David Gast
- Listed as
- architect, authorized agent-others, designer, engineer, lessee
- Firm
- Gast Architects
- Based in
- San Francisco
- On San Francisco permits
- Jan 2003 to May 2026
117 permits since 2000 (architect on 110 permits, authorized agent-others on 6 permits, designer on 2 permits, engineer on 1 permit, lessee on 1 permit): 73 completed, 3 in progress, 12 never finaled, 29 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 117.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 20, 2026 | In progress issued Jul 2026 | 516 Baker St | new interior remodel at the 4th fl to add new main bath with curb shower. 2 sink vanity, toilet, tub. no exterior work. no structural work. no changes in floor area.Details
new interior remodel at the 4th fl to add new main bath with curb shower. 2 sink vanity, toilet, tub. no exterior work. no structural work. no changes in floor area. | $30,000 | |
| Mar 3, 2026 | In progress issued Jun 2026 | 286 Eureka St | Elisha Mayost | rear additoin (22 sf) and roof raise (approx 15") to e 1 story rear room at 2nd fl. construct new interior 1st to 2nd fl stair, relocate kitchen and powder room on 2nd fl. provide new exterior doors, windows, and skylight. demo existing rear deck, relocate and reconstruct with new 30" h fire ratedDetails
rear additoin (22 sf) and roof raise (approx 15") to e 1 story rear room at 2nd fl. construct new interior 1st to 2nd fl stair, relocate kitchen and powder room on 2nd fl. provide new exterior doors, windows, and skylight. demo existing rear deck, relocate and reconstruct with new 30" h fire rated | $240,000 |
| Dec 7, 2023 | Completed final sign-off Feb 2026 | 3542 Broderick St | Ben Hardy & Company | replace (e) roof access skylight hatch w/ 120 sqft stair penthouse at roof. reconstruct (e) roof deck to (n) 410 sqft roof deck. provide (2) 80"x62" steel frames heating fixture mounts. provide planters 30"x42" guardwalls & 69" glass windscreens. relocate (e) natural gas line/water, install 120v powDetails
replace (e) roof access skylight hatch w/ 120 sqft stair penthouse at roof. reconstruct (e) roof deck to (n) 410 sqft roof deck. provide (2) 80"x62" steel frames heating fixture mounts. provide planters 30"x42" guardwalls & 69" glass windscreens. relocate (e) natural gas line/water, install 120v pow | $150,000 |
| Dec 1, 2023 | In progress issued Oct 2024 | 1462 11th Av | Elite Engineering Contractors | 941 sf vert addition of (n) 3rd flr to incl: 3 bdrms,2 baths. (n)doors, wndws & skylites. int partition chnges @ 1st & 2nd flrs. (n)2nd fl blcny & stair to rear yd. 9sf court infill 2nd fl. relocate 1st fl mech equip. full seismic upgrd of bldg. rmdl entry hall at level 1. relocate garage door.Details
941 sf vert addition of (n) 3rd flr to incl: 3 bdrms,2 baths. (n)doors, wndws & skylites. int partition chnges @ 1st & 2nd flrs. (n)2nd fl blcny & stair to rear yd. 9sf court infill 2nd fl. relocate 1st fl mech equip. full seismic upgrd of bldg. rmdl entry hall at level 1. relocate garage door. | $450,000 |
| Dec 23, 2022 | Completed final sign-off Feb 2024 | 23 Harry St | Mizen Construction Inc | revision to approved pa# 201908280046, revised hvac systems, revised t-24 report and energy inspection requirements.Details
revision to approved pa# 201908280046, revised hvac systems, revised t-24 report and energy inspection requirements. | $5,000 |
| Sep 15, 2021 | Completed final sign-off Dec 2022 | 255 Chattanooga St | Ken O'sullivan Construction And Renovati | revise plan for as built bay, ref bpa#201503272040Details
revise plan for as built bay, ref bpa#201503272040 | $2 |
| Jul 21, 2021 | Expired or cancelled expired Apr 2026 | 515 Duboce Av | Hunter Dale Builders Inc. | interior renovations and partitoin changes. fill in 2 story light well. relocate kitchen and baths, and bedrooms. enlarge e rear facade and east light court windows. new skylights. new mep, fixtures, finishes, fittingsDetails
interior renovations and partitoin changes. fill in 2 story light well. relocate kitchen and baths, and bedrooms. enlarge e rear facade and east light court windows. new skylights. new mep, fixtures, finishes, fittings | $300,000 |
| Jun 16, 2021 | Expired or cancelled expired Apr 2026 | 515 Duboce Av | Hunter Dale Builders Inc. | replace 2-story ext. rear wd stairs & landings to dwell units on 517 & 519. w/ (n) 3-story steel stairs to rf w/ cantilvrd landings. add 479 sqft rf deck w/ lvl pavers, built-in seats & planters. raise portion (e) rear sloped rf 132 sqft to align w/ int celing. replace all (e) hist dbl hung windowsDetails
replace 2-story ext. rear wd stairs & landings to dwell units on 517 & 519. w/ (n) 3-story steel stairs to rf w/ cantilvrd landings. add 479 sqft rf deck w/ lvl pavers, built-in seats & planters. raise portion (e) rear sloped rf 132 sqft to align w/ int celing. replace all (e) hist dbl hung windows | $90,000 |
| Jun 14, 2021 | Expired or cancelled expired Jul 2025 | 375 Edgehill Wy | Aaron Gordon Construction Inc | addition of 543 sq ft adu within existing space under the streamlined adu program. proposed location of adu is within second floor level renovation of approved permit 2019-08229631, issued on october 10 2019, currently in construction. no changes to the previously approved envelope.Details
addition of 543 sq ft adu within existing space under the streamlined adu program. proposed location of adu is within second floor level renovation of approved permit 2019-08229631, issued on october 10 2019, currently in construction. no changes to the previously approved envelope. | $4,000 |
| Oct 1, 2019 | Completed final sign-off Aug 2020 | 636 Belvedere St | Hakewill Construction Co. Inc. | interior alter to the (e) 2nd floor in 2-story dwelling, including remodeling the kitchens & bathroom & powder room, expansion into (e) lightwell to expand (e) powder room. new windows to match & rep (e) new deck on grade and landscape.Details
interior alter to the (e) 2nd floor in 2-story dwelling, including remodeling the kitchens & bathroom & powder room, expansion into (e) lightwell to expand (e) powder room. new windows to match & rep (e) new deck on grade and landscape. | $45,000 |
| Sep 25, 2019 | Completed final sign-off Feb 2021 | 1120 South Van Ness Av | Saturn Construction Co | front gate, planter only no work to interior or back of house no roof deck. revision to 2017-0906-7104 to provide additional details at front gate and planters.Details
front gate, planter only no work to interior or back of house no roof deck. revision to 2017-0906-7104 to provide additional details at front gate and planters. | |
