256 permits since 2000 (engineer on 211 permits, designer on 22 permits, architect on 19 permits, authorized agent-others on 4 permits): 203 completed, 21 never finaled, 32 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 256.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 6, 2025 | Completed final sign-off Jul 2025 | 1400 Guerrero St | M J Hayhurst Const Co | revision for permit #202501087935 provide 1-a35 angle at entry ceiling framing to corner post.Details
revision for permit #202501087935 provide 1-a35 angle at entry ceiling framing to corner post. | $3 |
| Aug 30, 2023 | Completed final sign-off Jan 2024 | 60 Montezuma St | to comply w/ nov# 202200586. new rear retaining wall. replacement of existingDetails
to comply w/ nov# 202200586. new rear retaining wall. replacement of existing | $64,900 | |
| May 16, 2023 | Completed final sign-off Jun 2024 | 463 Duboce Av | A J O Group Build Inc | replace rear yard stairs and add deck at 3rd floor. replace wood siding on entire rear with hardie plank.Details
replace rear yard stairs and add deck at 3rd floor. replace wood siding on entire rear with hardie plank. | $55,000 |
| May 16, 2023 | Completed final sign-off Aug 2024 | 3040 22nd Av | A-1 Dynamic Builders Inc. | voluntary structural strengthening install one steel frame in garageDetails
voluntary structural strengthening install one steel frame in garage | $30,000 |
| Jul 26, 2022 | Completed final sign-off Oct 2022 | 72 Stanyan St | A J O Group Build Inc | to comply with nov# 202293113. soil stabilization via geo-grouting along north property line foundation required for excavation work at adjacent property at 66-68 stanyan st under pa# 202205275167 & revision to pa# 202207259208.Details
to comply with nov# 202293113. soil stabilization via geo-grouting along north property line foundation required for excavation work at adjacent property at 66-68 stanyan st under pa# 202205275167 & revision to pa# 202207259208. | $5,000 |
| Jul 25, 2022 | Completed final sign-off Mar 2023 | 66 Stanyan St | A J O Group Build Inc | revision to pa# 2022-0527-5167 change bathroom layout patio walls configuration and foundation along south property lineDetails
revision to pa# 2022-0527-5167 change bathroom layout patio walls configuration and foundation along south property line | $5,000 |
| Jul 25, 2022 | Completed final sign-off Sep 2022 | 1772 Golden Gate Av | A J O Group Build Inc | revision pa# 202205275164: minor construction changesDetails
revision pa# 202205275164: minor construction changes | |
| Jun 14, 2022 | Completed final sign-off Feb 2023 | 772 Elizabeth St | A J O Group Build Inc | revision to pa# 2021-0625-3264: new steel beam, new steel frame, new foundation pit for future elevator new grade beam at interior stairsDetails
revision to pa# 2021-0625-3264: new steel beam, new steel frame, new foundation pit for future elevator new grade beam at interior stairs | $15,000 |
| Jun 14, 2022 | Completed final sign-off Aug 2022 | 1615 Powell St | David Jone | rev to pa# 2017-0831-6575: eliminate planned wood shear walls and attach (e) diaphram directly to new concrete foundation stemsDetails
rev to pa# 2017-0831-6575: eliminate planned wood shear walls and attach (e) diaphram directly to new concrete foundation stems | $2,000 |
| May 27, 2022 | Completed final sign-off Mar 2023 | 66 Stanyan St | A J O Group Build Inc | ground floor remodel with new family room, bathroom & wet bar. voluntary seismic upgrade at ground floor.Details
ground floor remodel with new family room, bathroom & wet bar. voluntary seismic upgrade at ground floor. | $95,000 |
