Michelle Brooks
- Listed as
- architect, authorized agent-others, contractor, designer
- Firm
- Rfi Enterprises Inc.
- Based in
- San Jose
- On San Francisco permits
- Jul 2003 to Sep 2024
126 permits since 2000 (contractor on 126 permits, architect on 3 permits, authorized agent-others on 2 permits, designer on 2 permits): 75 completed, 1 in progress, 35 never finaled, 15 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
Showing the 100 most recent of 126.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 27, 2024 | Completed final sign-off Nov 2025 | 110 Geary St | Rfi Enterprises Inc. | provide (n) remote power supply, provide (n) smoke detector above ps, provide 6 (n) smpke detectors in kitchen, provide 12 (n) nac devices, provide (n) duct smoke detector and (n) relay moduleDetails
provide (n) remote power supply, provide (n) smoke detector above ps, provide 6 (n) smpke detectors in kitchen, provide 12 (n) nac devices, provide (n) duct smoke detector and (n) relay module | $19,968 |
| Jul 18, 2024 | Completed final sign-off Apr 2026 | 3368 Jackson St | Rfi Enterprises Inc. | provide new fire alarm control panel, new cellular communicator, new smoke, heat and co detectors with lf sounder, new modules to monitor waterflow and bfp, new pull station. ref ti permit 202308164565, sprinkler permit 202406204813.Details
provide new fire alarm control panel, new cellular communicator, new smoke, heat and co detectors with lf sounder, new modules to monitor waterflow and bfp, new pull station. ref ti permit 202308164565, sprinkler permit 202406204813. | $21,784 |
| Apr 18, 2024 | In progress filed Apr 2024, not yet issued | 400 Castro St | Rfi Enterprises Inc. | 1) add 3 nw heat detectors at elevator lobby & 1 nw smoke detector. 2)add 2 nw smoke detectors & 2 nw heat detectors at elev. machine room. 3)add 1 nw duct smoke detector for vent. system fsc. 4)add 5 nw interface control modules w/relay for elev. functions.Details
1) add 3 nw heat detectors at elevator lobby & 1 nw smoke detector. 2)add 2 nw smoke detectors & 2 nw heat detectors at elev. machine room. 3)add 1 nw duct smoke detector for vent. system fsc. 4)add 5 nw interface control modules w/relay for elev. functions. | $16,170 |
| Apr 5, 2024 | Completed final sign-off Nov 2024 | 160 Portola Dr | Rfi Enterprises Inc. | provide (n) low frequency sounder in each unit. provide notification at every floor & garage level. replace (e) pull stations with new. replace (e) conventional facp with new addressable facp. provide (n) cellular dialerDetails
provide (n) low frequency sounder in each unit. provide notification at every floor & garage level. replace (e) pull stations with new. replace (e) conventional facp with new addressable facp. provide (n) cellular dialer | $35,254 |
| Apr 5, 2024 | Completed final sign-off Apr 2025 | 2450 Market St | Rfi Enterprises Inc. | provide (n) low frequency sounder @ each apartment unit; provide (n) notification appliances @ common areas; replace obselete facp with new; replace (e) smoke detectors & pull stations with (n); provide (n) cellular dialerDetails
provide (n) low frequency sounder @ each apartment unit; provide (n) notification appliances @ common areas; replace obselete facp with new; replace (e) smoke detectors & pull stations with (n); provide (n) cellular dialer | $36,958 |
| Mar 21, 2024 | Completed final sign-off Nov 2024 | 848 Battery St | Rfi Enterprises Inc. | remove and replace (e) facp with new corberus pro. provide new corberus annunciatok, one to one replacement of ex intiating devinces, (e) nac power supply and devices will stay, (e) clss communicator will stayDetails
remove and replace (e) facp with new corberus pro. provide new corberus annunciatok, one to one replacement of ex intiating devinces, (e) nac power supply and devices will stay, (e) clss communicator will stay | $52,339 |
| Dec 12, 2023 | Completed final sign-off Feb 2024 | 140 Geary St | Rfi Enterprises Inc. | add new power supply at 2nd floor elec room. provide new notification appliances at 3rd fl area or work. ref ti # 2023-0303-3046Details
add new power supply at 2nd floor elec room. provide new notification appliances at 3rd fl area or work. ref ti # 2023-0303-3046 | $17,276 |
| Nov 16, 2023 | Completed final sign-off Feb 2024 | 848 Battery St | Rfi Enterprises Inc. | to provide and install clss dual-path lte communicator coith dual capture interface.Details
to provide and install clss dual-path lte communicator coith dual capture interface. | $4,884 |
| Nov 16, 2023 | Completed final sign-off Feb 2025 | 140 Geary St | Rfi Enterprises Inc. | to provide and install clss dual path lte communicator with dual capture interface - fire alarm.Details
to provide and install clss dual path lte communicator with dual capture interface - fire alarm. | $4,747 |
