expired or cancelled expired Feb 2026 | 4117 Cesar Chavez St | renovations of kitchen and existing bathroom.Details
renovations of kitchen and existing bathroom. | $75,000 | |
| May 2, 2023 | Never finaled filed May 2023, never issued | 169 Bernard St | (e) 2-story building modified to 3-story non-elevator building consisting of (1) residential unit, built-in garage, privately funded.Details
(e) 2-story building modified to 3-story non-elevator building consisting of (1) residential unit, built-in garage, privately funded. | $1,290,000 | |
| May 2, 2023 | Never finaled filed May 2023, never issued | 1270 Pacific Av | erect a 4-story, type 3a, residential building with 2 units, buil-in garage.Details
erect a 4-story, type 3a, residential building with 2 units, buil-in garage. | $1,800,000 | |
| Apr 28, 2023 | Completed final sign-off Oct 2024 | 550 Teresita Bl | Brendan J Uniacke Construction | expansion of conditioned living space to the 1st fl w/new interior stair, new bedrm, family rm & study; renovation & reconfiguration of kitchen, dining & bathrm; addition of a (n) primary bath and the enclosure of the interior lightwells @ 2nd flDetails
expansion of conditioned living space to the 1st fl w/new interior stair, new bedrm, family rm & study; renovation & reconfiguration of kitchen, dining & bathrm; addition of a (n) primary bath and the enclosure of the interior lightwells @ 2nd fl | $300,000 |
| Apr 27, 2023 | Completed final sign-off Sep 2023 | 2327 Bay St | Consolidated Construction Inc | revision to pa 2022-0912-2298 includes the widening of the existing interior doorway openings at kitchen, living and dining roomDetails
revision to pa 2022-0912-2298 includes the widening of the existing interior doorway openings at kitchen, living and dining room | $2,500 |
| Apr 27, 2023 | Completed final sign-off Nov 2023 | 3692 Folsom St | Td Builder Llc | revision to pa# 202209082100 & 202208100281, incl the removal of dryrot as required at south & west elevation, stucco finish to match extg, extg wood siding to be removed at rear and be replaced w/ new stucco finish to match south side. reduce sliding door opening at level 1, window changes on southDetails
revision to pa# 202209082100 & 202208100281, incl the removal of dryrot as required at south & west elevation, stucco finish to match extg, extg wood siding to be removed at rear and be replaced w/ new stucco finish to match south side. reduce sliding door opening at level 1, window changes on south | $1,000 |
| Mar 31, 2023 | Completed final sign-off Jul 2025 | 706 Vermont St | Caliber Carpentry Inc | rev to pa# 202002184616 s2, conversion of the green roof to an occupied roof deck.Details
rev to pa# 202002184616 s2, conversion of the green roof to an occupied roof deck. | |
| Feb 2, 2023 | Completed final sign-off Feb 2023 | 1338 17th Av | for documentation purpose, the legal use of this building is a 2 unit r-3 occupancy building. the determination is based on a review of city records and a site visit. no work under this permit.Details
for documentation purpose, the legal use of this building is a 2 unit r-3 occupancy building. the determination is based on a review of city records and a site visit. no work under this permit. | ||
| Jan 13, 2023 | Expired or cancelled cancelled Jan 2026 | 22 Shotwell St | the scope of work is the installation of a power door operator to the business entry for compliance with the mandatory disability access improvement program. abe #202002111991.Details
the scope of work is the installation of a power door operator to the business entry for compliance with the mandatory disability access improvement program. abe #202002111991. | $2,000 | |
| Jan 13, 2023 | Expired or cancelled cancelled Jan 2026 | 3095 21st St | application for technical infeasibility due to constrainsts of three exterior stairs at the entry way. a new power door operator will be installed at the existing entrance to supplement the existing conditions. abe #201902054913.Details
application for technical infeasibility due to constrainsts of three exterior stairs at the entry way. a new power door operator will be installed at the existing entrance to supplement the existing conditions. abe #201902054913. | $2,000 |