Sean Thomas Condry
- Listed as
- architect, attorney, authorized agent-others, designer, engineer
- Firm
- Stc Design & Engineering
- Based in
- San Anselmo
- On San Francisco permits
- Jul 2003 to Mar 2026
187 permits since 2000 (engineer on 157 permits, architect on 25 permits, authorized agent-others on 4 permits, designer on 2 permits, attorney on 1 permit): 116 completed, 8 in progress, 25 never finaled, 38 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 187.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 6, 2026 | In progress issued Mar 2026 | 479 Ralston St | 3rd floor, master bathroom remodel. interior work only. no exterior work.Details
3rd floor, master bathroom remodel. interior work only. no exterior work. | $32,000 | |
| Jan 5, 2026 | In progress filed Jan 2026, not yet issued | 457 Roosevelt Wy | legalization of changes pa 201708165047: subbasement addition.(p)subbasement:(p)office & gym.basement:(as-built) 1 bed,1 media rm,rear deck,(p)office.1/f:(as-built) gate & fene at front.(p) trash enclosure under (e) front stair.2/f:(as-built) living rm.ext (as-built) site stair connect yard to bsmt.Details
legalization of changes pa 201708165047: subbasement addition.(p)subbasement:(p)office & gym.basement:(as-built) 1 bed,1 media rm,rear deck,(p)office.1/f:(as-built) gate & fene at front.(p) trash enclosure under (e) front stair.2/f:(as-built) living rm.ext (as-built) site stair connect yard to bsmt. | $50,000 | |
| Aug 19, 2025 | In progress issued Jun 2026 | 1406 Diamond St | Cardenas Custom Builders Inc. | 3/f vertical addition. 1/f: (n) entry.2/f: interior renovations (dining/living). (n) 3/f: 2 beds, 1 bath, 1 sitting rm. new int stairs connect 1/2/3. rear yd: new site stair connection 1/f to 2/f rear yard.Details
3/f vertical addition. 1/f: (n) entry.2/f: interior renovations (dining/living). (n) 3/f: 2 beds, 1 bath, 1 sitting rm. new int stairs connect 1/2/3. rear yd: new site stair connection 1/f to 2/f rear yard. | $400,000 |
| Jan 20, 2025 | In progress issued Jun 2025 | 573 Diamond St | Doran Construction & Design | revision to permit#: 201908290257. 1st flr: no addition, remodel laundry and entry. 2nd flr: no addition, remodel entry, bath and music room. 3rd flr: reconfigure layout of master bed and dressing room. 4th flr: (n) bath. (reduce scope)Details
revision to permit#: 201908290257. 1st flr: no addition, remodel laundry and entry. 2nd flr: no addition, remodel entry, bath and music room. 3rd flr: reconfigure layout of master bed and dressing room. 4th flr: (n) bath. (reduce scope) | |
| Apr 17, 2024 | In progress issued Apr 2024 | 583 04th Av | L C Builders Inc. | foundation replacement at south side of buildingDetails
foundation replacement at south side of building | $46,000 |
| Apr 17, 2024 | Expired or cancelled expired Dec 2025 | 589 04th Av | L C Builders Inc. | revision 201910174823- to reduce the size of the foundation located at the left and center area of the building and modify the amount of rebar used.Details
revision 201910174823- to reduce the size of the foundation located at the left and center area of the building and modify the amount of rebar used. | |
| Mar 29, 2024 | In progress issued May 2024 | 6 Scenic Wy | (e) window replcment with smooth stucco top coat on (e) stucco walls; replace (e) side yard steel gate with a (n) 7ft high steel gate & fence with cornice detail; gate to have (n) access panel and address signage; add raised planter box along front & side yards; add lanscape lighting along side yardDetails
(e) window replcment with smooth stucco top coat on (e) stucco walls; replace (e) side yard steel gate with a (n) 7ft high steel gate & fence with cornice detail; gate to have (n) access panel and address signage; add raised planter box along front & side yards; add lanscape lighting along side yard | $70,000 | |
| Dec 21, 2023 | Completed final sign-off Jun 2026 | 55 Dolores St | Michael Clarke Construction | new roof deck(659 sq ft)pethouse extension (55 sq ft) structrual work as indicated on the plans.Details
new roof deck(659 sq ft)pethouse extension (55 sq ft) structrual work as indicated on the plans. | $82,000 |