| Aug 7, 2023 | Completed final sign-off Apr 2024 | 1201 Ortega St | Rfi Enterprises Inc. | remove existing facp and replace w/new notifier facp, replace existing annunciator w/new color touch screen display, provide new class gateway which will connect thru a csm cellular data connectionDetails
remove existing facp and replace w/new notifier facp, replace existing annunciator w/new color touch screen display, provide new class gateway which will connect thru a csm cellular data connection | $37,219 |
| Aug 7, 2023 | Completed final sign-off Jun 2025 | 685 07th St | Rfi Enterprises Inc. | voluntary replacement: emergency replacement of (e) malfunctioning facp (est) with new (notifier). like for like replacement of (e) slc & initiating devices. (e) nac appliances to remain.Details
voluntary replacement: emergency replacement of (e) malfunctioning facp (est) with new (notifier). like for like replacement of (e) slc & initiating devices. (e) nac appliances to remain. | $30,012 |
| Jun 1, 2023 | Completed final sign-off Oct 2024 | 755 Ashbury St | Rfi Enterprises Inc. | voluntary upgrade of (e) f/a system. replace (e) facp w/new cerberus pro modular facp, (e) input/output modules for graphic annunciator w/new, (e) communicator w/new telegard cellular, (e) slc devices w/newDetails
voluntary upgrade of (e) f/a system. replace (e) facp w/new cerberus pro modular facp, (e) input/output modules for graphic annunciator w/new, (e) communicator w/new telegard cellular, (e) slc devices w/new | $79,900 |
| Apr 28, 2023 | Completed final sign-off Apr 2024 | 454 Larkin St | Rfi Enterprises Inc. | provide new low frequency sounder inside apartment units, additional notification appliances @ common areasDetails
provide new low frequency sounder inside apartment units, additional notification appliances @ common areas | $25,955 |
| Jan 27, 2023 | Completed final sign-off Feb 2023 | 124 Geary St | Rfi Enterprises Inc. | 1 power supply, 1 smoke detector, 2 pull stations, 3 strobes, 22 horn-strobes, 2 monitor modules, 1 relay modules, 1 duct smoke detector 1 control moduleDetails
1 power supply, 1 smoke detector, 2 pull stations, 3 strobes, 22 horn-strobes, 2 monitor modules, 1 relay modules, 1 duct smoke detector 1 control module | $36,000 |
| Jun 15, 2022 | Completed final sign-off May 2023 | 755 Ashbury St | Rfi Enterprises Inc. | provide (2) new heat detectors, provide 1 new smoke detector, provide (4) new interface modules with relay for elevator functions.Details
provide (2) new heat detectors, provide 1 new smoke detector, provide (4) new interface modules with relay for elevator functions. | $18,484 |
| May 3, 2022 | Completed final sign-off Jun 2022 | 1145 Market St | Rfi Enterprises Inc. | 6th fl: provide 1 new speaker / strobe for new conference room.Details
6th fl: provide 1 new speaker / strobe for new conference room. | $7,000 |
| Mar 8, 2022 | Completed final sign-off Mar 2023 | 124 Geary St | Rfi Enterprises Inc. | fire alarm: provide 1 remote p/s;1 new smoke detctor above p/s;provide 2 pull stations; provide 4 strobes & 22 horn/strobes; provide 2 duct detectors & 2 relay modules for fsd & 1 control module for music safe-off. pa202108116268. maher n/aDetails
fire alarm: provide 1 remote p/s;1 new smoke detctor above p/s;provide 2 pull stations; provide 4 strobes & 22 horn/strobes; provide 2 duct detectors & 2 relay modules for fsd & 1 control module for music safe-off. pa202108116268. maher n/a | $9,000 |
| Dec 14, 2021 | Never finaled issued Jan 2022, no final | 1145 Market St | Rfi Enterprises Inc. | provide(2)new relay modules for elevator alternative recall and "fireman's hat".provide (2)new smoke detector for elevator lobby at first floor.Details
provide(2)new relay modules for elevator alternative recall and "fireman's hat".provide (2)new smoke detector for elevator lobby at first floor. | $15,502 |
| Nov 23, 2021 | Completed final sign-off Apr 2022 | 209 Post St | Rfi Enterprises Inc. | fire alarm modification due to ti 202107124144. provide new nac devices on 11/f: 1 power, 6 mod/relay, 5 duct detectors, 2 strobes, 16 speaker/strobes. (e) slc & nac devices on 12/f to remain. demo (e) duct detectors & provide new duct detectors. maher n/a.Details
fire alarm modification due to ti 202107124144. provide new nac devices on 11/f: 1 power, 6 mod/relay, 5 duct detectors, 2 strobes, 16 speaker/strobes. (e) slc & nac devices on 12/f to remain. demo (e) duct detectors & provide new duct detectors. maher n/a. | $18,860 |
| Nov 23, 2021 | Never finaled issued Nov 2021, no final | 140 Geary St | Rfi Enterprises Inc. | 1/f & 2/f: mod to (e) fire alarm system in 1 of 2 retail units: van cleef & arpels. provide new nac devices at area of work. provide 3 new duct smoke detectors. 11 speaker/strobes. 5 relays. new power supply at 2/f facp room. ref t.i. pa202106253279. maher n/a.Details
