185 permits since 2000 (architect on 177 permits, authorized agent-others on 13 permits, engineer on 2 permits, designer on 1 permit): 107 completed, 26 in progress, 29 never finaled, 23 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 185.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 2, 2026 | In progress filed Oct 2026, not yet issued | 248 Whitney St | remove (e) closet partitions and doors at 2nd floor primary bedroom. provide framing per structural plans.Details
remove (e) closet partitions and doors at 2nd floor primary bedroom. provide framing per structural plans. | $3,000 | |
| Aug 31, 2026 | In progress issued Sep 2026 | 980 Ashbury St | K 2 Builders Inc | first floor: renovate (e) kitchen, relocate 1/2 bath. @nd floor: renovate(2)(e) bathrooms and laundry area. renovate principal bedroom and closet area. remove (e) masonary chimneyDetails
first floor: renovate (e) kitchen, relocate 1/2 bath. @nd floor: renovate(2)(e) bathrooms and laundry area. renovate principal bedroom and closet area. remove (e) masonary chimney | $130,000 |
| Aug 27, 2026 | In progress filed Aug 2026, not yet issued | 3 Peralta Av | horizontal expansion of first and second floor per section 311. within rear yard. demo calculations consistent of section 317. addition of interior stair from first to second level. no loss of dwelling units per section 317.Details
horizontal expansion of first and second floor per section 311. within rear yard. demo calculations consistent of section 317. addition of interior stair from first to second level. no loss of dwelling units per section 317. | $20,000 | |
| Jul 7, 2026 | In progress issued Aug 2026 | 1167 Munich St | legalize existing ground floor sleeping and bath area including replacing existing solid entry door with new frosted safety glass door.Details
legalize existing ground floor sleeping and bath area including replacing existing solid entry door with new frosted safety glass door. | $100 | |
| Jun 30, 2026 | In progress filed Jun 2026, not yet issued | 2299 Pacific Av | 1. legalization of an existing studio apartment on the 9th floor which was previously installed without a permit. no change to the building or unit. 2. no construction work is proposed 3. trade permits as requiredDetails
1. legalization of an existing studio apartment on the 9th floor which was previously installed without a permit. no change to the building or unit. 2. no construction work is proposed 3. trade permits as required | ||
| Jun 23, 2026 | In progress issued Aug 2026 | 2344 15th St | K 2 Builders Inc | remove and replace (e) front entry stair, guard rail and hand rails. 3rd floor bedroom closet and dressing area renovation.Details
remove and replace (e) front entry stair, guard rail and hand rails. 3rd floor bedroom closet and dressing area renovation. | $7,500 |
| May 5, 2026 | In progress issued May 2026 | 3780 22nd St | rear deck renovation. removal of (e) rear sliding patio door and window. replacement of patio door and window with single patio door unit. (no change to interior)Details
rear deck renovation. removal of (e) rear sliding patio door and window. replacement of patio door and window with single patio door unit. (no change to interior) | $5,000 | |
| May 5, 2026 | In progress filed May 2026, not yet issued | 1336 Shotwell St | revision to bpa: 202309116345 - new railing at roof deck north and east sides to be cable rail to match the permitted rail at satir opening. all (e) hvac ro be replaced with new heat pump units, (e) hot water heater to be replaced with (n) hot water heater.Details
revision to bpa: 202309116345 - new railing at roof deck north and east sides to be cable rail to match the permitted rail at satir opening. all (e) hvac ro be replaced with new heat pump units, (e) hot water heater to be replaced with (n) hot water heater. | ||
| Mar 27, 2026 | In progress filed Mar 2026, not yet issued | 68 Santa Marina St | to comply with complaint 202298597.legalization of the rear deck through variance #2022-012041var;addition of a 1-hour-rated firewall along deck at the rear property line. remove portion of deck to allow for 3' between adjacent property lineDetails
to comply with complaint 202298597.legalization of the rear deck through variance #2022-012041var;addition of a 1-hour-rated firewall along deck at the rear property line. remove portion of deck to allow for 3' between adjacent property line | $2,500 | |
| Feb 24, 2026 | In progress issued Apr 2026 | 36 Sussex St | Ava Jamshidnejad | extend 1st floor kitchen below existing 2nd floor overhang. remodel existing kitchen. repair siding at north wall.Details
extend 1st floor kitchen below existing 2nd floor overhang. remodel existing kitchen. repair siding at north wall. | $35,000 |
| Feb 17, 2026 | In progress filed Feb 2026, not yet issued | 220 Mullen Av | new skylights at 1st floor roof (3) and new stationary picture window at 3rd floor.Details
new skylights at 1st floor roof (3) and new stationary picture window at 3rd floor. | $800 | |
