Block 4093, lot 080
875 Vermont St
- City’s use
- Single Family Residential
- Built
- 1965
- Units
- 1
- Rooms
- 1 bathroom
- Building
- 549 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
9 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 4, 2025 | Completed final sign-off Jan 2026 | 875 Vermont St | Aura Fire Safety | remove and replace e fire alarm panel w new es-200xp. provide and install 1 new systems record doc box. provide and install 1 manual pull station next to facu. provide and install 1 heat detector above the facu. provide install lf sounders in all units as req by code.Details
remove and replace e fire alarm panel w new es-200xp. provide and install 1 new systems record doc box. provide and install 1 manual pull station next to facu. provide and install 1 heat detector above the facu. provide install lf sounders in all units as req by code. | $34,800 |
| Nov 30, 2022 | Never finaled filed Nov 2022, never issued | 875 Vermont St | H Construction Co | replace rear deck & stairway in-kind; construct security fence beneath entry landing; replace door to workman's walkway service entrance; patch spalled concrete on entry landingDetails
replace rear deck & stairway in-kind; construct security fence beneath entry landing; replace door to workman's walkway service entrance; patch spalled concrete on entry landing | $20,000 |
| Oct 17, 2019 | Completed final sign-off Sep 2020 | 875 Vermont St | Sgv Group Construction | revision to pa 201709117647. replace 2 planned steel frames w/ shear wallsDetails
revision to pa 201709117647. replace 2 planned steel frames w/ shear walls | |
| Sep 25, 2019 | Never finaled issued Sep 2019, no final | 875 Vermont St | Sgv Group Construction | street spaceDetails
street space | |
| Sep 11, 2017 | Completed final sign-off Sep 2020 | 875 Vermont St | Sgv Group Construction | soft story seismic upgrade, sfbc chapter 4d, per cebc appendix a-4.Details
soft story seismic upgrade, sfbc chapter 4d, per cebc appendix a-4. | $70,000 |
| Sep 28, 2015 | Completed final sign-off Mar 2016 | 875 Vermont St | Aaron Gordon Construction Inc | rear facade only; replace "in-kind" structrual sheething and siding.Details
rear facade only; replace "in-kind" structrual sheething and siding. | $23,000 |
| Nov 2, 2012 | Completed final sign-off Jan 2013 | 875 Vermont St | Aaron Gordon Construction Inc | remove wood fascia and replace stucco around all 4 sides of building. replacing just the top 1 foot of wood fasciaDetails
remove wood fascia and replace stucco around all 4 sides of building. replacing just the top 1 foot of wood fascia | $2,800 |
| Sep 12, 2012 | Completed final sign-off Jan 2013 | 875 Vermont St | Aaron Gordon Construction Inc | repair dry rot in north light well as necessary "replace in kind" common area exterior. clan not see from streetDetails
repair dry rot in north light well as necessary "replace in kind" common area exterior. clan not see from street | $5,000 |
| Apr 21, 2009 | Completed final sign-off Jul 2009 | 875 Vermont St | Dinyari Construction Inc. | reroofingDetails
reroofing | $18,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Aaron Gordon Construction Inc (3), Sgv Group Construction (3), Aura Fire Safety, Dinyari Construction Inc., H Construction Co
- Engineers
- Guiseppe Sircana (2), Charles Perry
- Designers
- Lo Choe
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.