Emmet Mc Mahon
- Listed as
- authorized agent-others, contractor
- Firm
- Mcmahon Construction
- Based in
- San Francisco
- On San Francisco permits
- Apr 2009 to Sep 2026
172 permits since 2000 (contractor on 172 permits, authorized agent-others on 1 permit): 127 completed, 12 in progress, 28 never finaled, 5 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. Their ranked record as a contractor is on their contractor page. How to read these records
Worked with
Every other licensed party on the 100 most recent of their permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Dijeau Poage Construction Inc. (3), Alder Construction (2), Etna Enterprises, M N Construction, S A Baxter Inc., Sandquist Construction
- Architects
- Ernie Selander (12), Allan Fox (5), Gisela Schmoll (2), Brian Milford, James Treman, Jason Chan, Lee Shea, Marissa Brandon, Mike Hom, Patrick Mora, Troy Kashanipour, Wright Sherman
- Engineers
- Mike Hom (4), Michael Hom (2), Victor Ramos (2), Abraham Lynn, Andrew Arnold, Chen Jefferson Jie, Chuck Voong, Derrick Roorda, Engin Yagmur, Lawrence Wong, Lisa Tse, Rodrigo Santos
- Authorized agents
- Bryan Fox (2), Marissa Brandon (2)
Where they worked
- Single-family 64
- Multi-family (2-family, apartments) 33
- Commercial 1
- Other or unknown 2
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
Showing the 100 most recent of 172.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 25, 2026 | In progress issued Nov 2026 | 24 Presidio Av | Mcmahon Construction | recommencement and completion of work approved under pa# 202210184614Details
recommencement and completion of work approved under pa# 202210184614 | $35,000 |
| Sep 10, 2026 | In progress issued Sep 2026 | 24 Presidio Av | Mcmahon Construction | unit 24: remove kitchen countertop & replace, paint kitchen cabinets, refinish upper floor hardwood floors & stairs, install new can lighting & switches, patch a finish drywall, paint entire unit, no structural work or removing walls.Details
unit 24: remove kitchen countertop & replace, paint kitchen cabinets, refinish upper floor hardwood floors & stairs, install new can lighting & switches, patch a finish drywall, paint entire unit, no structural work or removing walls. | $170,000 |
| May 8, 2026 | In progress issued Jun 2026 | 370 Lexington St | Mcmahon Construction | pursuant to planning approval 2025-002290prj, front facade improvements, demolition of (e) rear horizontal addition, replacement with (n) rear horizontal addition inluding (n) bedroom, (n) bath, (n) laundry room.Details
pursuant to planning approval 2025-002290prj, front facade improvements, demolition of (e) rear horizontal addition, replacement with (n) rear horizontal addition inluding (n) bedroom, (n) bath, (n) laundry room. | $80,000 |
| May 1, 2026 | Completed final sign-off Nov 2026 | 2221 Scott St | Mcmahon Construction | remodel (e) attic bathroom in kind. new plumbing fixtures, tile in (e) locations. (attic bathroom previously permitted under pa# 254499, dated 08/30/1961. approx 50 sq ft.Details
remodel (e) attic bathroom in kind. new plumbing fixtures, tile in (e) locations. (attic bathroom previously permitted under pa# 254499, dated 08/30/1961. approx 50 sq ft. | $15,000 |
| Feb 25, 2026 | In progress issued Feb 2026 | 160 05th Av | Mcmahon Construction | remove & replace countertop in kitchen, install new hardwood floor at entryway & refinish (e), new paint on both interior level. no structural work.Details
remove & replace countertop in kitchen, install new hardwood floor at entryway & refinish (e), new paint on both interior level. no structural work. | $80,400 |
| Jan 23, 2026 | Completed final sign-off Aug 2026 | 2019 Green St | Mcmahon Construction | demo fixtures and finishes in 2 existing bathrooms. install new fixtures and finishes in 2 existing bathrooms. fixtures to be replace to current locations. no structural work. demo kitchen countertops and backsplash and replace . all in kindDetails
demo fixtures and finishes in 2 existing bathrooms. install new fixtures and finishes in 2 existing bathrooms. fixtures to be replace to current locations. no structural work. demo kitchen countertops and backsplash and replace . all in kind | $166,000 |
| Dec 12, 2025 | Completed final sign-off Nov 2026 | 2221 Scott St | Mcmahon Construction | 1. add bedroom to playroom at level 1, nonstructural partions. 2. remodel level 1 laundry room and new cabinets at basement mudroom.Details
1. add bedroom to playroom at level 1, nonstructural partions. 2. remodel level 1 laundry room and new cabinets at basement mudroom. | $25,000 |
| Oct 28, 2025 | In progress issued Oct 2025 | 233 Parker Av | Mcmahon Construction | replace 3 windows at the front of the building, 5 windows and 2 door units at the rear of the building. repair stucco and paint in kind. same material (aluminum) and operation. all windows and doors to be replaced in kind in the existing openings.Details
replace 3 windows at the front of the building, 5 windows and 2 door units at the rear of the building. repair stucco and paint in kind. same material (aluminum) and operation. all windows and doors to be replaced in kind in the existing openings. | $50,000 |