1/f & 2/f: mod to (e) fire alarm system in 1 of 2 retail units: van cleef & arpels. provide new nac devices at area of work. provide 3 new duct smoke detectors. 11 speaker/strobes. 5 relays. new power supply at 2/f facp room. ref t.i. pa202106253279. maher n/a. | $18,334 |
| Nov 23, 2021 | Never finaled issued Nov 2021, no final | 111 Maiden Ln | Rfi Enterprises Inc. | revise sequence of operation matrix for: fireman's hat, elevator recall, remove heat detector in machine room and shunt trip from matrix. reference pa #202010196797.Details
revise sequence of operation matrix for: fireman's hat, elevator recall, remove heat detector in machine room and shunt trip from matrix. reference pa #202010196797. | |
| Nov 23, 2021 | Completed final sign-off Dec 2021 | 1145 Market St | Rfi Enterprises Inc. | update sequence of operation matrix and omit monitor point for diesel fire pump. existing fire pump diesel has no valve for low fuel monitor. as built 202107204708, base permit 202005207642Details
update sequence of operation matrix and omit monitor point for diesel fire pump. existing fire pump diesel has no valve for low fuel monitor. as built 202107204708, base permit 202005207642 | |
| Jul 20, 2021 | Completed final sign-off Dec 2021 | 1145 Market St | Rfi Enterprises Inc. | fire as-built revisions for pa# 202005207642. to provide installed new interfacemodule to monitor both electric pimp and diesel fire pump.Details
fire as-built revisions for pa# 202005207642. to provide installed new interfacemodule to monitor both electric pimp and diesel fire pump. | |
| Jun 7, 2021 | Completed final sign-off Aug 2021 | 427 Brannan St | Rfi Enterprises Inc. | provide new ceiling mounted strobe in conference room. adjust (2) ceiling strobe candela to 30cd.Details
provide new ceiling mounted strobe in conference room. adjust (2) ceiling strobe candela to 30cd. | $8,644 |
| Mar 9, 2021 | Never finaled issued Mar 2021, no final | 1201 Ortega St | Rfi Enterprises Inc. | to obtain final imspection for work approved under permit application number 201810021949. all work is completed.Details
to obtain final imspection for work approved under permit application number 201810021949. all work is completed. | $8,800 |
| Oct 19, 2020 | Never finaled issued Jan 2021, no final | 111 Maiden Ln | Rfi Enterprises Inc. | provide smoke detectors at elevator lobby at every floor. provide monitoring for elevator functions. elevator upgrade.Details
provide smoke detectors at elevator lobby at every floor. provide monitoring for elevator functions. elevator upgrade. | $21,534 |
| Aug 22, 2020 | Completed final sign-off Mar 2021 | 239 Geary St | Rfi Enterprises Inc. | tenant improvement on retail 1. to provide by electrical contractor as requirement for fire alarm.Details
tenant improvement on retail 1. to provide by electrical contractor as requirement for fire alarm. | $10,775 |
| May 20, 2020 | Completed final sign-off Dec 2021 | 1145 Market St | Rfi Enterprises Inc. | provide replacement unit for the (e) mxl panel to new xls fire alarm control panel, while utilizing (e) fire alarm devices & wiresDetails
provide replacement unit for the (e) mxl panel to new xls fire alarm control panel, while utilizing (e) fire alarm devices & wires | $175,752 |
| Oct 11, 2019 | Completed final sign-off Oct 2019 | 125 Grant Av | Rfi Enterprises Inc. | ref pa# 2019021503044; as built drawings of a approved fire alarm drawingDetails
ref pa# 2019021503044; as built drawings of a approved fire alarm drawing | $500 |
| Jul 26, 2019 | Completed final sign-off Oct 2019 | 209 Post St | Rfi Enterprises Inc. | rev to pa#201906052559; updating of fire alarm system inside paradigm per new renovationDetails
rev to pa#201906052559; updating of fire alarm system inside paradigm per new renovation | $24,920 |
| Apr 19, 2019 | Completed final sign-off May 2022 | 233 Geary St | Rfi Enterprises Inc. | separate existing facd from macys network. make it a shand alone fire alarm system for new owner to be monitored by new ownerDetails
separate existing facd from macys network. make it a shand alone fire alarm system for new owner to be monitored by new owner | $168,000 |
| Apr 5, 2019 | Completed final sign-off Feb 2023 | 170 Ofarrell St | Rfi Enterprises Inc. | dressing rm and restroom ti 8 new spwaker strobes, 3 new strobes tie to e power boosterDetails
dressing rm and restroom ti 8 new spwaker strobes, 3 new strobes tie to e power booster | $6,654 |
| Feb 28, 2019 | Completed final sign-off Jul 2022 | 170 Ofarrell St | Rfi Enterprises Inc. | 5th flr on geary side. fire alarm t.i. 1 power supply, 4 sync modules, 4 monitor modules, 2 speaker strobes, 1 strobeDetails