| Aug 28, 2019 | Completed final sign-off Feb 2024 | 23 Harry St | Mizen Construction Inc | convert 1/f storage, workshop & crawlspace to habitable space w/int stairs to 2/f. minor renovation to 2/f, replacement stairs btwn 2/f & 3/f. reorganize 3/f interior. new insulated clad wood windows & doors. new ext fiber cement plank siding, upgrade to seismic resistance. elec, plumb, hvac systemsDetails
convert 1/f storage, workshop & crawlspace to habitable space w/int stairs to 2/f. minor renovation to 2/f, replacement stairs btwn 2/f & 3/f. reorganize 3/f interior. new insulated clad wood windows & doors. new ext fiber cement plank siding, upgrade to seismic resistance. elec, plumb, hvac systems | $585,000 |
| Aug 22, 2019 | Expired or cancelled expired Jul 2025 | 375 Edgehill Wy | Aaron Gordon Construction Inc | revision/reduced to pa 2015-0820-4819. 2nd fl - no horizontal extensions. remove habitable spae @ crawl space. propose renovation of (e) space; 3rd fl -no extension at kitchen & reduce extension @ dining;reduced extension at (n) vestibule lift adjacent (e) garage; reno (e) space & carport. rebuild &Details
revision/reduced to pa 2015-0820-4819. 2nd fl - no horizontal extensions. remove habitable spae @ crawl space. propose renovation of (e) space; 3rd fl -no extension at kitchen & reduce extension @ dining;reduced extension at (n) vestibule lift adjacent (e) garage; reno (e) space & carport. rebuild & | |
| Aug 8, 2019 | Expired or cancelled cancelled Aug 2022 | 1805 Scott St | Quality General Construction Co Inc | add 2nd fl w/ roof deck. reconfigure 1st fl. seismic upgrade w/ foundation work. upgrade electrical, plumbing & hvac systems. replace front, wood sash in kind.Details
add 2nd fl w/ roof deck. reconfigure 1st fl. seismic upgrade w/ foundation work. upgrade electrical, plumbing & hvac systems. replace front, wood sash in kind. | $210,000 |
| Aug 2, 2019 | Expired or cancelled cancelled Feb 2023 | 196 Avila St | Amn Construction | vertical addition @ (e) roof deck consisting of (2) new bedrooms, (2) baths. rework (e) roof at rear to extend tile roof to south and create small roof deck. extend (e) roof deck to south for more direct avila stto interior stair.Details
vertical addition @ (e) roof deck consisting of (2) new bedrooms, (2) baths. rework (e) roof at rear to extend tile roof to south and create small roof deck. extend (e) roof deck to south for more direct avila stto interior stair. | $893,000 |
| Jul 3, 2019 | Completed final sign-off Feb 2020 | 155 22nd Av | 1) remodel family room to include office, no structural work. 2) renovate extg bathroom. 3)plmg, elect, hvac work as required. 4)new fixtures, finishes, & fittings throughout.Details
1) remodel family room to include office, no structural work. 2) renovate extg bathroom. 3)plmg, elect, hvac work as required. 4)new fixtures, finishes, & fittings throughout. | $23,000 | |
| Apr 24, 2019 | Never finaled issued Sep 2021, no final | 79 Elsie St | construct 1 story vertical & 3 story horizontal addition to (e) 2 story sfr. remove (e) 1 story wood deck @ rear & provide 1 deck @ 3rd floor & 1 roof deck. relocate entry to 1st floor. renovate 2 story interior with new partitions & finishes.Details
construct 1 story vertical & 3 story horizontal addition to (e) 2 story sfr. remove (e) 1 story wood deck @ rear & provide 1 deck @ 3rd floor & 1 roof deck. relocate entry to 1st floor. renovate 2 story interior with new partitions & finishes. | $561,000 | |
| Jan 24, 2019 | Completed final sign-off Apr 2021 | 477 Belvedere St | J K Construction Co | mep work at 3rd flr. 8'-0" rear horizontal additon of 155 sq ft to (e) 3rd flr. (3) new windows & (3) new skylights. interior partition changes & renovations to (e) 3 bedrooms, 3 closets, 2 full baths & 1 study. w/ sprinklersDetails
mep work at 3rd flr. 8'-0" rear horizontal additon of 155 sq ft to (e) 3rd flr. (3) new windows & (3) new skylights. interior partition changes & renovations to (e) 3 bedrooms, 3 closets, 2 full baths & 1 study. w/ sprinklers | $208,000 |
| Dec 12, 2018 | Completed final sign-off May 2019 | 188 Haight St | Fahan Construction | replace 21 linear ft of (e) rotted wood property line retaining wall with concrete less than 3 ft high. replace 21 linear ft of (e) 12'-6" high wood fence with 10'-0" high wood fence in-kind. no work to front facade.Details
replace 21 linear ft of (e) rotted wood property line retaining wall with concrete less than 3 ft high. replace 21 linear ft of (e) 12'-6" high wood fence with 10'-0" high wood fence in-kind. no work to front facade. | $2,750 |
| Oct 19, 2018 | Expired or cancelled withdrawn Dec 2018 | 375 Edgehill Wy | Aaron Gordon Construction Inc | adition of 784 sf adu (2 bedrooms & 1 bathroom) within (e) space per ordinance# 95-17. proposed location of adu is within 2nd floor renovation of approved pa# 2015/08/20/4819-s1. proposed adu include close off entry from lower hall. add new range with fan above. 1 hour separation @ walls & ceiling.Details
adition of 784 sf adu (2 bedrooms & 1 bathroom) within (e) space per ordinance# 95-17. proposed location of adu is within 2nd floor renovation of approved pa# 2015/08/20/4819-s1. proposed adu include close off entry from lower hall. add new range with fan above. 1 hour separation @ walls & ceiling. | $5,000 |
| Jul 6, 2018 | Completed final sign-off May 2019 | 565 Jersey St | stell framed bridge and landing w/structural glass floor panels from rear of 2nd flr to backyard grade. door & window replacement in modified (e) opening at rear facade. replace guard at (e) rear yard retainin wallDetails
stell framed bridge and landing w/structural glass floor panels from rear of 2nd flr to backyard grade. door & window replacement in modified (e) opening at rear facade. replace guard at (e) rear yard retainin wall | $11,800 | |
| Jul 3, 2018 | Completed final sign-off Oct 2021 | 45 Culebra Tr | Eastwood Development Incorporated | demolish a 2 story, type 5 building w/ one dwelling unit.Details
demolish a 2 story, type 5 building w/ one dwelling unit. | $45,000 |
| Jul 3, 2018 | Completed final sign-off Dec 2023 | 43 Culebra Tr | Eastwood Development Incorporated | to erect a 4-story, no basement, type v-b building w/two family dwelling units. sprinkler per nfpa 13r, solar, sprinkler monitoring under sep permits.Details
to erect a 4-story, no basement, type v-b building w/two family dwelling units. sprinkler per nfpa 13r, solar, sprinkler monitoring under sep permits. | $817,000 |
