Jeffrey Graham
- Listed as
- architect, authorized agent-others, pmt consultant/expediter
- Firm
- Graham Architects
- Based in
- San Francisco
- On San Francisco permits
- Oct 2004 to Jan 2026
82 permits since 2000 (architect on 80 permits, authorized agent-others on 1 permit, pmt consultant/expediter on 1 permit): 63 completed, 6 in progress, 7 never finaled, 6 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 15, 2026 | In progress issued Jan 2026 | 1596 Post St | Cal C A D E Construction Inc | rev 202405091826: structural field revisions; window replacement at (e) openings.Details
rev 202405091826: structural field revisions; window replacement at (e) openings. | |
| Jul 8, 2025 | Completed final sign-off Nov 2025 | 3103 Clay St | L H Construction | interior ground flr only, non-structural residential improvment. add bedroom on ground level, (n) window for bedroom and library. (n) bedroom and bathroom doors. total area for (n) conditional space: 129 sqft. no new plumbing fixtures. no work in pulbic right of way.Details
interior ground flr only, non-structural residential improvment. add bedroom on ground level, (n) window for bedroom and library. (n) bedroom and bathroom doors. total area for (n) conditional space: 129 sqft. no new plumbing fixtures. no work in pulbic right of way. | $75,000 |
| Jun 2, 2025 | In progress issued Aug 2025 | 3575 Clay St | The Toboni Group | rev 202411265790: revise framing at new dormer, rmove framing for previously proposed chimney and beam & retianing wall revisions.Details
rev 202411265790: revise framing at new dormer, rmove framing for previously proposed chimney and beam & retianing wall revisions. | |
| May 21, 2025 | In progress issued Jun 2025 | 3621 Clay St | The Toboni Group | add (n) in ground soaking pool 8' x 8' in rear yard. pool equipment on 2nd circuit pump equipment next to the houseDetails
add (n) in ground soaking pool 8' x 8' in rear yard. pool equipment on 2nd circuit pump equipment next to the house | $8,000 |
| Dec 24, 2024 | In progress issued May 2025 | 3575 Clay St | The Toboni Group | new dormer. fill in 56 sq ft on level 1. demo e construct new partitons, structural and non structural . excavate basement and add new rooms. removel and add new baths and kitchen. new lighting and electrical.Details
new dormer. fill in 56 sq ft on level 1. demo e construct new partitons, structural and non structural . excavate basement and add new rooms. removel and add new baths and kitchen. new lighting and electrical. | $850,000 |
| May 16, 2024 | In progress issued May 2024 | 3621 Clay St | The Toboni Group | revision to previously approved bpa #202211287189. add new 8' dormer on east side of house. no changesd to mep. no work in prowDetails
revision to previously approved bpa #202211287189. add new 8' dormer on east side of house. no changesd to mep. no work in prow | $10,000 |
| Apr 24, 2024 | Completed final sign-off Jun 2025 | 55 Loraine Ct | Custom Construction Enterprises | interior remodel w/ fl reconfiguraton at both lvls. replace windows, n) electrical, appliances & fixtures. voluntary seismic upgrade of lower lvl. no work in public row, convert lvl 1 study to bedroom, expand e) bath,expansion of 495 sf within bldg envelope.mamorialize rooms down at ground level 938Details
interior remodel w/ fl reconfiguraton at both lvls. replace windows, n) electrical, appliances & fixtures. voluntary seismic upgrade of lower lvl. no work in public row, convert lvl 1 study to bedroom, expand e) bath,expansion of 495 sf within bldg envelope.mamorialize rooms down at ground level 938 | $345,000 |
| Mar 1, 2024 | In progress issued Mar 2024 | 3621 Clay St | The Toboni Group | revision to 202211287187 to correct foundation for adu located at rear of property. changes at facade, roof and ceiling framing, footing detail. no work in public right of way,no mep, or fixture count changechanges @ facade roof framing/ceiling framing , footing detailDetails
revision to 202211287187 to correct foundation for adu located at rear of property. changes at facade, roof and ceiling framing, footing detail. no work in public right of way,no mep, or fixture count changechanges @ facade roof framing/ceiling framing , footing detail | $10,000 |