| May 27, 2022 | Completed final sign-off Sep 2022 | 1772 Golden Gate Av | A J O Group Build Inc | comply with san francisco wood-frame seismic retrofit program (soft story), sfbc chapter 4d, 2019 ceac appendix a-4Details
comply with san francisco wood-frame seismic retrofit program (soft story), sfbc chapter 4d, 2019 ceac appendix a-4 | $60,000 |
| Dec 23, 2021 | Never finaled issued Feb 2022, no final | 147 Fillmore St | remodel work to superced bpa#202103025669,and comply with nov#202177213 & complaint#20217150. g/f:structural work for (n)beams above units 145 & 147. (n)strutural beams,remodeld kitchen,4/2 bath,3/4 bath,(n)mbr,bath & closets.Details
remodel work to superced bpa#202103025669,and comply with nov#202177213 & complaint#20217150. g/f:structural work for (n)beams above units 145 & 147. (n)strutural beams,remodeld kitchen,4/2 bath,3/4 bath,(n)mbr,bath & closets. | $120,000 | |
| Dec 17, 2021 | Expired or cancelled cancelled Mar 2022 | 772 Elizabeth St | A J O Group Build Inc | revision to pa 202112154483 install five new windows on side wall (not visible street)Details
revision to pa 202112154483 install five new windows on side wall (not visible street) | |
| Dec 13, 2021 | Completed final sign-off Apr 2022 | 338 Sanchez St | A J O Group Build Inc | enclosed rear cantilever w./ new walls and foundations.Details
enclosed rear cantilever w./ new walls and foundations. | $15,000 |
| Nov 24, 2021 | Completed final sign-off Mar 2022 | 3947 18th St | A J O Group Build Inc | comply with sf wood frame seismic retrofit program soft story sfbc ch 4d per 2019 cebc appendix a4Details
comply with sf wood frame seismic retrofit program soft story sfbc ch 4d per 2019 cebc appendix a4 | $85,000 |
| Jun 25, 2021 | Completed final sign-off Feb 2023 | 772 Elizabeth St | A J O Group Build Inc | g/f: structural upgrade. replace entire ground floor.Details
g/f: structural upgrade. replace entire ground floor. | $110,000 |
| Jun 23, 2021 | Completed final sign-off Oct 2021 | 20 Apparel Wy | A J O Group Build Inc | warehouse voluntary minor structural upgrades. install 2 new steel columns with concrete foundation pads to reinforce deteriorated concrete columns.Details
warehouse voluntary minor structural upgrades. install 2 new steel columns with concrete foundation pads to reinforce deteriorated concrete columns. | $9,000 |
| Mar 1, 2021 | Completed final sign-off Apr 2021 | 3340 18th St | A J O Group Build Inc | revision to pa# 202011108667. connection changes to steel frame at grid line a.Details
revision to pa# 202011108667. connection changes to steel frame at grid line a. | |
| Nov 12, 2020 | Never finaled filed Nov 2020, never issued | 31 Belmont Av | A J O Group Build Inc | replace full brick founation, new g/f slab on grade, replace in-kind brick entry stairs,(n) interior stairs to g/f, add'l g/f space within building envelope:remodel 2/f & 3/f bathrooms, (n) 3/f laundry room,(n) new windows but no change to facade.Details
replace full brick founation, new g/f slab on grade, replace in-kind brick entry stairs,(n) interior stairs to g/f, add'l g/f space within building envelope:remodel 2/f & 3/f bathrooms, (n) 3/f laundry room,(n) new windows but no change to facade. | $110,000 |
| Nov 10, 2020 | Completed final sign-off Apr 2021 | 3340 18th St | A J O Group Build Inc | voluntary structural upgrade. install new steel frame at front wall.Details
voluntary structural upgrade. install new steel frame at front wall. | $30,000 |
| Oct 2, 2020 | Completed final sign-off Feb 2021 | 1235 Waller St | A J O Group Build Inc | rev to 201712277461 to replace entire previous set. to comly with san francisco wood-frame seismic retrofit program (soft story), sfbc ch4d, 2016 cebc apendex a-4.Details