| Nov 14, 2017 | Completed final sign-off Apr 2021 | 477 Belvedere St | J K Construction Co | remove 2nd fl rear decks, exterior stairs, dinoing bay window of kitchen, const 2 story rear addition w/ 1 story roof deck off 2nd fl & stairs to yard, adding guest bed, bath, 2 media rm at 1st fl, 3rd fl, roof over one-story light court enclose for office use, new fixt, finishes, seismic upgrade.Details
remove 2nd fl rear decks, exterior stairs, dinoing bay window of kitchen, const 2 story rear addition w/ 1 story roof deck off 2nd fl & stairs to yard, adding guest bed, bath, 2 media rm at 1st fl, 3rd fl, roof over one-story light court enclose for office use, new fixt, finishes, seismic upgrade. | $575,000 |
| Oct 5, 2017 | Completed final sign-off Nov 2018 | 111 Santa Paula Av | J Fitzsimmons Building Inc. | int reno to (e) kitchen, powder room, master suite, hall bath, laundry closet and 2 bedroomw ith new fixtures, fitting and finishes. install 2 (n) window units. install 2 new curb mounted roof skylight. provide hydronic radiant heating system throughout w/high efficiency combo domestic hot waterDetails
int reno to (e) kitchen, powder room, master suite, hall bath, laundry closet and 2 bedroomw ith new fixtures, fitting and finishes. install 2 (n) window units. install 2 new curb mounted roof skylight. provide hydronic radiant heating system throughout w/high efficiency combo domestic hot water | $225,000 |
| Oct 4, 2017 | Completed final sign-off May 2019 | 1150 Sacramento St | Douglas Gower Dba Mesa Construction | unit 101: 2 story interior renovation. relocate (e) interior stair. relocate entry door at lower level elevator lobby. upgrade fixtures, finishes and fitting througout unit. partial rewiring and new plumibng in selected areas. maher naDetails
unit 101: 2 story interior renovation. relocate (e) interior stair. relocate entry door at lower level elevator lobby. upgrade fixtures, finishes and fitting througout unit. partial rewiring and new plumibng in selected areas. maher na | $175,000 |
| Sep 20, 2017 | Expired or cancelled expired Feb 2023 | 1315 Monterey Bl | Richbay Construction, Jin Qing Construction Corp., Bannon Construction Inc | 1st fl - add powder rm & convert office to media. add patio deck at 1st fl and cantilevered blacony at 3rd fl; remove (e) 3rd fl window bay at rear, add roof deck above. replace front facade picture window, door and garage door. excavate at 1st fl to extend new interior stair. interior reno to incluDetails
1st fl - add powder rm & convert office to media. add patio deck at 1st fl and cantilevered blacony at 3rd fl; remove (e) 3rd fl window bay at rear, add roof deck above. replace front facade picture window, door and garage door. excavate at 1st fl to extend new interior stair. interior reno to inclu | $350,000 |
| Sep 18, 2017 | Completed final sign-off Apr 2018 | 2253 Clay St | Amn Construction | revision to app#201404284336. replace easterly retaining wall in-kind where a planter was originaly scoped, remove planter from east.Details
revision to app#201404284336. replace easterly retaining wall in-kind where a planter was originaly scoped, remove planter from east. | $2,000 |
| Sep 6, 2017 | Never finaled issued Apr 2018, no final | 1120 South Van Ness Av | new 6'high metal fence and gate at front property line. 2nd floor: rear bay addition. expand 3rd floor roof deck for new hot tub.new 2 story spiral stair in rear. first floor unit interior partion change and renovation. kitchen and bath renovation. relocate laundry closetDetails
new 6'high metal fence and gate at front property line. 2nd floor: rear bay addition. expand 3rd floor roof deck for new hot tub.new 2 story spiral stair in rear. first floor unit interior partion change and renovation. kitchen and bath renovation. relocate laundry closet | $226,000 | |
| Aug 10, 2017 | Never finaled issued Aug 2017, no final | 3855 Washington St | Larkspur Builder | add all thread & straps to support existing glulam beam; revised 4th floor framing plan; hss beam connection with bent plate detail; new psl beam hanger at existing wide flange columnDetails
add all thread & straps to support existing glulam beam; revised 4th floor framing plan; hss beam connection with bent plate detail; new psl beam hanger at existing wide flange column | |
| Mar 16, 2017 | Completed final sign-off Jan 2018 | 2170 Jackson St | Plath & Company Inc | #3:rev to 201609299161.int remodel: r&r (e) finish flooring, interior walls & dropped ceiling. install new elect service, power & lighting. (e) steam heat to remain with new radiators. install five windows in modif openings. install (n) branch plbg & fix. windows 1,2,24.08,09,window 7 inkindmaher naDetails
#3:rev to 201609299161.int remodel: r&r (e) finish flooring, interior walls & dropped ceiling. install new elect service, power & lighting. (e) steam heat to remain with new radiators. install five windows in modif openings. install (n) branch plbg & fix. windows 1,2,24.08,09,window 7 inkindmaher na | $150,000 |
| Feb 23, 2017 | Completed final sign-off Sep 2017 | 188 Haight St | Kilrea Construction Inc. | interior partition changes; master bedroom, mud/laundry, bath and wetbar renovation; plumbing, electrical and mechanical work; doors & windows envelope changesDetails
interior partition changes; master bedroom, mud/laundry, bath and wetbar renovation; plumbing, electrical and mechanical work; doors & windows envelope changes | $50,000 |
| Feb 22, 2017 | Completed final sign-off Jan 2019 | 188 Haight St | Kilrea Construction Inc., Fahan Construction | add 2 flat skylights and 1 window.Details
add 2 flat skylights and 1 window. | $2,500 |
| Dec 20, 2016 | Never finaled issued Jun 2017, no final | 3855 Washington St | Larkspur Builder, Aaron Gordon Construction Inc | new 217 sf unconditioned green house horiz addition at 4th story, new 80 sf. conditioned horiz addition to (e) closet at 4th story; extend existing sprinkler system to new greenhouse and closet addition; new 167 sf roof deck over (e) roof at 4th floorDetails
new 217 sf unconditioned green house horiz addition at 4th story, new 80 sf. conditioned horiz addition to (e) closet at 4th story; extend existing sprinkler system to new greenhouse and closet addition; new 167 sf roof deck over (e) roof at 4th floor | $70,000 |
| Nov 22, 2016 | Never finaled issued Oct 2017, no final | 326 Capp St | renovations to legalize (e) rear unit to provide light, ventilation, fire egress, exit corridor & outdoor space. add 688 sq ft vertical additon with 123 sq ft roof deck above (e) renovated rear unit. provide type 13-d sprinkler system.Details
