W.Charles Perry
- Listed as
- architect, authorized agent-others, designer, engineer, lessee
- Firm
- W. Charles Perry & Assoc.
- Based in
- San Mateo
- On San Francisco permits
- Jul 2002 to Jan 2024
168 permits since 2000 (engineer on 146 permits, architect on 18 permits, designer on 3 permits, authorized agent-others on 1 permit, lessee on 1 permit): 132 completed, 1 in progress, 12 never finaled, 23 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 168.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 31, 2024 | In progress filed Jan 2024, not yet issued | 4220 Cesar Chavez St | Acme Builders | rev to pa# 202203029096 replace decayed joist @ rear decks/balconiesDetails
rev to pa# 202203029096 replace decayed joist @ rear decks/balconies | |
| Oct 6, 2023 | Completed final sign-off Apr 2024 | 275 Burnett Av | revision to pa# 201701318343, change steel/metal guardrails to glass railings.Details
revision to pa# 201701318343, change steel/metal guardrails to glass railings. | ||
| Aug 21, 2023 | Completed final sign-off Nov 2024 | 1555 Oak St | H Construction Co | administrative permit only to show as-built conditions of units/building per district bid. ref pa# 202002265525 (adu),22103317632 (#11), 20209033429 (#10), 201911307765 (#9), 201911207764 (#7), 201911207762 (#6), 202010217083 (#5), 201911207761 (#4), 201911207760 (#3), 202211307385 (#2)Details
administrative permit only to show as-built conditions of units/building per district bid. ref pa# 202002265525 (adu),22103317632 (#11), 20209033429 (#10), 201911307765 (#9), 201911207764 (#7), 201911207762 (#6), 202010217083 (#5), 201911207761 (#4), 201911207760 (#3), 202211307385 (#2) | |
| Jun 28, 2023 | Expired or cancelled withdrawn Feb 2025 | 1255 Page St | repair all 6 balconies as needed including decayed joist & deck surface. install new gutters & guardrail to match old guardrails.Details
repair all 6 balconies as needed including decayed joist & deck surface. install new gutters & guardrail to match old guardrails. | $30,000 | |
| Jun 28, 2023 | Completed final sign-off Sep 2024 | 275 Burnett Av | Exterior Perfection Builders Inc | unit #8: install new prefab solarium on balcony. deferred submittal - shop drawing for prefab solarium.Details
unit #8: install new prefab solarium on balcony. deferred submittal - shop drawing for prefab solarium. | $18,000 |
| Dec 6, 2022 | Never finaled filed Dec 2022, never issued | 2924 16th St | voluntary seismic retrofit to prevent masonry facades from collapsing in an earthquake.Details
voluntary seismic retrofit to prevent masonry facades from collapsing in an earthquake. | $100,000 | |
| Nov 30, 2022 | Completed final sign-off Aug 2024 | 1555 Oak St | H Construction Co | 2nd flr - unit 2 remodel - relocate (e) kitchen & bath, remodel bedroom, add 1 bath & 2 bedroom per plan.Details
2nd flr - unit 2 remodel - relocate (e) kitchen & bath, remodel bedroom, add 1 bath & 2 bedroom per plan. | $50,000 |
| Nov 30, 2022 | Never finaled filed Nov 2022, never issued | 875 Vermont St | H Construction Co | replace rear deck & stairway in-kind; construct security fence beneath entry landing; replace door to workman's walkway service entrance; patch spalled concrete on entry landingDetails
replace rear deck & stairway in-kind; construct security fence beneath entry landing; replace door to workman's walkway service entrance; patch spalled concrete on entry landing | $20,000 |
| Nov 3, 2022 | Completed final sign-off Apr 2024 | 2525 Balboa St | H Construction Co | repair water damage & replace windows on south facade.Details
repair water damage & replace windows on south facade. | $10,000 |
| Jul 12, 2022 | Completed final sign-off Mar 2024 | 2525 Balboa St | H Construction Co | mandatory soft story seismic retrofit per san francisco ordinance 66-13, san francisco building code ch 34b & san francisco administrative bulletins 106 & 107. analysis per iebc-a4.Details
mandatory soft story seismic retrofit per san francisco ordinance 66-13, san francisco building code ch 34b & san francisco administrative bulletins 106 & 107. analysis per iebc-a4. | $100,000 |
| Jun 15, 2022 | Completed final sign-off Sep 2023 | 468 18th Av | 1)replace 5 living room windows with new custom wood framed windows that match the original windows as are present in the 2nd story. 2) replace the entry door with a custom wood and glass door match extg. 3) replace window in the southern light well. comply with 202289216.Details