| Sep 30, 2025 | In progress issued Sep 2025 | 636 Hyde St | Mcmahon Construction | unit #201: remodel bathroom: partial demo on drywall, remove and replace, remove all finishes. install tile flooring, new plumbing fixture, and paint. remodel in-kind.Details
unit #201: remodel bathroom: partial demo on drywall, remove and replace, remove all finishes. install tile flooring, new plumbing fixture, and paint. remodel in-kind. | $28,221 |
| Sep 23, 2025 | In progress issued Sep 2025 | 70 Saint Marys Av | Alder Construction, Mcmahon Construction | revision to pa # 2024-0829-9696. change window material vinyl. replace rear foundation at existing house. remove redundant foundation at passageway.Details
revision to pa # 2024-0829-9696. change window material vinyl. replace rear foundation at existing house. remove redundant foundation at passageway. | $10,000 |
| Jul 31, 2025 | In progress issued Aug 2025 | 100 Judah St | Mcmahon Construction | maintain existing detached garage, widen garage door, and repair existing roof as needed, new siding, and doors. new fenceDetails
maintain existing detached garage, widen garage door, and repair existing roof as needed, new siding, and doors. new fence | $55,000 |
| Apr 9, 2025 | In progress issued Apr 2025 | 233 Parker Av | Mcmahon Construction | to comply with nov# 202428823: do repairs in units 203, 204, 303, 304, & 400 due to fire damage. repairs kitchen and bathrooms in-kind.Details
to comply with nov# 202428823: do repairs in units 203, 204, 303, 304, & 400 due to fire damage. repairs kitchen and bathrooms in-kind. | $250,000 |
| Jan 30, 2025 | In progress issued Jan 2025 | 135 Cerritos Av | Mcmahon Construction | remove drywall and insluation from primary bathroom ceiling, remove deck tile above to expose roofing membrane make neccessary repairs to stop leak. install (n) drywall, insulation, and paint ceiling. not visible from street.Details
remove drywall and insluation from primary bathroom ceiling, remove deck tile above to expose roofing membrane make neccessary repairs to stop leak. install (n) drywall, insulation, and paint ceiling. not visible from street. | $15,000 |
| Oct 9, 2024 | Completed final sign-off Aug 2025 | 1466 07th Av | Mcmahon Construction | revision to 202206236955. reduced scope at proposed adu. existing kitchen to remain existing mudroom and closet to remain. existing windows to remain. no structural changes.Details
revision to 202206236955. reduced scope at proposed adu. existing kitchen to remain existing mudroom and closet to remain. existing windows to remain. no structural changes. | |
| Sep 25, 2024 | In progress issued Jun 2025 | 70 St Marys Av | Alder Construction, Mcmahon Construction | ab1114: horizontal addition to add second residential unit at front of lot. remodel of (e) cottage kitchen, add entry room to cottage. raise portions of roof of (e) cottage. new connecting corridor between residential units.Details
ab1114: horizontal addition to add second residential unit at front of lot. remodel of (e) cottage kitchen, add entry room to cottage. raise portions of roof of (e) cottage. new connecting corridor between residential units. | $250,000 |
| Jul 30, 2024 | Completed final sign-off Apr 2026 | 100 Judah St | Mcmahon Construction | revision to pa 202403077342 1st fl demo & rebuild sun room & utility rooms; revise location of originally proposed powder roomDetails
revision to pa 202403077342 1st fl demo & rebuild sun room & utility rooms; revise location of originally proposed powder room | $10,000 |
| Apr 3, 2024 | Completed final sign-off Feb 2025 | 840 Lake St | Mcmahon Construction | unit 3 - remodel bathroom, new kitchen countertops, tile backsplash and drawer/door fronts. refinish hardwood floors and paint unit interior. all in kindDetails
unit 3 - remodel bathroom, new kitchen countertops, tile backsplash and drawer/door fronts. refinish hardwood floors and paint unit interior. all in kind | $130,000 |
| Mar 27, 2024 | Completed final sign-off Jan 2025 | 184 Aptos Av | Mcmahon Construction | remodel (e) kitchen & pantry area. replace kitchen window & rear facing pantry window with new exterior door w an opening protective device to prevent door from opening. opening to lead onto deck under sep permit 202405061498Details
remodel (e) kitchen & pantry area. replace kitchen window & rear facing pantry window with new exterior door w an opening protective device to prevent door from opening. opening to lead onto deck under sep permit 202405061498 | $100,000 |
| Mar 11, 2024 | Completed final sign-off Apr 2024 | 540 El Camino Del Mar | Mcmahon Construction | remove kitchen countertops & install new tops, 2 new kitchen sinks & faucets, refinish hardwood floors on 2nd level, paint kitchen, playroom cabinets, landing and 2 bedrooms. all work in kitchen is replace in like kind.Details
remove kitchen countertops & install new tops, 2 new kitchen sinks & faucets, refinish hardwood floors on 2nd level, paint kitchen, playroom cabinets, landing and 2 bedrooms. all work in kitchen is replace in like kind. | $100,000 |
| Mar 7, 2024 | Completed final sign-off Apr 2026 | 100 Judah St | Mcmahon Construction | expansion and remodel of basement: new powder room, gym, storage, mech room & laundry closet. 1 nw window, 1st floor kitchen remodel, demo & rebuild of extg sunrm & utility rooms, new powder room & pantry. 1 nw window. 2nd fl: remodel, 2 nw full bathrooms, 3rd fl remodel: 2 nw full baths & laundryDetails