renovations to legalize (e) rear unit to provide light, ventilation, fire egress, exit corridor & outdoor space. add 688 sq ft vertical additon with 123 sq ft roof deck above (e) renovated rear unit. provide type 13-d sprinkler system. | $325,000 | |
| Feb 29, 2016 | Expired or cancelled withdrawn May 2016 | 825 Lake St | Amn Construction | legalize & rebuild existing 47 sq ft deck at 2nd fl rear yard, add fire-rated parapet guardwall at property line, fill-in below existing 2nd floor deck to create 47 sq ft of harbitable space for the lower unit. fire sprinkler under separate permit.Details
legalize & rebuild existing 47 sq ft deck at 2nd fl rear yard, add fire-rated parapet guardwall at property line, fill-in below existing 2nd floor deck to create 47 sq ft of harbitable space for the lower unit. fire sprinkler under separate permit. | $11,000 |
| Feb 17, 2016 | Completed final sign-off Oct 2018 | 2226 Green St | Eastwood Development Incorporated | 1'-0" deep deck extension at 4th flr rear. 2'-0" horizontal in-fill addition at east light well.convert 3 living rm openings to 21'-0" wide lift/slide door.provide 4(n) washrooms and replace units throughout. remove fure escape, add fire suppression (under sep permit). interior renovations.maher n/aDetails
1'-0" deep deck extension at 4th flr rear. 2'-0" horizontal in-fill addition at east light well.convert 3 living rm openings to 21'-0" wide lift/slide door.provide 4(n) washrooms and replace units throughout. remove fure escape, add fire suppression (under sep permit). interior renovations.maher n/a | $460,000 |
| Jan 28, 2016 | Completed final sign-off Nov 2017 | 2380 Vallejo St | Clayton Timbrell & Co | replace exterior window sashes.Details
replace exterior window sashes. | $18,000 |
| Dec 8, 2015 | Completed final sign-off Oct 2018 | 2226 Green St | Eastwood Development Incorporated | Details
| $45,000 |
| Oct 21, 2015 | Expired or cancelled cancelled Jun 2016 | 80 Ashbury Tr | interior renovations @ kitchen & sunroom. new rear & side windows. new 2 skylights. along with new roof deck and new connecting bridge under appl#2015-10-21-0394s.Details
interior renovations @ kitchen & sunroom. new rear & side windows. new 2 skylights. along with new roof deck and new connecting bridge under appl#2015-10-21-0394s. | $25,000 | |
| Oct 21, 2015 | Never finaled issued Jul 2016, no final | 80 Ashbury Tr | new roof deck over (e) detached garage w/ new spiral stair to grade & new bridge connecting to 1st/fl of house. interior renovations at kitchen & sunroom. new rear & side windows. 2 new skylights. replace (e) masonry fireplace chimney with metal above roff levelDetails
new roof deck over (e) detached garage w/ new spiral stair to grade & new bridge connecting to 1st/fl of house. interior renovations at kitchen & sunroom. new rear & side windows. 2 new skylights. replace (e) masonry fireplace chimney with metal above roff level | $30,000 | |
| Aug 20, 2015 | Expired or cancelled expired Jul 2025 | 375 Edgehill Wy | Aaron Gordon Construction Inc | 3rd flr vertical addition & roof deck over second floor. horizontal addition at 2nd flr, interior remodel at floors 1,2&3. new habitable space in existing 1st flr. encloing (e) carport, fire prinklers upgrade mech, elec & plumbing.Details
3rd flr vertical addition & roof deck over second floor. horizontal addition at 2nd flr, interior remodel at floors 1,2&3. new habitable space in existing 1st flr. encloing (e) carport, fire prinklers upgrade mech, elec & plumbing. | $900,000 |
| Aug 20, 2015 | Completed final sign-off Nov 2018 | 823 Lake St | Amn Construction | add 4/fl penthouse&roof decks to upper unit of 2-flat building.convert space behind garage to part of lower unit.expand horizontally into litewell.legalize(e)decks at 2nd&3rd fls & create habitable space below lower deck at 1/fl.add sprinkler throughout.upgrde sys&seismic resistance.add new bathroomDetails
add 4/fl penthouse&roof decks to upper unit of 2-flat building.convert space behind garage to part of lower unit.expand horizontally into litewell.legalize(e)decks at 2nd&3rd fls & create habitable space below lower deck at 1/fl.add sprinkler throughout.upgrde sys&seismic resistance.add new bathroom | $1,000,000 |
| Jun 12, 2015 | Completed final sign-off Oct 2015 | 1455 12th Av | Aaron Gordon Construction Inc | replace (e) 8 front facade vinyl double hung windows with aluminum -clad wood double-hung type with insulating glass. replace front door panel.Details
replace (e) 8 front facade vinyl double hung windows with aluminum -clad wood double-hung type with insulating glass. replace front door panel. | $6,500 |
| Apr 15, 2015 | Completed final sign-off Dec 2015 | 638 Belvedere St | Hakewill Construction Co. Inc. | lower unit: remodel kitchen, bath, powder room, closet, laundry area. reinforce existing front bay. no change to front facadeDetails
lower unit: remodel kitchen, bath, powder room, closet, laundry area. reinforce existing front bay. no change to front facade | $50,000 |
| Mar 27, 2015 | Completed final sign-off Dec 2022 | 255 Chattanooga St | Ken O'sullivan Construction And Renovati | vertical 1-story addition incl bedrooms,baths&ext.deck. interior renov@(e)1/fl.new hori bay at 1/fl rear.new skylite,full seismic upgrade.new mech,elec&plumb in area of work.improv garage&deck stru&per code.Details
vertical 1-story addition incl bedrooms,baths&ext.deck. interior renov@(e)1/fl.new hori bay at 1/fl rear.new skylite,full seismic upgrade.new mech,elec&plumb in area of work.improv garage&deck stru&per code. | $291,500 |
| Feb 5, 2015 | Expired or cancelled suspend Jan 2019 | 2833 Fillmore St | renovation, lowering, and full -seismic upgrade of (e) 2- story 2-unit building. construct shared roof deck with storge enclosure accessible to 2300 vallejo st.Details
renovation, lowering, and full -seismic upgrade of (e) 2- story 2-unit building. construct shared roof deck with storge enclosure accessible to 2300 vallejo st. | $315,000 | |
| Feb 5, 2015 | Never finaled issued Jul 2016, no final | 2300 Vallejo St | construct 1-story attached garage at basement level in area of (e) rear yard parking. construct shared roof deck over garage. change. existing north facade windows to doors.Details
construct 1-story attached garage at basement level in area of (e) rear yard parking. construct shared roof deck over garage. change. existing north facade windows to doors. | $70,000 | |
| Nov 21, 2014 | Completed final sign-off Apr 2019 | 188 Haight St | 2-story bay window addition @ 2nd & 3rd floor. spiral stair from new deck to mid-lot patio @ grade. front facade window replacement. see also pa# 2014/11/21/2216.Details
