Gregory Iboshi
- Listed as
- architect, authorized agent-others, designer, engineer
- Firm
- Huang Iboshi Architecture
- Based in
- San Francisco
- On San Francisco permits
- Apr 2000 to Sep 2026
154 permits since 2000 (architect on 147 permits, authorized agent-others on 3 permits, designer on 3 permits, engineer on 1 permit): 97 completed, 17 in progress, 14 never finaled, 26 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 154.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 30, 2026 | In progress filed Sep 2026, not yet issued | 2450 Van Ness Av | construction of a 2-unit detached adu building, type v-b, 2 story, with 1 bedroom and 1 bathroom per unit per the state programDetails
construction of a 2-unit detached adu building, type v-b, 2 story, with 1 bedroom and 1 bathroom per unit per the state program | $225,000 | |
| Aug 20, 2026 | In progress filed Aug 2026, not yet issued | 2155 Jackson St | L H Construction | revision to bpa#202212208821 to reflect minor adjustments to the adu layout based on the field conditions.Details
revision to bpa#202212208821 to reflect minor adjustments to the adu layout based on the field conditions. | $3,000 |
| Jun 17, 2026 | In progress issued Jul 2026 | 1027 Hayes St | Andrew Gallagher Construction | revision to 202308295507 to inlcude renovation to primary suite and interior renovation to unit 3.Details
revision to 202308295507 to inlcude renovation to primary suite and interior renovation to unit 3. | $55,000 |
| Jun 11, 2026 | In progress issued Jun 2026 | 2174 California St | L H Construction | unit l- interior remodel to include kitchen , bathroom and relocate (e) bedroom to living room area.Details
unit l- interior remodel to include kitchen , bathroom and relocate (e) bedroom to living room area. | $100,288 |
| Jun 11, 2026 | In progress issued Jul 2026 | 2101 Divisadero St | Mueller Nicholls Inc | top unit: partial interior renovation to include new primary bathroom & walk-in closet, new shared bathroom between hallway bedrooms. renovate 3d floor bath #2. renovate hall & powder room n 2nd floor. no change to exterior , no change to existing windows.Details
top unit: partial interior renovation to include new primary bathroom & walk-in closet, new shared bathroom between hallway bedrooms. renovate 3d floor bath #2. renovate hall & powder room n 2nd floor. no change to exterior , no change to existing windows. | $293,560 |
| Jun 2, 2026 | In progress filed Jun 2026, not yet issued | 2450 Van Ness Av | convert g/f t o2 new residential units. renovate 2nd flor unit #201.Details
convert g/f t o2 new residential units. renovate 2nd flor unit #201. | $175,000 | |
| May 12, 2026 | In progress issued May 2026 | 2544 Baker St | L H Construction | interior remodel on 3/fl to convert family room to (n) master suite with closetDetails
interior remodel on 3/fl to convert family room to (n) master suite with closet | $45,000 |
| Apr 10, 2026 | Completed final sign-off Aug 2026 | 2174 California St | L H Construction | revision to permit 202504184748 to reflect minor modifications to non-structural partitions within the adu made in the field.Details
revision to permit 202504184748 to reflect minor modifications to non-structural partitions within the adu made in the field. | |
| Feb 25, 2026 | In progress issued Apr 2026 | 1916 Lake St | Bicardo Builders | revision 202211025698-s1- change stair design, add mech. room, convert rear window into french doors, pantry remodelDetails
revision 202211025698-s1- change stair design, add mech. room, convert rear window into french doors, pantry remodel | $250,000 |
| Feb 6, 2026 | In progress issued Mar 2026 | 3409 Jackson St | Mcguinness Mccann Group | renovation of existing 3 story sfd limited to partial modification to existing 1st floor and 2nd floors, including renovation of existing kitchen and living areas at rear of house, inner grading and low retaining wall at rear yard.Details
renovation of existing 3 story sfd limited to partial modification to existing 1st floor and 2nd floors, including renovation of existing kitchen and living areas at rear of house, inner grading and low retaining wall at rear yard. | $150,000 |
| Jan 24, 2026 | In progress issued May 2026 | 2672 Union St | Mueller Nicholls Inc | new horizontal addition, new vertical 4th story addition, add 1/f adu under state program and remodel of existing three stories.Details
new horizontal addition, new vertical 4th story addition, add 1/f adu under state program and remodel of existing three stories. | $1,300,000 |
| Oct 16, 2025 | In progress issued Oct 2025 | 740 Sanchez St | Saturn Construction Co | revision 202412207184-s1 to remove fire sprinkler system from scope of work.Details
revision 202412207184-s1 to remove fire sprinkler system from scope of work. | |
| Sep 18, 2025 | In progress issued Oct 2025 | 2546 Baker St | L H Construction | interior remodel , partial lightwell infill for stairs from 1/f to 2/f.Details
interior remodel , partial lightwell infill for stairs from 1/f to 2/f. | $136,000 |
| Apr 30, 2025 | Completed final sign-off Aug 2026 | 2174 California St | L H Construction | one new converted adu in (e) basement of (e) multi family structure per sf state ordinance.Details
one new converted adu in (e) basement of (e) multi family structure per sf state ordinance. | $100,000 |