| Aug 9, 2023 | Expired or cancelled expired Jun 2026 | 1414 06th Av | Mc Gowan Builders | partial foundation replacementDetails
partial foundation replacement | |
| Jul 14, 2023 | Expired or cancelled expired Jul 2025 | 144 Bonview St | Cardenas Custom Builders Inc. | revision to pa# 2020-1022-7155. new foundation @ g/lDetails
revision to pa# 2020-1022-7155. new foundation @ g/l | |
| May 17, 2023 | In progress issued Jan 2025 | 91 Coleridge St | Doran Construction & Design | front & rear yard addition. rear yard variance. 1st: (n) porch @ front. 2nd: (n) addition @ m.bath to align w/ floor below. renovation of 2 baths, (n) hallway to rear yard. roof: (n) skylight. (n) ext. stairs @ front of buildingDetails
front & rear yard addition. rear yard variance. 1st: (n) porch @ front. 2nd: (n) addition @ m.bath to align w/ floor below. renovation of 2 baths, (n) hallway to rear yard. roof: (n) skylight. (n) ext. stairs @ front of building | $50,000 |
| Nov 1, 2022 | Completed final sign-off Jul 2023 | 12 Ford St | parital replacement of rear property line fence, north and east side of property. max height not to exceed 10 ft from adjacent grade. in response to nov 2022090786Details
parital replacement of rear property line fence, north and east side of property. max height not to exceed 10 ft from adjacent grade. in response to nov 2022090786 | $18,000 | |
| Jun 22, 2022 | Completed final sign-off May 2024 | 1322 York St | Mar Construction | 3rd fl: kitchen & bathroom remodel, new bathroom. demolition as indicated on plans. plumbing, mechanical & electrical as req/indicated. structural work per plans.Details
3rd fl: kitchen & bathroom remodel, new bathroom. demolition as indicated on plans. plumbing, mechanical & electrical as req/indicated. structural work per plans. | $52,000 |
| Apr 15, 2022 | Expired or cancelled withdrawn Dec 2023 | 55 Dolores St | unit #4: new roof deck (~588 sf). structural work per plans.Details
unit #4: new roof deck (~588 sf). structural work per plans. | $89,000 | |
| Jan 6, 2022 | Completed final sign-off Jun 2026 | 1414 06th Av | Mc Gowan Builders | vertical addition. 2nd fl: (n) library, powder rm, kitchen & dining rm, & rear deck. new 3rd fl: (n) 3 bedrooms, bath, master suite & rear deck. roof: (n) skylightsDetails
vertical addition. 2nd fl: (n) library, powder rm, kitchen & dining rm, & rear deck. new 3rd fl: (n) 3 bedrooms, bath, master suite & rear deck. roof: (n) skylights | $275,000 |
| Apr 5, 2021 | Completed final sign-off Apr 2022 | 66 Saint Elmo Wy | Lingruen Associates | existing foundation improvements. structural work per plans. revision to no-plan pa 202008121608Details
existing foundation improvements. structural work per plans. revision to no-plan pa 202008121608 | $68,000 |
| Nov 13, 2020 | In progress issued May 2026 | 619 21st Av | rear addition @ 1st floor - 1/f: (n) 1 bed, sitting, bath,laundry; 2/f: (n) kitchen, powder rm & rear deck. (n) skylight, (n) int. stair connecting 1/f & 2/f; rear yard: (n) spiral stair connecting rear yard to 2nd deck.Details
rear addition @ 1st floor - 1/f: (n) 1 bed, sitting, bath,laundry; 2/f: (n) kitchen, powder rm & rear deck. (n) skylight, (n) int. stair connecting 1/f & 2/f; rear yard: (n) spiral stair connecting rear yard to 2nd deck. | $280,000 | |
| Nov 13, 2020 | Completed final sign-off Dec 2021 | 619 21st Av | L C Builders Inc. | response to nov 202046691: partially rebuild front wall and garage door on 1/f due to car-crash. structur work per plans.Details
response to nov 202046691: partially rebuild front wall and garage door on 1/f due to car-crash. structur work per plans. | $22,000 |
| Jun 26, 2020 | Completed final sign-off Jun 2021 | 124 Haight St | Keightley Builders Inc | revision to pa# 201605207974. basement: revert to (e) garage & stair to 1st level deck. reconfigure living room, bath, ktichen and laundry. 1st: revert to (e) stair from deck to 2nd level. reconfigure bedroom 3. (n) bath, closet in bedroom, 2 closet in bedroom, 2 laundry & storage. 2nd: (n) 2020Details