rev to 201712277461 to replace entire previous set. to comly with san francisco wood-frame seismic retrofit program (soft story), sfbc ch4d, 2016 cebc apendex a-4. | |
| Jan 29, 2020 | Completed final sign-off Jul 2020 | 45 Grattan St | A J O Group Build Inc | ground floor: add bathroom. replace 3 windows and add 1 window. no work visible from the street.Details
ground floor: add bathroom. replace 3 windows and add 1 window. no work visible from the street. | $25,000 |
| Dec 11, 2019 | Completed final sign-off Mar 2020 | 1250 48th Av | A J O Group Build Inc | rev to pa# 201811014711; changes to steel frame at grid line aDetails
rev to pa# 201811014711; changes to steel frame at grid line a | |
| Dec 11, 2019 | Completed final sign-off May 2020 | 45 Grattan St | A J O Group Build Inc | ground floor voluntary seismic/structural upgrad with replacement of about 70% of foundations and constructions of new shear wallsDetails
ground floor voluntary seismic/structural upgrad with replacement of about 70% of foundations and constructions of new shear walls | $65,000 |
| Nov 25, 2019 | Never finaled issued Sep 2022, no final | 1670 Mcallister St | Dajani Construction | comply with san francisco wood-fram seismic retrofit program (soft story), sfbc chapter 4d, per 2016 iebc appendix a-4. to comply with nov #201990711 (failure to comply with soft story retrofit)Details
comply with san francisco wood-fram seismic retrofit program (soft story), sfbc chapter 4d, per 2016 iebc appendix a-4. to comply with nov #201990711 (failure to comply with soft story retrofit) | $50,000 |
| Nov 5, 2019 | Completed final sign-off Aug 2020 | 250 21st Av | A J O Group Build Inc | revision to app#201812037353. residential addition. changes to foundation plan due to differing extg conditions.Details
revision to app#201812037353. residential addition. changes to foundation plan due to differing extg conditions. | $10,000 |
| Oct 17, 2019 | Completed final sign-off Sep 2020 | 875 Vermont St | Sgv Group Construction | revision to pa 201709117647. replace 2 planned steel frames w/ shear wallsDetails
revision to pa 201709117647. replace 2 planned steel frames w/ shear walls | |
| Sep 30, 2019 | Completed final sign-off Jul 2020 | 2952 Folsom St | soft story seismic upgrade. ord 66-13 file 1356119Details
soft story seismic upgrade. ord 66-13 file 1356119 | $40,000 | |
| Jun 27, 2019 | Completed final sign-off Mar 2020 | 250 21st Av | A J O Group Build Inc | voluntary seismic upgrade. legalization & upgrade of unit under separate pa #201812037353Details
voluntary seismic upgrade. legalization & upgrade of unit under separate pa #201812037353 | $20,000 |
| Jun 20, 2019 | Expired or cancelled cancelled Jan 2026 | 2849 Fillmore St | A J O Group Build Inc | revision to pa 2019-0307-4657 minor structural changesDetails
revision to pa 2019-0307-4657 minor structural changes | |
| Jun 20, 2019 | Completed final sign-off Oct 2019 | 2849 Fillmore St | A J O Group Build Inc | revision to pa # 201903074657 minor structural changes.Details
revision to pa # 201903074657 minor structural changes. | |
| Jun 12, 2019 | Expired or cancelled cancelled Jan 2026 | 203 Willow St | unit 502. office remodel, partial demo of (e) partition walls, replace carpetDetails
unit 502. office remodel, partial demo of (e) partition walls, replace carpet | $20,000 | |
| May 22, 2019 | Completed final sign-off May 2020 | 735 Thornton Av | Cullinane Plastering | demolish partition walls at warehouse on ground fl, no unit removal ab-017 applies.Details
demolish partition walls at warehouse on ground fl, no unit removal ab-017 applies. | $5,000 |
