Tritech Construction
- Based in
- Northridge
- On San Francisco permits
- Sep 2010 to Jan 2019
- Last 24 months
- 0 permits filed
30 permits since 2000: 28 completed, 2 never finaled.
Of the 2 never-finaled permits, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 31, 2019 | Completed final sign-off Jun 2019 | 785 Corbett Av | revision to pa 2017-0913-2998 (soft story) replace hardy panel to moment framesDetails
revision to pa 2017-0913-2998 (soft story) replace hardy panel to moment frames | $20,000 |
| Jul 13, 2018 | Completed final sign-off Aug 2020 | 3645 Buchanan St | commercial: ada bathroom upgrades for soft story retrofit 2016 sfebc chapter 4d per cebc appendix a-4. residential pa #201807134581.Details
commercial: ada bathroom upgrades for soft story retrofit 2016 sfebc chapter 4d per cebc appendix a-4. residential pa #201807134581. | $10,000 |
| Jul 13, 2018 | Completed final sign-off Jun 2020 | 3645 Buchanan St | residential: soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. commercial pa #201807134584.Details
residential: soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. commercial pa #201807134584. | $60,000 |
| Jan 25, 2018 | Completed final sign-off Aug 2018 | 1003 Anza St | soft story retrofit per sfebc chapter 4d engineering critereia 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d engineering critereia 2016 cebc appendix a-4 | $120,000 |
| Dec 6, 2017 | Never finaled issued Aug 2018, no final | 3014 Pine St | ground floor: legalize (1) (e) unit (3014-b pine st) per ordinance 43-14 sprinklers deferred.Details
ground floor: legalize (1) (e) unit (3014-b pine st) per ordinance 43-14 sprinklers deferred. | $2,200 |
| Sep 13, 2017 | Completed final sign-off Jun 2019 | 785 Corbett Av | soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4 | $110,000 |
| Jun 8, 2017 | Completed final sign-off Jun 2018 | 1906 Powell St | mandatory seismic retrofit (soft story) per san francisco ordinance no.66-13 and 2012 iebc appendix a-4.Details
mandatory seismic retrofit (soft story) per san francisco ordinance no.66-13 and 2012 iebc appendix a-4. | $70,000 |
| Mar 7, 2017 | Completed final sign-off Aug 2022 | 2199 Turk Bl | exploratory destructive testing/ window leak on the south wall / less than 50% repair of decayed stairway temporary sidewalk encroachment entry stairs during the stairway repair.Details
exploratory destructive testing/ window leak on the south wall / less than 50% repair of decayed stairway temporary sidewalk encroachment entry stairs during the stairway repair. | $6,000 |
| Dec 9, 2016 | Completed final sign-off Sep 2017 | 5625 Anza St | soft story retrofit per sfbc chapter 34b per 2012 iebc appendix a-4Details
soft story retrofit per sfbc chapter 34b per 2012 iebc appendix a-4 | $90,000 |
| Sep 22, 2016 | Never finaled issued Sep 2016, no final | 2651 15th Av | remove wood post and install 4x4 metal post.Details
remove wood post and install 4x4 metal post. | $3,000 |
| Jun 13, 2016 | Completed final sign-off Aug 2022 | 2199 Turk Bl | soft story seismic retrodit per sf ord 6613 sf building cope soft story seismic retrofit per ord 66-13, sf building code ch 34b and sf admin bulletins 106/107. iebc appendix a4.Details
soft story seismic retrodit per sf ord 6613 sf building cope soft story seismic retrofit per ord 66-13, sf building code ch 34b and sf admin bulletins 106/107. iebc appendix a4. | $80,000 |
| Jan 28, 2016 | Completed final sign-off May 2016 | 2101 California St | field revision detail to permit no. 201510260734 - soft story retrofit - asce 41-13.Details
field revision detail to permit no. 201510260734 - soft story retrofit - asce 41-13. | |
| Dec 18, 2015 | Completed final sign-off Jul 2016 | 325 Green St | soft story seismic retrofit per sf ordinance 66-13, sf bldg code chapter 34b & sf admin bulletins 106 & 107. structural analysis per iebc appendix a-4Details
soft story seismic retrofit per sf ordinance 66-13, sf bldg code chapter 34b & sf admin bulletins 106 & 107. structural analysis per iebc appendix a-4 | $65,000 |
| Nov 9, 2015 | Completed final sign-off Dec 2015 | 789 Corbett Av | soft story retrofit. revision to app#201506189328.Details
soft story retrofit. revision to app#201506189328. | |
| Oct 26, 2015 | Completed final sign-off May 2016 | 2101 California St | seismic retrofit of soft story per sfbc chapter 34b, asce 41-13 - quake brake framing system.Details
seismic retrofit of soft story per sfbc chapter 34b, asce 41-13 - quake brake framing system. | $150,000 |