2-story bay window addition @ 2nd & 3rd floor. spiral stair from new deck to mid-lot patio @ grade. front facade window replacement. see also pa# 2014/11/21/2216. | $192,815 | |
| Nov 21, 2014 | Completed final sign-off Apr 2019 | 188 Haight St | renovate (e) rear yard accessory structure & enclose (e) uncovered parking pad into single enclosed 1-story 1-car garage structure w/ adjacent workshop space. garage roof deck. curb cut. see also appln #201411212216 for work on main house.Details
renovate (e) rear yard accessory structure & enclose (e) uncovered parking pad into single enclosed 1-story 1-car garage structure w/ adjacent workshop space. garage roof deck. curb cut. see also appln #201411212216 for work on main house. | $92,167 | |
| Nov 17, 2014 | Completed final sign-off Aug 2017 | 196 Avila St | Amn Construction | replace (e) wood fence at rear yard with 8'-0" high property line stucco fence, replace (e) 4'-0" dia spiral stair to (e) roof deck with (n) 5'-0" dia spiral stair, (n) 270 sq.ft. roof deck expansion to (e) roof deck, minor window & door modifications, missc interior partition changes per plan, kitDetails
replace (e) wood fence at rear yard with 8'-0" high property line stucco fence, replace (e) 4'-0" dia spiral stair to (e) roof deck with (n) 5'-0" dia spiral stair, (n) 270 sq.ft. roof deck expansion to (e) roof deck, minor window & door modifications, missc interior partition changes per plan, kit | $270,000 |
| Nov 13, 2014 | Expired or cancelled cancelled Mar 2020 | 3971 20th St | new roof deck and exterior stairs. interior remodel.Details
new roof deck and exterior stairs. interior remodel. | $80,500 | |
| Jun 25, 2014 | Expired or cancelled withdrawn Sep 2015 | 2224 Sacramento St | side yard horiz. add.of 2 stories-green house/conservatory over a 2 car parking garage. minor modif. to (e) east & west dormers. legalize & renovate 1 (e) non conforming dwg unit into a legal dwg unit. basemt add. recreation area. n/elevator access/storage n/covered porch at side yard legalize oneDetails
side yard horiz. add.of 2 stories-green house/conservatory over a 2 car parking garage. minor modif. to (e) east & west dormers. legalize & renovate 1 (e) non conforming dwg unit into a legal dwg unit. basemt add. recreation area. n/elevator access/storage n/covered porch at side yard legalize one | $602,000 | |
| Jun 9, 2014 | Expired or cancelled expired Feb 2020 | 155 22nd Av | 1)kitchen remodel with new fixtures, fittings and finishes. 2) replace extg garage door and side entry door in kind.Details
1)kitchen remodel with new fixtures, fittings and finishes. 2) replace extg garage door and side entry door in kind. | $15,000 | |
| Apr 3, 2014 | Completed final sign-off Mar 2017 | 21 San Pablo Av | Caruso Construction Inc. | rear extension of (e) sun room (+-7'-0"). including (n) wood windows & doors, and skylight. remodel (e) kitchen including the addition of four (n) wood windows. remodel firest & second floor baths. replace (e) furnace no change to front facade.Details
rear extension of (e) sun room (+-7'-0"). including (n) wood windows & doors, and skylight. remodel (e) kitchen including the addition of four (n) wood windows. remodel firest & second floor baths. replace (e) furnace no change to front facade. | $95,000 |
| Mar 31, 2014 | Never finaled issued May 2015, no final | 327 Richland Av | Aaron Gordon Construction Inc | rear 2-story 9'-3" horizontal addition to (e) 2 story over garage single family dwelling. front 3'-0" horizontal additional at 2nd floor over, new 1st flr window bays.excavation and lowering of floor plate 3'-6" & lift gable roof +2'1" . full seismic upgrade. new finishes, fixtures + fittingDetails
rear 2-story 9'-3" horizontal addition to (e) 2 story over garage single family dwelling. front 3'-0" horizontal additional at 2nd floor over, new 1st flr window bays.excavation and lowering of floor plate 3'-6" & lift gable roof +2'1" . full seismic upgrade. new finishes, fixtures + fitting | $600,000 |
| Mar 3, 2014 | Completed final sign-off Jan 2015 | 2759 Broderick St | Dijeau Poage Construction Inc. | revision to app#201311273046, underpining foundations and new footing.Details
revision to app#201311273046, underpining foundations and new footing. | $1,000 |
| Feb 21, 2014 | Completed final sign-off Jul 2016 | 2430 Hyde St | Young & Burton Inc | horizontal addition of 181 sq ft at rear, wood garden trellis, remodel interior including laundry room, mech, storage in basement, dining, kitchen, family dining, ground floor bedroom, interior stair, bedrooms & master bath.Details
horizontal addition of 181 sq ft at rear, wood garden trellis, remodel interior including laundry room, mech, storage in basement, dining, kitchen, family dining, ground floor bedroom, interior stair, bedrooms & master bath. | $550,000 |
| Dec 11, 2013 | Completed final sign-off Jun 2018 | 276 Hartford St | Cullinane Plastering | 2 story over basement horizontal addition at the rear. rear yard patio excavated below grade. interior renovation & re-partitioning at 3 floors. upgraded plumbing electrical & mechanical systems. new fixtures finishes & fittings throughout. legalize (e) condition as single family dwelling.Details
2 story over basement horizontal addition at the rear. rear yard patio excavated below grade. interior renovation & re-partitioning at 3 floors. upgraded plumbing electrical & mechanical systems. new fixtures finishes & fittings throughout. legalize (e) condition as single family dwelling. | $600,000 |
| Oct 24, 2013 | Completed final sign-off Sep 2014 | 175 Carl St | Modern Art Construction | converting 670 sq.ft. of 1/f garage & laundry area to 1 bedrm; 1 lv rm; 1 bath,add 160 sq.ft.new space @1/f under (e)kitchen & bay windows, add 11 sq.ft. of new space @ 2/f via modified bay window design, remodel 2/f&3/f:1/2 bath, kitchen, family room, new bathroom. upgrade mech, elec & plumbingDetails
converting 670 sq.ft. of 1/f garage & laundry area to 1 bedrm; 1 lv rm; 1 bath,add 160 sq.ft.new space @1/f under (e)kitchen & bay windows, add 11 sq.ft. of new space @ 2/f via modified bay window design, remodel 2/f&3/f:1/2 bath, kitchen, family room, new bathroom. upgrade mech, elec & plumbing | $260,000 |
| Oct 4, 2013 | Completed final sign-off Oct 2013 | 3975 20th St | B R J Construction | revision to pa201305156954. omit voluntary seismic strentghening at garage per sheets s1 & sheet s2.1. delte proposed skylight at third floor hall & delete built in cabinets. relocate skylight to bathroom.Details