| Feb 2, 2026 | In progress issued May 2026 | 150 Liberty St | Olive Remodeling | vertical addition of 4th story and stair to upper unit, 152 liberty, addition of (n) roof deck at 4th floor, sprinkler entire building with nfpa 13r system on seperate permit, full seismic upgrade.Details
vertical addition of 4th story and stair to upper unit, 152 liberty, addition of (n) roof deck at 4th floor, sprinkler entire building with nfpa 13r system on seperate permit, full seismic upgrade. | $175,000 |
| Jan 4, 2026 | In progress issued Jul 2026 | 321 Rutledge St | Ava Jamshidnejad | garage level: voluntary foundation replacement, new retaining walls, shoring, excavate rear crawl space, total excavation of 22 cubic yards; 1/f kitchen renovation, (n) bathroom; 2/f bathroom renovation. alteration of rear existing porch roof.Details
garage level: voluntary foundation replacement, new retaining walls, shoring, excavate rear crawl space, total excavation of 22 cubic yards; 1/f kitchen renovation, (n) bathroom; 2/f bathroom renovation. alteration of rear existing porch roof. | $10,000 |
| Oct 23, 2025 | In progress issued Oct 2025 | 672 Hamilton St | Wing On Construction Inc | revision to pa# 202107295380 & adu pa# 202110180694. propsed envelope expnsions. 1st floor exterior entry infill. 2nd floor lightwell infill. 3rd floor envelope expension.Details
revision to pa# 202107295380 & adu pa# 202110180694. propsed envelope expnsions. 1st floor exterior entry infill. 2nd floor lightwell infill. 3rd floor envelope expension. | $10,000 |
| Aug 8, 2025 | Completed final sign-off Jul 2026 | 250 Mullen Av | Sean Kelly Construction | interior renovation of bathroom area, laundry area, and bedroom closet on 2nd floor. repair hvac.Details
interior renovation of bathroom area, laundry area, and bedroom closet on 2nd floor. repair hvac. | $10,000 |
| Jun 23, 2025 | In progress issued May 2026 | 26 Prospect Av | A C B Inc | legalize (e) shed per nov 2024254812. new window and new doors at 2nd floor bedroom.Details
legalize (e) shed per nov 2024254812. new window and new doors at 2nd floor bedroom. | $2,500 |
| Jun 23, 2025 | In progress issued Jul 2025 | 127 Ellert St | Ava Jamshidnejad | kitchen and bathroom remodel, addition of half bathroom, relocate laundry to garage, replace windows in front, replace flooring and repaint interior. demo of deck and reconstruction as shown on plans.Details
kitchen and bathroom remodel, addition of half bathroom, relocate laundry to garage, replace windows in front, replace flooring and repaint interior. demo of deck and reconstruction as shown on plans. | $50,000 |
| Jun 20, 2025 | In progress issued Jul 2025 | 461 Gates St | Ava Jamshidnejad | revision to pa# 202503051616: replace (e) entry stair with new entry stair and rails in same location - updated details.Details
revision to pa# 202503051616: replace (e) entry stair with new entry stair and rails in same location - updated details. | $1,000 |
| Jun 6, 2025 | Completed final sign-off Aug 2026 | 90 Peralta Av | Occidental Express, Hugo Tejada/Dba Alpha & Omega Renovation | 1. complying with nov #202422466 & nov # 202288431. 2. addition of adu as per state program. legalize the kitchen on the 2nd floor. legalize the habitable space on the ground level.Details
1. complying with nov #202422466 & nov # 202288431. 2. addition of adu as per state program. legalize the kitchen on the 2nd floor. legalize the habitable space on the ground level. | $25,000 |
| May 16, 2025 | In progress issued Apr 2026 | 246 Bocana St | Ava Jamshidnejad | conversion of garage/storage to new habitable space 2. 2nd floor renovation 3. 3rd floor additionDetails
conversion of garage/storage to new habitable space 2. 2nd floor renovation 3. 3rd floor addition | $375,000 |
| May 2, 2025 | In progress issued Aug 2025 | 600 Texas St | Ava Jamshidnejad | excavation of approx 47 cu yd; remodel and horizontal expansion of 1st fl; remodel of 2nd fl (partial); removal of gas service, full electric 20181Details
excavation of approx 47 cu yd; remodel and horizontal expansion of 1st fl; remodel of 2nd fl (partial); removal of gas service, full electric 20181 | $185,000 |
| Mar 5, 2025 | In progress issued Mar 2025 | 461 Gates St | Ava Jamshidnejad | front stair replacement in kind. remove gas service, all electric in area of work. new insulation at roof. kithcen renovation.Details
front stair replacement in kind. remove gas service, all electric in area of work. new insulation at roof. kithcen renovation. | $20,000 |
| Dec 3, 2024 | Completed final sign-off Jan 2025 | 3238 Harrison St | Gil Construction & Assoc Inc. | remove (e) non complaints deck and stairs, replace w/ (n) landing and stairs.Details
remove (e) non complaints deck and stairs, replace w/ (n) landing and stairs. | $5,000 |
| Dec 2, 2024 | Completed final sign-off Mar 2026 | 4830 Mission St | Alpha Construction Co *Stop Issusing* | unit #304: upgrade unit for substitution mobility unit for 202407106115, 202407025689, and 202405202504 (4042 sycamore st)Details