| Mar 26, 2025 | In progress issued Aug 2025 | 3645 Washington St | Mcguinness Mccann Group | replace foundation, excavate (e) basement and crawl space for additional habitable space including a mudroom, bedroom, bathroom and living space.Details
replace foundation, excavate (e) basement and crawl space for additional habitable space including a mudroom, bedroom, bathroom and living space. | $213,462 |
| Dec 17, 2024 | Completed final sign-off Feb 2026 | 152 Collins St | Andrew Gallagher Construction | 3/f: renovate 3/f and rebuild rear roof. replace 3/f powder room with full bathroom. new egress window for 3/f bedrooms. add 3 bedrooms by reallocating (e) rooms on 3/f.Details
3/f: renovate 3/f and rebuild rear roof. replace 3/f powder room with full bathroom. new egress window for 3/f bedrooms. add 3 bedrooms by reallocating (e) rooms on 3/f. | $67,300 |
| Aug 6, 2024 | Completed final sign-off Jan 2025 | 3030 Pacific Av | Saturn Construction Co | replace side yard trellis with new fence, approx. length 28'-2"x max 9'-11.5" htDetails
replace side yard trellis with new fence, approx. length 28'-2"x max 9'-11.5" ht | $5,000 |
| Apr 5, 2024 | Completed final sign-off Jul 2025 | 2544 Baker St | L H Construction | revision to permit# 202308214891 which was a revision to permit# 202206176567: drop garage floor elevation. addition of parapet at north lightwell and replace existing glass roof with new skylight.Details
revision to permit# 202308214891 which was a revision to permit# 202206176567: drop garage floor elevation. addition of parapet at north lightwell and replace existing glass roof with new skylight. | $18,000 |
| Oct 23, 2023 | Completed final sign-off Apr 2025 | 2728 Union St | Caruso Construction Inc. | revision to permit# 202008252555: kitchen remodel added to scope, minor floor plan revisions.Details
revision to permit# 202008252555: kitchen remodel added to scope, minor floor plan revisions. | $63,155 |
| Aug 29, 2023 | In progress issued Nov 2025 | 1027 Hayes St | Andrew Gallagher Construction | partial renovation of 2 story, 3 unit building. add storage space at sidwalk level below entry stairs.Details
partial renovation of 2 story, 3 unit building. add storage space at sidwalk level below entry stairs. | $487,433 |
| Aug 21, 2023 | Completed final sign-off Jul 2025 | 2544 Baker St | L H Construction | revision to pa# 2022-0617-6567: additon of half bath at fourth fl.den. repair sunroom roof and windows, not visible from streetDetails
revision to pa# 2022-0617-6567: additon of half bath at fourth fl.den. repair sunroom roof and windows, not visible from street | $1,800 |
| Aug 2, 2023 | Completed final sign-off Apr 2025 | 2728 Union St | Caruso Construction Inc. | revision to 202008252555 for documenting unforseen conditions. added shotcrete to scope. remove lower balcony from scopeDetails
revision to 202008252555 for documenting unforseen conditions. added shotcrete to scope. remove lower balcony from scope | $15,000 |
| Jul 24, 2023 | In progress issued Sep 2024 | 2157 Jackson St | L H Construction | infill addition of 54 sq.ft. corridor at unit# 4.Details
infill addition of 54 sq.ft. corridor at unit# 4. | $14,900 |
| Feb 10, 2023 | Expired or cancelled withdrawn Sep 2023 | 2544 Baker St | replace sun room glass roof structure on the fourth floor with walls and roof.new dormer at fourth floor stairs.Details
replace sun room glass roof structure on the fourth floor with walls and roof.new dormer at fourth floor stairs. | $47,500 | |
| Feb 3, 2023 | Expired or cancelled cancelled Jan 2026 | 1251 35th Av | James Garcia Construction | rebuild interior stair and reconfigure ground level storage. renovate bathroomDetails
rebuild interior stair and reconfigure ground level storage. renovate bathroom | $82,700 |
| Jan 10, 2023 | Completed final sign-off May 2023 | 225 11th Av | L H Construction | 2/flr unit 101: interior renovation to include demo and relocation of existing kitchen and existing bedroom and removal of non-load bearing interior walls.Details
2/flr unit 101: interior renovation to include demo and relocation of existing kitchen and existing bedroom and removal of non-load bearing interior walls. | $35,600 |
| Dec 20, 2022 | In progress issued Feb 2026 | 2155 Jackson St | L H Construction | construction of new 1 bedroom conversion accessory dwelling unit at the ground floor of an existing seven unit buildingDetails
construction of new 1 bedroom conversion accessory dwelling unit at the ground floor of an existing seven unit building | $137,696 |
| Nov 2, 2022 | Never finaled issued Sep 2023, no final | 1916 Lake St | Bicardo Builders | interior renovation of(e)3-story,single family residence. new exterior deck/stair at rear, new 3 stop elevator, new balcony at master bedroom, replace exterior siding at rear facade.Details
interior renovation of(e)3-story,single family residence. new exterior deck/stair at rear, new 3 stop elevator, new balcony at master bedroom, replace exterior siding at rear facade. | $175,000 |
| Aug 8, 2022 | Completed final sign-off Apr 2023 | 737 Ashbury St | L H Construction | interior renovation of 1 (e) apartment unit 2nd/f, #1. relocate kitchen to (e) bedroom location to create a new office. relocate (e) bedroom to (e) living room location. one new window in lightwell (not visible from street or adjacent neighbor)Details