expansion and remodel of basement: new powder room, gym, storage, mech room & laundry closet. 1 nw window, 1st floor kitchen remodel, demo & rebuild of extg sunrm & utility rooms, new powder room & pantry. 1 nw window. 2nd fl: remodel, 2 nw full bathrooms, 3rd fl remodel: 2 nw full baths & laundry | $450,000 |
| Feb 14, 2024 | In progress issued Feb 2024 | 883 42nd Av | Mcmahon Construction | in-kind remodeling of 1 bathroom(s) in basement with 0 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in basement with 0 shower pan(s). | $11,000 |
| Jan 31, 2024 | Completed final sign-off Mar 2024 | 724 Lyon St | Mcmahon Construction | remove drywall & trim on south & east walls of the rear laundry room to check for leak. repair leak & repair in kind. no structural work. no exterior work. all sheet rock 5/8" type xDetails
remove drywall & trim on south & east walls of the rear laundry room to check for leak. repair leak & repair in kind. no structural work. no exterior work. all sheet rock 5/8" type x | $10,000 |
| Jan 11, 2024 | Completed final sign-off May 2024 | 2123 33rd Av | Mcmahon Construction | in-kind remodeling of 1 kitchen(s) in 1st flDetails
in-kind remodeling of 1 kitchen(s) in 1st fl | $59,600 |
| Dec 21, 2023 | Completed final sign-off Oct 2024 | 257 Brentwood Av | Mcmahon Construction | interior remodel at 2nd floor - remodel kitchen, pantry, and powder room. exterior - replace kitchen window (not street facing-rear).Details
interior remodel at 2nd floor - remodel kitchen, pantry, and powder room. exterior - replace kitchen window (not street facing-rear). | $60,000 |
| Sep 22, 2023 | Completed final sign-off Oct 2023 | 120 Arguello Bl | Mcmahon Construction | remove approx 30 sf of deck boards on the top floor rear deck to check for leaks, reapir in kind. repair approax 6 sf of drywall in 2 bedrooms, patch and paint.Details
remove approx 30 sf of deck boards on the top floor rear deck to check for leaks, reapir in kind. repair approax 6 sf of drywall in 2 bedrooms, patch and paint. | $5,800 |
| Aug 29, 2023 | Completed final sign-off Oct 2023 | 480 Fillmore St | Mcmahon Construction | unit #3: remove 2 sliding door units at the rear deck (top floor), install new waterproofing and door pans, reinstall doors andtrims. paint to match existing.Details
unit #3: remove 2 sliding door units at the rear deck (top floor), install new waterproofing and door pans, reinstall doors andtrims. paint to match existing. | $10,000 |
| Jul 25, 2023 | Completed final sign-off Jan 2024 | 1766 44th Av | Mcmahon Construction | replace (2) front windows in (e) openings, windows will be aluminum clad, remove approx 50 sq. ft. of stucco to check for water damage, repair patches & paint. max u-factor 0.30.Details
replace (2) front windows in (e) openings, windows will be aluminum clad, remove approx 50 sq. ft. of stucco to check for water damage, repair patches & paint. max u-factor 0.30. | $25,000 |
| Jul 25, 2023 | Never finaled issued Jul 2023, no final | 200 Seacliff Av | Mcmahon Construction, Dijeau Poage Construction Inc. | remodel basement bathroom, new sheetrock, tile, plumbing fixtures, light fixtures, paint. new hardwood floors, doors, trim & tile bathroom on top level, patch sheetrock and paint. no new fixtures added. all work in kind.Details
remodel basement bathroom, new sheetrock, tile, plumbing fixtures, light fixtures, paint. new hardwood floors, doors, trim & tile bathroom on top level, patch sheetrock and paint. no new fixtures added. all work in kind. | $150,000 |
| May 16, 2023 | Completed final sign-off Sep 2023 | 1253 Guerrero St | Mcmahon Construction | repair leak at rear 3rd floor deck, remove finishes and waterproofing on deck, approx 3 rows at siding, install 2 nd floor , repair in kind, no structural workDetails
repair leak at rear 3rd floor deck, remove finishes and waterproofing on deck, approx 3 rows at siding, install 2 nd floor , repair in kind, no structural work | $50,000 |
| Apr 21, 2023 | Completed final sign-off Nov 2023 | 131 San Aleso Av | Mcmahon Construction | add insolation, dry wall & trim to basement front room & paint.Details
add insolation, dry wall & trim to basement front room & paint. | $5,000 |
| Apr 10, 2023 | Completed final sign-off Feb 2024 | 601 Fell St | Mcmahon Construction | water damage repair and resolution of nov 202171894. remove and replace damaged drywall, insulation, finishes, etc. reconfigure flr plan at 3/f bathroom. replace damaged electrical wiring to panel. replace (e) plumbing fixtures. remove (e) wooden portion of fence to meet 3' max height.Details
water damage repair and resolution of nov 202171894. remove and replace damaged drywall, insulation, finishes, etc. reconfigure flr plan at 3/f bathroom. replace damaged electrical wiring to panel. replace (e) plumbing fixtures. remove (e) wooden portion of fence to meet 3' max height. | $211,000 |
| Mar 24, 2023 | Completed final sign-off Nov 2023 | 131 San Aleso Av | Mcmahon Construction | remove approx 70 sq ft of stucco to check for water damage, repair & paint to match (e) in material, texture & finish. exploratory demo. patch in kind afterDetails