unit #304: upgrade unit for substitution mobility unit for 202407106115, 202407025689, and 202405202504 (4042 sycamore st) | $15,000 |
| Dec 2, 2024 | Completed final sign-off Apr 2026 | 40 Sycamore St | Blackline Construction | 100% affordable housing, mayor dir 13-01: addition 2-local adu's to 1/f: (1)studio and (1)2-bedroom. (e) cottage @ clarion alley unchanged. voluntary soft story seismic retrofit per adminstrative bulletin no.94 under separate permit. sprinkler under separate permit. relocate rear stair on separateDetails
100% affordable housing, mayor dir 13-01: addition 2-local adu's to 1/f: (1)studio and (1)2-bedroom. (e) cottage @ clarion alley unchanged. voluntary soft story seismic retrofit per adminstrative bulletin no.94 under separate permit. sprinkler under separate permit. relocate rear stair on separate | $209,352 |
| Nov 20, 2024 | Completed final sign-off Apr 2025 | 2627 Chestnut St | Ava Jamshidnejad | 2nd fl - kitchen and laundry remodelDetails
2nd fl - kitchen and laundry remodel | $24,000 |
| Nov 19, 2024 | Expired or cancelled expired Sep 2026 | 2303 Lombard St | S L M Development Inc. | revision to pa#202206216655 to address nov #202311161: new egress door from lot 9 to sidewalk, relocation of existing store front and door and associated path of travel. permit #202206216655 was original issued under lot 0512/031, then was subdivided as 2301 lombard (0512/91) andDetails
revision to pa#202206216655 to address nov #202311161: new egress door from lot 9 to sidewalk, relocation of existing store front and door and associated path of travel. permit #202206216655 was original issued under lot 0512/031, then was subdivided as 2301 lombard (0512/91) and | $2,200 |
| Sep 9, 2024 | In progress issued Sep 2024 | 150 Bronte St | J5 Real Estate Development Co | revision to pa 2016-0916-7950 to change the previously approved, ~10-foot tall, steel soldier pile and wood lagging wall adjacent to the east side of the rear patio to a concrete retaining wall using a previously approved structural detail.Details
revision to pa 2016-0916-7950 to change the previously approved, ~10-foot tall, steel soldier pile and wood lagging wall adjacent to the east side of the rear patio to a concrete retaining wall using a previously approved structural detail. | $1,000 |
| Sep 6, 2024 | Completed final sign-off Mar 2025 | 1683 Page St | J5 Real Estate Development Co | interior renovation of bathroom area and bedroom closet at 3rd floor.Details
interior renovation of bathroom area and bedroom closet at 3rd floor. | $18,000 |
| Apr 15, 2024 | In progress issued May 2024 | 2030 Golden Gate Av | Cuan Construction | rebuild (e) front entry stairs and adjacent retaining walls. remove (e) interior spiral stairs and provide (n) interior elevator from 1st to 2nd flDetails
rebuild (e) front entry stairs and adjacent retaining walls. remove (e) interior spiral stairs and provide (n) interior elevator from 1st to 2nd fl | $20,000 |
| Apr 5, 2024 | In progress filed Apr 2024, not yet issued | 668 Hamilton St | Wing On Construction Inc | revision to pa# 202107295403 proposed envelope expansions include 2nd floor and 3rd floor envelope expansion.Details
revision to pa# 202107295403 proposed envelope expansions include 2nd floor and 3rd floor envelope expansion. | $10,000 |
| Apr 2, 2024 | Completed final sign-off Nov 2024 | 285 Moultrie St | Jfieco | revision to pa# 2023-1206-2015 to document 5 new window changes.Details
revision to pa# 2023-1206-2015 to document 5 new window changes. | $200 |
| Jan 9, 2024 | Completed final sign-off Jan 2024 | 159 Bonview St | Ka - Bi Construction Inc. | to document as-constructed partition layout for final. reference permit# 201806192232, 202003056257, and 202306019024.Details
to document as-constructed partition layout for final. reference permit# 201806192232, 202003056257, and 202306019024. | |
| Dec 15, 2023 | Completed final sign-off Jun 2024 | 566 Natoma St | Blackline Construction | provide new security bars at 5 (e) 1st floor windows, 2 openable at (e) bedrooms per cbc 1031 and california building standards code part 12 chapter 12-3Details
provide new security bars at 5 (e) 1st floor windows, 2 openable at (e) bedrooms per cbc 1031 and california building standards code part 12 chapter 12-3 | |
| Dec 6, 2023 | Completed final sign-off Dec 2024 | 285 Moultrie St | Jfieco | renovate (e) kitchen, dining room. add den. renovate laundry room, convert (e) storage to a bedroom.Details
renovate (e) kitchen, dining room. add den. renovate laundry room, convert (e) storage to a bedroom. | $150,000 |
| Nov 16, 2023 | Completed final sign-off May 2025 | 10 San Benito Wy | J5 Real Estate Development Co | conversion of (e) basement storage & crawlspace to (n) habitable space, relocate stairs down, 1/f: (e) 1/2-bath & hallway renovation, (4) (n) wood windows & (1) wood door/side lite @ basement (not visible from street)Details