| Dec 6, 2023 | Completed final sign-off Jan 2024 | 2090 Pacific Av | Cairn Construction | #503: add new stackable washer and dryer in entry closet. dryer will be an electric, ductless dryer. the water supply and the drain will be conected to the adjacent bathroom's plumbing. no structural work and no exterior work.Details
#503: add new stackable washer and dryer in entry closet. dryer will be an electric, ductless dryer. the water supply and the drain will be conected to the adjacent bathroom's plumbing. no structural work and no exterior work. | $3,500 |
| Mar 27, 2023 | Completed final sign-off Jul 2024 | 4085 26th St | revision to pa 2020-0925-5001 close off garage from living space with wall and remove planned doorDetails
revision to pa 2020-0925-5001 close off garage from living space with wall and remove planned door | ||
| Nov 28, 2022 | Never finaled issued Sep 2023, no final | 3621 Clay St | The Toboni Group | main sfr building - interior: excavation at level 1 to 9'6", wall reconfigurations, (n) kitchen, baths, electrical, lighting and radiant heating system. exterior: add 12' wide garage door. (n) dormer. gable roof, deck at level 2 & 4. (n) siding, wood clad windows, doors.(n) roof, colums & entry doorDetails
main sfr building - interior: excavation at level 1 to 9'6", wall reconfigurations, (n) kitchen, baths, electrical, lighting and radiant heating system. exterior: add 12' wide garage door. (n) dormer. gable roof, deck at level 2 & 4. (n) siding, wood clad windows, doors.(n) roof, colums & entry door | $2,400,000 |
| Nov 28, 2022 | Never finaled issued Sep 2023, no final | 3621 Clay St | The Toboni Group | existing detached carport to be converted to new adu under state program government code 65852.2. enclose shed, (n) siding, windows, doors, kitchen, bath, skylight, finishes and fixtures.Details
existing detached carport to be converted to new adu under state program government code 65852.2. enclose shed, (n) siding, windows, doors, kitchen, bath, skylight, finishes and fixtures. | $200,000 |
| Feb 14, 2022 | Completed final sign-off Sep 2023 | 3311 Jackson St | Cairn Construction | revision to pa# 202110070019. interior only scope of work: lower grade in (e) crawl space to provide mep and storage. add laundry room to garage. move rear stair from garage to back yard to avoid established tree. no woork in pro w.Details
revision to pa# 202110070019. interior only scope of work: lower grade in (e) crawl space to provide mep and storage. add laundry room to garage. move rear stair from garage to back yard to avoid established tree. no woork in pro w. | $20,000 |
| Jun 17, 2021 | Completed final sign-off Nov 2022 | 3103 Clay St | Cairn Construction | revision to pa 2020-1006-5947, 2020-1209-0663 and 2021-01293685 voluntary lateral strengthening onlyDetails
revision to pa 2020-1006-5947, 2020-1209-0663 and 2021-01293685 voluntary lateral strengthening only | $55,000 |
| Jan 29, 2021 | Completed final sign-off Nov 2022 | 3103 Clay St | Cairn Construction | remove (e) deteriorated siding & trim on sides & rear of home & replace inkind.r/r in-kind deteriorating windows.front windows will be wood, side & rear wood w/ metal cladding.1/2in sheer plywood & waterproof membrane.fitness room added to lower level.skylights to foyer & pantry. no facade,prow.Details
remove (e) deteriorated siding & trim on sides & rear of home & replace inkind.r/r in-kind deteriorating windows.front windows will be wood, side & rear wood w/ metal cladding.1/2in sheer plywood & waterproof membrane.fitness room added to lower level.skylights to foyer & pantry. no facade,prow. | $120,000 |
| Dec 9, 2020 | Completed final sign-off Nov 2022 | 3103 Clay St | Cairn Construction | revision to pa# 202010065947. floor plan change to upper floor kitchen & main bath & bedroom structural work to reflect changes. interior only.Details
revision to pa# 202010065947. floor plan change to upper floor kitchen & main bath & bedroom structural work to reflect changes. interior only. | $5,000 |