interior renovation of 1 (e) apartment unit 2nd/f, #1. relocate kitchen to (e) bedroom location to create a new office. relocate (e) bedroom to (e) living room location. one new window in lightwell (not visible from street or adjacent neighbor) | $30,000 |
| Aug 4, 2022 | Expired or cancelled expired May 2026 | 3080 Jackson St | L H Construction | rev to 202106041729 for additional work. expand approved adu by converting additional garage space of (e) g/f into a 1 bedroom aduDetails
rev to 202106041729 for additional work. expand approved adu by converting additional garage space of (e) g/f into a 1 bedroom adu | $20,000 |
| Jul 18, 2022 | Expired or cancelled expired Feb 2026 | 3637 California St | D B I Contracting Inc | t.i. to alter layout for use as a dental clinic: replace the exterior & canopy to improve disable access in complainvr e/ accessible business entrace program 51-16. upgrade mep sysyems, alter/replace (e) exterior doors & windows. install new skylight & new deck at rear yard.Details
t.i. to alter layout for use as a dental clinic: replace the exterior & canopy to improve disable access in complainvr e/ accessible business entrace program 51-16. upgrade mep sysyems, alter/replace (e) exterior doors & windows. install new skylight & new deck at rear yard. | $275,280 |
| Jul 14, 2022 | Expired or cancelled expired Aug 2026 | 2703 Jackson St | L H Construction | revision to pa# 201901180761. revision to window and skylight locations.Details
revision to pa# 201901180761. revision to window and skylight locations. | |
| Jun 17, 2022 | Completed final sign-off Nov 2024 | 3030 Pacific Av | Saturn Construction Co | exterior renovation including enclosing deck on 3rd fl. addition of front balcony on 3rd fl office. expansion of rear deck on 3rd fl.Details
exterior renovation including enclosing deck on 3rd fl. addition of front balcony on 3rd fl office. expansion of rear deck on 3rd fl. | $800,000 |
| Jun 17, 2022 | Completed final sign-off Jul 2025 | 2544 Baker St | L H Construction | create shared lobby and reconfigure entries for both units. demolish partition at ground floor garage. renovate upper unit (2544) add bedroom and 2 bathrooms.Details
create shared lobby and reconfigure entries for both units. demolish partition at ground floor garage. renovate upper unit (2544) add bedroom and 2 bathrooms. | $378,500 |
| Jan 28, 2022 | Completed final sign-off Nov 2024 | 3030 Pacific Av | Saturn Construction Co | interior renovation inlcuding removal of smaller staircase and extending main staircase to basement and 3rd floor. minor kitchen reconfiguration ofdr pantry and closet space. reconfiguration of bathroom and closet space. 2nd & 3rd floor master bedroom and master bathroom. add a full bath at 2nd fl.Details
interior renovation inlcuding removal of smaller staircase and extending main staircase to basement and 3rd floor. minor kitchen reconfiguration ofdr pantry and closet space. reconfiguration of bathroom and closet space. 2nd & 3rd floor master bedroom and master bathroom. add a full bath at 2nd fl. | $1,000,000 |
| Oct 14, 2021 | Completed final sign-off Oct 2023 | 2108 Broadway | L H Construction | (front bldg) select new exterior windows and doors. new guardrail, fence. and gates. add power rm @ 1st fl & sauna rm @ 4th fl. reconfigure unit #2 entry and doors to bed/bath #2Details
(front bldg) select new exterior windows and doors. new guardrail, fence. and gates. add power rm @ 1st fl & sauna rm @ 4th fl. reconfigure unit #2 entry and doors to bed/bath #2 | $90,000 |
| Aug 20, 2021 | Completed final sign-off Jun 2023 | 30 Chaves Av | James Garcia Construction | rev pa202102033925: including corrected property line dims. impacting non-street facing window sizes & operations, and lower floor bedroom layout. also includes structural modification to master bedroom shear wall.Details
rev pa202102033925: including corrected property line dims. impacting non-street facing window sizes & operations, and lower floor bedroom layout. also includes structural modification to master bedroom shear wall. | |
| Aug 19, 2021 | Completed final sign-off Oct 2023 | 2108 Broadway | L H Construction | interior renovation: at unit #1 to renovate master bedroom-closet, kitchen and 3 bathrooms. at unit #2: renovate 2 bathrooms and kitchen. general bldg upgrades to include fixtures, finishes and lighting.Details
interior renovation: at unit #1 to renovate master bedroom-closet, kitchen and 3 bathrooms. at unit #2: renovate 2 bathrooms and kitchen. general bldg upgrades to include fixtures, finishes and lighting. | $242,695,000 |
| Jul 20, 2021 | Completed final sign-off Feb 2023 | 224 32nd Av | extend (e) bay window at rear yard vertically to included 3rd fl. replace windows @ master bedroom @ rear.Details
extend (e) bay window at rear yard vertically to included 3rd fl. replace windows @ master bedroom @ rear. | $6,880 | |
| Jul 14, 2021 | Never finaled issued Jan 2022, no final | 2537 Chestnut St | Andrew Gallagher Construction | rev to 202102013732: remove (e) skylight above ktichen & install (n) skylight.Details
rev to 202102013732: remove (e) skylight above ktichen & install (n) skylight. | $500 |
| Jul 1, 2021 | Completed final sign-off May 2022 | 225 11th Av | L H Construction | apt 102: interior renovation of 2nd floor unit #102. renovation to include demolition and relocation of extg kitchen and extg bedroom and removal of non-load bearing wall interior.Details