conversion of (e) basement storage & crawlspace to (n) habitable space, relocate stairs down, 1/f: (e) 1/2-bath & hallway renovation, (4) (n) wood windows & (1) wood door/side lite @ basement (not visible from street) | $180,000 |
| Oct 12, 2023 | In progress issued Oct 2023 | 150 Bronte St | J5 Real Estate Development Co | revision to 201609167950. basement bath will now be a full bathroom. all heating changed to electricDetails
revision to 201609167950. basement bath will now be a full bathroom. all heating changed to electric | $1,000 |
| Sep 12, 2023 | Never finaled filed Sep 2023, never issued | 83 Noe St | Bai Construction | legalization of 1st floor into a "converted adu" per government code section 65852.2(a) through (d). (n) window @ south wall, demo (e) interior stair from 1st floor to 2nd floor. (n) 1-hr rated floor/ceiling fire separation @ (e) stair opening. (n) landing & stair @ (e) front eero window.Details
legalization of 1st floor into a "converted adu" per government code section 65852.2(a) through (d). (n) window @ south wall, demo (e) interior stair from 1st floor to 2nd floor. (n) 1-hr rated floor/ceiling fire separation @ (e) stair opening. (n) landing & stair @ (e) front eero window. | $150,000 |
| Sep 11, 2023 | In progress issued May 2025 | 1336 Shotwell St | Ava Jamshidnejad | conversion of 1/f to new studio adu. front facade renovation. remove (e) peaked roof for new flat roof and roof deck.Details
conversion of 1/f to new studio adu. front facade renovation. remove (e) peaked roof for new flat roof and roof deck. | $100,000 |
| Jun 2, 2023 | Completed final sign-off Nov 2023 | 157 Bonview St | Ka - Bi Construction Inc. | rev pa# 201806192232 for 159 bonview & in coordination w/ 157 bonview easement in pa# 201810042285, field discovered conditions, repair & remove extg crumbling & deteriorating exterior stair wall, provide new reinforced concrete wall per structural drawings 202305318898Details
rev pa# 201806192232 for 159 bonview & in coordination w/ 157 bonview easement in pa# 201810042285, field discovered conditions, repair & remove extg crumbling & deteriorating exterior stair wall, provide new reinforced concrete wall per structural drawings 202305318898 | |
| May 31, 2023 | Completed final sign-off Nov 2023 | 159 Bonview St | Ka - Bi Construction Inc. | rev pa# 201806192232 for 159 bonview & in coordination w/ 157 bonview easement in pa# 204810042285, field discovered conditions, repair & remove extg crumbing & deteriorating exterior stair wall, provide new reinforced concrete wall per structural drawings.Details
rev pa# 201806192232 for 159 bonview & in coordination w/ 157 bonview easement in pa# 204810042285, field discovered conditions, repair & remove extg crumbing & deteriorating exterior stair wall, provide new reinforced concrete wall per structural drawings. | $500 |
| May 12, 2023 | Completed final sign-off Jul 2023 | 256 Mullen Av | Jose Martinez | rev to pa#202106152489, to remove new roof deck for front unit above garage from scope of work.Details
rev to pa#202106152489, to remove new roof deck for front unit above garage from scope of work. | |
| Feb 14, 2023 | Completed final sign-off Jun 2023 | 2301 Lombard St | K 2 Builders Inc | ground/f: new interior walls above platform level to divide space for phase 1 barbershop completion per bpa#202206216655, new ada compliant toilet roomDetails
ground/f: new interior walls above platform level to divide space for phase 1 barbershop completion per bpa#202206216655, new ada compliant toilet room | $5,000 |
| Dec 30, 2022 | Expired or cancelled cancelled Jan 2026 | 348 Precita Av | comply with accessible entrance program abe 202210114990 automatic door opener set back from the prop lineDetails
comply with accessible entrance program abe 202210114990 automatic door opener set back from the prop line | $4,000 | |
| Dec 29, 2022 | Never finaled issued Aug 2023, no final | 952 Minnesota St | J5 Real Estate Development Co | ref coa#2022-005798coa. 2)interior renovation of 952 including: conversion on 1st floor storage to new habitable space, infill under extg flr above approx 93 sq ft and partial renovation of extg bath. 3)interior renovation of 954 including: legalize 4th floor and provide nftp 13r sprinklersDetails
ref coa#2022-005798coa. 2)interior renovation of 952 including: conversion on 1st floor storage to new habitable space, infill under extg flr above approx 93 sq ft and partial renovation of extg bath. 3)interior renovation of 954 including: legalize 4th floor and provide nftp 13r sprinklers | $50,000 |
| Dec 28, 2022 | Expired or cancelled cancelled Jan 2026 | 4830 Mission St | abe compliance unit #102; abe 202210114986 new automatic door operatorsDetails
abe compliance unit #102; abe 202210114986 new automatic door operators | $2,000 | |
| Dec 28, 2022 | Expired or cancelled cancelled Jan 2026 | 4830 Mission St | abe compliance unit #101; abe 202210114985 new automatic door operatorsDetails
abe compliance unit #101; abe 202210114985 new automatic door operators | $2,000 | |