revision to pa201305156954. omit voluntary seismic strentghening at garage per sheets s1 & sheet s2.1. delte proposed skylight at third floor hall & delete built in cabinets. relocate skylight to bathroom. | |
| Jul 19, 2013 | Completed final sign-off May 2014 | 2253 Clay St | remove (e) bay at court, not visable from street, no other exterior envelope changes. remodel kitchen & bathrooms per plan, replace (e) boiler with new furnace, replace (e) water heater serving both units #2253-2255 with new water heaters, one for each unit.Details
remove (e) bay at court, not visable from street, no other exterior envelope changes. remodel kitchen & bathrooms per plan, replace (e) boiler with new furnace, replace (e) water heater serving both units #2253-2255 with new water heaters, one for each unit. | $120,000 | |
| Jun 7, 2013 | Completed final sign-off Oct 2013 | 2135 Greenwich St | Patrick Coakley Construction | interior renovation on 3 floors-add washer & dryer, utility sink. configure bathroom on 3rd floor, eliminate 2 sinks, 1 toilet. no structural work. no change to exterior envelope, no alterations to 2nd floor. no change to (e).Details
interior renovation on 3 floors-add washer & dryer, utility sink. configure bathroom on 3rd floor, eliminate 2 sinks, 1 toilet. no structural work. no change to exterior envelope, no alterations to 2nd floor. no change to (e). | $125,000 |
| May 15, 2013 | Completed final sign-off Oct 2013 | 3975 20th St | B R J Construction | repartitioning & interior renovation of 3rd floor - bedrooms & bath; add bedroom storage lofts within existing attic space; add (4) new skylights. replace (e) 3rd floor front windows with new wood windows, detailing to match (e), relocate 3rd floor rear window. no change to (e) building envelope.Details
repartitioning & interior renovation of 3rd floor - bedrooms & bath; add bedroom storage lofts within existing attic space; add (4) new skylights. replace (e) 3rd floor front windows with new wood windows, detailing to match (e), relocate 3rd floor rear window. no change to (e) building envelope. | $65,000 |
| Apr 1, 2013 | Completed final sign-off Jul 2013 | 55 Carmel St | F R James Construction | remodel 1st floor guest bathroom & toilet, fill in lightwell at 1st floor level, no impact on neighbors - faces a blank wall.Details
remodel 1st floor guest bathroom & toilet, fill in lightwell at 1st floor level, no impact on neighbors - faces a blank wall. | $25,000 |
| Mar 8, 2013 | Completed final sign-off Jul 2013 | 335 Lawton St | replace existing first & second floor windows @ front facade only w/wood windows per original design. add non-structural partition walls @ garage level only.Details
replace existing first & second floor windows @ front facade only w/wood windows per original design. add non-structural partition walls @ garage level only. | $10,000 | |
| Mar 5, 2013 | Completed final sign-off Jul 2013 | 335 Lawton St | demo and replace kitchen and 2 baths. new electrical panel/wiring,plumb/fixtures,boiler/heat. replace 2 rear windows with french doors. remove/replace property line window with 45 min window.2 move pantry widnows/infill 1 kitch wndwDetails
demo and replace kitchen and 2 baths. new electrical panel/wiring,plumb/fixtures,boiler/heat. replace 2 rear windows with french doors. remove/replace property line window with 45 min window.2 move pantry widnows/infill 1 kitch wndw | $60,000 | |
| Aug 20, 2012 | Never finaled issued Sep 2019, no final | 69 Garcia Av | to erect 3 stories, single family dwelling builidng.Details
to erect 3 stories, single family dwelling builidng. | $200,000 | |
| Aug 1, 2012 | Expired or cancelled expired Jan 2017 | 3494 Jackson St | Matarozzi/Pelsinger Builders Inc. | remove (e) rear yard wood deck & reconstruct 32" higher to align with interior living space. new rear yard steps, retaining walls, property line fences, and lower garden landscaping. no new drain-line to city sewer system.Details
remove (e) rear yard wood deck & reconstruct 32" higher to align with interior living space. new rear yard steps, retaining walls, property line fences, and lower garden landscaping. no new drain-line to city sewer system. | $65,000 |
| Jun 25, 2012 | Completed final sign-off Mar 2014 | 3494 Jackson St | Matarozzi/Pelsinger Builders Inc. | revise 201201041654 & 201201112083. 4 story interior renovation, full seismic upgrade, fire sprinkler system on separate permit, (n)bedroom suite in(e)garage, rebuild interior stairs w/ elevator, remove glazed roof, put(n)skylights,(4)(n) windows, restructure (e) roof dormers, modify brick veneer.Details
revise 201201041654 & 201201112083. 4 story interior renovation, full seismic upgrade, fire sprinkler system on separate permit, (n)bedroom suite in(e)garage, rebuild interior stairs w/ elevator, remove glazed roof, put(n)skylights,(4)(n) windows, restructure (e) roof dormers, modify brick veneer. | $650,000 |
| Mar 5, 2012 | Expired or cancelled cancelled Apr 2013 | 2833 Fillmore St | demolish 2-unit residential bldg.Details
demolish 2-unit residential bldg. | $10,000 | |
| Mar 5, 2012 | Expired or cancelled cancelled Apr 2013 | 2833 Fillmore St | erect type v 1-story building.Details
erect type v 1-story building. | $357,000 | |
| Feb 16, 2012 | Completed final sign-off Oct 2012 | 540 Liberty St | Jeff King And Company Inc | revision to appl #2010.12.07.6235 - additional roof framing for project under construction.Details
revision to appl #2010.12.07.6235 - additional roof framing for project under construction. | $5,000 |
| Jan 10, 2012 | Completed final sign-off Jun 2012 | 60 Normandie Tr | Matarozzi/Pelsinger Builders Inc. | revision to 201107150362. add a 1 story 21.5 sf detached accessory structure (storge shed) to south east side of (e) single family residence. extend exterior stair landing 4'-6" south, add 5' long 1-hr wall along south property line to replace delapidated wall/guardrail at neighbor's stairsDetails
revision to 201107150362. add a 1 story 21.5 sf detached accessory structure (storge shed) to south east side of (e) single family residence. extend exterior stair landing 4'-6" south, add 5' long 1-hr wall along south property line to replace delapidated wall/guardrail at neighbor's stairs | $1,500 |
| Dec 20, 2011 | Expired or cancelled cancelled Jun 2016 | 3451 Jackson St | Houseworks Enterprises Inc. | 1)renovate 4 bathrooms on 3/f. 2)add 5 new curb mounted skylights.3)add 3 new windows. 4)add wardrobe closets at bedroom #1 and master. 5) repair service stair. 6)add gas log lighter.7)plumbing, electrical and mechanical work as required.Details