remove approx 70 sq ft of stucco to check for water damage, repair & paint to match (e) in material, texture & finish. exploratory demo. patch in kind after | $22,000 |
| Mar 8, 2023 | Completed final sign-off Apr 2024 | 883 42nd Av | Mcmahon Construction | remove 8 sashes at front and replace in-kind. remove 2 sashes and 1 picture window from top flr bathroom located at side of house. apply finish paint after window and sash installation. picture window replaced is same size and location.Details
remove 8 sashes at front and replace in-kind. remove 2 sashes and 1 picture window from top flr bathroom located at side of house. apply finish paint after window and sash installation. picture window replaced is same size and location. | $43,000 |
| Feb 3, 2023 | Never finaled issued Feb 2023, no final | 611 02nd Av | Mcmahon Construction | repair walls and celing in kitchen area due to leak in roof install new tile back splash refinish kitchen hardwood floor install new under cab lights, paint.Details
repair walls and celing in kitchen area due to leak in roof install new tile back splash refinish kitchen hardwood floor install new under cab lights, paint. | $20,000 |
| Feb 1, 2023 | Never finaled issued Feb 2023, no final | 200 Seacliff Av | Mcmahon Construction, Dijeau Poage Construction Inc. | remove partial ceiling drywall, wall sheetrock, finish flooring & baseboard, repair in-kind on 1/f & 2/f due to water damage. no structural work.Details
remove partial ceiling drywall, wall sheetrock, finish flooring & baseboard, repair in-kind on 1/f & 2/f due to water damage. no structural work. | $50,000 |
| Sep 23, 2022 | Completed final sign-off Sep 2023 | 1336 Shrader St | Mcmahon Construction | replace rear deck and stairs in kind.Details
replace rear deck and stairs in kind. | $25,000 |
| Jul 19, 2022 | Never finaled issued Jul 2022, no final | 6 Seacliff Av | Mcmahon Construction | remove approx 100 sf of oak flooring in living room, repair subfloor, reinstall new oak flooring and finish. paint walls and ceiling. repair 2 stets of dbl doors at courtyard and paint.Details
remove approx 100 sf of oak flooring in living room, repair subfloor, reinstall new oak flooring and finish. paint walls and ceiling. repair 2 stets of dbl doors at courtyard and paint. | $35,000 |
| Jun 23, 2022 | Completed final sign-off Aug 2025 | 1466 07th Av | Mcmahon Construction | addition of one adu unit at the ground level per the state adu program. the project also proposes a new sliding door and windows, interior renovations, a new adu entrance next to the garage and conversion of the mudroom to closet space.Details
addition of one adu unit at the ground level per the state adu program. the project also proposes a new sliding door and windows, interior renovations, a new adu entrance next to the garage and conversion of the mudroom to closet space. | $195,370 |
| May 25, 2022 | Never finaled issued May 2022, no final | 200 Seacliff Av | Mcmahon Construction, Dijeau Poage Construction Inc. | remodel exisitng top floor primary bathroom, strip walls (less than 50% repair), ceiling and floor to sub strate. new electrical, plumbing, drywall, tile, trim and paint. (no work)Details
remodel exisitng top floor primary bathroom, strip walls (less than 50% repair), ceiling and floor to sub strate. new electrical, plumbing, drywall, tile, trim and paint. (no work) | $60,000 |
| Mar 25, 2022 | Completed final sign-off Sep 2022 | 1642 44th Av | Mcmahon Construction | replace interior doors, change light fixtures, refinish floors, paint interior of house- clean bathroom tile and tubs.Details
replace interior doors, change light fixtures, refinish floors, paint interior of house- clean bathroom tile and tubs. | $15,000 |
| Mar 17, 2022 | Completed final sign-off Apr 2024 | 254 28th Av | S A Baxter Inc., Mcmahon Construction | remodel 1 (e) bathroom. remodle and remove wall at ktichen.rebuild interal stair to g/f . excavate at g/f to add new conditioned living space, including media room, new full bathroom and new bedroom. replace furnace.Details
remodel 1 (e) bathroom. remodle and remove wall at ktichen.rebuild interal stair to g/f . excavate at g/f to add new conditioned living space, including media room, new full bathroom and new bedroom. replace furnace. | $300,000 |
| Mar 11, 2022 | Never finaled issued Mar 2022, no final | 630 27th Av | Mcmahon Construction | remove approx 70 sqft of stucco from the front of the house and repair sheathing, repair stucco and paint.Details
remove approx 70 sqft of stucco from the front of the house and repair sheathing, repair stucco and paint. | $6,000 |
| Dec 9, 2021 | Completed final sign-off Oct 2022 | 563 19th Av | Mcmahon Construction | remove vinyl siding on the south rear of the bldg,repair existing siding(redwood) patchpaint.Details
remove vinyl siding on the south rear of the bldg,repair existing siding(redwood) patchpaint. | $4,000 |
| Nov 23, 2021 | Completed final sign-off Feb 2023 | 30 Santa Rita Av | Mcmahon Construction | remove approx 40sf of stuco from se corner of the house and repair sheating repair stucco inkind and paint.Details