| Oct 13, 2020 | Completed final sign-off Jul 2024 | 4085 26th St | Michael E Miranda General Contractor | level one - excavate to gain more ceiling height (7' to 8'), add bathroom, bedroom, den, and laundry room.level two - new stair down to backyardDetails
level one - excavate to gain more ceiling height (7' to 8'), add bathroom, bedroom, den, and laundry room.level two - new stair down to backyard | $150,000 |
| Oct 6, 2020 | Completed final sign-off Nov 2022 | 3103 Clay St | Cairn Construction | residential improvement: replace in kind front stairs, kitchen, and two bathroom remodels. new plumbing and new electrical. widen interior stairway. no work outside property line or in public right of way. legalize 664 sq feet of habitable space on ground floor.Details
residential improvement: replace in kind front stairs, kitchen, and two bathroom remodels. new plumbing and new electrical. widen interior stairway. no work outside property line or in public right of way. legalize 664 sq feet of habitable space on ground floor. | $650,000 |
| Aug 28, 2020 | Completed final sign-off Sep 2022 | 3103 Clay St | Cairn Construction | remodel upper level bathroom, replace in-kind, no structural, no walls moved.Details
remodel upper level bathroom, replace in-kind, no structural, no walls moved. | $25,000 |
| Mar 6, 2020 | Completed final sign-off Jan 2021 | 755 14th Av | Harte Building & Design Inc. | bathroom remodel. new plumbing fixtures and tile. convert bathtub to shower. reconfigure closet next to bathroom.Details
bathroom remodel. new plumbing fixtures and tile. convert bathtub to shower. reconfigure closet next to bathroom. | $16,000 |
| Jun 13, 2019 | Expired or cancelled cancelled Aug 2022 | 1060 Church St | level 1- no work. level 2 - add exterior spiral stair at rear of house from backyard to upper deck. level 3 - add office on top of existing rear deck. add closet on top of existng side deck. maher n/a.Details
level 1- no work. level 2 - add exterior spiral stair at rear of house from backyard to upper deck. level 3 - add office on top of existing rear deck. add closet on top of existng side deck. maher n/a. | $95,000 | |
| Feb 14, 2019 | Completed final sign-off Feb 2020 | 3415 Pacific Av | Cairn Construction | new roof deck. level 2, new stair from level 2 to roof with retractable skylight. roof new walkway from stair to new roof deckDetails
new roof deck. level 2, new stair from level 2 to roof with retractable skylight. roof new walkway from stair to new roof deck | $150,000 |
| Oct 31, 2018 | Completed final sign-off Feb 2020 | 3415 Pacific Av | Cairn Construction | basement level-fill in crawl space under the dining rm. and area under exterior deck with concrete slan on grade above. add light well to fitness rm. level 1- new concrete slab at dining rm. with new wood flooring, new concrete slab at exterior deck, sloped to drain with stone pavers,Details
basement level-fill in crawl space under the dining rm. and area under exterior deck with concrete slan on grade above. add light well to fitness rm. level 1- new concrete slab at dining rm. with new wood flooring, new concrete slab at exterior deck, sloped to drain with stone pavers, | $54,000 |
| Oct 2, 2018 | Completed final sign-off Feb 2020 | 3415 Pacific Av | Cairn Construction | basement level: conditioning 602 s.f. of extg space, remodeling laundry room,adding bathroom, wine room, new furnace and on demand water heater, adding storage closets in hall, & new elect. level one: open up wall between kitchen and family room, remodel kitchen, relocate powder room,Details
basement level: conditioning 602 s.f. of extg space, remodeling laundry room,adding bathroom, wine room, new furnace and on demand water heater, adding storage closets in hall, & new elect. level one: open up wall between kitchen and family room, remodel kitchen, relocate powder room, | $375,000 |
| May 23, 2018 | Never finaled issued Aug 2018, no final | 360 Claremont Bl | basement level: lower floor at rear of garage and convert storage space into media room, laundry & storage and add bathroom. level one: new rear stair down to backyard. add radiant heating throughout house & add on demand water heater.Details
