Block 1052, lot 009
2460 Sutter St
- City’s use
- Commercial Misc
- Built
- 1911
- Stories
- 3
- Units
- 1
- Rooms
- 8 bathrooms
- Building
- 37,020 sq ft
- Lot
- 11,582 sq ft
- Zoning
- NC3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
14 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 23, 2025 | Completed final sign-off May 2025 | 2460 Sutter St | Gorman Construction | replacement in kind of front exterior stair treads and risers and the addition of new waterproof barrier below. door leaf replacement inkind of 2 sets of flush wood exterior doors withlites at ajdacent main entryDetails
replacement in kind of front exterior stair treads and risers and the addition of new waterproof barrier below. door leaf replacement inkind of 2 sets of flush wood exterior doors withlites at ajdacent main entry | $30,000 |
| Jan 7, 2020 | Never finaled issued Jan 2020, no final | 2450 Sutter St | street space & sidewalk repairDetails
street space & sidewalk repair | ||
| May 21, 2019 | Never finaled issued May 2019, no final | 2450 Sutter St | streetspaceDetails
streetspace | ||
| Apr 25, 2019 | Completed final sign-off Sep 2019 | 2450 Sutter St | Gorman Construction | remove e maple gym flooring damaged by water/moisture, install a new vapor barrier over e structural slab, install a new topping/leveling slab to protect the waterproofing membrane and to achieve a 1/8" in 10' "level" tolerance required for installation of a new modular polyproplene floor byDetails
remove e maple gym flooring damaged by water/moisture, install a new vapor barrier over e structural slab, install a new topping/leveling slab to protect the waterproofing membrane and to achieve a 1/8" in 10' "level" tolerance required for installation of a new modular polyproplene floor by | $60,000 |
| Feb 19, 2013 | Never finaled issued Feb 2013, no final | 2450 Sutter St | street spaceDetails
street space | ||
| Jun 5, 2012 | Never finaled issued Jul 2012, no final | 2450 Sutter St | Sf Gonzalez Concrete Inc. | replace topping slab at sidewalk. no structural work. waterproof & replace topping slab.Details
replace topping slab at sidewalk. no structural work. waterproof & replace topping slab. | $5,000 |
| Jul 6, 2011 | Completed final sign-off Nov 2011 | 2450 Sutter St | Build Group Inc. | shoring & underpining for new construction on adjacent property at 2420 sutter st.Details
shoring & underpining for new construction on adjacent property at 2420 sutter st. | $160,000 |
| Apr 14, 2009 | Never finaled issued Apr 2009, no final | 2460 Sutter St | Exxell Corp. Dba Exxell Fire Systems | ul300 upgrade of fire suppression system.Details
ul300 upgrade of fire suppression system. | $4,000 |
| Jan 28, 2009 | Completed final sign-off Feb 2009 | 2450 Sutter St | remove door & sidelight between lobby & vestibule, on 2nd fl, new grab bar in men's room. 200008077095 modified.Details
remove door & sidelight between lobby & vestibule, on 2nd fl, new grab bar in men's room. 200008077095 modified. | $200 | |
| Nov 28, 2007 | Expired or cancelled cancelled Dec 2011 | 2450 Sutter St | shoring & underpinning as a result of adjacent new construction @2420 sutter street. bpn # 2007/0330/7721sDetails
shoring & underpinning as a result of adjacent new construction @2420 sutter street. bpn # 2007/0330/7721s | $200,000 | |
| Feb 2, 2001 | Completed final sign-off Apr 2001 | 2450 Sutter St | A-1 Steam & Fire Protection | install fire system to kitchen hoodDetails
install fire system to kitchen hood | $1,600 |
| Dec 12, 2000 | Completed final sign-off Jan 2001 | 2450 Sutter St | provide fire alarm sys per app#200008077095Details
provide fire alarm sys per app#200008077095 | $4,000 | |
| Nov 14, 2000 | Completed final sign-off Jun 2001 | 2450 Sutter St | provide new range hood & duct to roof in existing rated shaft, location of hood is basement kitchenDetails
provide new range hood & duct to roof in existing rated shaft, location of hood is basement kitchen | $12,000 | |
| Aug 7, 2000 | Completed final sign-off Jan 2001 | 2450 Sutter St | convert 2 rooms to day care occupancy (no construction)Details
convert 2 rooms to day care occupancy (no construction) |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Gorman Construction (2), A-1 Steam & Fire Protection, Build Group Inc., Exxell Corp. Dba Exxell Fire Systems, Sf Gonzalez Concrete Inc.
- Architects
- Harvey J Hacker, Mark Topetcher
- Authorized agent-otherss
- Harvey Hacker
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.