1)replace 5 living room windows with new custom wood framed windows that match the original windows as are present in the 2nd story. 2) replace the entry door with a custom wood and glass door match extg. 3) replace window in the southern light well. comply with 202289216. | $15,000 | |
| May 13, 2022 | Completed final sign-off May 2023 | 305 Bocana St | Winder Construction Inc. | adding framing details to existing pa# 202110220991 as per inspector's request.Details
adding framing details to existing pa# 202110220991 as per inspector's request. | |
| Apr 22, 2022 | Never finaled filed Apr 2022, never issued | 275 Burnett Av | install (n) fireproofing under roof. (n) solarium on roof. (n) additional decking on roof. (n) additional guardrails at roof.Details
install (n) fireproofing under roof. (n) solarium on roof. (n) additional decking on roof. (n) additional guardrails at roof. | $75,000 | |
| Mar 2, 2022 | Expired or cancelled expired Apr 2025 | 4220 Cesar Chavez St | Acme Builders | rev to pa202109087988: submit drawings as requested by field inspector for deck repairs. deck joist and guard rail repairDetails
rev to pa202109087988: submit drawings as requested by field inspector for deck repairs. deck joist and guard rail repair | |
| Aug 17, 2021 | Completed final sign-off Apr 2022 | 3140 Octavia St | Reliable Construction Inc | apt 3: remodel of (e) unit on 3rd fl kitchen, 1 bath, 2 bedrooms.Details
apt 3: remodel of (e) unit on 3rd fl kitchen, 1 bath, 2 bedrooms. | $40,000 |
| Jun 16, 2021 | Completed final sign-off Jun 2025 | 1470 09th Av | H Construction Co | revision to pa 201709209110. alterating to unit 2 garage as follows: construction of non bearing partition walls at garage and relocation of back wall of unit 2.Details
revision to pa 201709209110. alterating to unit 2 garage as follows: construction of non bearing partition walls at garage and relocation of back wall of unit 2. | |
| Jun 11, 2021 | Completed final sign-off Jan 2022 | 3140 Octavia St | Reliable Construction Inc | remodel (e) unit #4 (3rd fl.) revision to bpa#202105110132Details
remodel (e) unit #4 (3rd fl.) revision to bpa#202105110132 | $40,000 |
| Jun 9, 2021 | Expired or cancelled expired Nov 2024 | 1555 Oak St | H Construction Co | revision to bldg permit 202009244911. relocate boiler room.Details
revision to bldg permit 202009244911. relocate boiler room. | |
| Apr 14, 2021 | Completed final sign-off Aug 2021 | 1740 Polk St | Pioneer Builders | revision to pa# 201804166492 & 201804166493. soft story & ada restroom.Details
revision to pa# 201804166492 & 201804166493. soft story & ada restroom. | |
| Apr 12, 2021 | Completed final sign-off Nov 2024 | 1555 Oak St | H Construction Co | revision to pa# 201911207764. structural work only. no exterior work no change to unit size or locationDetails
revision to pa# 201911207764. structural work only. no exterior work no change to unit size or location | |
| Apr 9, 2021 | Completed final sign-off Nov 2024 | 1555 Oak St | H Construction Co | apt 6 remodel: revision to pa 201911207762. structural changes only.Details
apt 6 remodel: revision to pa 201911207762. structural changes only. | |
| Apr 9, 2021 | Completed final sign-off Nov 2024 | 1555 Oak St | H Construction Co | apt 3 remodel: revision to pa 201911207760. structural changes only. double joist over bedrom 2 and kitchen and shearwall. no exterior work, no change to unit size or location.Details
apt 3 remodel: revision to pa 201911207760. structural changes only. double joist over bedrom 2 and kitchen and shearwall. no exterior work, no change to unit size or location. | |
| Feb 3, 2021 | Expired or cancelled withdrawn Jun 2021 | 3910 24th St | fire-escape replacement at east side of existing 2-unit (over commercial) building.Details
fire-escape replacement at east side of existing 2-unit (over commercial) building. | $10,000 | |
| Oct 21, 2020 | Completed final sign-off Feb 2023 | 1555 Oak St | H Construction Co | unit #5/3rd flr remodel: 1(e) bedroom to 2(n) bedrooms. 1(e) bathroom to 2(n) bathrooms. relocate (e) kitchen. (n) window (visible from street). must comply with sffc 1103.7.6.1: fire alarm modification under separate permit.Details
unit #5/3rd flr remodel: 1(e) bedroom to 2(n) bedrooms. 1(e) bathroom to 2(n) bathrooms. relocate (e) kitchen. (n) window (visible from street). must comply with sffc 1103.7.6.1: fire alarm modification under separate permit. | $60,000 |