| Dec 28, 2022 | Expired or cancelled cancelled Jan 2026 | 4830 Mission St | abe compliance unit #100; abe 202210114984 new automatic door operatorsDetails
abe compliance unit #100; abe 202210114984 new automatic door operators | $2,000 | |
| Dec 15, 2022 | Expired or cancelled cancelled Jan 2026 | 2091 Mission St | 2091 mission: install (n) auto door openrt on (e) dual swing doors to comply w/ access businiess entrance program 51-16, abe 202210114988. 2093 mission: install (n) auto door openrt on (e) dual swing doors to comply w/ access businiess entrance program 51-16, abe 202210114989.Details
2091 mission: install (n) auto door openrt on (e) dual swing doors to comply w/ access businiess entrance program 51-16, abe 202210114988. 2093 mission: install (n) auto door openrt on (e) dual swing doors to comply w/ access businiess entrance program 51-16, abe 202210114989. | $4,000 | |
| Dec 7, 2022 | Never finaled issued Apr 2023, no final | 666 Hamilton St | Wing On Construction Inc | shoring for proposed development. ref bpa#202107295380. to comply with nov #202293899 dated 9/30/2022Details
shoring for proposed development. ref bpa#202107295380. to comply with nov #202293899 dated 9/30/2022 | $5,000 |
| Nov 14, 2022 | Completed final sign-off Dec 2022 | 216 Yerba Buena Av | revision to pa# 201907267134. patio door at kitchen. 2 windows at center bay changed to double doors. infill (e) window in master bathroom.Details
revision to pa# 201907267134. patio door at kitchen. 2 windows at center bay changed to double doors. infill (e) window in master bathroom. | ||
| Aug 19, 2022 | Completed final sign-off Nov 2025 | 161 Prentiss St | K 2 Builders Inc | first floor single story addition at rear with roof deck. 1st and 2nd floor renovation. window & exterior door replacement. front facade stucco replacement. new rear deck.Details
first floor single story addition at rear with roof deck. 1st and 2nd floor renovation. window & exterior door replacement. front facade stucco replacement. new rear deck. | $200,000 |
| Jun 21, 2022 | Expired or cancelled expired Sep 2026 | 2301 Lombard St | S L M Development Inc., K 2 Builders Inc | first tenant improvement including finishes and fixtures of barbershop and spa; m & w locker rooms raised platform with hot spa, cold plunges and amenities.Details
first tenant improvement including finishes and fixtures of barbershop and spa; m & w locker rooms raised platform with hot spa, cold plunges and amenities. | $160,000 |
| Jun 15, 2022 | Never finaled issued Jun 2022, no final | 150 Liberty St | Olive Remodeling | replace (e) side & rear windows with (n) aluminum clad wood windows. (n) rear deck, less than 10'0" above grade, extends into required rear yard 12'0" max per planning.Details
replace (e) side & rear windows with (n) aluminum clad wood windows. (n) rear deck, less than 10'0" above grade, extends into required rear yard 12'0" max per planning. | $20,000 |
| Mar 21, 2022 | Completed final sign-off Apr 2023 | 110 Ripley St | J5 Real Estate Development Co | add (1) window @ rear and (1) skylightDetails
add (1) window @ rear and (1) skylight | $500 |
| Mar 17, 2022 | Never finaled issued Mar 2022, no final | 150 Liberty St | Olive Remodeling | conversion of (e) storage into common space(conditioned). renovation of 2nd floor kitchen & bath. renovation of 3rd floor kitchen & bath.Details
conversion of (e) storage into common space(conditioned). renovation of 2nd floor kitchen & bath. renovation of 3rd floor kitchen & bath. | $120,000 |
| Feb 24, 2022 | Completed final sign-off Mar 2025 | 112 Montcalm St | Mrcc | repair + replacement of (e) stairs, handrails, guardrail, 8 landing footing replacement in (e) location.Details
repair + replacement of (e) stairs, handrails, guardrail, 8 landing footing replacement in (e) location. | $1,500 |
| Aug 25, 2021 | Completed final sign-off Apr 2023 | 110 Ripley St | J5 Real Estate Development Co | 1st fl - relocate (e) bathroom, renovate (e) kitchen, dining and bedroomsDetails
1st fl - relocate (e) bathroom, renovate (e) kitchen, dining and bedrooms | $141,129 |
| Jun 14, 2021 | Completed final sign-off Jun 2021 | 338 Park St | Grip Art Inc. Dba Jan Heyneker Custom Wk | revision to pa# 202010086188. ti document as constructed, per building inspector's request. (2 side windows in upper floor closets not installed. not visible from street)Details
revision to pa# 202010086188. ti document as constructed, per building inspector's request. (2 side windows in upper floor closets not installed. not visible from street) | |
| Jun 2, 2021 | Completed final sign-off Jan 2023 | 566 Natoma St | priority: mandatory soft story retrofit designed to requirements of 2019 california building code appendix a4. to comply with nov #201992704.Details
priority: mandatory soft story retrofit designed to requirements of 2019 california building code appendix a4. to comply with nov #201992704. | $225,000 | |