apt 102: interior renovation of 2nd floor unit #102. renovation to include demolition and relocation of extg kitchen and extg bedroom and removal of non-load bearing wall interior. | $85,601 |
| Jul 1, 2021 | Completed final sign-off May 2022 | 225 11th Av | L H Construction | apt 202: interior renovation of third floor unit 202. renovation to include demolition and relocation of extg kitchen and extg bedroom and removal of non-load bearing walls.Details
apt 202: interior renovation of third floor unit 202. renovation to include demolition and relocation of extg kitchen and extg bedroom and removal of non-load bearing walls. | $85,601 |
| Jun 4, 2021 | Expired or cancelled expired May 2026 | 3080 Jackson St | L H Construction | demolition and conversion of existing ground floor garage into a proposed adu studio, including proposed kitchen & and proposed bathroom. also includes a proposed entry door from existing lobby. adu per government code section 65852.2.Details
demolition and conversion of existing ground floor garage into a proposed adu studio, including proposed kitchen & and proposed bathroom. also includes a proposed entry door from existing lobby. adu per government code section 65852.2. | $75,000 |
| Mar 31, 2021 | Completed final sign-off Jun 2022 | 2009 Buchanan St | L H Construction | interior renovation including a reconfiguration of kitchen, kitchen nook, minor modifications to the entry parlor and powder room. minor modification to the bldg exterior which includes replacing 4 (e) windows with new windows and 2 (e) doors with new doors at rear of the structure.Details
interior renovation including a reconfiguration of kitchen, kitchen nook, minor modifications to the entry parlor and powder room. minor modification to the bldg exterior which includes replacing 4 (e) windows with new windows and 2 (e) doors with new doors at rear of the structure. | $62,390 |
| Mar 31, 2021 | Completed final sign-off Oct 2021 | 2174 California St | L H Construction | unit i, 3rd flr: interior renovation of a two bedroom apartment.Details
unit i, 3rd flr: interior renovation of a two bedroom apartment. | $32,259 |
| Mar 2, 2021 | Never finaled filed Mar 2021, never issued | 2108 Broadway | renovate existing 1st floor unauthorized dwelling unit (udu) into a legal accessory dwelling unit (adu).Details
renovate existing 1st floor unauthorized dwelling unit (udu) into a legal accessory dwelling unit (adu). | $79,992 | |
| Feb 3, 2021 | Completed final sign-off Jun 2023 | 30 Chaves Av | James Garcia Construction | renovation within (e) envelope. additional 2 bedrooms & 1 bath. modifications to living room, ceiling, floor, rear facade & new deck. structural upgrades & new foundation.Details
renovation within (e) envelope. additional 2 bedrooms & 1 bath. modifications to living room, ceiling, floor, rear facade & new deck. structural upgrades & new foundation. | $592,000 |
| Feb 1, 2021 | Completed final sign-off Apr 2022 | 2537 Chestnut St | Andrew Gallagher Construction | interior renovation of (e) 1/f & 2/f: partial conversion of 1/f floor area from non-habitable to habitable including new rec room, laundry, storage and bathroom. 2/f: new bathrooms, kitchen remodel, remove walls. no increase in gross sf.Details
interior renovation of (e) 1/f & 2/f: partial conversion of 1/f floor area from non-habitable to habitable including new rec room, laundry, storage and bathroom. 2/f: new bathrooms, kitchen remodel, remove walls. no increase in gross sf. | $150,000 |
| Jan 29, 2021 | Never finaled issued Jul 2021, no final | 60 Hazelwood Av | Caruso Construction Inc. | partially excavate (e) lower level to create new bedroom, bathroom and sitting room. renovate ktichen at upper level. replce interior stairs.Details
partially excavate (e) lower level to create new bedroom, bathroom and sitting room. renovate ktichen at upper level. replce interior stairs. | $140,000 |
| Dec 18, 2020 | Expired or cancelled expired Jul 2026 | 2350 California St | L H Construction | construct 2 new 1 bedroom/1bath accessory dwelling units at the ground floor of an existing 6 unit building.Details
construct 2 new 1 bedroom/1bath accessory dwelling units at the ground floor of an existing 6 unit building. | $327,767 |
| Nov 24, 2020 | Never finaled filed Nov 2020, never issued | 2108 Broadway | L H Construction | at unit 1: remove secondary tsair 7 add new stairway to connect 3rd/4th floor. add secondary elevator for access to unit from parking level. at unit 2: reconfigure main entry to side yard, replace main stair, add bed & bathroom at 1st fl. maher n/aDetails
at unit 1: remove secondary tsair 7 add new stairway to connect 3rd/4th floor. add secondary elevator for access to unit from parking level. at unit 2: reconfigure main entry to side yard, replace main stair, add bed & bathroom at 1st fl. maher n/a | $300,000 |
| Nov 9, 2020 | Completed final sign-off Jun 2022 | 2009 Buchanan St | L H Construction | interior renovation of mastersuite, 2 shared bathros, relocate stairs.minor modfication of exterior including infill of window at new closet. relocate window at 3/f bathroom. new skylights.Details
interior renovation of mastersuite, 2 shared bathros, relocate stairs.minor modfication of exterior including infill of window at new closet. relocate window at 3/f bathroom. new skylights. | $150,000 |
| Oct 10, 2020 | Never finaled issued Jan 2021, no final | 2537 Chestnut St | Andrew Gallagher Construction | interior renovation of (e) upper level master closet and master bathroom. no increase in sq ft.Details