5th flr on geary side. fire alarm t.i. 1 power supply, 4 sync modules, 4 monitor modules, 2 speaker strobes, 1 strobe | $6,019 |
| Feb 28, 2019 | Completed final sign-off Aug 2022 | 170 Ofarrell St | Rfi Enterprises Inc. | 6th flr on geary side. fire alarm t.i. 11 power supply, 4 modules, 3 speaker strobes, 3 strobesDetails
6th flr on geary side. fire alarm t.i. 11 power supply, 4 modules, 3 speaker strobes, 3 strobes | $7,710 |
| Feb 15, 2019 | Completed final sign-off Oct 2019 | 125 Grant Av | Rfi Enterprises Inc. | b-2nd flr. replace speakers & strobes for t.i area. 39 horn strobes, 38 strobes, 4 remote power supply. 22 (n) duct detectors w/ shut down modules. ref pa #201808177686.Details
b-2nd flr. replace speakers & strobes for t.i area. 39 horn strobes, 38 strobes, 4 remote power supply. 22 (n) duct detectors w/ shut down modules. ref pa #201808177686. | $71,400 |
| Feb 15, 2019 | Completed final sign-off Aug 2022 | 170 Ofarrell St | Rfi Enterprises Inc. | 7th flr. dressing room t.i. 3 speaker strobesDetails
7th flr. dressing room t.i. 3 speaker strobes | $22,939 |
| Feb 15, 2019 | Completed final sign-off Sep 2019 | 170 Ofarrell St | Rfi Enterprises Inc. | 8th flr. replace speakers & strobes for t.i area. 9 speakers, 7 speaker strobes, 2 pad remote power supply. 4 (n) duct detectors w/ shut down modulesDetails
8th flr. replace speakers & strobes for t.i area. 9 speakers, 7 speaker strobes, 2 pad remote power supply. 4 (n) duct detectors w/ shut down modules | $57,953 |
| Feb 15, 2019 | Completed final sign-off Feb 2020 | 170 Ofarrell St | Rfi Enterprises Inc. | 1st fl geary t.i. replace speakers & strobe's. 21 speaker strobes, 1 speaker, 10 strobe onlyDetails
1st fl geary t.i. replace speakers & strobe's. 21 speaker strobes, 1 speaker, 10 strobe only | $59,440 |
| Oct 24, 2018 | Completed final sign-off Nov 2022 | 170 Ofarrell St | Rfi Enterprises Inc. | 1st fl. relocation of (e) strobes and (e) speakers. 2nd fl. demolish (e) non-sync strobes and speakers, provide (n) speaker strobes w/sync. capabilites, provide (n) duct detectors, roof: provide duct detector for ahu- 19 notifaction and 19 duct detectorsDetails
1st fl. relocation of (e) strobes and (e) speakers. 2nd fl. demolish (e) non-sync strobes and speakers, provide (n) speaker strobes w/sync. capabilites, provide (n) duct detectors, roof: provide duct detector for ahu- 19 notifaction and 19 duct detectors | $77,600 |
| Oct 24, 2018 | Expired or cancelled cancelled Aug 2023 | 125 Grant Av | Rfi Enterprises Inc. | fire alarm in basement, existing system. add (n) remote power supply, install (4) new ceiling mounted strobes, (e) new duct detectors including test swithces & relay modules- mechanical plan with ti work under 201706088743-Details
fire alarm in basement, existing system. add (n) remote power supply, install (4) new ceiling mounted strobes, (e) new duct detectors including test swithces & relay modules- mechanical plan with ti work under 201706088743- | $33,950 |
| Oct 2, 2018 | Never finaled issued Oct 2018, no final | 1201 Ortega St | Rfi Enterprises Inc. | provide 1 new horn / strobe at basement storage using new circuit. maher n/aDetails
provide 1 new horn / strobe at basement storage using new circuit. maher n/a | $8,800 |
| Oct 2, 2018 | Never finaled issued Oct 2018, no final | 755 Ashbury St | Rfi Enterprises Inc. | revision to 201710201797. address correction from 765 to 755 ashburyDetails
revision to 201710201797. address correction from 765 to 755 ashbury | |
| Sep 7, 2018 | Completed final sign-off Sep 2019 | 111 Maiden Ln | Rfi Enterprises Inc. | voluntary facp upgrade, replacing like for like. neither adding nor deleting any slc or nac devices. no bld permit neededDetails
voluntary facp upgrade, replacing like for like. neither adding nor deleting any slc or nac devices. no bld permit needed | $50,000 |
| Mar 7, 2018 | Never finaled issued Jul 2018, no final | 170 Ofarrell St | Rfi Enterprises Inc. | ti on the 7th fl. of macy's: relocation of notification devices adding (1) sprinkler/strobe and (1) speaker. ref ba# 201707071273Details
ti on the 7th fl. of macy's: relocation of notification devices adding (1) sprinkler/strobe and (1) speaker. ref ba# 201707071273 | $3,500 |
| Nov 20, 2017 | Never finaled issued Nov 2017, no final | 170 Ofarrell St | Rfi Enterprises Inc. | install 1 speaker strobe in 3rd fl restroom, connect to existing . elocate 1 strobe in 3rd fl restroom. remove and replace 1 speaker for speaker strobe, fire alrmDetails
install 1 speaker strobe in 3rd fl restroom, connect to existing . elocate 1 strobe in 3rd fl restroom. remove and replace 1 speaker for speaker strobe, fire alrm | $3,500 |
| Oct 20, 2017 | Completed final sign-off Dec 2018 | 765 Ashbury St | Rfi Enterprises Inc. | adding (2) smokes & (2) door holders.Details
