Kevin Brown
- Listed as
- architect, authorized agent-others, designer, engineer
- Firm
- Kbcce
- Based in
- Hercules
- On San Francisco permits
- Apr 2009 to Sep 2026
64 permits since 2000 (engineer on 42 permits, architect on 18 permits, authorized agent-others on 3 permits, designer on 1 permit): 33 completed, 15 in progress, 6 never finaled, 10 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 17, 2026 | In progress issued Sep 2026 | 1357 17th Av | A + General Construction Inc | revision to 202606223683. updated fl walk in closet and master bath layout.Details
revision to 202606223683. updated fl walk in closet and master bath layout. | $500 |
| Sep 17, 2026 | In progress filed Sep 2026, not yet issued | 315 Capp St | Bc United Construction Inc | rebuilt (e) front deck.Details
rebuilt (e) front deck. | $8,000 |
| Sep 2, 2026 | Completed final sign-off Sep 2026 | 3995 Alemany Bl | Kyj Construction Inc | minor revision to 202607265651. change location to ada counter.Details
minor revision to 202607265651. change location to ada counter. | |
| Aug 12, 2026 | In progress issued Aug 2026 | 434 10th Av | Y W Builders Inc. | upper unit #434: kitchen remodel, existing half bath remodel, and convert closet into half bath. no exterior change.Details
upper unit #434: kitchen remodel, existing half bath remodel, and convert closet into half bath. no exterior change. | $40,000 |
| Jun 22, 2026 | In progress issued Jul 2026 | 1357 17th Av | Hong Shink Construction | 1/f: add 1 full bath, 1 half bath, 1 bedroom and 1 family room (710 sf). 2/f: kitchen relocate, add half bath. 3/f: add master bathroom. new radiant heat, replace windows, repair (e) deck less than 50%.Details
1/f: add 1 full bath, 1 half bath, 1 bedroom and 1 family room (710 sf). 2/f: kitchen relocate, add half bath. 3/f: add master bathroom. new radiant heat, replace windows, repair (e) deck less than 50%. | $245,000 |
| Jun 12, 2026 | In progress issued Jun 2026 | 752 10th Av | Yl General Construction | revision to pa # 202605261871: revise half bath to full bath 2/f.Details
revision to pa # 202605261871: revise half bath to full bath 2/f. | $1,000 |
| May 26, 2026 | In progress issued May 2026 | 752 10th Av | Yl General Construction | 2nd floor kithchen and bathroom remodel. add one half bath. no exterior change.Details
2nd floor kithchen and bathroom remodel. add one half bath. no exterior change. | $60,000 |
| May 13, 2026 | In progress issued Jun 2026 | 4109 24th St | minor kitchen remodel: change of cooking equipments. add new countertop and cabinets.Details
minor kitchen remodel: change of cooking equipments. add new countertop and cabinets. | $8,800 | |
| May 11, 2026 | Completed final sign-off Jul 2026 | 320 Texas St | convert living room into bedroom. no exterior changes. no plumbing work. remove fireplace interiorDetails
convert living room into bedroom. no exterior changes. no plumbing work. remove fireplace interior | $500 | |
| Apr 1, 2026 | In progress issued Apr 2026 | 3255 Balboa St | M L S Builder Inc. | horizontal addition -add 43 sf to rear of building. relocate side setback wall and construct new wall. remove partial roof and construct new partial roof. the lighting and receptacles are existing to remain.Details
horizontal addition -add 43 sf to rear of building. relocate side setback wall and construct new wall. remove partial roof and construct new partial roof. the lighting and receptacles are existing to remain. | $15,000 |
| Nov 14, 2025 | Completed final sign-off Jun 2026 | 612 12th Av | Kwan Chok Kee Inc | revision to 202510167541. relocate kitchen and dining. relay out powder room.Details
revision to 202510167541. relocate kitchen and dining. relay out powder room. | $100 |