interior renovation of (e) upper level master closet and master bathroom. no increase in sq ft. | $43,000 |
| Aug 25, 2020 | Completed final sign-off Apr 2025 | 2728 Union St | Bill Brown Construction, Caruso Construction Inc. | renovation an expansion of unit #2 to basement level with rear yard access. partial renovation of unit #1 to include (n) roof dormer, various (n) windows/doors throughout, updated stair, alteration of master bedroom roof line.Details
renovation an expansion of unit #2 to basement level with rear yard access. partial renovation of unit #1 to include (n) roof dormer, various (n) windows/doors throughout, updated stair, alteration of master bedroom roof line. | $470,000 |
| Feb 14, 2020 | Expired or cancelled withdrawn Jan 2024 | 40 Saint Elmo Wy | Sneed & Co Construction Inc. | construct new deck at the rear yard. replace the front door and various windows. construct entry canopy. replace rear and sideyard fencing.Details
construct new deck at the rear yard. replace the front door and various windows. construct entry canopy. replace rear and sideyard fencing. | $13,600 |
| Sep 27, 2019 | Never finaled issued Sep 2021, no final | 2034 22nd Av | Pascal Liope | single story rear yard addition & renovation of existing two story building. reconstruct existing interior stair. reconfigure upper floor bathroom and closet.Details
single story rear yard addition & renovation of existing two story building. reconstruct existing interior stair. reconfigure upper floor bathroom and closet. | $274,043 |
| Aug 12, 2019 | Completed final sign-off Jan 2020 | 225 11th Av | L H Construction | interior elevation of 4th fl unit 301. renovation to include demolition and relocation of e kitchen and e bedroom, removal non load bearing interior interior wallsDetails
interior elevation of 4th fl unit 301. renovation to include demolition and relocation of e kitchen and e bedroom, removal non load bearing interior interior walls | $35,000 |
| Jul 8, 2019 | Never finaled issued Jul 2019, no final | 2219 Scott St | Saturn Construction Co | (n) gate at front entry & (n) electronic gate at driveway entrance for privacy.Details
(n) gate at front entry & (n) electronic gate at driveway entrance for privacy. | $8,000 |
| Jun 14, 2019 | Completed final sign-off Aug 2020 | 126 Shotwell St | Daniel Knight Construction | front building - interior renovation of 2 units in 2 story apartment building. new kitchen and bath in bath in each unit. surface finish improvements only in all other areasDetails
front building - interior renovation of 2 units in 2 story apartment building. new kitchen and bath in bath in each unit. surface finish improvements only in all other areas | $75,000 |
| May 15, 2019 | Never finaled issued Jul 2019, no final | 225 11th Av | L H Construction | revision to pa 2016-1130-3816 to include (n) unit entry door location to be at vestibule, revised layout of unit 1 bathroom & closet arrangementDetails
revision to pa 2016-1130-3816 to include (n) unit entry door location to be at vestibule, revised layout of unit 1 bathroom & closet arrangement | $7,000 |
| May 15, 2019 | Completed final sign-off Feb 2020 | 235 Francisco St | Narrowback Construction Co. | various inteior renovations to include replacement of select windows & doors, removval of wet bar to allow expansion of sunroom to be used as 3rd bedroom, upgrade to roof deck with wood decking & new railing, upgrade to hvac & lighting, upgrade to 1st fl; fireplace with new gas fireplace, removal ofDetails
various inteior renovations to include replacement of select windows & doors, removval of wet bar to allow expansion of sunroom to be used as 3rd bedroom, upgrade to roof deck with wood decking & new railing, upgrade to hvac & lighting, upgrade to 1st fl; fireplace with new gas fireplace, removal of | $30,000 |
| Mar 18, 2019 | Never finaled issued Mar 2019, no final | 2219 Scott St | Saturn Construction Co | revision to pa 201810254170. clarification of note regarding fire sprinkler scope. fire sprinkers nfpa13r only for the main house, not the garageDetails
revision to pa 201810254170. clarification of note regarding fire sprinkler scope. fire sprinkers nfpa13r only for the main house, not the garage | |
| Mar 11, 2019 | Completed final sign-off Dec 2019 | 256 Casitas Av | Caruso Construction Inc. | revision to 201704073430-s1. to include new bath at 1st flr lower level, division of 1st flr lower level storage w/1 hr rated fire seperation, and division of basement storage level storage. w/1hr rated fire seperation. new title 24Details
revision to 201704073430-s1. to include new bath at 1st flr lower level, division of 1st flr lower level storage w/1 hr rated fire seperation, and division of basement storage level storage. w/1hr rated fire seperation. new title 24 | $18,202 |
| Feb 22, 2019 | Never finaled issued Mar 2019, no final | 224 32nd Av | J R W Construction Inc | interior renovation of 3 story house at ground floor, updates to (e) kitchen and finishes, on 2nd fl. remodel bedrooms and add a new bathroom and laundry closet, a door will be installed at the 3rd fl. entry to the master bedroomDetails
interior renovation of 3 story house at ground floor, updates to (e) kitchen and finishes, on 2nd fl. remodel bedrooms and add a new bathroom and laundry closet, a door will be installed at the 3rd fl. entry to the master bedroom | $98,824 |