| Oct 6, 2020 | Completed final sign-off Jun 2023 | 816 Taraval St | Brendan Lalor Construction | construct two adu units per sf ordinance 162-16.2. alterations to (e) unit 101.3. construct two storage lofts for existing commercial spaces.Details
construct two adu units per sf ordinance 162-16.2. alterations to (e) unit 101.3. construct two storage lofts for existing commercial spaces. | $140,000 |
| Sep 24, 2020 | Completed final sign-off Nov 2024 | 1555 Oak St | H Construction Co | replace e boiler and domestic hot water tank with new for e 12 apts. replace e baseboard heater in unit 3,4,5,6,7,9,10. replace all e associated piping with new, leave sub-up for apt 1,2,11,12 for new base board heater during future remodelDetails
replace e boiler and domestic hot water tank with new for e 12 apts. replace e baseboard heater in unit 3,4,5,6,7,9,10. replace all e associated piping with new, leave sub-up for apt 1,2,11,12 for new base board heater during future remodel | $11,000 |
| Sep 23, 2020 | Completed final sign-off May 2024 | 1555 Oak St | H Construction Co | to comply with nov2020047514: ground sand along the p|l at reion to be excavated. demolosh (e4) patient retaining wall. excavate to enlarge patio approx 5ft in width. construction new allan block retaning wall & patio. new fence.Details
to comply with nov2020047514: ground sand along the p|l at reion to be excavated. demolosh (e4) patient retaining wall. excavate to enlarge patio approx 5ft in width. construction new allan block retaning wall & patio. new fence. | $20,000 |
| Sep 4, 2020 | Never finaled issued Dec 2022, no final | 1575 Washington St | construction two accessory dwelling unit per sf ordinance 162-12. alterations to existing unathorized unit 3 expansions at 2nd floor.Details
construction two accessory dwelling unit per sf ordinance 162-12. alterations to existing unathorized unit 3 expansions at 2nd floor. | $130,000 | |
| Sep 3, 2020 | Completed final sign-off Feb 2023 | 1555 Oak St | H Construction Co | unit #10 remodel: 1 existing bedroom to 3 new bedrooms. 1 existing bathroom to 2 new bathrooms. relocate existing kitchen.Details
unit #10 remodel: 1 existing bedroom to 3 new bedrooms. 1 existing bathroom to 2 new bathrooms. relocate existing kitchen. | $60,000 |
| Jan 22, 2020 | Completed final sign-off Feb 2021 | 1531 09th Av | Sgdm Llc | garage need new posts.please reference cc report #8330 compliance (item #1)Details
garage need new posts.please reference cc report #8330 compliance (item #1) | $40,000 |
| Nov 20, 2019 | Expired or cancelled expired Nov 2024 | 1555 Oak St | H Construction Co | unit #6: remodel unit. one existing bedroom to three new bedrooms. relocating kitchen & bathroom. replace 1 new window (double-hung) to match existing window (egress), not visible from street. add new bathroomDetails
unit #6: remodel unit. one existing bedroom to three new bedrooms. relocating kitchen & bathroom. replace 1 new window (double-hung) to match existing window (egress), not visible from street. add new bathroom | $50,000 |
| Nov 20, 2019 | Completed final sign-off Feb 2023 | 1555 Oak St | H Construction Co | remodel unit# 4. 1 (e) bedroom to 3 new bedrooms. replace 1 new casement window - match (e) window. visible from street. relocate kitchen & bathroom. n new bathroom. replace 1 new window (not visiable from street).Details
remodel unit# 4. 1 (e) bedroom to 3 new bedrooms. replace 1 new casement window - match (e) window. visible from street. relocate kitchen & bathroom. n new bathroom. replace 1 new window (not visiable from street). | $80,000 |
| Nov 20, 2019 | Completed final sign-off Mar 2024 | 1555 Oak St | H Construction Co | unit #9: remodel unit. one existing bedroom to two new bedrooms. relocating kitchen & bathroom.Details
unit #9: remodel unit. one existing bedroom to two new bedrooms. relocating kitchen & bathroom. | $50,000 |
| Nov 20, 2019 | Completed final sign-off Feb 2023 | 1555 Oak St | H Construction Co | unit #3: remodel unit. one existing bedroom to two new bedrooms. relocating kitchen & bathroomDetails
unit #3: remodel unit. one existing bedroom to two new bedrooms. relocating kitchen & bathroom | $50,000 |
| Nov 20, 2019 | Completed final sign-off Feb 2023 | 1555 Oak St | H Construction Co | unit #7: remodel unit. one existing bedroom to two new bedrooms. relocating kitchen & bathroomDetails
unit #7: remodel unit. one existing bedroom to two new bedrooms. relocating kitchen & bathroom | $50,000 |
| Nov 12, 2019 | Completed final sign-off Jun 2020 | 1230 Hyde St | Steelcore Builders Inc | revision to 201712227305, soft story retrofit new moment frame 2 bays to 1 bayDetails