adding (2) smokes & (2) door holders. | $600 |
| Sep 27, 2017 | Never finaled issued Sep 2017, no final | 170 Ofarrell St | Rfi Enterprises Inc. | 8/f- adding monitor module for 8th fl ansul system to tie into fire alarm system. maher naDetails
8/f- adding monitor module for 8th fl ansul system to tie into fire alarm system. maher na | $3,000 |
| Sep 27, 2017 | Completed final sign-off Mar 2018 | 201 Post St | Rfi Enterprises Inc. | ti for cartier moving in 201 post st. adding (20 remote power supplies, (13) ducts, (48) notification appliances, (5) smokes, (1) heat, elev control, (2) fsd's. ref ti #201705116376.Details
ti for cartier moving in 201 post st. adding (20 remote power supplies, (13) ducts, (48) notification appliances, (5) smokes, (1) heat, elev control, (2) fsd's. ref ti #201705116376. | $7,000 |
| Aug 22, 2017 | Completed final sign-off Jul 2022 | 170 Ofarrell St | Rfi Enterprises Inc. | lower level - adding (2) new strobes to area of work, remaining strobes in viewing area to be removed & replaced to synch all strobes. tie into exisitng cirucits. all work on lower level.Details
lower level - adding (2) new strobes to area of work, remaining strobes in viewing area to be removed & replaced to synch all strobes. tie into exisitng cirucits. all work on lower level. | $15,000 |
| Aug 4, 2017 | Completed final sign-off May 2018 | 201 Post St | Rfi Enterprises Inc. | revised drawings, turning in fire alarm corrected as-builts. ref pa#201703131261.Details
revised drawings, turning in fire alarm corrected as-builts. ref pa#201703131261. | $200 |
| Apr 24, 2017 | Completed final sign-off Sep 2017 | 425 Brannan St | Rfi Enterprises Inc. | as built drawings ref pa 2016-1123-3429. maher naDetails
as built drawings ref pa 2016-1123-3429. maher na | |
| Mar 13, 2017 | Completed final sign-off Apr 2018 | 201 Post St | Rfi Enterprises Inc. | fire alarm for new tenant (fendi) 1st fl/bsmt. add fire power supply (remote), add 10 notification appliances, 8 smokes, 3 heats, 7 ducts, 2 fsds ref 201611152698Details
fire alarm for new tenant (fendi) 1st fl/bsmt. add fire power supply (remote), add 10 notification appliances, 8 smokes, 3 heats, 7 ducts, 2 fsds ref 201611152698 | $15,000 |
| Nov 23, 2016 | Completed final sign-off Sep 2017 | 427 Brannan St | Rfi Enterprises Inc. | 2nd flr: installing remote power supply 6 a/v, 13 strobes, 2 ducts maher naDetails
2nd flr: installing remote power supply 6 a/v, 13 strobes, 2 ducts maher na | $6,700 |
| Oct 7, 2016 | Completed final sign-off Oct 2016 | 170 Ofarrell St | Rfi Enterprises Inc. | 4/f- add (3) strobes & (3) speaker/strobes to existing remote power supply for lenscrafters. t.i. pa#201603303522. n/a ordinance #155-13Details
4/f- add (3) strobes & (3) speaker/strobes to existing remote power supply for lenscrafters. t.i. pa#201603303522. n/a ordinance #155-13 | $4,700 |
| Jul 6, 2016 | Never finaled issued Jul 2016, no final | 2095 Jackson St | Rfi Enterprises Inc. | final fire alarm as built for permit #201511132604Details
final fire alarm as built for permit #201511132604 | |
| Nov 13, 2015 | Never finaled issued Nov 2015, no final | 2095 Jackson St | Rfi Enterprises Inc. | fire alarm job- elevator modernization project to add (2) smokes & (3) elevator control modules. ref pa # 2013-0829-5542Details
fire alarm job- elevator modernization project to add (2) smokes & (3) elevator control modules. ref pa # 2013-0829-5542 | $4,800 |
| Oct 22, 2015 | Completed final sign-off Sep 2016 | 425 Brannan St | Rfi Enterprises Inc. | fire alarm system - monitor flow & tamper, provide full notification thru-out. (approved mech plan are also included). ref pa #201508285513. n/a maher ordinanceDetails
fire alarm system - monitor flow & tamper, provide full notification thru-out. (approved mech plan are also included). ref pa #201508285513. n/a maher ordinance | $9,500 |
| Aug 12, 2015 | Completed final sign-off Aug 2015 | 233 Geary St | Rfi Enterprises Inc. | as builts revisions to ref pa 2015 0626 0012Details
as builts revisions to ref pa 2015 0626 0012 | |
| Jun 26, 2015 | Completed final sign-off Aug 2015 | 233 Geary St | Rfi Enterprises Inc. | additional notification and duct detector monitoring on an extg fire alarm system. ref t.i. #201502239094Details
additional notification and duct detector monitoring on an extg fire alarm system. ref t.i. #201502239094 | $22,800 |
| Mar 20, 2015 | Never finaled issued Mar 2015, no final | 201 Post St | Rfi Enterprises Inc. | fire alarm as builts per app#201502118003- changing matrix to elimante stairwell locks on plan, non in buildingDetails
fire alarm as builts per app#201502118003- changing matrix to elimante stairwell locks on plan, non in building | |