| Oct 16, 2025 | Completed final sign-off Jun 2026 | 612 12th Av | Kwan Chok Kee Inc | kitchen and bathroom remodel, relocated interior stairs on the (1st floor to basement, add living space (687 sqft). 1 bath and 1 laundry room, 1 office, 1 media at basement level. relocated water heater and furnace.Details
kitchen and bathroom remodel, relocated interior stairs on the (1st floor to basement, add living space (687 sqft). 1 bath and 1 laundry room, 1 office, 1 media at basement level. relocated water heater and furnace. | $161,217 |
| Oct 10, 2025 | Completed final sign-off Feb 2026 | 226 Balboa St | revision to 202206025458: replace glass window with glass doorDetails
revision to 202206025458: replace glass window with glass door | ||
| Aug 19, 2025 | Completed final sign-off Dec 2025 | 1050 Huron Av | Odysseus Builders | 1st/f: convert part of garage into living space (290 sf) included: 1 full bath, 1 media rm. with wet bar. no change present to 2nd & 3rd fl. relocate water heater & furnaceDetails
1st/f: convert part of garage into living space (290 sf) included: 1 full bath, 1 media rm. with wet bar. no change present to 2nd & 3rd fl. relocate water heater & furnace | $80,000 |
| Jul 18, 2025 | Expired or cancelled cancelled Dec 2025 | 1256 30th Av | M L S Plumbing And Builder Inc | to comply with nov 202537138 item #2. revision to permits 202002184667 and 202002194849. to accommodate field construction conditions.Details
to comply with nov 202537138 item #2. revision to permits 202002184667 and 202002194849. to accommodate field construction conditions. | $10,000 |
| Jun 25, 2025 | Expired or cancelled withdrawn Oct 2025 | 1028 Balboa St | interior remodel of daycare. remove (e) wooden stairs in the rear and construct (n) concrete landing and steps. add 73 sf of unused exterior hall space. (remodel kitchen, dining & bedrooms on 2nd level)Details
interior remodel of daycare. remove (e) wooden stairs in the rear and construct (n) concrete landing and steps. add 73 sf of unused exterior hall space. (remodel kitchen, dining & bedrooms on 2nd level) | $120,000 | |
| Apr 22, 2024 | In progress issued May 2024 | 638 Rhode Island St | revision to pa#202209162645: (ref nov# 202313020) - to include window opening modifications on 1st and 2nd floor, exterior plywood and siding replacement, rebuild walk where necessary in kind. (n) exterior stair to 2nd floor at rear of property, (n) exterior stair from grade to 1/f, (n) structural..Details
revision to pa#202209162645: (ref nov# 202313020) - to include window opening modifications on 1st and 2nd floor, exterior plywood and siding replacement, rebuild walk where necessary in kind. (n) exterior stair to 2nd floor at rear of property, (n) exterior stair from grade to 1/f, (n) structural.. | ||
| Mar 22, 2024 | In progress issued Jul 2024 | 25 Alta St | replace approx 10 linear ft of foundation hit by car. repair front stairs hit by car. to comply w/ nov 202292608 & 202290459Details
replace approx 10 linear ft of foundation hit by car. repair front stairs hit by car. to comply w/ nov 202292608 & 202290459 | $10,000 | |
| Jan 19, 2024 | In progress issued Jan 2024 | 562 28th Av | Romkon Inc | permit for permeation grouting of soils along the existing foundation. ref pa 201705055838Details
permit for permeation grouting of soils along the existing foundation. ref pa 201705055838 | $10,000 |
| Jan 19, 2024 | In progress issued Jan 2024 | 568 28th Av | Romkon Inc | permit for permeation grouting of soils along the existing foundationDetails
permit for permeation grouting of soils along the existing foundation | $10,000 |
| Jan 9, 2024 | Completed final sign-off Dec 2024 | 520 Argonaut Av | Three Brothers Construction | comply w/ nov# 202302268: 1st fl- change sliding glass door. to remove (e) bathroom wall. close opening in kitchen to family room. remodel kitchen. change water heater to tankless. remove wall heaters and install central heating. 2nd fl-remove (e) wall in master bathroom. remodel (e) bathroom.Details