1)renovate 4 bathrooms on 3/f. 2)add 5 new curb mounted skylights.3)add 3 new windows. 4)add wardrobe closets at bedroom #1 and master. 5) repair service stair. 6)add gas log lighter.7)plumbing, electrical and mechanical work as required. | $55,000 |
| Dec 20, 2011 | Completed final sign-off Feb 2014 | 184 Edgewood Av | Moroso Construction Inc | revision to (e) permit #2010/08/18/9020. demolition exceeded orignal permit to satisfy structural requirements. scope of actual demo per this revision. see complaint & correction notice per joe duffy dated 11/18/11Details
revision to (e) permit #2010/08/18/9020. demolition exceeded orignal permit to satisfy structural requirements. scope of actual demo per this revision. see complaint & correction notice per joe duffy dated 11/18/11 | $650 |
| Nov 1, 2011 | Completed final sign-off Jun 2012 | 60 Normandie Tr | Matarozzi/Pelsinger Builders Inc. | structural revision to 201107150362. expanded foundation upgrade, framing modificationsDetails
structural revision to 201107150362. expanded foundation upgrade, framing modifications | |
| May 2, 2011 | Completed final sign-off Aug 2011 | 704 05th Av | add one new bathroom and remodel one closet and one extg bathroom. all work on 3rd story within extg bldg envelope.Details
add one new bathroom and remodel one closet and one extg bathroom. all work on 3rd story within extg bldg envelope. | $28,000 | |
| Apr 11, 2011 | Completed final sign-off Jul 2013 | 2111 Steiner St | both units: (n) curb cut & sidewalk paving, remove (e) entry steps & provide (n) for both units, seismic upgrade. replace historic facade windows. unit#2109: remove non-permitted rear addition, repartition interior w/(n) fixtures & finishes, (n) mech. & elec. & plumbing system. unit#2111: remove nonDetails
both units: (n) curb cut & sidewalk paving, remove (e) entry steps & provide (n) for both units, seismic upgrade. replace historic facade windows. unit#2109: remove non-permitted rear addition, repartition interior w/(n) fixtures & finishes, (n) mech. & elec. & plumbing system. unit#2111: remove non | $400,000 | |
| Mar 15, 2011 | Completed final sign-off Nov 2011 | 479 Arkansas St | lower unit#479: relocate rear entry dr and repartition int.rooms. provide 2 new windows and 1 new ext.door. window and dr at rear not visible from the street. upper unit#481. replace guard rail at 3rd fl deck. rebuild 2nd floor rear. repair/replace rear facade siding.Details
lower unit#479: relocate rear entry dr and repartition int.rooms. provide 2 new windows and 1 new ext.door. window and dr at rear not visible from the street. upper unit#481. replace guard rail at 3rd fl deck. rebuild 2nd floor rear. repair/replace rear facade siding. | $37,500 | |
| Feb 17, 2011 | Completed final sign-off Aug 2011 | 155 22nd Av | 3rd fl: convert e closet to new master bath, remodel e guest bath, 2 new skylightsDetails
3rd fl: convert e closet to new master bath, remodel e guest bath, 2 new skylights | $35,000 | |
| Dec 15, 2010 | Completed final sign-off Mar 2011 | 140 Laidley St | unit #140 & 140a-change 2nd fl rear exterior doors to windows, rebuild interior stairs & ramp to meet code. new plumbing fixtures & fittings in powder & master bathroom. new kitchen appliances, modify island cabinets, plumbing, electrical & mechanical changes in areas of workDetails
unit #140 & 140a-change 2nd fl rear exterior doors to windows, rebuild interior stairs & ramp to meet code. new plumbing fixtures & fittings in powder & master bathroom. new kitchen appliances, modify island cabinets, plumbing, electrical & mechanical changes in areas of work | $40,000 | |
| Dec 7, 2010 | Completed final sign-off Oct 2012 | 540 Liberty St | provide new approx 15' wide roof dormer on east facing roof. expand (e) west facing roof dormer to approx 33' length. add new skylights & reroof building. remove (e) + provide (n) interior partitions per plans. remodel kitchen, (2) baths and laudry rooms.Details
provide new approx 15' wide roof dormer on east facing roof. expand (e) west facing roof dormer to approx 33' length. add new skylights & reroof building. remove (e) + provide (n) interior partitions per plans. remodel kitchen, (2) baths and laudry rooms. | $290,000 | |
| Oct 5, 2010 | Completed final sign-off Nov 2011 | 2700 Lake St | convert e 1100 sf basement to occupied space by excavating down approx 30". provide new concrete underspinning at e foundation walls, new steel floor beam, new interior partitons for 6 rms including 2 bedrooms, bath etcDetails
convert e 1100 sf basement to occupied space by excavating down approx 30". provide new concrete underspinning at e foundation walls, new steel floor beam, new interior partitons for 6 rms including 2 bedrooms, bath etc | $170,600 | |
| Aug 18, 2010 | Completed final sign-off Feb 2014 | 184 Edgewood Av | raise existing two stories 2'0". construct 1450 sqft 3 story rear addition w/2nd & 3rd flr. roof decks. provide full seismic upgrade of structure. new interior partitions per plasn + finishes throughout. new mechanical, plumbing + electrical systems througout.Details
raise existing two stories 2'0". construct 1450 sqft 3 story rear addition w/2nd & 3rd flr. roof decks. provide full seismic upgrade of structure. new interior partitions per plasn + finishes throughout. new mechanical, plumbing + electrical systems througout. | $640,000 | |
| Jun 1, 2010 | Completed final sign-off Nov 2011 | 481 Arkansas St | extend (e) interior stair upwards to new roof access penthouse enclosure. add new 364 sq. ft. roof deck. relocate mechanical equipment, plumbing vents & mech. flues.Details
extend (e) interior stair upwards to new roof access penthouse enclosure. add new 364 sq. ft. roof deck. relocate mechanical equipment, plumbing vents & mech. flues. | $70,000 | |
| Mar 18, 2010 | Expired or cancelled cancelled Mar 2017 | 140 Laidley St | deconstruct (e) 2-unit, 2-story east wing. construct (n) 3-story lateral addition o/ (n) entry/garage to (e) 3-story west wing. convert from 3 to 2-unit occupancy. (n) vertical stair circulation with elevator. (n) living facade "green" wall. (n) mech./elect./plumb. system throughout.Details
deconstruct (e) 2-unit, 2-story east wing. construct (n) 3-story lateral addition o/ (n) entry/garage to (e) 3-story west wing. convert from 3 to 2-unit occupancy. (n) vertical stair circulation with elevator. (n) living facade "green" wall. (n) mech./elect./plumb. system throughout. | $1,500,000 | |