| Apr 11, 2019 | Completed final sign-off May 2019 | 2560 Polk St | A J O Group Build Inc | revision to 201706280527 minor structural changesDetails
revision to 201706280527 minor structural changes | |
| Mar 11, 2019 | Completed final sign-off Apr 2022 | 250 Kenwood Wy | Chen & Wong Construction Inc | replace entirely deteriorated front stairs in kind.Details
replace entirely deteriorated front stairs in kind. | $25,000 |
| Mar 8, 2019 | Completed final sign-off Aug 2019 | 2853 Sacramento St | A J O Group Build Inc | rev to pa201811297059 - change of lateral framing system.Details
rev to pa201811297059 - change of lateral framing system. | $10,000 |
| Mar 7, 2019 | Completed final sign-off Oct 2019 | 2849 Fillmore St | A J O Group Build Inc | revision to pa #201801249413. soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4.Details
revision to pa #201801249413. soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. | |
| Dec 20, 2018 | Completed final sign-off Feb 2020 | 1411 Diamond St | A J O Group Build Inc | reconfigure rear deck stairs and landscaping.Details
reconfigure rear deck stairs and landscaping. | $10,000 |
| Dec 14, 2018 | Completed final sign-off Aug 2020 | 150 Anzavista Av | A J O Group Build Inc | voluntary structural upgrade per ab-094 per 2016 cebc appx a4Details
voluntary structural upgrade per ab-094 per 2016 cebc appx a4 | $50,000 |
| Dec 5, 2018 | Never finaled issued Jan 2019, no final | 981 Valencia St | A J O Group Build Inc, Chin Pang Construction Co ***Check Id*** | altered site to pa #2018-0531-0658 s. new railing on unoccupied roof.Details
altered site to pa #2018-0531-0658 s. new railing on unoccupied roof. | $10,000 |
| Oct 31, 2018 | Completed final sign-off Mar 2019 | 850 Greenwich St | A J O Group Build Inc | volunteer seismic retrofit program (soft story), sfbc chapter 4d per 2016 cebc appendix a-4Details
volunteer seismic retrofit program (soft story), sfbc chapter 4d per 2016 cebc appendix a-4 | $80,000 |
| Oct 30, 2018 | Completed final sign-off Apr 2019 | 80 Crestline Dr | replace balcony flooring at all building balconiesDetails
replace balcony flooring at all building balconies | $9,000 | |
| Sep 14, 2018 | Completed final sign-off Jul 2020 | 5907 Geary Bl | A J O Group Build Inc | soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4(residential)Details
soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4(residential) | $20,000 |
| Sep 14, 2018 | Completed final sign-off Jul 2020 | 5901 Geary Bl | A J O Group Build Inc | soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4(commercial)Details
soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4(commercial) | $10,000 |
| Sep 13, 2018 | Completed final sign-off Aug 2019 | 401 Capp St | Ryan Construction | commericial: comply with san francisco wood frame seismic retrofit program soft story, sfbc chap 4d, per 2016 cebc appendix a4.Details
commericial: comply with san francisco wood frame seismic retrofit program soft story, sfbc chap 4d, per 2016 cebc appendix a4. | $10,000 |
| Sep 13, 2018 | Completed final sign-off Aug 2019 | 403 Capp St | Ryan Construction | residential: comply with sf wood frame seismic retrofit program soft story sfbc ch 4d per 2016 cebc appendix a4.Details
residential: comply with sf wood frame seismic retrofit program soft story sfbc ch 4d per 2016 cebc appendix a4. | $20,000 |
| Aug 29, 2018 | Completed final sign-off Apr 2020 | 810 Lyon St | Collier-Ostrom Enterprise | replace (e) rear deck and stairs, relocate (e) windows ands doors at rear wall, replace (e) finish at rear walls.Details
replace (e) rear deck and stairs, relocate (e) windows ands doors at rear wall, replace (e) finish at rear walls. | $15,000 |