| Feb 11, 2015 | Never finaled issued Feb 2015, no final | 201 Post St | Rfi Enterprises Inc. | t.i. on the 7th floor. adding remote power supply and notification appliances. no mech changes. ref app#201412294593Details
t.i. on the 7th floor. adding remote power supply and notification appliances. no mech changes. ref app#201412294593 | $6,200 |
| Feb 11, 2015 | Never finaled issued Feb 2015, no final | 2095 Jackson St | Rfi Enterprises Inc. | to obtain final inspection for work approved under pa #201308295542. all work is complete.4Details
to obtain final inspection for work approved under pa #201308295542. all work is complete.4 | |
| Jan 9, 2015 | Never finaled issued Apr 2015, no final | 848 Battery St | Rfi Enterprises Inc. | ground floor - install one relay to fire alarm system to unlock door. ref 201503110473Details
ground floor - install one relay to fire alarm system to unlock door. ref 201503110473 | $3,935 |
| Oct 23, 2014 | Completed final sign-off Oct 2015 | 1145 Market St | Rfi Enterprises Inc. | final fire alarm as builts for 201407100871Details
final fire alarm as builts for 201407100871 | |
| Oct 23, 2014 | Completed final sign-off Oct 2015 | 1145 Market St | Rfi Enterprises Inc. | add 100 watt amp and divide up speaker circiuts on facpDetails
add 100 watt amp and divide up speaker circiuts on facp | $3,000 |
| Jul 10, 2014 | Completed final sign-off Oct 2015 | 1145 Market St | Rfi Enterprises Inc. | 5th, 6th & 7th floor - adding notification appliances where required, remote power supply per floor, (9) duct det where required. (5th & 6th flr ref #2014.0605.7632 & 7th flr ref #2014.0605.7630.)Details
5th, 6th & 7th floor - adding notification appliances where required, remote power supply per floor, (9) duct det where required. (5th & 6th flr ref #2014.0605.7632 & 7th flr ref #2014.0605.7630.) | $19,500 |
| Jun 4, 2014 | Expired or cancelled cancelled Sep 2023 | 170 Ofarrell St | Rfi Enterprises Inc. | adding one (1) monitor module for ansul system, adding one control module for shutting gas to burner; compliance with ord no 155-13 not requiredDetails
adding one (1) monitor module for ansul system, adding one control module for shutting gas to burner; compliance with ord no 155-13 not required | $3,000 |
| May 21, 2014 | Completed final sign-off Jun 2014 | 1145 Market St | Rfi Enterprises Inc. | 8th flr: fire alarm t.i. on the 8th flr, there will be new remote power supply for strobes, speakers to tie into existing sprinkler circuits, duct det, for new fsd's (ref. 201311202429)Details
8th flr: fire alarm t.i. on the 8th flr, there will be new remote power supply for strobes, speakers to tie into existing sprinkler circuits, duct det, for new fsd's (ref. 201311202429) | $8,500 |
| Jan 29, 2014 | Completed final sign-off Apr 2014 | 1145 Market St | Rfi Enterprises Inc. | t.i. on the 1st and 3rd floor. fire alarm system to be expanded with new remote power supply, speaker/strobes, strobes and duct detectors. ref app#201312164261. n/a for interim controls #428-13Details
t.i. on the 1st and 3rd floor. fire alarm system to be expanded with new remote power supply, speaker/strobes, strobes and duct detectors. ref app#201312164261. n/a for interim controls #428-13 | $8,000 |
| Jan 3, 2014 | Completed final sign-off Dec 2015 | 2840 Broadway | Rfi Enterprises Inc. | new facp for elev. control elev smokes, sprinkler monitoring emergency gen & smokes in bedrooms and vicinity of bedrooms.ref pa# 201310240167Details
new facp for elev. control elev smokes, sprinkler monitoring emergency gen & smokes in bedrooms and vicinity of bedrooms.ref pa# 201310240167 | $11,500 |
| Nov 14, 2013 | Completed final sign-off Dec 2013 | 201 Post St | Rfi Enterprises Inc. | fire alarm: ti on the 11th fl. provide notification appliance througout floor. no initiation devices added.Details
fire alarm: ti on the 11th fl. provide notification appliance througout floor. no initiation devices added. | $4,000 |
| Oct 9, 2013 | Completed final sign-off Jan 2014 | 140 Geary St | Rfi Enterprises Inc. | fire alarm t.i. on the 8/f, adding 1 sprinkler/strobe & relocate 1 sprinkler/strobe. ref. to t.i.# 201307303064Details
fire alarm t.i. on the 8/f, adding 1 sprinkler/strobe & relocate 1 sprinkler/strobe. ref. to t.i.# 201307303064 | $6,000 |
| Aug 29, 2013 | Completed final sign-off Jul 2016 | 2095 Jackson St | Rfi Enterprises Inc. | provide new control panel for new elevator also provide full notification appliances & smoke detector in front of elevatorsDetails
provide new control panel for new elevator also provide full notification appliances & smoke detector in front of elevators | $17,000 |
| Aug 29, 2013 | Completed final sign-off Oct 2013 | 1145 Market St | Rfi Enterprises Inc. | 4/f- providing t.i. on 4/f, adding notification appliances & power supply. t.i. 201308083898Details