comply w/ nov# 202302268: 1st fl- change sliding glass door. to remove (e) bathroom wall. close opening in kitchen to family room. remodel kitchen. change water heater to tankless. remove wall heaters and install central heating. 2nd fl-remove (e) wall in master bathroom. remodel (e) bathroom. | $110,000 |
| Dec 11, 2023 | Completed final sign-off May 2024 | 1863 42nd Av | T T K Construction Inc | construct 42 lf of 3'6" h retaining wall w/ 5' h wooden fence on top of rear lotDetails
construct 42 lf of 3'6" h retaining wall w/ 5' h wooden fence on top of rear lot | $16,000 |
| Nov 21, 2023 | In progress issued Jan 2024 | 562 28th Av | Romkon Inc | revision to bpa#201705055838, revision of property line details. provide detail at stair footing.Details
revision to bpa#201705055838, revision of property line details. provide detail at stair footing. | $2,000 |
| Oct 12, 2023 | Expired or cancelled withdrawn Jul 2025 | 535 Fell St | pressure grouting at west property line wallDetails
pressure grouting at west property line wall | $15,000 | |
| Jul 6, 2023 | Expired or cancelled withdrawn Jun 2024 | 25 Alta St | Singh Construction | to comply w/ 202290459 & 202292608 repair (e) foundationDetails
to comply w/ 202290459 & 202292608 repair (e) foundation | $85,000 |
| Jun 13, 2023 | In progress issued May 2025 | 638 Rhode Island St | Waters And Waters | rear cottage: renovation of (e) 2-story rear cottage. 1st fl: new bathroom, bedrrom and study. 2nd fl: new kitchen and living room new exterior balcony @ 2nd floor. new structural, electrical, and plumbing as required.Details
rear cottage: renovation of (e) 2-story rear cottage. 1st fl: new bathroom, bedrrom and study. 2nd fl: new kitchen and living room new exterior balcony @ 2nd floor. new structural, electrical, and plumbing as required. | $94,000 |
| Feb 3, 2023 | In progress issued Jun 2024 | 638 Rhode Island St | Waters And Waters | legalization of 3rd unit under ord 43-14 to include: 1 bedroom, 1 baths, living room, dining room, kitchen & laundry.(n) structural, electrical, plumbing as req.replacement of (e) west egres stairs. ref legalization pa on sheet a0.01.Details
legalization of 3rd unit under ord 43-14 to include: 1 bedroom, 1 baths, living room, dining room, kitchen & laundry.(n) structural, electrical, plumbing as req.replacement of (e) west egres stairs. ref legalization pa on sheet a0.01. | $182,000 |
| Sep 16, 2022 | Never finaled issued Apr 2023, no final | 638 Rhode Island St | Waters And Waters | renovation/recofiguration of (e) 4 units: (4) new bathrooms, kitchens, laudry and bedrooms on fl 1-2. renovation/recofifurarion comply w/complaint 201524471 & 202209972. no work @ (e) roof and (e) rear yard cottage. areas shown for ref only.Details
renovation/recofiguration of (e) 4 units: (4) new bathrooms, kitchens, laudry and bedrooms on fl 1-2. renovation/recofifurarion comply w/complaint 201524471 & 202209972. no work @ (e) roof and (e) rear yard cottage. areas shown for ref only. | $510,000 |
| Jun 2, 2022 | Completed final sign-off Feb 2026 | 226 Balboa St | M L S Builder Inc. | revision change of use (e) building to child carre center pa# 201802080819 change of occupancy. restroom revisions & electrical.Details
revision change of use (e) building to child carre center pa# 201802080819 change of occupancy. restroom revisions & electrical. | $40,000 |
| Feb 16, 2022 | Completed final sign-off Oct 2022 | 674 28th Av | Bob Ellison Woodworking | add spiral staircase. revision to pa#202108166505Details
add spiral staircase. revision to pa#202108166505 | $12,000 |