| Aug 21, 2018 | Never finaled issued Aug 2018, no final | 1011 Shotwell St | front building - voluntary seismic retrofit per sfbc chapter 4d, 2016 cebc appendix a-4. ab-094Details
front building - voluntary seismic retrofit per sfbc chapter 4d, 2016 cebc appendix a-4. ab-094 | $50,000 | |
| Aug 14, 2018 | Completed final sign-off Dec 2018 | 1809 Lyon St | A J O Group Build Inc | voluntary structural upgrade. install steel frame at bld front wallDetails
voluntary structural upgrade. install steel frame at bld front wall | $15,000 |
| Aug 9, 2018 | Expired or cancelled cancelled Jan 2026 | 2512 Quint St | to comply with san francisco wood frame seismic retrofit program (soft story), sfbc chapter 4d, per 2016 cebc, appendix a-4. maher n/a.Details
to comply with san francisco wood frame seismic retrofit program (soft story), sfbc chapter 4d, per 2016 cebc, appendix a-4. maher n/a. | $70,000 | |
| Aug 9, 2018 | Completed final sign-off May 2019 | 4100 24th St | A J O Group Build Inc | commercial:to comply with san francisco wood frame seismic retrofit program (soft story), sfbc chapter 4d, per 2016 cebc, appendix a-4. maher n/a.Details
commercial:to comply with san francisco wood frame seismic retrofit program (soft story), sfbc chapter 4d, per 2016 cebc, appendix a-4. maher n/a. | $27,200 |
| Aug 9, 2018 | Never finaled issued Feb 2019, no final | 1246 Castro St | A J O Group Build Inc | residential: to comply with san francisco wood frame seismic retrofit program (soft story), sfbc chapter 4d, per 2016 cebc, appendix a-4. maher n/a.Details
residential: to comply with san francisco wood frame seismic retrofit program (soft story), sfbc chapter 4d, per 2016 cebc, appendix a-4. maher n/a. | $52,800 |
| Jul 25, 2018 | Completed final sign-off Sep 2018 | 724 16th Av | common area. replace entirely deteriorated lightwell stairs in kind.Details
common area. replace entirely deteriorated lightwell stairs in kind. | $30,000 | |
| Jun 27, 2018 | Completed final sign-off Aug 2018 | 875 25th Av | A J O Group Build Inc | revision to app#201708043972. relocate front steel frame and new shear walls.Details
revision to app#201708043972. relocate front steel frame and new shear walls. | |
| Jun 21, 2018 | Completed final sign-off May 2021 | 2006 Green St | A J O Group Build Inc | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. to comply with complaint 201712021Details
soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. to comply with complaint 201712021 | $50,000 |
| Jun 20, 2018 | Completed final sign-off Dec 2018 | 100 20th Av | A J O Group Build Inc | comply with sf wood frame seismic retrofit program (soft story) sfbc chapter 4d, per 2016 cebc appx a4Details
comply with sf wood frame seismic retrofit program (soft story) sfbc chapter 4d, per 2016 cebc appx a4 | $45,000 |
| Jun 11, 2018 | Completed final sign-off Aug 2022 | 307 Page St | revision to 201605046517 minor structural construction changesDetails
revision to 201605046517 minor structural construction changes | ||
| May 31, 2018 | Completed final sign-off Mar 2019 | 981 Valencia St | A J O Group Build Inc, Chin Pang Construction Co ***Check Id*** | (n) roof deck - repair (e) rear stairs (less than 50%)Details
(n) roof deck - repair (e) rear stairs (less than 50%) | $10,000 |
| Mar 30, 2018 | Completed final sign-off Aug 2022 | 65 Brady St | S F Garage Company Inc. | soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4 | $75,000 |
| Mar 27, 2018 | Expired or cancelled cancelled Jan 2026 | 363 Arkansas St | replace existing retaining wall & fence along north property line. reconfigure back yard with new retaining wall, stairs & landscaped area.Details