4/f- providing t.i. on 4/f, adding notification appliances & power supply. t.i. 201308083898 | $7,500 |
| May 9, 2013 | Never finaled issued May 2013, no final | 848 Battery St | Rfi Enterprises Inc. | revision to pa# 2012-1011-1783-as builts, additional work-added 20 strobes & 3 horn/strobesDetails
revision to pa# 2012-1011-1783-as builts, additional work-added 20 strobes & 3 horn/strobes | |
| Nov 8, 2012 | Never finaled issued Nov 2012, no final | 450 Guerrero St | Rfi Enterprises Inc. | 1st floor t.i. to existing facp, provide (1) new elev lobby smoke det, (2) new elev recall modules, existing facp operation & functionality will not change.Details
1st floor t.i. to existing facp, provide (1) new elev lobby smoke det, (2) new elev recall modules, existing facp operation & functionality will not change. | $3,800 |
| Nov 2, 2012 | Completed final sign-off Jan 2013 | 1145 Market St | Rfi Enterprises Inc. | 9th floor: t.i. to extg fire alarm system. adding 6 strobes, 8 speaker strobes,2 speakers connect to extg power supply. app#201209280859Details
9th floor: t.i. to extg fire alarm system. adding 6 strobes, 8 speaker strobes,2 speakers connect to extg power supply. app#201209280859 | $3,700 |
| Oct 11, 2012 | Never finaled issued Oct 2012, no final | 848 Battery St | Rfi Enterprises Inc. | 1st floor-fire alarm tenant improvement, adding remote power supply, 21 strobes, 3 a/v to existing facp. t.i ref pa# 201208157467.Details
1st floor-fire alarm tenant improvement, adding remote power supply, 21 strobes, 3 a/v to existing facp. t.i ref pa# 201208157467. | $6,807 |
| Sep 10, 2012 | Completed final sign-off Oct 2013 | 170 Ofarrell St | Rfi Enterprises Inc. | t.i on 3rd floor of macy's, adding notification appliances and remote power supply. t.i. ref pa# 201201041671Details
t.i on 3rd floor of macy's, adding notification appliances and remote power supply. t.i. ref pa# 201201041671 | $4,000 |
| Jun 6, 2012 | Never finaled issued Jun 2012, no final | 77 Beale St | Rfi Enterprises Inc. | 12th floor-new notification appliances being added for an tenant improvement-new fsd's to be added as well (8 total). t.i pa# 201204067773Details
12th floor-new notification appliances being added for an tenant improvement-new fsd's to be added as well (8 total). t.i pa# 201204067773 | $3,000 |
| May 23, 2012 | Completed final sign-off Jan 2013 | 245 Market St | Rfi Enterprises Inc. | voluntary upgrade of visual notification appliances on existing phase ii. fire alarm permit. 42 new power supplies, 18 sync modules, 987 new notification appliances (strobes and speaker strobes).Details
voluntary upgrade of visual notification appliances on existing phase ii. fire alarm permit. 42 new power supplies, 18 sync modules, 987 new notification appliances (strobes and speaker strobes). | $100,000 |
| Feb 17, 2012 | Never finaled issued Feb 2012, no final | 77 Beale St | Rfi Enterprises Inc. | revision to 201009140860. as builts submittal plans, fire alarmDetails
revision to 201009140860. as builts submittal plans, fire alarm | $7,500 |
| Nov 8, 2011 | Completed final sign-off Dec 2011 | 201 Post St | Rfi Enterprises Inc. | 11th floor fire alarm - add modules for (2) fsd's being added & relocate notification appliances.Details
11th floor fire alarm - add modules for (2) fsd's being added & relocate notification appliances. | $4,000 |
| Apr 18, 2011 | Completed final sign-off Jun 2011 | 201 Post St | Rfi Enterprises Inc. | 4th floor tenant improvement, add on to extg fire life safty system.Details
4th floor tenant improvement, add on to extg fire life safty system. | $6,000 |
| Feb 24, 2011 | Completed final sign-off Jan 2012 | 699 08th St | Rfi Enterprises Inc. | install card access system control supporting seventy three(73) doors. install emergency release devices and signage at 5 door. install cctv system.Details
install card access system control supporting seventy three(73) doors. install emergency release devices and signage at 5 door. install cctv system. | $400,000 |
| Jan 3, 2011 | Completed final sign-off Feb 2011 | 77 Beale St | Rfi Enterprises Inc. | revision to (e) pa 2010.12.14.6622, as built for fire alarm system on 25th floor.Details
revision to (e) pa 2010.12.14.6622, as built for fire alarm system on 25th floor. | |
| Dec 14, 2010 | Completed final sign-off Mar 2011 | 77 Beale St | Rfi Enterprises Inc. | revision to 201007096317, 201007287670. final as builts, fire alarmDetails
revision to 201007096317, 201007287670. final as builts, fire alarm | $1,000 |
| Oct 27, 2010 | Never finaled issued Oct 2010, no final | 100 California St | Rfi Enterprises Inc. | card access control on doors in 3rd floor elevator lobby. emergency door release ul listed/ada compliant buttons to be installed on a total 4 doors.Details