| Jun 2, 2021 | Completed final sign-off Jan 2023 | 566 Natoma St | Future General Construction Inc | priority: renovate (e) 1st floor unit and convert portion of (e) laundry and storage space into (n) habitable space.Details
priority: renovate (e) 1st floor unit and convert portion of (e) laundry and storage space into (n) habitable space. | $75,000 |
| Apr 29, 2021 | Completed final sign-off Apr 2023 | 2344 15th St | K 2 Builders Inc | new post & beam in garage. conversion of (e) unconditioned 1st fl space into new bathroom. renovate 2nd & 3rd fl bathrooms. new skylights & roof.Details
new post & beam in garage. conversion of (e) unconditioned 1st fl space into new bathroom. renovate 2nd & 3rd fl bathrooms. new skylights & roof. | $85,000 |
| Feb 9, 2021 | Completed final sign-off Feb 2022 | 2380 Folsom St | L C Builders Inc. | voluntary barrier removal & lowering of entry to sidewalk level for increased accessibility. renovation of existing 2nd floor kitchen into new fully accessible bathroom. renovation of existing 3rd floor kitchen into new fully accessible kitchen.Details
voluntary barrier removal & lowering of entry to sidewalk level for increased accessibility. renovation of existing 2nd floor kitchen into new fully accessible bathroom. renovation of existing 3rd floor kitchen into new fully accessible kitchen. | $20,000 |
| Feb 4, 2021 | Completed final sign-off Jan 2022 | 447 03rd Av | Aurora Builders | 1st fl expansion of (e) habitable space. infill under (e) 2nd fl room above, and (n) full bath. 2nd fl relocate stairs down and relocate of half bath.Details
1st fl expansion of (e) habitable space. infill under (e) 2nd fl room above, and (n) full bath. 2nd fl relocate stairs down and relocate of half bath. | $60,000 |
| Dec 18, 2020 | Completed final sign-off Apr 2025 | 58 Rudden Av | comply w/ nov #200233025: revision to pa #200301165372 - interior remodel of (e) 1st floor bed & bath and 2nd floor kitchen.Details
comply w/ nov #200233025: revision to pa #200301165372 - interior remodel of (e) 1st floor bed & bath and 2nd floor kitchen. | $20,000 | |
| Oct 8, 2020 | Completed final sign-off Jun 2021 | 338 Park St | Grip Art Inc. Dba Jan Heyneker Custom Wk | addition of 3 dormers incl a (n) erd flr full bathroom and 2 closetsDetails
addition of 3 dormers incl a (n) erd flr full bathroom and 2 closets | $20,000 |
| Mar 12, 2020 | Completed final sign-off Apr 2022 | 79 Walter St | J5 Real Estate Development Co | 4th fl - residential condo renovation, 79 walter st - renovate (e) kitchen & dining room; renovate (e) bathroom; new full bathroom; reframe (e) ceiling and room. install new skylightsDetails
4th fl - residential condo renovation, 79 walter st - renovate (e) kitchen & dining room; renovate (e) bathroom; new full bathroom; reframe (e) ceiling and room. install new skylights | $50,000 |
| Mar 5, 2020 | Completed final sign-off Jan 2024 | 159 Bonview St | Pro Com Home Services California Inc, Ka - Bi Construction Inc. | ref app#201806192232 & #201812148377. 1st flr: relocate 3 shear walls per plan layout. 1st, 2nd fl: remove water damaged section of p/l wall, replace in situ w/nw fire rated wall. attic: prov. new gwb enclosed raised vault cieling, new per hatch, ladder. roof replace in situ. rev struct. accordinglyDetails
ref app#201806192232 & #201812148377. 1st flr: relocate 3 shear walls per plan layout. 1st, 2nd fl: remove water damaged section of p/l wall, replace in situ w/nw fire rated wall. attic: prov. new gwb enclosed raised vault cieling, new per hatch, ladder. roof replace in situ. rev struct. accordingly | $7,800 |
| Dec 30, 2019 | Completed final sign-off Apr 2023 | 110 Ripley St | J5 Real Estate Development Co | convert (e) garage into habitable space. replace foundation & slab. rebuild portion of (e) stair. replace (e) concrete stair.Details
convert (e) garage into habitable space. replace foundation & slab. rebuild portion of (e) stair. replace (e) concrete stair. | $60,000 |
| Dec 17, 2019 | Expired or cancelled cancelled Nov 2024 | 186 Ripley St | vertical addition. 1st & 2nd floor renovation, new 3-story interior stair, 3rd floor addition with 1 bedroom & 1 bath. fire sprinkler filed separately.Details
vertical addition. 1st & 2nd floor renovation, new 3-story interior stair, 3rd floor addition with 1 bedroom & 1 bath. fire sprinkler filed separately. | $115,000 | |
| Nov 19, 2019 | Never finaled issued Mar 2022, no final | 244 Mullen Av | facade renovations. (n) windows.Details
facade renovations. (n) windows. | $40,000 | |
| Oct 11, 2019 | Expired or cancelled cancelled Nov 2024 | 329 Crescent Av | foundation replacement; excavate 65 cubic yds; renovate facade; (n) 3rd fl deck at rear. (n) 3rd fl bath. (n) 2nd fl half bath; convert partion of garage to habitable space. 1st fl expension into rear.Details
foundation replacement; excavate 65 cubic yds; renovate facade; (n) 3rd fl deck at rear. (n) 3rd fl bath. (n) 2nd fl half bath; convert partion of garage to habitable space. 1st fl expension into rear. | $175,000 | |