revision to 201712227305, soft story retrofit new moment frame 2 bays to 1 bay | |
| Nov 1, 2019 | Never finaled issued Aug 2021, no final | 1575 Washington St | soft story retrofit per sfebc chapter 4d. 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d. 2016 cebc appendix a-4 | $130,000 | |
| Oct 3, 2019 | Never finaled filed Oct 2019, never issued | 1401 Mason St | construct accessory dwelling unit per ord #162-16. mandatory soft story seismic retrofit under permit appl #201904117798 (residential), #201904117801 (commercial)Details
construct accessory dwelling unit per ord #162-16. mandatory soft story seismic retrofit under permit appl #201904117798 (residential), #201904117801 (commercial) | $100,000 | |
| Aug 7, 2019 | Completed final sign-off Feb 2020 | 170 Parnassus Av | Steelcore Builders Inc | repair (e) stairway support. add new cages to (e) storage areaDetails
repair (e) stairway support. add new cages to (e) storage area | $20,000 |
| Jun 20, 2019 | Completed final sign-off Mar 2023 | 3253 16th St | H Construction Co | mandatory disability access improvements for accessible business entrance program per ordinance 51-16.Details
mandatory disability access improvements for accessible business entrance program per ordinance 51-16. | $9,000 |
| Apr 30, 2019 | Completed final sign-off Oct 2019 | 1165 Francisco St | C B W Construction Inc. | remodel unit #1: 2 new bathrooms. replace 6(e) windows in-kind.- not visible from street. remodel kitchen. to comply with 1103.7.6.1 sffc. maher n/a.Details
remodel unit #1: 2 new bathrooms. replace 6(e) windows in-kind.- not visible from street. remodel kitchen. to comply with 1103.7.6.1 sffc. maher n/a. | $80,000 |
| Apr 30, 2019 | Completed final sign-off Oct 2019 | 1165 Francisco St | C B W Construction Inc. | remodel unit 4. remodel kitchen & 1 bathroom. addition of 1 (n) bedroom. replace 4 windows in-kind. mustl comply with sffd 1103.7.6.1. (n) bedroom to be equipped with rescue window.Details
remodel unit 4. remodel kitchen & 1 bathroom. addition of 1 (n) bedroom. replace 4 windows in-kind. mustl comply with sffd 1103.7.6.1. (n) bedroom to be equipped with rescue window. | $80,000 |
| Apr 11, 2019 | Completed final sign-off Mar 2022 | 1401 Mason St | Sgdm Llc | commercial - soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a4. new door at laundromat. residential soft story under pa 201904117798Details
commercial - soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a4. new door at laundromat. residential soft story under pa 201904117798 | $20,000 |
| Apr 11, 2019 | Completed final sign-off Mar 2022 | 1403 Mason St | Sgdm Llc | residential - soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a4. commercial soft story under pa 201904117801Details
residential - soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a4. commercial soft story under pa 201904117801 | $100,000 |
| Apr 2, 2019 | Completed final sign-off Apr 2019 | 2205 Taylor St | Pioneer Builders | revision to pa# 2017-0913-7997. to correct layout to as built conditions.Details
revision to pa# 2017-0913-7997. to correct layout to as built conditions. | |
| Mar 29, 2019 | Completed final sign-off Apr 2019 | 2205 Taylor St | Pioneer Builders | remodel ground floor. remodel of kitchen. relocate bathroom and convert from 1/2 bath to full bathDetails
remodel ground floor. remodel of kitchen. relocate bathroom and convert from 1/2 bath to full bath | $50,000 |
| Mar 27, 2019 | Completed final sign-off Oct 2025 | 468 18th Av | Modern Design Construction | 3/f: reconfigure (e) floor layout: covert (e) 2 bedroom apt to a 3 bedroom: relocate kitchen, covert (e) kitchen to bedroom. new non-loading partitions. add 2 full bathroom. infill rear windows. no exterior work visible from street.Details
3/f: reconfigure (e) floor layout: covert (e) 2 bedroom apt to a 3 bedroom: relocate kitchen, covert (e) kitchen to bedroom. new non-loading partitions. add 2 full bathroom. infill rear windows. no exterior work visible from street. | $30,000 |
| Oct 10, 2018 | Completed final sign-off Feb 2023 | 816 Taraval St | Brendan Lalor Construction | mandatory ada entrance & restroom upgrade(commercial). retrofit 1st flr basement for future ti. mep/fire under separate permitDetails
mandatory ada entrance & restroom upgrade(commercial). retrofit 1st flr basement for future ti. mep/fire under separate permit | $10,000 |