| Jun 18, 2015 | Completed final sign-off Dec 2015 | 789 Corbett Av | soft story seismic retrofit per sf ord 66-b sfbc ch 34b, ab106,107. analysis by iebc a4Details
soft story seismic retrofit per sf ord 66-b sfbc ch 34b, ab106,107. analysis by iebc a4 | $70,000 |
| Jun 5, 2015 | Completed final sign-off Sep 2016 | 1259 11th Av | seismic retrofit of soft story to comply with sfbc 34b mandatory seismic retrofit 2012 iebc appendix a-4Details
seismic retrofit of soft story to comply with sfbc 34b mandatory seismic retrofit 2012 iebc appendix a-4 | $65,000 |
| May 15, 2015 | Completed final sign-off Jul 2015 | 29 Palm Av | soft storey retrofit fema p-807Details
soft storey retrofit fema p-807 | $26,000 |
| Oct 31, 2014 | Completed final sign-off Mar 2015 | 933 Stanyan St | strengthen hallway wall, footing and foundation.Details
strengthen hallway wall, footing and foundation. | $4,000 |
| Oct 23, 2014 | Completed final sign-off Mar 2015 | 933 Stanyan St | revision to appl #2014.0912.6127 to include 2 grade beams, replacing 1 existing brick grade beam & 1 new full height partition. "work in common" include #929, 931 & 933.Details
revision to appl #2014.0912.6127 to include 2 grade beams, replacing 1 existing brick grade beam & 1 new full height partition. "work in common" include #929, 931 & 933. | $800 |
| Sep 26, 2014 | Completed final sign-off Apr 2015 | 1606 Church St | soft story retrofit per sf ordinance no 66-13, sfbc chpt. 34b & admin. bulletin 106. analysis and design per fema p807.Details
soft story retrofit per sf ordinance no 66-13, sfbc chpt. 34b & admin. bulletin 106. analysis and design per fema p807. | $70,000 |
| Sep 12, 2014 | Completed final sign-off Mar 2015 | 929 Stanyan St | strenthening garage ceiling beam & relocate and retrofit columns. provide structural strengtjening and anchor bolts to two (side and end) garage walls.Details
strenthening garage ceiling beam & relocate and retrofit columns. provide structural strengtjening and anchor bolts to two (side and end) garage walls. | $10,000 |
| Jun 20, 2014 | Completed final sign-off Aug 2014 | 210 Jules Av | revision to pa#201405065015, replace inadequate as-built original footing with new footing.Details
revision to pa#201405065015, replace inadequate as-built original footing with new footing. | |
| May 29, 2014 | Completed final sign-off Dec 2014 | 1612 48th Av | soft story retrofit per san francisco ordinance no 66-13, sf building code 34-b & administrative bulletin 106. analysis criteria per 2013 iebc appendix a chapter 4.Details
soft story retrofit per san francisco ordinance no 66-13, sf building code 34-b & administrative bulletin 106. analysis criteria per 2013 iebc appendix a chapter 4. | $73,000 |
| May 22, 2014 | Completed final sign-off Mar 2015 | 3012 Pine St | build new deck extending existing deck into 2 level deckDetails
build new deck extending existing deck into 2 level deck | $2,000 |
| May 6, 2014 | Completed final sign-off Aug 2014 | 210 Jules Av | soft story retrofit per sfbc chapter 34b. rebuild shear walls on ground floor to provide adequate seismic strength per fema p807.Details
soft story retrofit per sfbc chapter 34b. rebuild shear walls on ground floor to provide adequate seismic strength per fema p807. | $61,000 |
| Apr 11, 2014 | Completed final sign-off Feb 2015 | 1264 09th Av | soft story seismic retrofit per sf ordinance 66-13 using fema p807Details
soft story seismic retrofit per sf ordinance 66-13 using fema p807 | $54,000 |
| Dec 24, 2012 | Completed final sign-off Aug 2013 | 2 Parkridge Dr | soft story seismic retrofit per ab-094.Details
soft story seismic retrofit per ab-094. | $170,000 |
| Sep 28, 2010 | Completed final sign-off May 2011 | 743 Grove St | to demolish unwarranted separate unit and restore space back to existing at 743 grove #2 as existed prior in conformity with legal configuration. remove mech, elec, plumbDetails
to demolish unwarranted separate unit and restore space back to existing at 743 grove #2 as existed prior in conformity with legal configuration. remove mech, elec, plumb | $1,800 |
| Sep 2, 2010 | Completed final sign-off Feb 2011 | 743 Grove St | replace kitchen cabinets and center, 2 shower pans, plumbing fixtures, bath and lighting fixtures, tile, 4 elec outletsDetails
replace kitchen cabinets and center, 2 shower pans, plumbing fixtures, bath and lighting fixtures, tile, 4 elec outlets | $7,500 |