Chen & Wong Construction Inc
- Based in
- San Bruno
- On San Francisco permits
- Mar 2014 to Mar 2022
- Last 24 months
- 0 permits filed
12 permits since 2000: 10 completed, 2 never finaled.
Of the 2 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 22, 2022 | Never finaled issued Mar 2022, no final | 769 Ulloa St | remodel 3 bathrooms and 1 office. no removal of wallsDetails
remodel 3 bathrooms and 1 office. no removal of walls | $45,000 |
| Dec 6, 2021 | Completed final sign-off Mar 2022 | 1886 42nd Av | replace front wall stucco in-kind. approx 20' x 25" (500 sqft). non-structural only.Details
replace front wall stucco in-kind. approx 20' x 25" (500 sqft). non-structural only. | $8,000 |
| Dec 6, 2021 | Completed final sign-off Jun 2022 | 769 Ulloa St | kitchen remodel. remove & install (n) cabinets, update electrical. install (n) sub-panel. fixtures, cabinets, finishes, etc. no structural work. no framing modification.Details
kitchen remodel. remove & install (n) cabinets, update electrical. install (n) sub-panel. fixtures, cabinets, finishes, etc. no structural work. no framing modification. | $12,000 |
| Aug 31, 2021 | Completed final sign-off Sep 2021 | 1262 29th Av | front entrance staircase. minor damaged repair less than 50%. will be repairing water damage at stair treads. brick/concrete walls remain in place. all repairs replace in kind and <50% stair structural members replacementDetails
front entrance staircase. minor damaged repair less than 50%. will be repairing water damage at stair treads. brick/concrete walls remain in place. all repairs replace in kind and <50% stair structural members replacement | $6,000 |
| Dec 20, 2019 | Completed final sign-off Sep 2020 | 1823 38th Av | add a family room, a bedroom, a full bathroom and a storage room on the 1st fl. relocate e full bath on 1st flDetails
add a family room, a bedroom, a full bathroom and a storage room on the 1st fl. relocate e full bath on 1st fl | $70,000 |
| Oct 8, 2019 | Completed final sign-off Feb 2020 | 1506 41st Av | remodel existing bathroom, change bathroom tub to shower pan. update electrical and plumbing. install new vanity, toilet, fan sink. faucet and etc. no alteration to walls. approx 5'x8'.Details
remodel existing bathroom, change bathroom tub to shower pan. update electrical and plumbing. install new vanity, toilet, fan sink. faucet and etc. no alteration to walls. approx 5'x8'. | $6,000 |
| Apr 16, 2019 | Never finaled issued Jul 2019, no final | 1340 Sloat Bl | (74 sf) horizontal additon @ kitchen with wood deck to rear yard. new sliding glass door @ 1st fl media. new window @ 2nd fl bedroom. new powder room.Details
(74 sf) horizontal additon @ kitchen with wood deck to rear yard. new sliding glass door @ 1st fl media. new window @ 2nd fl bedroom. new powder room. | $55,000 |
| Mar 15, 2019 | Completed final sign-off Oct 2019 | 514 Vicente St | add a media room, full bath and closet on 1st flDetails
add a media room, full bath and closet on 1st fl | $22,000 |
| Mar 11, 2019 | Completed final sign-off Apr 2022 | 250 Kenwood Wy | replace entirely deteriorated front stairs in kind.Details
replace entirely deteriorated front stairs in kind. | $25,000 |
| Sep 7, 2017 | Completed final sign-off Aug 2019 | 52 Page St | seismic retrofit of soft story comply with sfebc 4d. mandatory seidmic retrofit per 2016 cebc appendix a-4. n/a maher ordinanceDetails
seismic retrofit of soft story comply with sfebc 4d. mandatory seidmic retrofit per 2016 cebc appendix a-4. n/a maher ordinance | $60,000 |
| Feb 24, 2016 | Completed final sign-off Sep 2016 | 486 Grove St | soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4. comply with san francisco wood-frame seimsice retrofit program (soft storey), sfbc chapter 34b, per iebc appx. a4Details
soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4. comply with san francisco wood-frame seimsice retrofit program (soft storey), sfbc chapter 34b, per iebc appx. a4 | $35,000 |
| Mar 12, 2014 | Completed final sign-off Sep 2017 | 1670 46th Av | third story & front addition & interior remodeling. add one 2 garage & 2 bedrooms.Details
third story & front addition & interior remodeling. add one 2 garage & 2 bedrooms. | $150,000 |