| Feb 6, 2019 | Completed final sign-off Aug 2020 | 1262 Union St | L H Construction | revision to 201602109299/r3 revision to layout of adu #1 due to addition of radiant heat. larger living area and corresponding rcp,mep,structuralDetails
revision to 201602109299/r3 revision to layout of adu #1 due to addition of radiant heat. larger living area and corresponding rcp,mep,structural | |
| Jan 30, 2019 | In progress issued Oct 2023 | 2076 14th Av | Kyle Wong Construction | rear yard addition to (e) 2-story house. additon & renovation to include a (n) batrhoom, library, family rm on the 1st flr. add a (n) master suite, additional bedrm & (n) laundry rm on 2nd flr, outdoor terrace, retaining walls & stairs added in rear yard.Details
rear yard addition to (e) 2-story house. additon & renovation to include a (n) batrhoom, library, family rm on the 1st flr. add a (n) master suite, additional bedrm & (n) laundry rm on 2nd flr, outdoor terrace, retaining walls & stairs added in rear yard. | $363,757 |
| Jan 18, 2019 | Expired or cancelled expired Aug 2026 | 2703 Jackson St | L H Construction | remodel (e) basement floor,laundry rm,reconfigure 2nd fl, new bath, build out attice for occupancy to expand unit 4, raise roof, dormer, remodel front facade, new elevator from garage to top fl, rear decks, roof deck and dormer.Details
remodel (e) basement floor,laundry rm,reconfigure 2nd fl, new bath, build out attice for occupancy to expand unit 4, raise roof, dormer, remodel front facade, new elevator from garage to top fl, rear decks, roof deck and dormer. | $200,000 |
| Oct 11, 2018 | Completed final sign-off Nov 2022 | 2066 Pine St | interior renovation of (e) kitchen @ ground level and extending kitchen into existing side yard on east. installing a new deck @ upper level (above kitchen extension). (horizontal addition into rear yard)Details
interior renovation of (e) kitchen @ ground level and extending kitchen into existing side yard on east. installing a new deck @ upper level (above kitchen extension). (horizontal addition into rear yard) | $55,231 | |
| Apr 24, 2018 | Never finaled issued Apr 2018, no final | 765 Market St | Saturn Construction Co | revision to 201704214531. changes to interior layout. replace one door system with rated enclosure for occupancy separationDetails
revision to 201704214531. changes to interior layout. replace one door system with rated enclosure for occupancy separation | |
| Apr 24, 2018 | Expired or cancelled cancelled Jan 2026 | 1206 19th St | Details
| $600,000 | |
| Jan 23, 2018 | Completed final sign-off Apr 2018 | 2288 Broadway | Dijeau Poage Construction Inc. | revision to 201610140385 - revise fire rates door designDetails
revision to 201610140385 - revise fire rates door design | |
| Sep 1, 2017 | Completed final sign-off Dec 2018 | 765 Market St | Thompson Brooks Inc., Wlg Construction And Development | units phi-e & ph1-f -partial modification to layout of interior renovation in previously approved pa 2014-0728-2260; remove 1 bathDetails
units phi-e & ph1-f -partial modification to layout of interior renovation in previously approved pa 2014-0728-2260; remove 1 bath | |
| Aug 25, 2017 | Completed final sign-off Jan 2018 | 1777 Chestnut St | L H Construction | revision to 2017-0803-3748 to include raised ceiling at unit 4 and new skylight above unit 4 entryDetails
revision to 2017-0803-3748 to include raised ceiling at unit 4 and new skylight above unit 4 entry | $9,500 |
| Aug 25, 2017 | Completed final sign-off Jan 2018 | 1777 Chestnut St | L H Construction | revision to 2017-0613-9218 to include raised ceiling at unit 3 and new skylight above unit 3 entryDetails
revision to 2017-0613-9218 to include raised ceiling at unit 3 and new skylight above unit 3 entry | $17,000 |
| Aug 25, 2017 | Completed final sign-off Dec 2019 | 1777 Chestnut St | L H Construction | new unit #3 on 3rd floor access to new roof deck, including custom retractable skylihgt over new stairs.Details
new unit #3 on 3rd floor access to new roof deck, including custom retractable skylihgt over new stairs. | $150,000 |
| Jun 13, 2017 | Completed final sign-off Feb 2018 | 26 Hancock St | Tom Can Construction | new folding doors at extg 2nd floor rear deck; including shear wall structural upgrade.Details
new folding doors at extg 2nd floor rear deck; including shear wall structural upgrade. | $7,000 |
| Jun 13, 2017 | Completed final sign-off Jan 2018 | 1777 Chestnut St | L H Construction | 3rd floor renovation of unit 3 including addition of new powder room, and expanded living/dining room areas, kitchen and bath. new skylights installed at kitchen and bathDetails
3rd floor renovation of unit 3 including addition of new powder room, and expanded living/dining room areas, kitchen and bath. new skylights installed at kitchen and bath | $120,000 |
| Jun 7, 2017 | Completed final sign-off Jan 2020 | 292 Circular Av | Professional Home Designs | intr renov(e)kitchen&addition to(e)kitn at upper&lower level.new interl stairwy to connect upper to lower level.intr remodel(e)lower level incl new bedrm,bathrm,studio&laudry area.new rear deck at upper level w/access to garden.mod bldg facade,windw+extr drs as req.maher n/a.Details