card access control on doors in 3rd floor elevator lobby. emergency door release ul listed/ada compliant buttons to be installed on a total 4 doors. | $10,500 |
| Oct 13, 2010 | Never finaled issued Oct 2010, no final | 3 Embarcadero Center | Rfi Enterprises Inc. | as built drawings.reference app#201002196844Details
as built drawings.reference app#201002196844 | |
| Oct 13, 2010 | Completed final sign-off Jan 2011 | 455 Mission Bay Blvd South | Rfi Enterprises Inc. | revised as built drawings to reflect 2nd 4th floor card reader door with emergency egress button. reference 201010062420Details
revised as built drawings to reflect 2nd 4th floor card reader door with emergency egress button. reference 201010062420 | |
| Oct 6, 2010 | Completed final sign-off Jan 2011 | 455 Mission Bay Blvd South | Rfi Enterprises Inc. | card access control system on 1st, 3rd and 4th floor. permit req'd due to card access conrol in elev.lobbies on 3rd and 4th fl.including freight. emergency dr releases will be installed at cardaccess controlled ele. lobby doors. edr will also be installed for roof cr doorDetails
card access control system on 1st, 3rd and 4th floor. permit req'd due to card access conrol in elev.lobbies on 3rd and 4th fl.including freight. emergency dr releases will be installed at cardaccess controlled ele. lobby doors. edr will also be installed for roof cr door | $31,996 |
| Sep 14, 2010 | Completed final sign-off Feb 2012 | 77 Beale St | Rfi Enterprises Inc. | voluntary upgrade of visual notification devices.Details
voluntary upgrade of visual notification devices. | $110,379 |
| Sep 2, 2010 | Completed final sign-off Nov 2010 | 135 Maiden Ln | Rfi Enterprises Inc. | 1st & 2nd floors-tenant improvement on 1st & 2nd flrs will be adding ada notification appliances thru out space. also adding duct detector for replacement of smokes in front of fsd's & new water heat pumpsDetails
1st & 2nd floors-tenant improvement on 1st & 2nd flrs will be adding ada notification appliances thru out space. also adding duct detector for replacement of smokes in front of fsd's & new water heat pumps | $10,000 |
| Jul 28, 2010 | Completed final sign-off Feb 2011 | 77 Beale St | Rfi Enterprises Inc. | 25th floor- as builts drawing for facp tenant improvement. tie to ap #201007096317.Details
25th floor- as builts drawing for facp tenant improvement. tie to ap #201007096317. | $1,000 |
| Jul 9, 2010 | Completed final sign-off Feb 2012 | 77 Beale St | Rfi Enterprises Inc. | fire alarm tenant inprovement on the 25th floorDetails
fire alarm tenant inprovement on the 25th floor | $14,830 |
| Feb 19, 2010 | Never finaled issued Feb 2010, no final | 3 Embarcadero Center | Rfi Enterprises Inc. | twenty six doors of card access control on 2nd and 3rd floors. elevator lobbies with emergency door release for freight and regular elevators.Details
twenty six doors of card access control on 2nd and 3rd floors. elevator lobbies with emergency door release for freight and regular elevators. | $54,900 |
| Dec 28, 2009 | Completed final sign-off Mar 2010 | 201 Post St | Rfi Enterprises Inc. | 10th floor-tenant improvement to office space turning into art gallery under pa# 2009-1020-9337-this is a fire alarm permit for tenant improvement-relocating 5 notification appliances, 1 smoke, 1 door holder & 1 fsd for new floor plan. connect to (e) curcuits. (e) fire alarm system will not changeDetails
10th floor-tenant improvement to office space turning into art gallery under pa# 2009-1020-9337-this is a fire alarm permit for tenant improvement-relocating 5 notification appliances, 1 smoke, 1 door holder & 1 fsd for new floor plan. connect to (e) curcuits. (e) fire alarm system will not change | $13,000 |
| Mar 17, 2009 | Never finaled issued Mar 2009, no final | 1145 Market St | Rfi Enterprises Inc. | renew pa# 2006/05/24/2377 to obtain final inspection. all work has been completed.Details
renew pa# 2006/05/24/2377 to obtain final inspection. all work has been completed. | |
| Nov 18, 2008 | Expired or cancelled expired Jul 2011 | 195 Kiska Rd | Rfi Enterprises Inc. | install new facp per plans and specs to include facp, notification smoke detection, annunciator per app #200712271351. as builts only.Details
install new facp per plans and specs to include facp, notification smoke detection, annunciator per app #200712271351. as builts only. | |
| Jun 25, 2008 | Completed final sign-off Nov 2008 | 1145 Market St | Rfi Enterprises Inc. | ti for fire alarm for the 7th floor. install 1 new strobe in the 7th floor conference rm# 705 and 1 sync moduleDetails
ti for fire alarm for the 7th floor. install 1 new strobe in the 7th floor conference rm# 705 and 1 sync module | $6,176 |