remove approx 40sf of stuco from se corner of the house and repair sheating repair stucco inkind and paint. | $5,000 |
| Oct 8, 2021 | Completed final sign-off Sep 2022 | 1741 16th Av | Mcmahon Construction | remove finishes in one primarty bathroom down to the studs & substrate. install new finishes, plumbing, fixtures and faucets. no walls to be removed or modified. no strutural work.Details
remove finishes in one primarty bathroom down to the studs & substrate. install new finishes, plumbing, fixtures and faucets. no walls to be removed or modified. no strutural work. | $80,000 |
| Sep 29, 2021 | Never finaled issued Feb 2022, no final | 634 27th Av | Mcmahon Construction | interior remodel. 1/f: replace stairs, develop habitable area, new bathroom, half bath, guest bedroom, family room and 2 storage. 2/f: remodel kitchen relocate half bath. 3/f: add new bathroom, upgrade (e) bath, fixtures and finishes. relocate master closet.Details
interior remodel. 1/f: replace stairs, develop habitable area, new bathroom, half bath, guest bedroom, family room and 2 storage. 2/f: remodel kitchen relocate half bath. 3/f: add new bathroom, upgrade (e) bath, fixtures and finishes. relocate master closet. | $425,000 |
| Aug 24, 2021 | Never finaled issued Aug 2021, no final | 245 Hartford St | Mcmahon Construction | remove extg brick fire place facade. repair wall and drywall, patch hardwood floor and refinish. install baseboard, paint bath rooms and closet.Details
remove extg brick fire place facade. repair wall and drywall, patch hardwood floor and refinish. install baseboard, paint bath rooms and closet. | $50,000 |
| Aug 3, 2021 | Completed final sign-off Sep 2022 | 559 19th Av | Mcmahon Construction | interior remodel proposed at top floor of 3 story building. involves removing finishes and reconfiguring interior wallsDetails
interior remodel proposed at top floor of 3 story building. involves removing finishes and reconfiguring interior walls | $50,000 |
| May 26, 2021 | Completed final sign-off Oct 2022 | 4021 Mission St | Mcmahon Construction | remodel bath on 2nd floor. convert 1st floor space to living space containing bedroom. replace wood siding at rear wall.Details
remodel bath on 2nd floor. convert 1st floor space to living space containing bedroom. replace wood siding at rear wall. | $75,000 |
| Apr 6, 2021 | Completed final sign-off Mar 2023 | 23 Alta St | Mcmahon Construction | 3rd flr: remove abandoned chimney. reconfigure windows and sliders. add new window at property line.Details
3rd flr: remove abandoned chimney. reconfigure windows and sliders. add new window at property line. | $45,000 |
| Feb 5, 2021 | Completed final sign-off Jul 2023 | 2361 Bryant St | Mcmahon Construction | interior remodels on 2/f & 3/f: remodel kitchens, remove wall between ktichen & living room; remodel bathrooms add 3/4 bathrooms. new skylights.Details
interior remodels on 2/f & 3/f: remodel kitchens, remove wall between ktichen & living room; remodel bathrooms add 3/4 bathrooms. new skylights. | $75,000 |
| Oct 17, 2020 | Expired or cancelled cancelled Jan 2026 | 247 Hartford St | Mcmahon Construction | remove (e) fireplace in office, build new closet nd install 2 new doors, new drywall patch work, refinish floor, paint.Details
remove (e) fireplace in office, build new closet nd install 2 new doors, new drywall patch work, refinish floor, paint. | $38,000 |
| Oct 15, 2020 | Completed final sign-off Aug 2021 | 12 25th North Av | Mcmahon Construction | remove stucco and damaged sheathing on the north east side of the house. make repairs and replace in kind. (no structural work)Details
remove stucco and damaged sheathing on the north east side of the house. make repairs and replace in kind. (no structural work) | $18,000 |
| Sep 24, 2020 | Completed final sign-off May 2021 | 254 Day St | Mcmahon Construction | remodel kitchen, new door in front, countertops & paint. add new light fixtures, new cabinets in the living room, family room, wine room, and gym. add new tile to kitchen backsplash and foyer room. paint interior and exterior of the house.Details
remodel kitchen, new door in front, countertops & paint. add new light fixtures, new cabinets in the living room, family room, wine room, and gym. add new tile to kitchen backsplash and foyer room. paint interior and exterior of the house. | $150,000 |
| Sep 17, 2020 | Never finaled issued Sep 2020, no final | 630 27th Av | Mcmahon Construction | install new kitchen cabinets, counter tops, hardwood floors, appliances, plumbing fixtures and paint. all work in kind.Details
install new kitchen cabinets, counter tops, hardwood floors, appliances, plumbing fixtures and paint. all work in kind. | $40,000 |
| Sep 17, 2020 | Completed final sign-off Apr 2021 | 2236 15th St | Mcmahon Construction | install new kitchen cabinets, counter tops, hardwood floors, appliances, plumbing fixrures and paint. all work in kind.Details
install new kitchen cabinets, counter tops, hardwood floors, appliances, plumbing fixrures and paint. all work in kind. | $60,000 |