intr renov(e)kitchen&addition to(e)kitn at upper&lower level.new interl stairwy to connect upper to lower level.intr remodel(e)lower level incl new bedrm,bathrm,studio&laudry area.new rear deck at upper level w/access to garden.mod bldg facade,windw+extr drs as req.maher n/a. | $79,193 |
| Apr 21, 2017 | Completed final sign-off Oct 2019 | 765 Market St | Saturn Construction Co | grand penthouse a- interior renovation of grand penthouse a in four seasons residences. work to include renovation of master bedroom, bath, closets & guest bedrooms, baths, closets; front entry foyer/hall; powder room, kitchen; dining room; family/living rooms; new media roomDetails
grand penthouse a- interior renovation of grand penthouse a in four seasons residences. work to include renovation of master bedroom, bath, closets & guest bedrooms, baths, closets; front entry foyer/hall; powder room, kitchen; dining room; family/living rooms; new media room | $500,000 |
| Apr 7, 2017 | Completed final sign-off Mar 2020 | 256 Casitas Av | Caruso Construction Inc. | erect 3 story, 1 basement, type v, single family residence.Details
erect 3 story, 1 basement, type v, single family residence. | $63,132 |
| Feb 15, 2017 | Completed final sign-off Mar 2018 | 26 Hancock St | Tom Can Construction | interior renovation of kitchen, dining room, bathroom on 2nd fl. remove kitchenette on 1st fl. 1st fl to include master bedroom, study/sitting rm, full master bathDetails
interior renovation of kitchen, dining room, bathroom on 2nd fl. remove kitchenette on 1st fl. 1st fl to include master bedroom, study/sitting rm, full master bath | $100 |
| Dec 8, 2016 | Completed final sign-off Oct 2018 | 3080 Jackson St | L H Construction | demolition and conversion of extg 1st floor laundry & storage rooms at rear of bldg into nw addition and remodel to unit #1, including additional necessary excavation at rear window well & steps. new door & relocation of extg storage at garage to allow additional car parking. n/a for maher.Details
demolition and conversion of extg 1st floor laundry & storage rooms at rear of bldg into nw addition and remodel to unit #1, including additional necessary excavation at rear window well & steps. new door & relocation of extg storage at garage to allow additional car parking. n/a for maher. | $180,000 |
| Nov 30, 2016 | Completed final sign-off Dec 2021 | 225 11th Av | L H Construction | conversion of 1st floor (e) garage & (e) storage into 2 new units, per ordinance no 162-16. allowed for adu & soft story retrofit submitted seperately. soft story permit #2016-0804-4188.Details
conversion of 1st floor (e) garage & (e) storage into 2 new units, per ordinance no 162-16. allowed for adu & soft story retrofit submitted seperately. soft story permit #2016-0804-4188. | $171,250 |
| Oct 14, 2016 | Completed final sign-off Apr 2018 | 2288 Broadway | Moroso Construction Inc, Dijeau Poage Construction Inc. | #3: inerior renovation of a full floor residential unit located on 3rd flr of a 10-story residential building.work to include the replacement in kind of existing windows & exterior doors.Details
#3: inerior renovation of a full floor residential unit located on 3rd flr of a 10-story residential building.work to include the replacement in kind of existing windows & exterior doors. | $384,995 |
| Sep 30, 2016 | Completed final sign-off Apr 2017 | 3080 Jackson St | L H Construction | unit #4 - interior renovation - additoin of (n) master closet & (n) master bath. renovate (e) kitchen & (e) bath, layout to remain.Details
unit #4 - interior renovation - additoin of (n) master closet & (n) master bath. renovate (e) kitchen & (e) bath, layout to remain. | $42,417 |
| Sep 21, 2016 | Completed final sign-off Jan 2019 | 2950 Vallejo St | L H Construction | horizontal addition. 2 story addition at side yard. expansion of existing kitchen, expansion of existing bedroomDetails
horizontal addition. 2 story addition at side yard. expansion of existing kitchen, expansion of existing bedroom | $15,652 |
| Jul 8, 2016 | Completed final sign-off Mar 2017 | 3080 Jackson St | L H Construction | unit #6: interior renovation. addition of new master closet and new master bathroom, renovation of (e) kitfchen and (e) bathroom. layout to remain maher naDetails
unit #6: interior renovation. addition of new master closet and new master bathroom, renovation of (e) kitfchen and (e) bathroom. layout to remain maher na | $39,889 |
| Jul 6, 2016 | Completed final sign-off Jun 2018 | 3934 Washington St | Dijeau Poage Construction Inc. | remodel of bsmt of (e). lower (e) floor slab to increase ceiling ht to 8'-9.5". addition to (e) bsmt at rear. interior remodel of bsmt convert (e) ofcs into new guest rm and renovation of (e) powder rm into new bathrm. on 1st (e) back patio at rear-resurface w/structural glass to provide lt. na forDetails
remodel of bsmt of (e). lower (e) floor slab to increase ceiling ht to 8'-9.5". addition to (e) bsmt at rear. interior remodel of bsmt convert (e) ofcs into new guest rm and renovation of (e) powder rm into new bathrm. on 1st (e) back patio at rear-resurface w/structural glass to provide lt. na for | $23,700 |
| Feb 10, 2016 | Completed final sign-off Aug 2020 | 1262 Union St | L H Construction | conversion of basement to 3 new dwellings per adu procedures.Details
conversion of basement to 3 new dwellings per adu procedures. | $120,000 |