basement level: lower floor at rear of garage and convert storage space into media room, laundry & storage and add bathroom. level one: new rear stair down to backyard. add radiant heating throughout house & add on demand water heater. | $25,000 | |
| Feb 15, 2018 | Completed final sign-off Dec 2018 | 20 Walnut St | Cairn Construction | revision to 201712045342 basemenet level - relocate bathroom, relocate mechanical, conditioning 171 sf of space, new electrical. excavate less than 30 yards, max ht 5'Details
revision to 201712045342 basemenet level - relocate bathroom, relocate mechanical, conditioning 171 sf of space, new electrical. excavate less than 30 yards, max ht 5' | $40,000 |
| Jan 8, 2018 | Completed final sign-off Dec 2018 | 20 Walnut St | Cairn Construction | level three add roof deck- 12'-6"x11'-3". no changes at basement level, level one, and level 2.Details
level three add roof deck- 12'-6"x11'-3". no changes at basement level, level one, and level 2. | $65,000 |
| Dec 4, 2017 | Completed final sign-off Dec 2018 | 20 Walnut St | Cairn Construction | basement level: relocate powder room and add shower, relocate mech conditoning 580 sf of space, add storage closet, enlarge wine room, new elec. level 1 no changes. level 2 no changes, level 3, no changes. no exterior changes.Details
basement level: relocate powder room and add shower, relocate mech conditoning 580 sf of space, add storage closet, enlarge wine room, new elec. level 1 no changes. level 2 no changes, level 3, no changes. no exterior changes. | $75,000 |
| Oct 12, 2017 | Expired or cancelled expired Jan 2020 | 2574 Broadway | Danziger Builders | basement level, relocate existing laundry room, remodel 2 existing bathrooms, new lighting. level 1 no work level 2 no work level 3 no work, maher not req.Details
basement level, relocate existing laundry room, remodel 2 existing bathrooms, new lighting. level 1 no work level 2 no work level 3 no work, maher not req. | $75,000 |
| Mar 23, 2017 | Completed final sign-off Nov 2017 | 1020 Union St | Cook Construction | unit 23 - add bathroom and washer & dryer closetDetails
unit 23 - add bathroom and washer & dryer closet | $20,000 |
| Oct 19, 2016 | Completed final sign-off Oct 2016 | 1011 Church St | San Francisco Design & Constr. | revision to pa 2015-0609-8494, change railing configuration to create space for bbq grillDetails
revision to pa 2015-0609-8494, change railing configuration to create space for bbq grill | $500 |
| Jul 22, 2016 | Completed final sign-off May 2017 | 1216 Sanchez St | Onsite Construx | basement - new electrical, add shear wall; level one - remodel kitchen, add powder, new elec, relocate washer; level two - remodel kitchen, bath, add powder, new elect, relocate washerDetails
basement - new electrical, add shear wall; level one - remodel kitchen, add powder, new elec, relocate washer; level two - remodel kitchen, bath, add powder, new elect, relocate washer | $30,000 |
| Jul 18, 2016 | Completed final sign-off Oct 2016 | 1011 Church St | San Francisco Design & Constr. | add bathroom remodel at basement level to (e) permit pa#201506098494. drawings have already been approve at addendum stage.Details
add bathroom remodel at basement level to (e) permit pa#201506098494. drawings have already been approve at addendum stage. | $8,000 |
| Jul 18, 2016 | Completed final sign-off Jan 2017 | 2409 Green St | Christopher Gate Construction Inc | basement level-no work. level one-remodel kitchen, breakfast room and powder room. level 2- no work.Details
basement level-no work. level one-remodel kitchen, breakfast room and powder room. level 2- no work. | $105,000 |
| Jul 18, 2016 | Never finaled issued Jul 2016, no final | 1407 Montgomery St | unit #2: remodel of kitchen, move plumbing. remodel of bathroom, move plumbing, no alteration of wall,window and door.Details
unit #2: remodel of kitchen, move plumbing. remodel of bathroom, move plumbing, no alteration of wall,window and door. | $30,000 | |