| Dec 7, 2021 | Never finaled issued Jan 2022, no final | 160 23rd Av | Galaxy Building Construction | interior remodel: remove wall betweem dining room and kitchen, wall between dining room/living room. new steel beam at unit 162. 2nd floor only. kitchen remodel.Details
interior remodel: remove wall betweem dining room and kitchen, wall between dining room/living room. new steel beam at unit 162. 2nd floor only. kitchen remodel. | $35,000 |
| Aug 16, 2021 | Completed final sign-off Aug 2022 | 674 28th Av | Bob Ellison Woodworking | kitchen remodel. 2 bathroom. add firewall at upstairs deck. replace beams at garage area only.Details
kitchen remodel. 2 bathroom. add firewall at upstairs deck. replace beams at garage area only. | $150,000 |
| Apr 14, 2021 | Completed final sign-off Mar 2022 | 671 Shotwell St | J Gerstenkorn Builders | demo existing stairs / frame in walls / construct circular stairs metal / install concrete pad / build two decks. remove (e) wooden stairs, deck and construct new circular metal stairs with two light weight decksDetails
demo existing stairs / frame in walls / construct circular stairs metal / install concrete pad / build two decks. remove (e) wooden stairs, deck and construct new circular metal stairs with two light weight decks | $30,000 |
| Mar 17, 2021 | Never finaled filed Mar 2021, never issued | 51 Rosewood Dr | removal of 1 wall (insert beam), windows update to dual pane, new electrical and plumbing fixtures for energy efficiency. move 1 bathroom. add 1.5 bath. kitchen remodel.Details
removal of 1 wall (insert beam), windows update to dual pane, new electrical and plumbing fixtures for energy efficiency. move 1 bathroom. add 1.5 bath. kitchen remodel. | $60,000 | |
| Dec 20, 2019 | Completed final sign-off Jul 2020 | 895 46th Av | Three Brothers Construction | revision to 201910316142, constuct new concrete slab 1st fl entry. relocate isolated footing on the garage lvel. resize closet in bedroom 1, loft, bedroom 3 and master bedroom, relcoate shear wallDetails
revision to 201910316142, constuct new concrete slab 1st fl entry. relocate isolated footing on the garage lvel. resize closet in bedroom 1, loft, bedroom 3 and master bedroom, relcoate shear wall | |
| Oct 31, 2019 | Completed final sign-off Jul 2020 | 895 46th Av | Three Brothers Construction | 1)level 1: relocate steps to garage & modify stairs going up to level2. 2)level 2: change extg living room into master bedroom with master bath & closet, remodel kitchen, dining area and remove extg wall seperating kitchen from bedroom, remodel extg bathroom and bedroom. infill lightwell at 2nd flDetails
1)level 1: relocate steps to garage & modify stairs going up to level2. 2)level 2: change extg living room into master bedroom with master bath & closet, remodel kitchen, dining area and remove extg wall seperating kitchen from bedroom, remodel extg bathroom and bedroom. infill lightwell at 2nd fl | $100,000 |
| Sep 18, 2019 | Completed final sign-off Jun 2020 | 205 Dellbrook Av | Innovative Construction & Design Co. | gr fl: enlarge fl bath with shower and tub, remove wall cabinet and add , new window at office, expand closet at bedroom, window above utility sink, delete door to hallway. upper level: dlete wall separating kitchen akd living area. kitchen remodel, new hood, peninsula, delete opening btwn entryDetails
gr fl: enlarge fl bath with shower and tub, remove wall cabinet and add , new window at office, expand closet at bedroom, window above utility sink, delete door to hallway. upper level: dlete wall separating kitchen akd living area. kitchen remodel, new hood, peninsula, delete opening btwn entry | $85,000 |