replace existing retaining wall & fence along north property line. reconfigure back yard with new retaining wall, stairs & landscaped area. | $40,000 | |
| Feb 22, 2018 | Never finaled issued Mar 2018, no final | 754 South Van Ness Av | Sean Rattigan Construction | replace 20' of (e) brick foundation with new concrete foundation along south property line wallDetails
replace 20' of (e) brick foundation with new concrete foundation along south property line wall | $15,000 |
| Feb 8, 2018 | Completed final sign-off Jan 2020 | 1460 Valencia St | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. leagl use: (7) res. gr, (4) tourist gr, and (1) dwelling, no change proposed.Details
soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. leagl use: (7) res. gr, (4) tourist gr, and (1) dwelling, no change proposed. | $70,000 | |
| Feb 6, 2018 | Completed final sign-off May 2019 | 2727 Lombard St | A J O Group Build Inc | soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4 | $55,000 |
| Jan 31, 2018 | Completed final sign-off May 2018 | 981 Valencia St | address nov # 201274643. remove extg railing. maher naDetails
address nov # 201274643. remove extg railing. maher na | $1,000 | |
| Jan 22, 2018 | Completed final sign-off Feb 2019 | 50 Mason St | interior stair revision for pa 2016-1230-6322Details
interior stair revision for pa 2016-1230-6322 | ||
| Jan 22, 2018 | Expired or cancelled expired Feb 2025 | 700 Cabrillo St | A J O Group Inc | revision to pa 201708316605 minor change to shear walls upgrade add two new sections of grade beamsDetails
revision to pa 201708316605 minor change to shear walls upgrade add two new sections of grade beams | $5,000 |
| Jan 19, 2018 | Completed final sign-off Jun 2021 | 527 Dolores St | Atm Construction | madatory soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4. to comply with nov#201720471Details
madatory soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4. to comply with nov#201720471 | $55,000 |
| Jan 11, 2018 | Completed final sign-off Nov 2020 | 1409 Shrader St | Atm Construction | comply w/ sf wood frame seismic retrofit program soft story retrofit per sfebc chapter 4d 2016 cebc appendix a-4.Details
comply w/ sf wood frame seismic retrofit program soft story retrofit per sfebc chapter 4d 2016 cebc appendix a-4. | $30,000 |
| Jan 11, 2018 | Completed final sign-off Aug 2022 | 1133 Hayes St | Atm Construction | comply w/ sf wood frame seismic retrofit program soft story retrofit per sfebc chapter 4d 2016 cebc appendix a-4. n/a for maherDetails
comply w/ sf wood frame seismic retrofit program soft story retrofit per sfebc chapter 4d 2016 cebc appendix a-4. n/a for maher | $65,000 |
| Dec 14, 2017 | Completed final sign-off Sep 2020 | 1535 Leavenworth St | Atm Construction | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4 | $80,000 |
| Dec 14, 2017 | Completed final sign-off Nov 2018 | 74 Crestline Dr | A J O Group Build Inc | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4 | $75,000 |
| Nov 22, 2017 | Expired or cancelled withdrawn Feb 2019 | 1948 Washington St | replace damage retaining rear yard along east property lineDetails
replace damage retaining rear yard along east property line | $20,000 | |
| Nov 14, 2017 | Completed final sign-off Jan 2018 | 2401 23rd Av | A J O Group Inc | soft story upgrade - revision to pa #201704043168: minor graphic update & minor change to tie down schedule.Details
soft story upgrade - revision to pa #201704043168: minor graphic update & minor change to tie down schedule. | |
| Sep 14, 2017 | Expired or cancelled withdrawn Dec 2017 | 3223 17th St | soft story, seismic retrofit program, sfbc ch 4d, per iebc 2016 app a4Details