| Jul 5, 2016 | Completed final sign-off Aug 2017 | 1367 14th Av | M 2 Design (Ck Id) | garage remodel: create master suite w/ bathroom and mechanical room. relocate (e) laundry.Details
garage remodel: create master suite w/ bathroom and mechanical room. relocate (e) laundry. | $85,000 |
| Jun 21, 2016 | Completed final sign-off Jul 2017 | 47 Rosewood Dr | Custom Construction Enterprises | basement level: excavate front portion and add bedroom bathroom, & laundry room. level one:remodel kitchen and powder room, add new stair down to basement. level two: remodel three extg bathrooms, move closets. excavating 23 cubic yards 18" deep.Details
basement level: excavate front portion and add bedroom bathroom, & laundry room. level one:remodel kitchen and powder room, add new stair down to basement. level two: remodel three extg bathrooms, move closets. excavating 23 cubic yards 18" deep. | $320,000 |
| Mar 3, 2016 | Expired or cancelled withdrawn Jul 2016 | 2409 Green St | Cairn Construction | basement level - lower floor in raised areas for family room, bathroom & office. level one - remodel ktichen, breakfast room & powder room. no work on level two. n/a maher ordinanceDetails
basement level - lower floor in raised areas for family room, bathroom & office. level one - remodel ktichen, breakfast room & powder room. no work on level two. n/a maher ordinance | $250,000 |
| Dec 17, 2015 | Expired or cancelled cancelled Mar 2021 | 1827 Vallejo St | add one story den to rear of house.Details
add one story den to rear of house. | $60,000 | |
| Nov 4, 2015 | Completed final sign-off Jul 2018 | 3651 Mission St | level two -add small rear additin at deck over existing level one. move bathrooms & add bedroom.Details
level two -add small rear additin at deck over existing level one. move bathrooms & add bedroom. | $120,000 | |
| Sep 17, 2015 | Completed final sign-off Apr 2016 | 1367 14th Av | M 2 Design (Ck Id) | kitchen remodel, add 1 bath, remodel 1 bathDetails
kitchen remodel, add 1 bath, remodel 1 bath | $85,000 |
| Aug 14, 2015 | Completed final sign-off Mar 2016 | 200 Laurel St | Cairn Construction | basement level: add laundry room and mud room. level 1: no additional work. level 2: extend master bedroom closet & add seperate toilet compartment (master bathroom). level 3: add wet bar.Details
basement level: add laundry room and mud room. level 1: no additional work. level 2: extend master bedroom closet & add seperate toilet compartment (master bathroom). level 3: add wet bar. | $50,000 |
| Jun 9, 2015 | Completed final sign-off Oct 2016 | 1011 Church St | Cairn Construction | replacing and enlarge rear deck. replace rear bay window with sliding door. open wall between kitchen and dining room.Details
replacing and enlarge rear deck. replace rear bay window with sliding door. open wall between kitchen and dining room. | $45,000 |
| Jun 9, 2015 | Completed final sign-off Mar 2016 | 200 Laurel St | Cairn Construction | add new shed dormer at back of houseDetails
add new shed dormer at back of house | $25,000 |
| Apr 20, 2015 | Completed final sign-off Mar 2016 | 200 Laurel St | Cairn Construction | basement level, move south wall in garage. waterproof wall a sw corner. level 1, remodel kitchen, pantry, butlers pantry, level 2 remodel powder room, 1 bath, add 1 bath, level 3 open up flat portion of ceiling in north tv room, create pitched ceiling, add skylights. no expansion of bldg envelope.Details
basement level, move south wall in garage. waterproof wall a sw corner. level 1, remodel kitchen, pantry, butlers pantry, level 2 remodel powder room, 1 bath, add 1 bath, level 3 open up flat portion of ceiling in north tv room, create pitched ceiling, add skylights. no expansion of bldg envelope. | $300,000 |
| Mar 2, 2015 | Completed final sign-off Jul 2015 | 2456 Clay St | J Reilly Construction | remove non permitted rear circular stair.Details
remove non permitted rear circular stair. | $1,000 |
| Dec 15, 2014 | Completed final sign-off Oct 2016 | 767 Marina Bl | Cairn Construction | enlarge garage door width from 7'8" to 11'1" (1/3 lot width), widen garage, add outdoor terrace over garage addition at level 2. add new exterior stair. ** maher: compliance with ordinance no# 155-13 not required **Details