| Oct 10, 2018 | Completed final sign-off Feb 2023 | 816 Taraval St | Brendan Lalor Construction | mandatory soft story seismic retrofit sf ord 66-13 soft story retrofit sfbc chapter 4d engineering criteria 2012 iebc appx a4 comercial residential pa # 201810102829Details
mandatory soft story seismic retrofit sf ord 66-13 soft story retrofit sfbc chapter 4d engineering criteria 2012 iebc appx a4 comercial residential pa # 201810102829 | $50,000 |
| Oct 10, 2018 | Completed final sign-off Feb 2023 | 816 Taraval St | Brendan Lalor Construction | soft story seismic retrofit sf ord 66-13. sfbc chapter 4d engineering criteria 2012 iebc appx a4 ( redisdential) comercial pa # 201810102830Details
soft story seismic retrofit sf ord 66-13. sfbc chapter 4d engineering criteria 2012 iebc appx a4 ( redisdential) comercial pa # 201810102830 | $45,000 |
| Sep 14, 2018 | Completed final sign-off Feb 2019 | 3140 Octavia St | Quality Painting Construction | revise bldg app#201807104131 to reflect changes found after demo and revise structural handling for such as shown on s1Details
revise bldg app#201807104131 to reflect changes found after demo and revise structural handling for such as shown on s1 | |
| Aug 23, 2018 | Completed final sign-off Mar 2019 | 333 Harrison St | Hill's Pool Service Inc. | remove extg roof top spa and replace with cast in place unit. install new ada spa lift. maher not reqDetails
remove extg roof top spa and replace with cast in place unit. install new ada spa lift. maher not req | $50,000 |
| Jul 20, 2018 | Completed final sign-off Aug 2018 | 1031 Leavenworth St | Steelcore Builders Inc | revision to 201609147629 soft story retrofitDetails
revision to 201609147629 soft story retrofit | |
| Jul 19, 2018 | Completed final sign-off Oct 2018 | 1165 Francisco St | C B W Construction Inc. | ref pa# 201801098208; change approved window from double hung to casement & replace (1) additional windowDetails
ref pa# 201801098208; change approved window from double hung to casement & replace (1) additional window | $2,000 |
| Jul 10, 2018 | Never finaled issued Jul 2018, no final | 3140 Octavia St | Steelcore Builders Inc | remodel (e) unit 2 on second floorDetails
remodel (e) unit 2 on second floor | $89,000 |
| Jun 19, 2018 | Expired or cancelled withdrawn Apr 2019 | 833 Corbett Av | mandatory soft story seismic retrofit per sf ord 66-13 sf bld code chapter 4d & sf admin bulletin 1063117 appx a4Details
mandatory soft story seismic retrofit per sf ord 66-13 sf bld code chapter 4d & sf admin bulletin 1063117 appx a4 | $100,000 | |
| Apr 16, 2018 | Completed final sign-off Aug 2021 | 1740 Polk St | Pioneer Builders | soft story retrofit in compliance with sf ord 06-13, bld code chapter 4d. admin bulletin c061107 and ibed a4. commercial - 201804166492Details
soft story retrofit in compliance with sf ord 06-13, bld code chapter 4d. admin bulletin c061107 and ibed a4. commercial - 201804166492 | $120,000 |
| Apr 16, 2018 | Completed final sign-off Aug 2021 | 1740 Polk St | Pioneer Builders | soft story retrofit in compliance with sf ord 06-13, bld code chapter 4d. admin bulletin c061107 and ibed a4. ada restroom reloationreqd by retrofit ele service relocated reqs by retrofit residential - 201804166493Details
soft story retrofit in compliance with sf ord 06-13, bld code chapter 4d. admin bulletin c061107 and ibed a4. ada restroom reloationreqd by retrofit ele service relocated reqs by retrofit residential - 201804166493 | $60,000 |
| Mar 29, 2018 | Expired or cancelled cancelled Oct 2022 | 798 Post St | legalization of dwelling unit per ordinance 43-14. increasing from 40 dwelling units & 6 guest rooms to 41 dwelling units at 6 guest rooms. ** maher: n/a **Details
legalization of dwelling unit per ordinance 43-14. increasing from 40 dwelling units & 6 guest rooms to 41 dwelling units at 6 guest rooms. ** maher: n/a ** | $4,000 | |
| Mar 27, 2018 | Expired or cancelled withdrawn Aug 2018 | 324 Connecticut St | soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4 | $90,000 | |
| Mar 23, 2018 | Completed final sign-off Mar 2020 | 1287 Noe St | Sft Construction Corp | soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4 | $60,000 |
| Jan 25, 2018 | Completed final sign-off Aug 2018 | 1003 Anza St | Tritech Construction | soft story retrofit per sfebc chapter 4d engineering critereia 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d engineering critereia 2016 cebc appendix a-4 | $120,000 |