| Jun 19, 2020 | Completed final sign-off May 2023 | 725 Florida St | Mcmahon Construction | unit 2 e aka #10 - remodel two existing bathrooms & kitchen like for like. paint entire unit. the downstairs bathroom is approximately 10¿ x 8¿ on the upstairs bathroom is approximately 8¿ 6¿ x 8¿. no plans. must comply with sffc sec 1103.7.6.1 fire alarm under sep permit.Details
unit 2 e aka #10 - remodel two existing bathrooms & kitchen like for like. paint entire unit. the downstairs bathroom is approximately 10¿ x 8¿ on the upstairs bathroom is approximately 8¿ 6¿ x 8¿. no plans. must comply with sffc sec 1103.7.6.1 fire alarm under sep permit. | $300,000 |
| Jun 12, 2020 | Expired or cancelled withdrawn Jun 2020 | 245 Hartford St | Mcmahon Construction | frame new closet in existing bedroom, install doors, drywall, interior trim, patch. refinish hardwood floors and paintDetails
frame new closet in existing bedroom, install doors, drywall, interior trim, patch. refinish hardwood floors and paint | $35,000 |
| Jun 11, 2020 | Never finaled issued Jun 2020, no final | 1655 38th Av | Mcmahon Construction | move approximately 20 sq ft of water damaged stucco/sheathing at the front top window. repair water damaged sheathing/stucco and paint to match original facadeDetails
move approximately 20 sq ft of water damaged stucco/sheathing at the front top window. repair water damaged sheathing/stucco and paint to match original facade | $6,000 |
| Jun 10, 2020 | Never finaled issued Jun 2020, no final | 257 Brentwood Av | Mcmahon Construction | remove ground covering at partial front and side of house. add drainage and repair in kindDetails
remove ground covering at partial front and side of house. add drainage and repair in kind | $15,000 |
| Feb 25, 2020 | Completed final sign-off Oct 2020 | 200 Seacliff Av | Mcmahon Construction | remove approx 200sf of stucco at the rear of the building, check for water damage, make necessary repairs, apply new stucco. no structurak work included.Details
remove approx 200sf of stucco at the rear of the building, check for water damage, make necessary repairs, apply new stucco. no structurak work included. | $25,000 |
| Jan 30, 2020 | Completed final sign-off Nov 2021 | 1940 Webster St | Mcmahon Construction | remove approx. 8 paint grade balusters at the side of the house and porch ceiling, replace in kind and paint.Details
remove approx. 8 paint grade balusters at the side of the house and porch ceiling, replace in kind and paint. | $15,000 |
| Jan 21, 2020 | Completed final sign-off May 2020 | 538 29th St | Mcmahon Construction | kitchen remodel at main floor, infill at family room, at rearDetails
kitchen remodel at main floor, infill at family room, at rear | $45,000 |
| Jan 16, 2020 | Never finaled issued Jan 2020, no final | 6439 California St | Mcmahon Construction | revision to pa 2018-0503-8117 add stemwall to existing footingDetails
revision to pa 2018-0503-8117 add stemwall to existing footing | $3,000 |
| Dec 24, 2019 | Completed final sign-off Apr 2022 | 131 San Aleso Av | Mcmahon Construction | remove 3 vinyl windows from the front and side of the house. install and paint 3 new all wood windows. 2 double hung windows close to garage and 2 upper corner windows.Details
remove 3 vinyl windows from the front and side of the house. install and paint 3 new all wood windows. 2 double hung windows close to garage and 2 upper corner windows. | $10,000 |
| Dec 13, 2019 | Completed final sign-off Jun 2020 | 93 Stanyan St | Mcmahon Construction | replace 4 windows not visible to street. in kind same size & location. max u-factor 0.32 or better.Details
replace 4 windows not visible to street. in kind same size & location. max u-factor 0.32 or better. | $6,000 |
| Oct 31, 2019 | Completed final sign-off Apr 2022 | 131 San Aleso Av | Mcmahon Construction | remove approx. 80 sf of stucco to check for water damage, repair and paint to match existing in material, texture, and finish. exploratory demo only.Details
remove approx. 80 sf of stucco to check for water damage, repair and paint to match existing in material, texture, and finish. exploratory demo only. | $5,000 |
| Oct 31, 2019 | Completed final sign-off Oct 2021 | 70 Commonwealth Av | Mcmahon Construction | counter tops and appliances. install new kitchen cabinets, counter tops and paint interior of kitchen. install new under cabinet lights. no structural work to be performedDetails
counter tops and appliances. install new kitchen cabinets, counter tops and paint interior of kitchen. install new under cabinet lights. no structural work to be performed | $50,000 |
| Aug 6, 2019 | Never finaled issued Aug 2019, no final | 2122 48th Av | Mcmahon Construction | remove & replace approx 80 sf of redwood siding at the rear side of the house, prime & paint.Details
remove & replace approx 80 sf of redwood siding at the rear side of the house, prime & paint. | $5,000 |
| Jun 3, 2019 | Completed final sign-off Feb 2020 | 930 Anza St | Mcmahon Construction | replace and enlarge deck at rearDetails
replace and enlarge deck at rear | $5,000 |
| Mar 12, 2019 | Completed final sign-off Sep 2019 | 1741 16th Av | Mcmahon Construction | revision to pa #201706270468, rmeove sistering of new footing scope.Details
revision to pa #201706270468, rmeove sistering of new footing scope. | |