enlarge garage door width from 7'8" to 11'1" (1/3 lot width), widen garage, add outdoor terrace over garage addition at level 2. add new exterior stair. ** maher: compliance with ordinance no# 155-13 not required ** | $90,000 |
| Nov 24, 2014 | Completed final sign-off Jun 2016 | 1924 Powell St | no work to be done. to document existance of cottage in rear yard of 1924-26 powell st and verify that this is an old strctur per 1938 aerial photo and attached photographs and lettersDetails
no work to be done. to document existance of cottage in rear yard of 1924-26 powell st and verify that this is an old strctur per 1938 aerial photo and attached photographs and letters | ||
| Nov 12, 2014 | Completed final sign-off Jul 2015 | 2454 Clay St | J Reilly Construction | to comply with inspection report #cc-7646 item #14 only. remove un-permitted mezzanine, stair and skylight.Details
to comply with inspection report #cc-7646 item #14 only. remove un-permitted mezzanine, stair and skylight. | $2,000 |
| Oct 6, 2014 | Completed final sign-off Jan 2015 | 1906 Powell St | replace deck on level 3. revision to app#201405075157Details
replace deck on level 3. revision to app#201405075157 | $5,000 | |
| Oct 6, 2014 | Completed final sign-off Dec 2015 | 777 Marina Bl | Cairn Construction | remove extg non code compliant front stair. water proof wall between extg stair and garage. add new code compliant stair in brick to match extg stair. n/a for maher.Details
remove extg non code compliant front stair. water proof wall between extg stair and garage. add new code compliant stair in brick to match extg stair. n/a for maher. | $18,000 |
| Aug 5, 2014 | Never finaled filed Aug 2014, never issued | 1657 Powell St | Ard Macha Construction | comply with nov 201214141 & complaint 200453638; carpentry- install 3 partition walls and install 3 doors. interior trim from office to medical office/plumbing, running hot & cold lines for new washer & dryer. electrical, new 220 for dryer/reconfiguring lights, hvac new ventilation & heating system,Details
comply with nov 201214141 & complaint 200453638; carpentry- install 3 partition walls and install 3 doors. interior trim from office to medical office/plumbing, running hot & cold lines for new washer & dryer. electrical, new 220 for dryer/reconfiguring lights, hvac new ventilation & heating system, | $30,500 |
| Jun 24, 2014 | Completed final sign-off Sep 2014 | 3715 Broderick St | Cairn Construction | enlarge garage door from 8' to 10' wide. n/a ordinance #155-13.Details
enlarge garage door from 8' to 10' wide. n/a ordinance #155-13. | $15,000 |
| Feb 25, 2014 | Completed final sign-off Apr 2017 | 1238 16th Av | rear addition & reconfiguration of 2 units. rear addition at ground floor & 3rd floor. added 4 bathrooms.Details
rear addition & reconfiguration of 2 units. rear addition at ground floor & 3rd floor. added 4 bathrooms. | $250,000 | |
| Oct 21, 2013 | Completed final sign-off Dec 2015 | 777 Marina Bl | Cairn Construction | add elevator in rear, expansion of den in rear at level 3 & remove existing deck and add new rear deck at level 2.Details
add elevator in rear, expansion of den in rear at level 3 & remove existing deck and add new rear deck at level 2. | $175,000 |
| Jul 17, 2013 | Completed final sign-off Jan 2014 | 954 Stanyan St | Daniel Larsen Builders | kitchen & bathroom remodel, new lighting in living room & bedrooms.Details
kitchen & bathroom remodel, new lighting in living room & bedrooms. | $55,000 |
| Jun 11, 2013 | Never finaled issued Jun 2013, no final | 439 Washington St | Morgan Construction | interior non-seismic conversion of an existing commercial tenant space to a stript wax bar. new window in front elevation, new partitions for treatment rooms, and one accessible restroom.Details
interior non-seismic conversion of an existing commercial tenant space to a stript wax bar. new window in front elevation, new partitions for treatment rooms, and one accessible restroom. | $48,000 |