| Jan 9, 2018 | Completed final sign-off Oct 2018 | 1165 Francisco St | C B W Construction Inc. | alteration to (e) unit 8 including but not limited to: selective demo of walls, windows, doors, electrical. new walls, window replacement, doors, cabinet, plumbing fixtures, electrical, mechnical, lighting & appliances. add 1 media roomDetails
alteration to (e) unit 8 including but not limited to: selective demo of walls, windows, doors, electrical. new walls, window replacement, doors, cabinet, plumbing fixtures, electrical, mechnical, lighting & appliances. add 1 media room | $100,000 |
| Jan 2, 2018 | Expired or cancelled cancelled Feb 2024 | 219 Cumberland St | mandatory soft story seismic retrofit per sf ordinance 66-13. sf building code chapter 34b & sf administrative bulletin 106 & 107.Details
mandatory soft story seismic retrofit per sf ordinance 66-13. sf building code chapter 34b & sf administrative bulletin 106 & 107. | $100,000 | |
| Dec 22, 2017 | Expired or cancelled cancelled Jan 2026 | 219 Cumberland St | remove and replace exterior stucco, window, waterproofing on north, south and eastwallsDetails
remove and replace exterior stucco, window, waterproofing on north, south and eastwalls | $100,000 | |
| Dec 22, 2017 | Completed final sign-off Jun 2020 | 1230 Hyde St | Steelcore Builders Inc | mandatory soft story seismic retrofit per sfebc chapter 4d ordiance 2016 cebc appendix a-4Details
mandatory soft story seismic retrofit per sfebc chapter 4d ordiance 2016 cebc appendix a-4 | $150,000 |
| Dec 22, 2017 | Completed final sign-off Aug 2023 | 1080 Capp St | Baba Builders Co | remodel (e) 4 bedroom apartment. relocate 1 full bath. adding 2-1/2 baths. replace 3 windows in the lightwell.Details
remodel (e) 4 bedroom apartment. relocate 1 full bath. adding 2-1/2 baths. replace 3 windows in the lightwell. | $150,000 |
| Dec 19, 2017 | Completed final sign-off Jun 2019 | 1679 Broderick St | Gil Construction & Assoc Inc. | mandatory soft story seismic retrofit per sfebc chapter 4d, engineering criteria 2016 cebc appendix a-4. to comply with nov 201716692.Details
mandatory soft story seismic retrofit per sfebc chapter 4d, engineering criteria 2016 cebc appendix a-4. to comply with nov 201716692. | $50,000 |
| Dec 1, 2017 | Completed final sign-off Apr 2021 | 410 15th Av | Roberto De Leon | mandatory ada entrance & restroom upgrade. new brick facade at 1st fl, enlarge windows, recessed entrance for (n) ramp (east elevation). remove (e) door, (e) window (west elevation). add new door replace first floor slab. refurbish 1st floor for future ti, flooring, mep. sprinklers separate permitDetails
mandatory ada entrance & restroom upgrade. new brick facade at 1st fl, enlarge windows, recessed entrance for (n) ramp (east elevation). remove (e) door, (e) window (west elevation). add new door replace first floor slab. refurbish 1st floor for future ti, flooring, mep. sprinklers separate permit | $50,000 |
| Nov 30, 2017 | Completed final sign-off Feb 2020 | 1865 Bush St | Thomson Construction, Inc. | mandatory soft story retrofit per sf ord 66-13, sfbc chapter 34b sf admin bulletin 106 & 107 analysis per iebc a4Details
mandatory soft story retrofit per sf ord 66-13, sfbc chapter 34b sf admin bulletin 106 & 107 analysis per iebc a4 | $180,000 |
| Nov 30, 2017 | Expired or cancelled withdrawn Jul 2019 | 1342 Jones St | mandatory soft story retrofit per sf ord 66-13, sfbc chapter 34b sf admin bulletin 106 & 107 analysis [er ceba4. maher naDetails
mandatory soft story retrofit per sf ord 66-13, sfbc chapter 34b sf admin bulletin 106 & 107 analysis [er ceba4. maher na | $100,000 | |
| Nov 30, 2017 | Completed final sign-off May 2020 | 1395 47th Av | Thomson Construction, Inc. | mandatory soft story retrofit per sf ord 66-13, sfbc chapter 34b sf admin bulletin 106 & 107 soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc app a4Details
mandatory soft story retrofit per sf ord 66-13, sfbc chapter 34b sf admin bulletin 106 & 107 soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc app a4 | $120,000 |
| Nov 13, 2017 | Completed final sign-off Jul 2019 | 800 Church St | Thomson Construction, Inc. | mandatory soft story seismic retrofit per sf ord 66-13, sf building code ch 34 b and sf admin bulletin 1063 analysis per iebc a4Details
mandatory soft story seismic retrofit per sf ord 66-13, sf building code ch 34 b and sf admin bulletin 1063 analysis per iebc a4 | $90,000 |
| Oct 23, 2017 | Completed final sign-off Aug 2019 | 1211 14th Av | H Construction Co | soft story retrofit per sfebc chapter 4d engineering criteria : 2016 cebc appendix a-4. per sf ord 66-13, sf building code chapter 34b & sf administrative bulletin 106 & 107.Details