| Mar 4, 2010 | Expired or cancelled expired May 2012 | 2120 Lyon St | Constructive Works Group Inc. | build new playroom under area of (e) 1st floor deck with horizontal extension of 1'-3". interior remodeing & bathroom renovation. new decking, handrails & bay windowDetails
build new playroom under area of (e) 1st floor deck with horizontal extension of 1'-3". interior remodeing & bathroom renovation. new decking, handrails & bay window | $100,000 |
| Feb 5, 2010 | Expired or cancelled cancelled Feb 2012 | 36 Woodland Av | vertical additon of 650 sf at 4t fl, master suite. 1st fl horiz infill under existing rear deck. 3fd fl horiz addition of 60 sf over exist 2nd fl rear room.new spiral staircase to 2nd fl roof deck at rear, upgrade kitchen/bath finishes, plumb/elec/mechDetails
vertical additon of 650 sf at 4t fl, master suite. 1st fl horiz infill under existing rear deck. 3fd fl horiz addition of 60 sf over exist 2nd fl rear room.new spiral staircase to 2nd fl roof deck at rear, upgrade kitchen/bath finishes, plumb/elec/mech | $425,000 | |
| Sep 3, 2009 | Never finaled issued Jan 2010, no final | 132 Belvedere St | 10 sq ft. 1 story rear kitchen addition, 23 sq ft. 1 story bathtub addition @ south lightwell, remove bearing wall @ kitchen/family. work @ lower level unit. remove of center bearing posts, widen garage door to include side passage (work to shared garage).Details
10 sq ft. 1 story rear kitchen addition, 23 sq ft. 1 story bathtub addition @ south lightwell, remove bearing wall @ kitchen/family. work @ lower level unit. remove of center bearing posts, widen garage door to include side passage (work to shared garage). | $85,000 | |
| Jun 30, 2009 | Completed final sign-off Mar 2011 | 3445 Washington St | Matarozzi/Pelsinger Builders Inc. | excavate and extend garage. new stair from grg to entry lvl. new hydronic heating throughout. remodel kitch. & add 70 sqft. remodel (e) baths. relocate selected int. partitions on 2nd & 3r flrs. remove 2 (e) chimneys. replace selected wdws. exterior patch of stucco and paintDetails
excavate and extend garage. new stair from grg to entry lvl. new hydronic heating throughout. remodel kitch. & add 70 sqft. remodel (e) baths. relocate selected int. partitions on 2nd & 3r flrs. remove 2 (e) chimneys. replace selected wdws. exterior patch of stucco and paint | $425,000 |
| Jun 16, 2009 | Completed final sign-off Oct 2009 | 2836 Washington St | Mayta & Jensen | new 2-story structural steel moment frame at rear elevation, new steel supported glass bridge to rear patio, new guardrail extension @ 4th floor roof deck, new french doors @ (e) wondow @ 2nd floor, (2) new windows @ (e) window openings @ 1st floor, (1) new window @ 3rd floor.Details
new 2-story structural steel moment frame at rear elevation, new steel supported glass bridge to rear patio, new guardrail extension @ 4th floor roof deck, new french doors @ (e) wondow @ 2nd floor, (2) new windows @ (e) window openings @ 1st floor, (1) new window @ 3rd floor. | $55,000 |
| Jun 1, 2009 | Completed final sign-off Oct 2009 | 2836 Washington St | Mayta & Jensen | repair/replace (e) wd siding;service (e) jomy lddr;(n) fixed rear vert.ladders; re-rrof 4th fl roof deck; aletr kitch. ceiling koffers; remove pl windows; fur-out fam. rm wall; relocate vanity sink; sister (e) 2' x 8' ceiling framing master bdrm; all work on 2836 unit.Details
repair/replace (e) wd siding;service (e) jomy lddr;(n) fixed rear vert.ladders; re-rrof 4th fl roof deck; aletr kitch. ceiling koffers; remove pl windows; fur-out fam. rm wall; relocate vanity sink; sister (e) 2' x 8' ceiling framing master bdrm; all work on 2836 unit. | $75,000 |
| May 13, 2009 | Completed final sign-off Nov 2009 | 2829 Green St | Matarozzi/Pelsinger Builders Inc. | revision to approved permit#2006/0223/5308. revision include: 1. deletion of 2nd. flr. bridge; 2. addition of net (6) skylights; 3. fenestration changes to doors & windows @ 1st. & 2nd. flrs. 4. add elevator & selected interior partition changes; & 5. change wood siding to stucco @ rear bldg. mass..Details
revision to approved permit#2006/0223/5308. revision include: 1. deletion of 2nd. flr. bridge; 2. addition of net (6) skylights; 3. fenestration changes to doors & windows @ 1st. & 2nd. flrs. 4. add elevator & selected interior partition changes; & 5. change wood siding to stucco @ rear bldg. mass.. | $25,000 |
| Jan 9, 2009 | Completed final sign-off Mar 2009 | 2627 Chestnut St | convert ground floor illegal unit to uncondtioned workshop and storage (voluntary). remove kitchen, shower and heater. add bath fan and occupancy sensor switches.Details
convert ground floor illegal unit to uncondtioned workshop and storage (voluntary). remove kitchen, shower and heater. add bath fan and occupancy sensor switches. | $1,000 | |
| Oct 14, 2008 | Completed final sign-off Nov 2009 | 2829 Green St | Matarozzi/Pelsinger Builders Inc. | revision to 200602235308, s1,r-2. replace existing siding and windows in kindDetails
revision to 200602235308, s1,r-2. replace existing siding and windows in kind | $5,000 |
| Aug 28, 2008 | Completed final sign-off Sep 2009 | 100 Webster St | create one-car off street parking and storage area at south east side of building.Details
create one-car off street parking and storage area at south east side of building. | $20,000 | |
| Jul 24, 2008 | Expired or cancelled expired Nov 2009 | 2829 Green St | install rear yard site retaining wall for landscaping (10' max height)Details
install rear yard site retaining wall for landscaping (10' max height) | $25,000 | |
| Jul 18, 2008 | Expired or cancelled cancelled Jul 2009 | 2829 Green St | revisions to approved app #200602235308 includes 1)298 sq ft, 2nd floor infill horizontal addition (bedroom, bathroom & laundry) 2) 10 new skylights,3)fenestration changes to doors & wndws 1st & 2nd floors 4)deletion of 2nd floor balcony and bridge.Details
revisions to approved app #200602235308 includes 1)298 sq ft, 2nd floor infill horizontal addition (bedroom, bathroom & laundry) 2) 10 new skylights,3)fenestration changes to doors & wndws 1st & 2nd floors 4)deletion of 2nd floor balcony and bridge. | $35,000 | |
| Jul 10, 2008 | Completed final sign-off May 2009 | 291 32nd Av | Scott & Warner Builders Inc | interior remodel of kitchen, powder room & dining room. no structural work, no exterior work, no interior wall removal. additional work to appl#200804089127Details
interior remodel of kitchen, powder room & dining room. no structural work, no exterior work, no interior wall removal. additional work to appl#200804089127 | $20,000 |