revision to pa# 201605207974. basement: revert to (e) garage & stair to 1st level deck. reconfigure living room, bath, ktichen and laundry. 1st: revert to (e) stair from deck to 2nd level. reconfigure bedroom 3. (n) bath, closet in bedroom, 2 closet in bedroom, 2 laundry & storage. 2nd: (n) 2020 | |
| Feb 19, 2020 | Completed final sign-off Sep 2020 | 807 Lombard St | Burradell Construction Inc---See Notes | revision to pa 2015-0204-7516 s1 revise deck joist revision to roof deck vertical additionDetails
revision to pa 2015-0204-7516 s1 revise deck joist revision to roof deck vertical addition | |
| Dec 4, 2019 | Never finaled issued Dec 2019, no final | 41 Peralta Av | revision to pa 2015-0304-9963 & 2018-0319-4025 replacing dryrot exterior wall & roof @ rearDetails
revision to pa 2015-0304-9963 & 2018-0319-4025 replacing dryrot exterior wall & roof @ rear | $6,000 | |
| Oct 17, 2019 | Completed final sign-off Dec 2025 | 589 04th Av | L C Builders Inc. | raise bldg 2.5' vertical/horizontal add & int'r renov.1st fl: (n)garage/storage. 2nd fl:(n)unit 1:(3)beds(2)bths,laundry/living/dining, kitche,baywindow,front balcony & reardeck. 3rd fl:(n)unit 2:(3)beds,(2)baths,laundry,living/dining,kitchen,bay window,front/rear balconyDetails
raise bldg 2.5' vertical/horizontal add & int'r renov.1st fl: (n)garage/storage. 2nd fl:(n)unit 1:(3)beds(2)bths,laundry/living/dining, kitche,baywindow,front balcony & reardeck. 3rd fl:(n)unit 2:(3)beds,(2)baths,laundry,living/dining,kitchen,bay window,front/rear balcony | $400,000 |
| Jul 15, 2019 | Expired or cancelled withdrawn Jul 2023 | 126 Haight St | horizontal & vertical rear addition. new residential unit over existing garage at rear of the property. include kitchen & bathroom. propose of waiving rear yard requirement per sfpc 134. 1 new unit approved under 201605207974.Details
horizontal & vertical rear addition. new residential unit over existing garage at rear of the property. include kitchen & bathroom. propose of waiving rear yard requirement per sfpc 134. 1 new unit approved under 201605207974. | $75,000 | |
| Feb 20, 2019 | Completed final sign-off Apr 2022 | 289 Bradford St | L C Builders Inc. | converting unconditioned 1st fl to habitable: 1/f (n) multi-use & bath, (n) stair connecting 1st & 2nd fl. (n) windows at 1st & 3rd fl. (n) rear yard patio. (n) siding at rear side.Details
converting unconditioned 1st fl to habitable: 1/f (n) multi-use & bath, (n) stair connecting 1st & 2nd fl. (n) windows at 1st & 3rd fl. (n) rear yard patio. (n) siding at rear side. | $90,000 |
| Dec 3, 2018 | Expired or cancelled withdrawn Apr 2023 | 124 Haight St | revision to 201718212645 new grade beamsDetails
revision to 201718212645 new grade beams | ||
| Dec 3, 2018 | Completed final sign-off Jul 2020 | 116 Laidley St | Barcewski Inc Dba Sunshine Construction | revision to 201403251685 s1 retaining wall at garage levelDetails
revision to 201403251685 s1 retaining wall at garage level | $25,000 |
| Aug 9, 2018 | Completed final sign-off Mar 2019 | 1870 Jackson St | Vanguard Construction Services | #702 - custom kitchen remodel. non bearing wall removal at bathroom. refinish bathrooms, replace plumbing fixtures as indicated. lighting & power modifications as reqd/indicatedDetails
#702 - custom kitchen remodel. non bearing wall removal at bathroom. refinish bathrooms, replace plumbing fixtures as indicated. lighting & power modifications as reqd/indicated | $48,000 |
| May 1, 2018 | Completed final sign-off Jun 2019 | 4740 Mission St | voluntary strengthening at commercial unit & basement. electrical & plumbing improvements. removal of a non-bearing interior wall. waterproofing improvements at basement. maher naDetails
voluntary strengthening at commercial unit & basement. electrical & plumbing improvements. removal of a non-bearing interior wall. waterproofing improvements at basement. maher na | $92,000 | |
| Apr 17, 2018 | Completed final sign-off Dec 2019 | 1786 Carroll Av | legalize 2nd floor construction to comply with nov 201836731 & electrical 201837392. disabled access upgrades under t.i. per ab017Details
legalize 2nd floor construction to comply with nov 201836731 & electrical 201837392. disabled access upgrades under t.i. per ab017 | $100,000 | |