| Aug 22, 2019 | Completed final sign-off Jan 2020 | 647 34th Av | Three Brothers Construction | revision to pa 2019-0418-8402 remove door in garage hallway. remove window in bathroom. change pantry to hall closet. shorten hallway wall @ 2nd fl; remove existing kitchen window; remove (e) pier and construct new concrete pier; add new beam under bathroom wall; add new ceiling beamDetails
revision to pa 2019-0418-8402 remove door in garage hallway. remove window in bathroom. change pantry to hall closet. shorten hallway wall @ 2nd fl; remove existing kitchen window; remove (e) pier and construct new concrete pier; add new beam under bathroom wall; add new ceiling beam | |
| Jul 31, 2019 | Completed final sign-off Feb 2020 | 840 42nd Av | Three Brothers Construction | revision to app#201810233901. revised foundation detail.Details
revision to app#201810233901. revised foundation detail. | |
| Jun 17, 2019 | Completed final sign-off Jan 2020 | 647 34th Av | Three Brothers Construction | revision to pa 2019-0418-8402. add new foundation and replace existing 3" thick slab with 4" thick slab concreteDetails
revision to pa 2019-0418-8402. add new foundation and replace existing 3" thick slab with 4" thick slab concrete | $20,000 |
| Apr 18, 2019 | Completed final sign-off Jan 2020 | 647 34th Av | Three Brothers Construction | level 1: add 1 bedroom, study, laundry room, modify (e) bathroom and relocate stairs going to level 2. level 2: change existing bedroom into master bedroom with master bath & closet, remodel, kitchen, dining area, relocate (e) stairs going down to level 1.Details
level 1: add 1 bedroom, study, laundry room, modify (e) bathroom and relocate stairs going to level 2. level 2: change existing bedroom into master bedroom with master bath & closet, remodel, kitchen, dining area, relocate (e) stairs going down to level 1. | $70,000 |
| Apr 9, 2019 | Completed final sign-off Feb 2020 | 840 42nd Av | Three Brothers Construction | revision to 201810233901. relocate closet, laundry, stairs, and bathroom level 1. relocate stairs level 2. delete and modify floor beams, shear walls and holddownsDetails
revision to 201810233901. relocate closet, laundry, stairs, and bathroom level 1. relocate stairs level 2. delete and modify floor beams, shear walls and holddowns | |
| Apr 5, 2019 | Completed final sign-off May 2019 | 2642 Ulloa St | Three Brothers Construction | revision to app#201809190831 to document changes. 1)change new foundation to extg. 2)change new skylights to extgDetails
revision to app#201809190831 to document changes. 1)change new foundation to extg. 2)change new skylights to extg | |
| Feb 13, 2019 | Never finaled issued Mar 2019, no final | 2642 Ulloa St | Three Brothers Construction | comply with nov 201830064. revision to 201809190831 shear wall deleted, shear wall changed from 9' to 7'. joist connected to ledge instead of top plate, closet wall removed. skyklights repairedDetails
comply with nov 201830064. revision to 201809190831 shear wall deleted, shear wall changed from 9' to 7'. joist connected to ledge instead of top plate, closet wall removed. skyklights repaired | |
| Jan 25, 2019 | Never finaled issued Jan 2019, no final | 671 Shotwell St | California Builders & Foundations | remove and replace 23ft of foundation with like kind.Details
remove and replace 23ft of foundation with like kind. | $10,000 |
| Oct 23, 2018 | Completed final sign-off Feb 2020 | 840 42nd Av | Three Brothers Construction | level 1 - add 2 bedrooms, family room, study, laundry room; modify existing bathroom and add stairs going up to level 2; level 2 - change existing bedroom into master bedroom with master bath and closet, remodel kitchen, dining area and add stair going to level 1; replace furnaceDetails
level 1 - add 2 bedrooms, family room, study, laundry room; modify existing bathroom and add stairs going up to level 2; level 2 - change existing bedroom into master bedroom with master bath and closet, remodel kitchen, dining area and add stair going to level 1; replace furnace | $70,000 |