| Jun 6, 2013 | Completed final sign-off Jul 2013 | 851 Beach St | Travis General Contractors | interior non-seismic conversion of an existing retail space to a vom fass retail store. demoliton permit 201305227648Details
interior non-seismic conversion of an existing retail space to a vom fass retail store. demoliton permit 201305227648 | $20,000 |
| Mar 5, 2013 | Never finaled issued Mar 2013, no final | 1395 Sanchez St | Aidan Mc Cracken Const Inc. | excavate crawl space to add bedrm, move bathrm location, add one additional bathrm, remodel (e) bedrm & den. upper level replace wood burning fireplace w/ gas fire place. replacing all windows in kind.wood with metal cladding, tru divided window in corner to be fully simulated litesDetails
excavate crawl space to add bedrm, move bathrm location, add one additional bathrm, remodel (e) bedrm & den. upper level replace wood burning fireplace w/ gas fire place. replacing all windows in kind.wood with metal cladding, tru divided window in corner to be fully simulated lites | $250,000 |
| Feb 5, 2013 | Expired or cancelled cancelled Dec 2015 | 2215 Lake St | Sandquist Construction | rear addition at lower two levels, add guest bedroom & bathroom at basement level behind garage. remodel kitchen & add family room on level one, extend rear deck on level two.Details
rear addition at lower two levels, add guest bedroom & bathroom at basement level behind garage. remodel kitchen & add family room on level one, extend rear deck on level two. | $235,000 |
| Dec 28, 2012 | Completed final sign-off Apr 2013 | 856 Church St | B R J Construction | convert (e) storage space into bedroom w/closet & full bathroomDetails
convert (e) storage space into bedroom w/closet & full bathroom | $20,000 |
| Dec 28, 2012 | Completed final sign-off Feb 2013 | 954 Stanyan St | Cairn Construction | re-build (e) rear external stair in kindDetails
re-build (e) rear external stair in kind | $9,000 |
| Dec 5, 2012 | Completed final sign-off Jul 2013 | 33 Alvarado St | Calvin Chan Constr Inc. **See Note ** | unit#3: kitchen & bathroom remodel. replace kitchen cabinets, move electrical outlets & new floor. bathroom-convert tub to shower, new floor & new vanity.Details
unit#3: kitchen & bathroom remodel. replace kitchen cabinets, move electrical outlets & new floor. bathroom-convert tub to shower, new floor & new vanity. | $30,000 |
| Feb 16, 2012 | Completed final sign-off Feb 2014 | 2425 Ocean Av | Aidan Mc Cracken Const Inc., Travis General Contractors | one story addition on west side of building. converting garage to office space, and adding ada bathroom.Details
one story addition on west side of building. converting garage to office space, and adding ada bathroom. | $95,000 |
| Aug 25, 2011 | Completed final sign-off Feb 2012 | 215 Lansdale Av | Cairn Construction | replace wood railing with metal railing & wood deck covering with tile deck covering on existing deck. structural calculation & detail for guardrail post connection.Details
replace wood railing with metal railing & wood deck covering with tile deck covering on existing deck. structural calculation & detail for guardrail post connection. | $8,000 |
| Aug 8, 2011 | Completed final sign-off Jan 2012 | 1214 02nd Av | High Level Construction Co | upper unit - remodel of existing ktichen, demo & install new drywall, flooring, electrical & plumbing & cabinetry. prep, prime & paint.Details
upper unit - remodel of existing ktichen, demo & install new drywall, flooring, electrical & plumbing & cabinetry. prep, prime & paint. | $15,000 |
| Apr 5, 2011 | Completed final sign-off Feb 2012 | 215 Lansdale Av | Cairn Construction | excavate crawl space at level one to create media room, wine room, bathroom, & storage rooms; add windows to rear of houseDetails
excavate crawl space at level one to create media room, wine room, bathroom, & storage rooms; add windows to rear of house | $200,000 |
| Aug 13, 2010 | Completed final sign-off Oct 2010 | 3647 Washington St | Stroub Construction | bathroom remodel on level twoDetails
bathroom remodel on level two | $18,000 |