| Oct 11, 2019 | Never finaled issued Oct 2019, no final | 2349 Market St | K 2 Builders Inc | g/f: t.i.-demo (e) millwork & food prop equipment, renovate (e) floors & walls. demo (e) non-load bearing partitions;l install (n) non-load bearing partitions. change use fro b occupancy coffee house to gymDetails
g/f: t.i.-demo (e) millwork & food prop equipment, renovate (e) floors & walls. demo (e) non-load bearing partitions;l install (n) non-load bearing partitions. change use fro b occupancy coffee house to gym | $70,000 |
| Sep 12, 2019 | Completed final sign-off Nov 2025 | 1314 Page St | Barton Builders | restore original two residential flats with one dwelling unit on the 2nd floor and the second unit on the third floor to satisfy planning enforcement #2019015765enf and building department nov#201975082Details
restore original two residential flats with one dwelling unit on the 2nd floor and the second unit on the third floor to satisfy planning enforcement #2019015765enf and building department nov#201975082 | |
| Sep 4, 2019 | Completed final sign-off Nov 2023 | 624 Moultrie St | J5 Real Estate Development Co | 3rd flr addition, approx 514 s.f. w/ 1 bedroom , 1 bathroom, 1 deck.Details
3rd flr addition, approx 514 s.f. w/ 1 bedroom , 1 bathroom, 1 deck. | $50,000 |
| Jul 26, 2019 | Completed final sign-off Dec 2022 | 216 Yerba Buena Av | K 2 Builders Inc | convert extg garage into habitable space, excavation at the rear, replace foundation and slab, renovate extg 2nd level.Details
convert extg garage into habitable space, excavation at the rear, replace foundation and slab, renovate extg 2nd level. | $220,971 |
| Jun 27, 2019 | Never finaled issued Aug 2019, no final | 69 Montezuma St | to comply w/ n.o.v 201033584. document (e) gate and lattice at front entry as constructedDetails
to comply w/ n.o.v 201033584. document (e) gate and lattice at front entry as constructed | ||
| Jun 18, 2019 | Never finaled issued Aug 2019, no final | 760 Moultrie St | Pro Com Home Services California Inc, J5 Real Estate Development Co | replace existing foundation walls at 1st floor, renovation 1st & 2nd floors, infill (e) 2 story lightwell, convert portion of (e) garage into habitable space, new interior stair, new windows.Details
replace existing foundation walls at 1st floor, renovation 1st & 2nd floors, infill (e) 2 story lightwell, convert portion of (e) garage into habitable space, new interior stair, new windows. | $150,000 |
| May 1, 2019 | In progress issued Mar 2024 | 488 Anderson St | Ka - Bi Construction Inc. | 3rd fl addition-approx 462 sq ft.Details
3rd fl addition-approx 462 sq ft. | $50,000 |
| Mar 15, 2019 | Never finaled issued Jun 2022, no final | 3101 20th St | Terence Mcmahon Construction | addition of solar panel rooftop array, new alterating tread stair with access hartch for non-occupiable roof. ** maher: n/a **Details
addition of solar panel rooftop array, new alterating tread stair with access hartch for non-occupiable roof. ** maher: n/a ** | $65,000 |
| Mar 5, 2019 | Expired or cancelled withdrawn Jul 2022 | 306 Precita Av | change of use to ground floor design professional office (no interior or exterior modifications). notice not required per pc section 311. approved otc.Details
change of use to ground floor design professional office (no interior or exterior modifications). notice not required per pc section 311. approved otc. | ||
| Feb 28, 2019 | Completed final sign-off Mar 2021 | 252 Richland Av | Sean Kelly Construction | interior renovation: upper two floors: (n) bathrooms, (n) kitchen. basement: conversion of basement to (n) habitable space. (n) mechanical room. excavation of 42.5 c/y.Details
interior renovation: upper two floors: (n) bathrooms, (n) kitchen. basement: conversion of basement to (n) habitable space. (n) mechanical room. excavation of 42.5 c/y. | $225,000 |
| Jan 25, 2019 | Completed final sign-off Jul 2020 | 172 University St | Pro Com Home Services California Inc | interior renovation of kitchen and baths (2.5) replace and extend rear deck and deck roofDetails
interior renovation of kitchen and baths (2.5) replace and extend rear deck and deck roof | $125,000 |
| Oct 22, 2018 | Completed final sign-off Apr 2022 | 226 Mullen Av | Pro Com Home Services California Inc, D E F Co | excavation of 190 cubic yards for (n) habitable 1st floor, including (n) bath & two (n) bedrooms. 2nd floor: renovation - (n) half bath & remodel kitchen. shoring under separate permit.Details
excavation of 190 cubic yards for (n) habitable 1st floor, including (n) bath & two (n) bedrooms. 2nd floor: renovation - (n) half bath & remodel kitchen. shoring under separate permit. | $100,000 |
| Oct 4, 2018 | Completed final sign-off Apr 2023 | 157 Bonview St | Pro Com Home Services California Inc | repair to concrete foundation & exterior wall of adjacent bldg in area of easment on subject property. shoring as indicated under pa# 2018-0619-2232.Details