| Feb 14, 2019 | Completed final sign-off Dec 2021 | 1253 Guerrero St | Mcmahon Construction | rev to pa# 201708114619; change crawl space at rear to slab on grade. repace (e) interior brick foundation with (n) foundationDetails
rev to pa# 201708114619; change crawl space at rear to slab on grade. repace (e) interior brick foundation with (n) foundation | $10,000 |
| Jan 24, 2019 | Completed final sign-off Oct 2020 | 2409 Scott St | Etna Enterprises, Mcmahon Construction | unit #1: remodel existing bathroom, add a powder room with washer & dryer.Details
unit #1: remodel existing bathroom, add a powder room with washer & dryer. | $25,000 |
| Oct 30, 2018 | Completed final sign-off Jan 2019 | 3324 Octavia St | Mcmahon Construction | #3 - refinish(e) hardwood floors, install new tile backsplashDetails
#3 - refinish(e) hardwood floors, install new tile backsplash | $10,000 |
| Oct 30, 2018 | Completed final sign-off Mar 2019 | 146 02nd Av | Mcmahon Construction | install new counter tops, back splash, refinish floors, install washer and dryer and kitchen appliances.Details
install new counter tops, back splash, refinish floors, install washer and dryer and kitchen appliances. | $50,000 |
| Oct 18, 2018 | Completed final sign-off Jan 2020 | 1443 Francisco St | Mcmahon Construction | 3rd floor: relocate kitchen, remodel bathroom, and add new bathroom.Details
3rd floor: relocate kitchen, remodel bathroom, and add new bathroom. | $46,000 |
| Sep 27, 2018 | Completed final sign-off Nov 2018 | 12 25th North Av | Mcmahon Construction | rev to pa# 201611042014; field revision to landscape retaining walls at rear yardDetails
rev to pa# 201611042014; field revision to landscape retaining walls at rear yard | |
| Sep 11, 2018 | Completed final sign-off May 2019 | 30 Rockaway Av | Mcmahon Construction | remodel kitchen on 2nd fl. new cabinets, hardwood floors, plumbing fixtures, tile, countertops, electrical, paint. no structural work. everything in same location. no moving of doors or walls.Details
remodel kitchen on 2nd fl. new cabinets, hardwood floors, plumbing fixtures, tile, countertops, electrical, paint. no structural work. everything in same location. no moving of doors or walls. | $35,000 |
| Aug 14, 2018 | Completed final sign-off Sep 2019 | 257 Brentwood Av | Mcmahon Construction | remodel basement: rebuild the stairs between basement and first floor. add bedroom, bath, and living spaceDetails
remodel basement: rebuild the stairs between basement and first floor. add bedroom, bath, and living space | $45,000 |
| Jun 21, 2018 | Completed final sign-off Jul 2018 | 81 Ashbury Tr | Mcmahon Construction | revision to 201512225753 to include electrical to be performed, no plumbing, additional step at gr fl entry pathway, removal of benches at roof deckDetails
revision to 201512225753 to include electrical to be performed, no plumbing, additional step at gr fl entry pathway, removal of benches at roof deck | |
| Jun 5, 2018 | Completed final sign-off Dec 2018 | 3236 Sacramento St | Mcmahon Construction | revision to 201805098619 create a new bathroom at second flrDetails
revision to 201805098619 create a new bathroom at second flr | $10,000 |
| May 9, 2018 | Completed final sign-off Jul 2018 | 3236 Sacramento St | Mcmahon Construction | remodel 3 bathrooms on 2/f. change tile, plumbing fiturs, shower doors, vaniies and paint. no structural work to be completed. no walls to be moved.size approx 8x8, 6x6,12x16, lighting per cenc 150.0(k).Details
remodel 3 bathrooms on 2/f. change tile, plumbing fiturs, shower doors, vaniies and paint. no structural work to be completed. no walls to be moved.size approx 8x8, 6x6,12x16, lighting per cenc 150.0(k). | $45,000 |
| Apr 23, 2018 | Completed final sign-off Jul 2019 | 1330 11th Av | Mcmahon Construction | 2016-01-28-8264 s1; fire sprinkler & equipments to be 13 at garage and 13r throughout the rest of the building.Details
2016-01-28-8264 s1; fire sprinkler & equipments to be 13 at garage and 13r throughout the rest of the building. | |
| Mar 1, 2018 | Completed final sign-off Nov 2018 | 2215 Lake St | Sandquist Construction, Mcmahon Construction | remodel 2 bathrooms at 3rd floor; lightwell infill at 3/f; 2 new skylights.Details
remodel 2 bathrooms at 3rd floor; lightwell infill at 3/f; 2 new skylights. | $20,000 |
| Aug 11, 2017 | Completed final sign-off Dec 2021 | 1253 Guerrero St | Mcmahon Construction | reary yard addition. 2 story tall for remodel kitchen & new deck.Details
reary yard addition. 2 story tall for remodel kitchen & new deck. | $180,000 |
| Jul 25, 2017 | Completed final sign-off Feb 2018 | 23 Alta St | Mcmahon Construction | new bedroom, add (n) en suite bath on 2/f, (n) partition wall at guest bedroom closet. (n) desk in guest bedroom & (n) pemko drop seal door at guest bedroom. (n) shelving in new bedroom.Details
new bedroom, add (n) en suite bath on 2/f, (n) partition wall at guest bedroom closet. (n) desk in guest bedroom & (n) pemko drop seal door at guest bedroom. (n) shelving in new bedroom. | $30,000 |
| Jul 6, 2017 | Completed final sign-off Sep 2017 | 386 30th Av | Mcmahon Construction | remove and replace stucco at front approx 200 sq. ft, like for like, no removal of character defining features, repaintingDetails