soft story, seismic retrofit program, sfbc ch 4d, per iebc 2016 app a4 | $20,000 | |
| Sep 12, 2017 | Expired or cancelled withdrawn Apr 2019 | 1948 Washington St | comply with s.f. wood frame soft story seismic retrofit program, sfebc chapter 4d per cebc appendix a-4. n/a maher ordinanceDetails
comply with s.f. wood frame soft story seismic retrofit program, sfebc chapter 4d per cebc appendix a-4. n/a maher ordinance | $60,000 | |
| Sep 12, 2017 | Completed final sign-off May 2018 | 1830 Beach St | A J O Group Build Inc, A J O Group Inc | comply with s.f. wood frame soft story seismic retrofit program, sfebc chapter 4d per cebc appendix a-4. n/a maher ordinanceDetails
comply with s.f. wood frame soft story seismic retrofit program, sfebc chapter 4d per cebc appendix a-4. n/a maher ordinance | $65,000 |
| Sep 12, 2017 | Completed final sign-off Jan 2018 | 125 San Felipe Av | A J O Group Inc | replace damaged retaining wall in rear yard, total excavation is less than 3 c.u. yard. n/a maher ordinanceDetails
replace damaged retaining wall in rear yard, total excavation is less than 3 c.u. yard. n/a maher ordinance | $35,000 |
| Sep 11, 2017 | Expired or cancelled withdrawn Oct 2019 | 1670 Mcallister St | soft story seismic upgrade, sfbc chapter 4d, per cebc appendix a-4.Details
soft story seismic upgrade, sfbc chapter 4d, per cebc appendix a-4. | $55,000 | |
| Sep 11, 2017 | Completed final sign-off Apr 2025 | 714 Bay St | B & B Construction | soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4. ** maher: n/a **Details
soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4. ** maher: n/a ** | $50,000 |
| Sep 11, 2017 | Completed final sign-off Jun 2018 | 120 Joice St | A J O Group Build Inc | soft story seismic upgrade, sfbc chapter 4d, per cebc appendix a-4.Details
soft story seismic upgrade, sfbc chapter 4d, per cebc appendix a-4. | $40,000 |
| Sep 11, 2017 | Never finaled issued Dec 2022, no final | 714 Bay St | B & B Construction | adu per ordinance# 162-16 on ground floor with 1 bedroom & 1 bathroom in each unit. add 1 powder room in staorge room. ** maher: n/a **Details
adu per ordinance# 162-16 on ground floor with 1 bedroom & 1 bathroom in each unit. add 1 powder room in staorge room. ** maher: n/a ** | $30,000 |
| Sep 11, 2017 | Completed final sign-off Jul 2019 | 2700 Union St | Phoenix Construction | soft story seismic upgrade, sfbc chapter 4d, per cebc appendix a-4.Details
soft story seismic upgrade, sfbc chapter 4d, per cebc appendix a-4. | $70,000 |
| Sep 11, 2017 | Completed final sign-off Sep 2020 | 875 Vermont St | Sgv Group Construction | soft story seismic upgrade, sfbc chapter 4d, per cebc appendix a-4.Details
soft story seismic upgrade, sfbc chapter 4d, per cebc appendix a-4. | $70,000 |
| Sep 8, 2017 | Completed final sign-off Oct 2018 | 1946 Grove St | A J O Group Build Inc | comply with sf wood frame seismic retrofit program soft story sfbc ch 4d per 2016 cebc appendix a4Details
comply with sf wood frame seismic retrofit program soft story sfbc ch 4d per 2016 cebc appendix a4 | $75,000 |
| Sep 8, 2017 | Expired or cancelled cancelled Jan 2026 | 1167 Pine St | comply with san francisco wood -frame seismic retrofit soft story programper sfebc chapter 4d, per 2016 cebc appendix 4Details
comply with san francisco wood -frame seismic retrofit soft story programper sfebc chapter 4d, per 2016 cebc appendix 4 | $70,000 | |
| Sep 8, 2017 | Completed final sign-off Oct 2018 | 967 Haight St | M J Construction | comply with san francisco wood frame seismic retrofit soft story programper sfebc chapter 4d, per 2016 cebc appendix 4Details