| Aug 10, 2010 | Completed final sign-off Oct 2011 | 289 Magellan Av | demo existing rear yard deck. construct new replacement deck. ref. variance 2009-0123v approval.Details
demo existing rear yard deck. construct new replacement deck. ref. variance 2009-0123v approval. | $9,000 | |
| Jun 7, 2010 | Completed final sign-off Jan 2011 | 3434 Broderick St | Aidan Mc Cracken Const Inc. | revision to 200909015955: changes to kitchen layoutDetails
revision to 200909015955: changes to kitchen layout | |
| May 18, 2010 | Completed final sign-off Jan 2012 | 3050 Lyon St | Ben Rogne Construction | 2 floor rear addition. remodel kitchen, powder room at level 2. add guest bedroom/study, office & bathroom at level 1.Details
2 floor rear addition. remodel kitchen, powder room at level 2. add guest bedroom/study, office & bathroom at level 1. | $200,000 |
| Apr 23, 2010 | Completed final sign-off Aug 2010 | 289 Magellan Av | remodel master bedroom & closetDetails
remodel master bedroom & closet | $35,000 | |
| Mar 17, 2010 | Completed final sign-off Dec 2010 | 3647 Washington St | Stroub Construction | enlarge garage, new garage door, new intenal stairs, add bathroom, replace windows in-kind.Details
enlarge garage, new garage door, new intenal stairs, add bathroom, replace windows in-kind. | $150,000 |
| Feb 17, 2010 | Completed final sign-off Jul 2011 | 55 Lagunitas Dr | Curran & Associates General Contractors | add dormer windows over garage & add stair addition in rear.Details
add dormer windows over garage & add stair addition in rear. | $70,000 |
| Nov 13, 2009 | Completed final sign-off Feb 2011 | 265 Moncada Wy | three story horizontal rear addition ( 2 floors and basement), new remodeled kitchen, 2 bedrooms, 3 bathrooms, remodeled 1 bathroom, expand family room, add breakfast room and new rear deckDetails
three story horizontal rear addition ( 2 floors and basement), new remodeled kitchen, 2 bedrooms, 3 bathrooms, remodeled 1 bathroom, expand family room, add breakfast room and new rear deck | $375,000 | |
| Sep 1, 2009 | Completed final sign-off Dec 2010 | 3434 Broderick St | 1st floor remodel, fill in under bedroom above. create 2nd bedroom and add 1/2 bath. laundry rm on upper level, remove garage stair to 2nd fl.Details
1st floor remodel, fill in under bedroom above. create 2nd bedroom and add 1/2 bath. laundry rm on upper level, remove garage stair to 2nd fl. | $240,000 | |
| Aug 7, 2009 | Completed final sign-off Aug 2009 | 1815 Vallejo St | to obtain final inspection for work approved under pa#200610195533. all work is complete.Details
to obtain final inspection for work approved under pa#200610195533. all work is complete. | ||
| Oct 14, 2008 | Completed final sign-off Aug 2009 | 1815 Vallejo St | Cove Construction | revision to 2006101945533, reduce scope of work. delete addition at kitchen and family room. remodel only. replace windows in kind at family room. replace damaged exterior stair off kitchen in kind.Details
revision to 2006101945533, reduce scope of work. delete addition at kitchen and family room. remodel only. replace windows in kind at family room. replace damaged exterior stair off kitchen in kind. | |
| Oct 19, 2006 | Expired or cancelled expired Aug 2009 | 1815 Vallejo St | kitchen extension on east side. sunroom additon on south side.Details
kitchen extension on east side. sunroom additon on south side. | $175,000 | |
| Sep 12, 2006 | Completed final sign-off Mar 2007 | 1391 05th Av | bathroom addition (convert ex bedroom to bath at 2nd floor)Details
bathroom addition (convert ex bedroom to bath at 2nd floor) | $30,000 | |
| Nov 10, 2004 | Completed final sign-off Feb 2006 | 33 Rossmoor Dr | Terence Keenan Construction | new rear wood deck at level one with wood stair to backyard.Details
new rear wood deck at level one with wood stair to backyard. | $20,000 |
| Oct 18, 2004 | Completed final sign-off Mar 2005 | 17 Landers St | Daniel Larsen Builders | remodel ex.kitchen & 1 bath,remove/replace cabinets,flooring.no exterior work.except replace 4windowDetails
remodel ex.kitchen & 1 bath,remove/replace cabinets,flooring.no exterior work.except replace 4window | $65,000 |