soft story retrofit per sfebc chapter 4d engineering criteria : 2016 cebc appendix a-4. per sf ord 66-13, sf building code chapter 34b & sf administrative bulletin 106 & 107. | $150,000 |
| Oct 10, 2017 | Completed final sign-off Apr 2019 | 1435 Fulton St | Baba Builders Co | mandatory soft story seismic retrofit per san francisco ordinance 66-13 san francisco bilding code chapter 34b, 2016 cebc appendix -4.Details
mandatory soft story seismic retrofit per san francisco ordinance 66-13 san francisco bilding code chapter 34b, 2016 cebc appendix -4. | $110,000 |
| Sep 20, 2017 | Never finaled filed Sep 2017, never issued | 435 Euclid Av | addition of adu per ordinance no. 162-16.Details
addition of adu per ordinance no. 162-16. | $525,000 | |
| Sep 15, 2017 | Completed final sign-off Feb 2019 | 3990 Sacramento St | Steelcore Builders Inc | mandatory soft story seismic retrofit epr sf ordinance 66-13, sfebc chapter 4d engineering criteria 2016 cebc appendix a-4.Details
mandatory soft story seismic retrofit epr sf ordinance 66-13, sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. | $110,000 |
| Sep 15, 2017 | Completed final sign-off Apr 2020 | 4272 23rd St | Baba Builders Co | mandatory soft story seismic retrofit per sf ord 66-13, sf building code ch 34 b and sf admin bulletin 106 & 107 analysis per iebc a4Details
mandatory soft story seismic retrofit per sf ord 66-13, sf building code ch 34 b and sf admin bulletin 106 & 107 analysis per iebc a4 | $135,000 |
| Sep 15, 2017 | Completed final sign-off Sep 2022 | 31 Leese St | mandatory soft story seismic retrofit epr sf ordinance 66-13, sfebc chapter 4d engineering criteria 2016 cebc appendix a-4.Details
mandatory soft story seismic retrofit epr sf ordinance 66-13, sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. | $110,000 | |
| Sep 13, 2017 | Completed final sign-off Apr 2019 | 2205 Taylor St | Pioneer Builders | soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4 | $110,000 |
| Sep 13, 2017 | Completed final sign-off Aug 2020 | 1470 09th Av | H Construction Co | soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4 | $180,000 |
| Sep 13, 2017 | Completed final sign-off Jun 2019 | 785 Corbett Av | Tritech Construction | soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4 | $110,000 |
| Jul 21, 2017 | Never finaled issued Jul 2017, no final | 3140 Octavia St | Quality Painting Construction | revision to pa #201705186977 to revise the type of furnace installed. work to be done in unit 1 only.Details
revision to pa #201705186977 to revise the type of furnace installed. work to be done in unit 1 only. | |
| Jun 14, 2017 | Completed final sign-off Aug 2021 | 1251 08th Av | H Construction Co | add unit per ordinance no. 162-16. add 2 units. unit#1 & unit#2 have 1 new bathroom , 1 new kitchen, & 1 new bedroom. fire alarm and sprinklers deferred.Details
add unit per ordinance no. 162-16. add 2 units. unit#1 & unit#2 have 1 new bathroom , 1 new kitchen, & 1 new bedroom. fire alarm and sprinklers deferred. | $150,000 |
| Jun 13, 2017 | Completed final sign-off Aug 2019 | 170 Parnassus Av | Steelcore Builders Inc | mandatory soft story retrofit per sf ordinance 6613 sf building code chapter 34 b sf admin bulletin 106 and 107. analysis per iebc a4Details
mandatory soft story retrofit per sf ordinance 6613 sf building code chapter 34 b sf admin bulletin 106 and 107. analysis per iebc a4 | $100,000 |
| Jun 13, 2017 | Completed final sign-off Aug 2021 | 1251 08th Av | H Construction Co | soft story retrofit per sf ordinance 66-13 building code ch 34 b admin bulletin 106/107. soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4Details
soft story retrofit per sf ordinance 66-13 building code ch 34 b admin bulletin 106/107. soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4 | $100,000 |
| Jun 2, 2017 | Completed final sign-off Apr 2021 | 410 15th Av | Irving Diaz Construction | residential only: mandatory seismic upgrade project for retrofit of soft story building per sf ord 66-13. sfebc ch 4d.Details
residential only: mandatory seismic upgrade project for retrofit of soft story building per sf ord 66-13. sfebc ch 4d. | $150,000 |
| May 24, 2017 | Completed final sign-off Mar 2018 | 669 44th Av | Pioneer Builders | to comply with 201775357: retaining wall at rear and redwood fence max 6 ftDetails
to comply with 201775357: retaining wall at rear and redwood fence max 6 ft | $3,000 |