| Sep 19, 2018 | Completed final sign-off May 2019 | 2642 Ulloa St | Three Brothers Construction | 1st fl add 2 bedrooms, family rm, study, laundry rm, modify e bath and stairs going up, 2ndf l change e bdrm into master bedrm with master bath and closet, remodel kitchen, dining areaDetails
1st fl add 2 bedrooms, family rm, study, laundry rm, modify e bath and stairs going up, 2ndf l change e bdrm into master bedrm with master bath and closet, remodel kitchen, dining area | $60,000 |
| Jun 29, 2018 | Completed final sign-off Dec 2020 | 185 Haight St | Richbay Construction | convert basement to habitable space, 1 bed/bath, family room, relocate access stair to basement. main floor remove kitchen wall to expand kitchen 3rd flr - add in 1 bathrm, remove stair connection at back side of living space, rear deck expansionDetails
convert basement to habitable space, 1 bed/bath, family room, relocate access stair to basement. main floor remove kitchen wall to expand kitchen 3rd flr - add in 1 bathrm, remove stair connection at back side of living space, rear deck expansion | $100,000 |
| May 10, 2018 | Completed final sign-off Sep 2018 | 1278 44th Av | revision to foundation pa#201802121057Details
revision to foundation pa#201802121057 | ||
| Apr 23, 2018 | Never finaled issued May 2018, no final | 666 South Van Ness Av | new doors and moldings, new carpet and hardwood floor throughout, texture and paint at all rooms, recessed can lighting in bedrooms, living rm, dining rm, bath remodel, kitchen remodelDetails
new doors and moldings, new carpet and hardwood floor throughout, texture and paint at all rooms, recessed can lighting in bedrooms, living rm, dining rm, bath remodel, kitchen remodel | $55,000 | |
| Feb 28, 2018 | Completed final sign-off Apr 2018 | 2422 Pacheco St | replace all windows ; front windows to be aluminum-clad wood casement or fixed and visible right side windows to be aluminum-clad wood windows; non-visible windows - any mtl.Details
replace all windows ; front windows to be aluminum-clad wood casement or fixed and visible right side windows to be aluminum-clad wood windows; non-visible windows - any mtl. | ||
| Feb 12, 2018 | Completed final sign-off Sep 2018 | 1278 44th Av | 1st fl: add 2 new bedrm, bathrm, laundry rm, new garage entry doors & modify stairs from 1st to 2nd fl. 2nd fl: change e bedrm into dining area, renov kitch, modify e living rm, bathrm & add washer/dryer. 3rd fl: change e 2 bedrms into master bedrm, master bathrm, modify e master bedrm into 2 bedrmsDetails
1st fl: add 2 new bedrm, bathrm, laundry rm, new garage entry doors & modify stairs from 1st to 2nd fl. 2nd fl: change e bedrm into dining area, renov kitch, modify e living rm, bathrm & add washer/dryer. 3rd fl: change e 2 bedrms into master bedrm, master bathrm, modify e master bedrm into 2 bedrms | $75,000 | |
| Sep 8, 2017 | Completed final sign-off Apr 2018 | 2422 Pacheco St | convert storage area in garage to 1 family room, 1 full bathroom and 1 bed room. relocate kitchen, bedrooms and living room on 2nd fl.Details
convert storage area in garage to 1 family room, 1 full bathroom and 1 bed room. relocate kitchen, bedrooms and living room on 2nd fl. | $100,000 | |
| Aug 24, 2017 | Expired or cancelled cancelled Jan 2026 | 1379 De Haro St | revision to app#201610210944. adding a bathroom window to the extg bldg permit. not visible from street.Details
revision to app#201610210944. adding a bathroom window to the extg bldg permit. not visible from street. | $500 | |
| Oct 21, 2016 | Expired or cancelled expired Sep 2019 | 1379 De Haro St | Waters And Waters | remove interior walls per plan, relocate kitchen per plan, remove half bath and add full bath per planDetails