| Feb 12, 2018 | Completed final sign-off Jan 2021 | 3919 Washington St | Brian Mac Namara Construction | horizontal addition- custom interior remodel, excavation of approx 685 cu. ft (+/- 25 cu. ydDetails
horizontal addition- custom interior remodel, excavation of approx 685 cu. ft (+/- 25 cu. yd | $680,000 |
| Jan 26, 2018 | Completed final sign-off Jul 2018 | 111 Buena Vista Ave East Av | Service Concrete Company | replace retaining wall at north side of rear yard. replace fence at east north side of rear yardDetails
replace retaining wall at north side of rear yard. replace fence at east north side of rear yard | $24,000 |
| Nov 14, 2017 | Completed final sign-off Jan 2018 | 925 Fell St | San Francisco Earthquake Retrofitting | revision to permit #2017-0830-6459; #2017-0830-6461. rear and front foundation revision, new furring wall at front facade. n/a ordinance #155-13Details
revision to permit #2017-0830-6459; #2017-0830-6461. rear and front foundation revision, new furring wall at front facade. n/a ordinance #155-13 | |
| Nov 14, 2017 | Completed final sign-off Jan 2018 | 929 Fell St | San Francisco Earthquake Retrofitting | revision to permit #2017-0830-6459; #2017-0830-6461. rear and front foundation revision, new furring wall at front facade. n/a ordinance #155-13Details
revision to permit #2017-0830-6459; #2017-0830-6461. rear and front foundation revision, new furring wall at front facade. n/a ordinance #155-13 | |
| Aug 30, 2017 | Completed final sign-off Jan 2018 | 925 Fell St | Jimenez Construction Sf Inc | soft story retrofit for sfebc chapter 4 , 2016 cebc appendix a-4Details
soft story retrofit for sfebc chapter 4 , 2016 cebc appendix a-4 | $42,000 |
| Aug 30, 2017 | Completed final sign-off Jan 2018 | 929 Fell St | San Francisco Earthquake Retrofitting | soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d, 2016 cebc appendix a-4 | $42,000 |
| Jul 21, 2017 | Completed final sign-off Dec 2023 | 124 Haight St | Sophisticated Home Builder Inc | replace existing brick foundation with concrete foundation. n/a for maherDetails
replace existing brick foundation with concrete foundation. n/a for maher | $150,000 |
| Jul 5, 2017 | Completed final sign-off Sep 2017 | 137 Goettingen St | revision to 201406209003. omit construction of approved staircase at rear open deckDetails
revision to 201406209003. omit construction of approved staircase at rear open deck | ||
| Jun 30, 2017 | Completed final sign-off Jul 2018 | 1933 Jones St | Dugarry Construction Inc | kitchen remodeling, new bathroom, relocate laundry area, bedroom remodel, refinish existing bathroom, replace windows in kind (10) as indicated. structural, plumbing, mechanical as required/indicatedDetails
kitchen remodeling, new bathroom, relocate laundry area, bedroom remodel, refinish existing bathroom, replace windows in kind (10) as indicated. structural, plumbing, mechanical as required/indicated | $48,000 |
| May 24, 2017 | Completed final sign-off Jan 2018 | 358 Arguello Bl | Fontana Construction, Inc. | revision to pa 2016-0406-4078 (s1) revised rear landscape retaining wall. to comply with nov 201779561Details
revision to pa 2016-0406-4078 (s1) revised rear landscape retaining wall. to comply with nov 201779561 | $5,000 |
| Feb 16, 2017 | Completed final sign-off Jun 2017 | 118 Haight St | fire remediation to comply with nov 201635102 at front facade and roof; wood shingles at front facade.Details
fire remediation to comply with nov 201635102 at front facade and roof; wood shingles at front facade. | $45,000 | |
| Sep 7, 2016 | Completed final sign-off Mar 2017 | 33 19th Av | Diamond Home Restoration | (e) family room.bedroom remodel. (e) bathroom reconfigure. partially remove (e) bearing wall - new beam. plumb/ele/mech modifications as reqdDetails
(e) family room.bedroom remodel. (e) bathroom reconfigure. partially remove (e) bearing wall - new beam. plumb/ele/mech modifications as reqd | $22,000 |
