Block 5718, lot 031
31 Leese St
- City’s use
- Multi-Family Residential
- Built
- 1965
- Stories
- 2
- Units
- 5
- Rooms
- 5 bedrooms, 5 bathrooms
- Building
- 3,037 sq ft
- Lot
- 2,526 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
12 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 2, 2025 | In progress issued Jul 2025 | 31 Leese St | to obtain final inspection for work approved under pa#201710100799. all work is complete.Details
to obtain final inspection for work approved under pa#201710100799. all work is complete. | ||
| Feb 28, 2022 | Completed final sign-off Oct 2022 | 31 Leese St | Crime Watch Security Sys Llc | installation of a new manual & automatic fire alarm system. ref pa# 201710100799. ref sprinkler pa# 202012030213.Details
installation of a new manual & automatic fire alarm system. ref pa# 201710100799. ref sprinkler pa# 202012030213. | $15,000 |
| Dec 3, 2020 | Completed final sign-off Oct 2022 | 31 Leese St | Control Fire Inc. | installation of overhead fire protection sprinkler system of 25 heads for 1st level only (nfpa 13).. reference building permit number: 2017-1010-0799.Details
installation of overhead fire protection sprinkler system of 25 heads for 1st level only (nfpa 13).. reference building permit number: 2017-1010-0799. | $11,429 |
| Jul 18, 2019 | Completed final sign-off Sep 2022 | 31 Leese St | Michael E Miranda General Contractor | rev to pa# 201709158486; revise seismic retorfit designDetails
rev to pa# 201709158486; revise seismic retorfit design | $50,000 |
| Nov 3, 2017 | Completed final sign-off Jun 2018 | 31 Leese St | I E General Const Inc | revision to 201701237688, change from gas wall heat to new furnaceDetails
revision to 201701237688, change from gas wall heat to new furnace | |
| Oct 10, 2017 | Never finaled issued May 2019, no final | 31 Leese St | construct accessory dwelling unit per ord #162-16Details
construct accessory dwelling unit per ord #162-16 | $90,000 | |
| Sep 15, 2017 | Completed final sign-off Sep 2022 | 31 Leese St | mandatory soft story seismic retrofit epr sf ordinance 66-13, sfebc chapter 4d engineering criteria 2016 cebc appendix a-4.Details
mandatory soft story seismic retrofit epr sf ordinance 66-13, sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. | $110,000 | |
| Feb 10, 2017 | Completed final sign-off Apr 2017 | 31 Leese St | S & J Construction | remodel unit #1: kitchen remodel, replace all drywall throughout, repair/replace in-kindDetails
remodel unit #1: kitchen remodel, replace all drywall throughout, repair/replace in-kind | $25,000 |
| Jan 23, 2017 | Completed final sign-off Jun 2018 | 31 Leese St | I E General Const Inc | relocate kitchen in unit #5, convert (e) kitchen to (n) bedroom; move non-bearing wall between unit 2 & unit 5; add (n) tankless water heater to unit 2 & unit 5.Details
relocate kitchen in unit #5, convert (e) kitchen to (n) bedroom; move non-bearing wall between unit 2 & unit 5; add (n) tankless water heater to unit 2 & unit 5. | $20,000 |
| Jan 12, 2017 | Completed final sign-off Apr 2017 | 31 Leese St | S & J Construction | remodel the restroom at unit 1.Details
remodel the restroom at unit 1. | $10,000 |
| Jan 11, 2017 | Completed final sign-off Jun 2018 | 31 Leese St | I E General Const Inc | #2 & #5- bathroom remodel, no structural work, total 2 bathrooms.Details
#2 & #5- bathroom remodel, no structural work, total 2 bathrooms. | $20,000 |
| Feb 28, 2013 | Completed final sign-off Mar 2013 | 31 Leese St | Tom Lee Roofing Inc. | reroofingDetails
reroofing | $22,250 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.