comply with san francisco wood frame seismic retrofit soft story programper sfebc chapter 4d, per 2016 cebc appendix 4 | $68,000 |
| Sep 8, 2017 | Completed final sign-off Aug 2018 | 2225 Divisadero St | Nerland Building And Restoration | excvate current basement from 7' to 8' and replace brick foundation. replace 21'9 of support posts beams at rear of house with single level on lower level. create bath, 2 bedrooms and family rm. on f1.2 remodel kitchen and bath and create master suiteDetails
excvate current basement from 7' to 8' and replace brick foundation. replace 21'9 of support posts beams at rear of house with single level on lower level. create bath, 2 bedrooms and family rm. on f1.2 remodel kitchen and bath and create master suite | $150,000 |
| Sep 8, 2017 | Completed final sign-off Dec 2018 | 2676 Union St | De Brus Construction Inc | comply with sf wood frame seismic retrofit program soft sotry sfbc ch 4d per cebc appendix a4Details
comply with sf wood frame seismic retrofit program soft sotry sfbc ch 4d per cebc appendix a4 | $80,000 |
| Sep 8, 2017 | Completed final sign-off Dec 2018 | 250 Kenwood Wy | A J O Group Inc | gr fl remodel, convert storage room to living space by adding 1 bath, 1 bedroom, wet bar maher naDetails
gr fl remodel, convert storage room to living space by adding 1 bath, 1 bedroom, wet bar maher na | $35,000 |
| Sep 8, 2017 | Completed final sign-off Jul 2018 | 2230 Steiner St | A J O Group Build Inc | comply with sf wood frame seismic retrofit program soft story, sfbc ch 4d, per 2016, cebc appendix a4Details
comply with sf wood frame seismic retrofit program soft story, sfbc ch 4d, per 2016, cebc appendix a4 | $70,000 |
| Sep 5, 2017 | Completed final sign-off Mar 2023 | 1254 10th Av | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4 | $20,000 | |
| Sep 5, 2017 | Completed final sign-off Dec 2017 | 216 Jersey St | A J O Group Inc | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4 | $60,000 |
| Sep 5, 2017 | Completed final sign-off Nov 2019 | 102 Frederick St | Current Construction | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4 | $20,000 |
| Sep 1, 2017 | Completed final sign-off Jul 2018 | 1267 Page St | A J O Group Build Inc | soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4 | $20,000 |
| Sep 1, 2017 | Completed final sign-off Mar 2019 | 726 Oak St | Ryan Construction | soft story retrofit per sfebc chapter 4d: d2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d: d2016 cebc appendix a-4 | $20,000 |
| Sep 1, 2017 | Expired or cancelled withdrawn Aug 2019 | 1011 Hyde St | soft story retrofit per sfebc chapter 4d per engineering creteria 2016 cebc appendix a-4.Details
soft story retrofit per sfebc chapter 4d per engineering creteria 2016 cebc appendix a-4. | $70,000 | |
| Aug 31, 2017 | Completed final sign-off Jul 2018 | 1275 17th Av | A J O Group Build Inc | soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4. n/a ordinance #155-13Details
soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4. n/a ordinance #155-13 | $20,000 |
| Aug 31, 2017 | Completed final sign-off Aug 2022 | 1615 Powell St | David Jone | soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4. n/a ordinance #155-13Details
soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4. n/a ordinance #155-13 | $73,000 |
| Aug 31, 2017 | Completed final sign-off Jan 2018 | 700 Cabrillo St | A J O Group Inc | common area-soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4.Details
common area-soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4. | $20,000 |
| Aug 25, 2017 | Completed final sign-off Jan 2019 | 349 South Van Ness Av | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4 | $65,000 |