repair to concrete foundation & exterior wall of adjacent bldg in area of easment on subject property. shoring as indicated under pa# 2018-0619-2232. | |
| Sep 12, 2018 | Never finaled issued Nov 2019, no final | 150 Bronte St | J5 Real Estate Development Co | to demolish a 1-story storage shed. (2nd smaller shed on lot does not need a permit.)Details
to demolish a 1-story storage shed. (2nd smaller shed on lot does not need a permit.) | $2,000 |
| Aug 16, 2018 | Never finaled issued Jan 2019, no final | 18 Steiner St | 1). one (n) adu unit @ ground flr per ord# 162-16. 2). (n) foundation.Details
1). one (n) adu unit @ ground flr per ord# 162-16. 2). (n) foundation. | $70,000 | |
| Aug 6, 2018 | Completed final sign-off Aug 2018 | 49 Hamilton St | administrative permit to reflect the legal use & occupancy of this building as a single family dwelling. (based on site visit & city records, assessors, water dept & dbi.)Details
administrative permit to reflect the legal use & occupancy of this building as a single family dwelling. (based on site visit & city records, assessors, water dept & dbi.) | ||
| Aug 2, 2018 | Completed final sign-off Jan 2024 | 159 Bonview St | Pro Com Home Services California Inc, Ka - Bi Construction Inc. | interior alteration excavate garage basement approx 199 cubic yard at about 9' in depthDetails
interior alteration excavate garage basement approx 199 cubic yard at about 9' in depth | $250,000 |
| Aug 1, 2018 | Completed final sign-off Nov 2021 | 317 Surrey St | Pro Com Home Services California Inc | rear addition. new interior stair @ all floors. convert basement area to new bedroom. new bedroom @ 1st floor, new dinning room, new roof decks, demo (e) interior stair, renovate laundry.Details
rear addition. new interior stair @ all floors. convert basement area to new bedroom. new bedroom @ 1st floor, new dinning room, new roof decks, demo (e) interior stair, renovate laundry. | $65,000 |
| Aug 1, 2018 | Completed final sign-off Jan 2019 | 1706 17th Av | M J C Construction | bathroom and kitchen renovation 1st fl including new bathrm, conversion of 159 sf storage to habitable living infill portion of (e) interior patio for habitable space, new roofingDetails
bathroom and kitchen renovation 1st fl including new bathrm, conversion of 159 sf storage to habitable living infill portion of (e) interior patio for habitable space, new roofing | $24,000 |
| Jul 20, 2018 | Completed final sign-off Jan 2019 | 290 Maynard St | J5 Real Estate Development Co | conversion of ground floor storage into 305 sq ft habitable space - bedroom & bathroomDetails
conversion of ground floor storage into 305 sq ft habitable space - bedroom & bathroom | $25,000 |
| May 29, 2018 | Completed final sign-off Sep 2018 | 104 Molimo Dr | Nima Construction | 1)remove bearing wall, provide new posts and footings. 2) renovate kitchen, dining room and living room.Details
1)remove bearing wall, provide new posts and footings. 2) renovate kitchen, dining room and living room. | $10,000 |
| Apr 24, 2018 | Expired or cancelled cancelled Jan 2026 | 412 Texas St | replace (e) brick footing w/reinforced concrete footing. seismic retrofit g/f as per calif (e) bls code 2016 chapter 3aDetails
replace (e) brick footing w/reinforced concrete footing. seismic retrofit g/f as per calif (e) bls code 2016 chapter 3a | $70,000 | |
| Mar 12, 2018 | Never finaled issued Mar 2018, no final | 32 Aztec St | renovation of (e) rear yard deck (expansion)Details
renovation of (e) rear yard deck (expansion) | $10,000 | |
| Feb 16, 2018 | Completed final sign-off Jun 2018 | 124 Newman St | Nicholas Burnham Construction | revision to app#201412123692. 1)deck revision 2) structural floor framing revision. 3) dormer height reduction, 4) skylight location revision. 5)remove of outdoor fire place.Details
revision to app#201412123692. 1)deck revision 2) structural floor framing revision. 3) dormer height reduction, 4) skylight location revision. 5)remove of outdoor fire place. | |
| Feb 5, 2018 | Expired or cancelled cancelled Oct 2019 | 151 Bronte St | vertical & horizontal residential addition: adding 3rd story for one (n) bedroom, horizontal addition at rear.Details
vertical & horizontal residential addition: adding 3rd story for one (n) bedroom, horizontal addition at rear. | $75,000 | |
| Feb 5, 2018 | Never finaled issued Jan 2019, no final | 2707 Sutter St | A C Contracting | new curbcut with new off street parking space and gfate/screenDetails
new curbcut with new off street parking space and gfate/screen | $1,200 |
| Nov 7, 2017 | Completed final sign-off Jan 2022 | 645 Peralta Av | K 2 Builders Inc | addition of (1) dwelling unit. addition of (2) new decks.Details
addition of (1) dwelling unit. addition of (2) new decks. | $80,000 |
| Oct 13, 2017 | Completed final sign-off Jul 2022 | 456 08th Av | Handy Construction Team Inc | rear addition with new 2nd dwelling unit partially within (e) ground floor level. modification as required to (e) dwelling. new unit has 2 bedroom & 2 baths.Details