remove and replace stucco at front approx 200 sq. ft, like for like, no removal of character defining features, repainting | $15,000 |
| Jun 27, 2017 | Completed final sign-off Sep 2019 | 1741 16th Av | Mcmahon Construction | addition of new unit on 1st floor. no exterior changes based on state law. to complete the unit a kitchen will be added.Details
addition of new unit on 1st floor. no exterior changes based on state law. to complete the unit a kitchen will be added. | $10,000 |
| Jun 14, 2017 | Completed final sign-off Jul 2018 | 190 Seacliff Av | Mcmahon Construction | renovate 2 existing master bathrooms. new finishes throughout both bathrooms. no structural workDetails
renovate 2 existing master bathrooms. new finishes throughout both bathrooms. no structural work | $80,000 |
| Jun 14, 2017 | Never finaled issued Jun 2017, no final | 5 Downey St | Mcmahon Construction | remodel (e) kitchen, new hardwood floors throughout. new paint throughout, new double marvin doors at exterior of kitchen, change window at kitchen, new finishesDetails
remodel (e) kitchen, new hardwood floors throughout. new paint throughout, new double marvin doors at exterior of kitchen, change window at kitchen, new finishes | $80,000 |
| May 23, 2017 | Completed final sign-off Feb 2018 | 39 Delmar St | Mcmahon Construction | remodel bathroom and laundry area within new plumbing fixtures, new drywall, new tile, new interior doors & trim, paint area that have been remodeled. no structural work.Details
remodel bathroom and laundry area within new plumbing fixtures, new drywall, new tile, new interior doors & trim, paint area that have been remodeled. no structural work. | $52,000 |
| Apr 18, 2017 | Completed final sign-off Sep 2017 | 234 Gates St | Mcmahon Construction | renovate existing full bath and install new full bath at 2nd flDetails
renovate existing full bath and install new full bath at 2nd fl | $40,000 |
| Apr 5, 2017 | Completed final sign-off May 2017 | 2201 Sacramento St | Mcmahon Construction | unit 304: remove (e) lathe & plaster from livingroom ceiling, install 5/8" drywall, complete to a level 4 finish.Details
unit 304: remove (e) lathe & plaster from livingroom ceiling, install 5/8" drywall, complete to a level 4 finish. | $8,000 |
| Mar 23, 2017 | Completed final sign-off Mar 2018 | 722 31st Av | Mcmahon Construction | reconfigure habitable space & stair @ (e) 1st floor including a bedroom, bath, powder room, family room, laundry & storage area. add new skylight.Details
reconfigure habitable space & stair @ (e) 1st floor including a bedroom, bath, powder room, family room, laundry & storage area. add new skylight. | $91,000 |
| Mar 8, 2017 | Completed final sign-off Nov 2017 | 210 Magellan Av | Mcmahon Construction | remodel master bathroom, 1 new fixture, faucets, cabinets, tile, stone and paint. replace kitchen cabinets and new tile, re-finish 1st floor hardwood floors. new cabinets in dining room. paint interior of house. no structural work.Details
remodel master bathroom, 1 new fixture, faucets, cabinets, tile, stone and paint. replace kitchen cabinets and new tile, re-finish 1st floor hardwood floors. new cabinets in dining room. paint interior of house. no structural work. | $60,000 |
| Feb 24, 2017 | Expired or cancelled expired Mar 2026 | 315 Mississippi St | Mcmahon Construction, M N Construction | interior remodel of kitchen & bath in single family home, no new square footage, new windows & french door in remodeled rooms only, structural repair in crawl spaceDetails
interior remodel of kitchen & bath in single family home, no new square footage, new windows & french door in remodeled rooms only, structural repair in crawl space | $75,000 |
| Jan 26, 2017 | Completed final sign-off Oct 2017 | 159 Monterey Bl | Mcmahon Construction | remodel (e) kitchen - demo cabinets and floor finish, install new cabinets, countertops, hardwood floor, plumbing fixtures and appliances to same location. tile and paint. no structural to be performed.Details
remodel (e) kitchen - demo cabinets and floor finish, install new cabinets, countertops, hardwood floor, plumbing fixtures and appliances to same location. tile and paint. no structural to be performed. | $35,000 |
| Nov 10, 2016 | Expired or cancelled cancelled Feb 2020 | 113 Gates St | Mcmahon Construction | replce stair, deck & landing at rear of building, route with var 2015009598 (kimberly durandet)Details
replce stair, deck & landing at rear of building, route with var 2015009598 (kimberly durandet) | $8,000 |
| Nov 10, 2016 | Never finaled issued Nov 2016, no final | 524 27th Av | Mcmahon Construction | remodel existing bathroom(1) - remove existing finishes & fixtures, install new drywall, tile, trim, plumbing fixtures & faucets and paint. no walls to be moved and no structural to be performed.Details
remodel existing bathroom(1) - remove existing finishes & fixtures, install new drywall, tile, trim, plumbing fixtures & faucets and paint. no walls to be moved and no structural to be performed. | $30,000 |
| Nov 4, 2016 | Completed final sign-off Nov 2018 | 12 25th North Av | Mcmahon Construction | site retaining wall replacement along east proptery line approx 80' in lengthDetails
site retaining wall replacement along east proptery line approx 80' in length | $30,000 |