remove interior walls per plan, relocate kitchen per plan, remove half bath and add full bath per plan | $58,000 |
| Oct 12, 2016 | Expired or cancelled withdrawn Feb 2017 | 44 Holloway Av | revision to 201601076593; revision to 201601076593; remove and construct new stairs & porch in the rear and front of the building.Details
revision to 201601076593; revision to 201601076593; remove and construct new stairs & porch in the rear and front of the building. | $4,000 | |
| Dec 14, 2015 | Completed final sign-off Aug 2016 | 2546 44th Av | Waters And Waters | construct new office with bath in existing garage; change existing office into bedroom and extend foyer at front entranceDetails
construct new office with bath in existing garage; change existing office into bedroom and extend foyer at front entrance | $25,000 |
| Sep 23, 2014 | Completed final sign-off Sep 2015 | 574 Peralta Av | replace broken concrete block wall with reinforce concrete wall @ rear.Details
replace broken concrete block wall with reinforce concrete wall @ rear. | $20,000 | |
| Apr 21, 2014 | Completed final sign-off Jun 2017 | 1778 28th Av | Wing Construction Co. | 2 story horizontal addition @ rear of buidling. 3 bedrooms.Details
2 story horizontal addition @ rear of buidling. 3 bedrooms. | $50,000 |
| Oct 9, 2013 | Completed final sign-off May 2014 | 567 19th Av | Waters And Waters | remodel kitchen and half bath recessed lights throughout 2nd floor. remodel 1 full bath and convert 1 half bath into a full bath at 3rd floor, paint interior and exterior. replace electrical panel. to comply cec15(k) 8 & 10.Details
remodel kitchen and half bath recessed lights throughout 2nd floor. remodel 1 full bath and convert 1 half bath into a full bath at 3rd floor, paint interior and exterior. replace electrical panel. to comply cec15(k) 8 & 10. | $60,000 |
| Aug 29, 2013 | Expired or cancelled withdrawn Nov 2014 | 1984 Great Hy | M L S Builder Inc. | revision to pa #2013.05.14.6833 - re-routing ada ramp erection new door opening, re-configure ground floor ada kid bathroom, repair staircase from 2nd floor to attic.Details
revision to pa #2013.05.14.6833 - re-routing ada ramp erection new door opening, re-configure ground floor ada kid bathroom, repair staircase from 2nd floor to attic. | $3,000 |
| Aug 29, 2013 | Expired or cancelled withdrawn Nov 2014 | 1984 Great Hy | M L S Builder Inc. | comply w/nov #201313041 - revision to pa #2013.07.25.2783: repair dryrotted wooden deck, erection new staircase fro emergency exit. work scope more than 50%.Details
comply w/nov #201313041 - revision to pa #2013.07.25.2783: repair dryrotted wooden deck, erection new staircase fro emergency exit. work scope more than 50%. | $3,000 |
| Jan 8, 2013 | Completed final sign-off May 2014 | 1984 Great Hy | M L S Builder Inc. | change of use from church to children center as approved by hearing. tenant improvement removal of interior partition wall. add children & staff toilet. construction of (n) ada ramp on front door. demo (e) ada ramp on backyard. adding smoke barrier to 2nd floor.Details
change of use from church to children center as approved by hearing. tenant improvement removal of interior partition wall. add children & staff toilet. construction of (n) ada ramp on front door. demo (e) ada ramp on backyard. adding smoke barrier to 2nd floor. | $60,000 |
| Apr 17, 2009 | Expired or cancelled withdrawn Jun 2009 | 2621 Sacramento St | add door openings to front and rear building, and modify shearwall, all work to be in basement. all framing at basemetn replace due to dry rot. ref pa #200901291076.Details
add door openings to front and rear building, and modify shearwall, all work to be in basement. all framing at basemetn replace due to dry rot. ref pa #200901291076. | $800 |