| Dec 22, 2015 | Completed final sign-off Jul 2018 | 81 Ashbury Tr | Mcmahon Construction | alteration to e 3 story single family dwelling. modify windows front, replace select windows/doors. replace exterior siding, shingles to wood siding, modify e roof deck and mod to landscaping at front yard. reconfigure concrete steps. no habitable area added.Details
alteration to e 3 story single family dwelling. modify windows front, replace select windows/doors. replace exterior siding, shingles to wood siding, modify e roof deck and mod to landscaping at front yard. reconfigure concrete steps. no habitable area added. | $2,900 |
| Nov 19, 2015 | Never finaled issued Dec 2015, no final | 3934 Washington St | Dijeau Poage Construction Inc. | replacement in-kind of 4 windows (repalce sash only) custom wood. window (sash only) to match (e).Details
replacement in-kind of 4 windows (repalce sash only) custom wood. window (sash only) to match (e). | $3,000 |
| Nov 6, 2015 | Completed final sign-off Mar 2016 | 3080 Jackson St | L H Construction | interior renovation of unit #3. addition of new master closet, master bath. renovate (e) bath, layout to remain. addition of raised counter in kitchen. open kitchen to living room. widen openings and raise heads at dining roomDetails
interior renovation of unit #3. addition of new master closet, master bath. renovate (e) bath, layout to remain. addition of raised counter in kitchen. open kitchen to living room. widen openings and raise heads at dining room | $67,917 |
| Nov 5, 2015 | Completed final sign-off Feb 2018 | 3934 Washington St | Dijeau Poage Construction Inc. | interior renovation and remodeling on an existing single family house, proposed project includes remodeling of (e) kitchen, 4 (e) baths, replace bay window & windows, doors as noted, not visable from street. remodel (e) barbeques in the rear yard. n/a ordinance #155-13.Details
interior renovation and remodeling on an existing single family house, proposed project includes remodeling of (e) kitchen, 4 (e) baths, replace bay window & windows, doors as noted, not visable from street. remodel (e) barbeques in the rear yard. n/a ordinance #155-13. | $111,536 |
| Nov 2, 2015 | Completed final sign-off Jan 2019 | 2950 Vallejo St | L H Construction | modification to existing driveway. conversion of existing basement storage to garage. minor modifications to fensestration at sides and rear of buildingDetails
modification to existing driveway. conversion of existing basement storage to garage. minor modifications to fensestration at sides and rear of building | $25,000 |
| Oct 9, 2015 | Completed final sign-off Feb 2020 | 2620 Buchanan St | Paul Ryan Associates | renovation of 3 units residence, 2620 buchanan st #1, 2 & 3. complete interior renovation & upgrade to all units. n/a ordinance #155-13.Details
renovation of 3 units residence, 2620 buchanan st #1, 2 & 3. complete interior renovation & upgrade to all units. n/a ordinance #155-13. | $550,433 |
| Feb 13, 2015 | Completed final sign-off Dec 2015 | 1808 Vallejo St | fill-in of ground level space under an (e) sunroom above. fill-in will be part of (e) unit# 1. variance case: 2014.1460v. sprinklers sep permitDetails
fill-in of ground level space under an (e) sunroom above. fill-in will be part of (e) unit# 1. variance case: 2014.1460v. sprinklers sep permit | $60,000 | |
| Feb 11, 2015 | Completed final sign-off Mar 2018 | 79 Meadowbrook Dr | horiz addition &intr renov to (e)2-story sfd.the addition is on the rear side of hse & within req 25%.rear yd setback.addition incl extension (n) family rm(194 sf) on 1/fl.extension (e)bedrm #1&(n)balcony(155 sf)on 2/fl. intr renov inlc conversion of 204 sf unconditioned space into enclosed entrywayDetails
horiz addition &intr renov to (e)2-story sfd.the addition is on the rear side of hse & within req 25%.rear yd setback.addition incl extension (n) family rm(194 sf) on 1/fl.extension (e)bedrm #1&(n)balcony(155 sf)on 2/fl. intr renov inlc conversion of 204 sf unconditioned space into enclosed entryway | $68,400 | |
| Dec 22, 2014 | Completed final sign-off Aug 2015 | 3080 Jackson St | L H Construction | unit #7 interior renovation- addition of (n) master closet & (n) master bath, renovate (e) bath, layout to remain , addiiton of raised counter in kitchen, open kitchen to living room, widen openings & raise heads at dining room. n/a maher ordinanceDetails
unit #7 interior renovation- addition of (n) master closet & (n) master bath, renovate (e) bath, layout to remain , addiiton of raised counter in kitchen, open kitchen to living room, widen openings & raise heads at dining room. n/a maher ordinance | $20,000 |
| Aug 15, 2014 | Expired or cancelled cancelled Jan 2026 | 1808 Vallejo St | revision to pa #2013.1213.4114 - fill-in of grond level space under existing sunroom above. fill-in will be part of existing unit #1. modification to interior layout of unit #1 & (e) stair & garage.Details
revision to pa #2013.1213.4114 - fill-in of grond level space under existing sunroom above. fill-in will be part of existing unit #1. modification to interior layout of unit #1 & (e) stair & garage. | $60,000 | |
| Jul 28, 2014 | Completed final sign-off Dec 2018 | 765 Market St | Thompson Brooks Inc., Wlg Construction And Development | to merge units phie & phif. interior renovation for a new master bedroom, master bath, walk in closet, exercise nooks & storages.Details
to merge units phie & phif. interior renovation for a new master bedroom, master bath, walk in closet, exercise nooks & storages. | $219,536 |