| May 18, 2017 | Never finaled issued May 2017, no final | 3140 Octavia St | Quality Painting Construction | 1st fl: remodel existing unit #1. relocating living room and bedroom, add (1) bedroom.Details
1st fl: remodel existing unit #1. relocating living room and bedroom, add (1) bedroom. | $75,000 |
| May 11, 2017 | Completed final sign-off Sep 2021 | 824 Corbett Av | M. Gaehwiler Construction Inc | soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4 | $100,000 |
| May 3, 2017 | Completed final sign-off Dec 2019 | 3140 Octavia St | Steelcore Builders Inc | adu per sf ordinance 162-16. (n) kitchen & bathroom.Details
adu per sf ordinance 162-16. (n) kitchen & bathroom. | $150,000 |
| Apr 28, 2017 | Completed final sign-off Jan 2020 | 3140 Octavia St | Steelcore Builders Inc | remove existing steam boiler, piping and radiator in 6 existing units. install new gas furnace in 6 existing unitsDetails
remove existing steam boiler, piping and radiator in 6 existing units. install new gas furnace in 6 existing units | $20,000 |
| Mar 21, 2017 | Completed final sign-off Jan 2018 | 1715 Broadway | Promax Builders Inc Dba Procraft Builder | revision to pa #201512185471 - soft story seismic retrofit. revised drawings is for foundation repair to leave existing foundation in place & attach new footing next to it. soft story retrofit per sfbc chapter 34b fema p-807.Details
revision to pa #201512185471 - soft story seismic retrofit. revised drawings is for foundation repair to leave existing foundation in place & attach new footing next to it. soft story retrofit per sfbc chapter 34b fema p-807. | |
| Feb 17, 2017 | Completed final sign-off Oct 2018 | 1914 Pine St | Steelcore Builders Inc | common area- soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4. maher naDetails
common area- soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4. maher na | $95,000 |
| Feb 17, 2017 | Completed final sign-off Oct 2018 | 1916 Pine St | Steelcore Builders Inc | common area- soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4. maher naDetails
common area- soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4. maher na | $95,000 |
| Feb 17, 2017 | Expired or cancelled withdrawn Mar 2018 | 7015 California St | adding 1 apartment w/ 1 bathroom and 1 kitchen & 1 studio at groung flr in compliance with ordinance 162-16 and information sheet sf-05Details
adding 1 apartment w/ 1 bathroom and 1 kitchen & 1 studio at groung flr in compliance with ordinance 162-16 and information sheet sf-05 | $22,000 | |
| Jan 31, 2017 | Completed final sign-off Jan 2020 | 275 Burnett Av | Thomson Construction, Inc. | remove and replace e siding with hardi lapped sidng, new hardi trim, replace all windows except unit 9, reflash ex doors, replace e wood stairs and landing near driveway and concrete stairs at both sides of building, replace ex railings at stairs both sides, reflash parapet at parking deck, resurfacDetails
remove and replace e siding with hardi lapped sidng, new hardi trim, replace all windows except unit 9, reflash ex doors, replace e wood stairs and landing near driveway and concrete stairs at both sides of building, replace ex railings at stairs both sides, reflash parapet at parking deck, resurfac | $400,000 |
| Jan 31, 2017 | Completed final sign-off Apr 2024 | 275 Burnett Av | Thomson Construction, Inc. | remodel e 4th fl penthouse, ne windows, extend wind barrier at roof, relocate e water h eater flue, flash windows/exterior doors at penthouse, new harding siding and trim, piping for hottub, elec conduit for hottub, remove elc heaters and replace w gas units, new guard rails at roof.Details
remodel e 4th fl penthouse, ne windows, extend wind barrier at roof, relocate e water h eater flue, flash windows/exterior doors at penthouse, new harding siding and trim, piping for hottub, elec conduit for hottub, remove elc heaters and replace w gas units, new guard rails at roof. | $250,000 |
| Jan 25, 2017 | Completed final sign-off Jan 2019 | 7015 California St | Roberto De Leon | mandatory seismic upgrade project for retrofit of soft story bldg per sf ordinance 66-13. 2012 iebc appendix a-4.Details
mandatory seismic upgrade project for retrofit of soft story bldg per sf ordinance 66-13. 2012 iebc appendix a-4. | $188,000 |
| Dec 9, 2016 | Completed final sign-off Sep 2017 | 5625 Anza St | Tritech Construction | soft story retrofit per sfbc chapter 34b per 2012 iebc appendix a-4Details
soft story retrofit per sfbc chapter 34b per 2012 iebc appendix a-4 | $90,000 |