| Jul 1, 2016 | Completed final sign-off May 2022 | 71 Bronte St | Damar Construction And Remodeling Inc | vertical addition adding a partial 2nd flr (542 sf) over rear portion of (e) 1st flr footprint, set back 15'-10" from front facade. the 2nd fl will be accessed by a new interior staircase & will include 2 bedrooms, a walk-in closet/storage room, a bathroom, & hallwayDetails
vertical addition adding a partial 2nd flr (542 sf) over rear portion of (e) 1st flr footprint, set back 15'-10" from front facade. the 2nd fl will be accessed by a new interior staircase & will include 2 bedrooms, a walk-in closet/storage room, a bathroom, & hallway | $225,000 |
| May 18, 2016 | Completed final sign-off Jun 2018 | 662 Lisbon St | Carroll Construction | horizontal addition. remodel & extend rear deck. new fire wall at property line (both sides). rear sliding door. replace wood floor framing of the back porch due to dry rot.Details
horizontal addition. remodel & extend rear deck. new fire wall at property line (both sides). rear sliding door. replace wood floor framing of the back porch due to dry rot. | $16,000 |
| Mar 14, 2016 | Expired or cancelled cancelled Jan 2026 | 111 Hahn St | revision to pa #201510291162 - install (n) steel tube seismic post at gridline 1 in lieu of proposed strong walls.Details
revision to pa #201510291162 - install (n) steel tube seismic post at gridline 1 in lieu of proposed strong walls. | ||
| Mar 14, 2016 | Never finaled issued Mar 2016, no final | 24 Presidio Tr | Robinson Landscaping Inc | proposed 7ft tall fence (redwood) at porition of the side porperty line at rear. concrete shored driveway to be replaced with interlocking pavers. level up patio for new bastketball hoop (collapsible) & new invisible containment netting system (top porition removable). new electrical gate, newDetails
proposed 7ft tall fence (redwood) at porition of the side porperty line at rear. concrete shored driveway to be replaced with interlocking pavers. level up patio for new bastketball hoop (collapsible) & new invisible containment netting system (top porition removable). new electrical gate, new | $74,000 |
| Aug 25, 2015 | Completed final sign-off Sep 2015 | 807 Lombard St | demo roof deckDetails
demo roof deck | $4,600 | |
| Jul 31, 2015 | Completed final sign-off Nov 2015 | 100 Brentwood Av | permit application in respose to notice of violation #201554751 construction of a neew coblerstone retaining wall at north property line. approx 25'-0" in length and 3'-4" in height. back fill retaining wall to maintain (e) grade.Details
permit application in respose to notice of violation #201554751 construction of a neew coblerstone retaining wall at north property line. approx 25'-0" in length and 3'-4" in height. back fill retaining wall to maintain (e) grade. | $6,200 | |
| Jul 23, 2015 | Completed final sign-off Jan 2016 | 111 Buena Vista Ave East Av | D B H Construction | 1st fl: bathroom remodel and window replacement, 2nd fl relocate laundry room, ath, and kitchen. new isolated footing, new posts and beam. plumbing ele, mech modification as requiredDetails
1st fl: bathroom remodel and window replacement, 2nd fl relocate laundry room, ath, and kitchen. new isolated footing, new posts and beam. plumbing ele, mech modification as required | $42,000 |
| Jul 22, 2015 | Completed final sign-off Jan 2019 | 2151 Scott St | T T General Construction | interior renovation: 1st flr: convert unconditioned to fam room & bath. enlcose entry foyer. 2nd flr: remodel entire flr - kitchen, bath & add powder rm/ 3rd flr: convert 2 bedrms to master & new baths, new skylights, windows, reconfigure (e) stair.Details
interior renovation: 1st flr: convert unconditioned to fam room & bath. enlcose entry foyer. 2nd flr: remodel entire flr - kitchen, bath & add powder rm/ 3rd flr: convert 2 bedrms to master & new baths, new skylights, windows, reconfigure (e) stair. | $117,000 |
| Jul 22, 2015 | Completed final sign-off May 2016 | 539 Munich St | Throne Builders Inc | 1/f remodel: new livable space study room, family rm, full bathroom & bar sink (new area approx 722 sq ft), relocate duckt work, laundry rm & mech equip. 2/f: update (e) stairs to code, install (n) cable railing system, increase size of (e) openings. struc/plbg/mech/elec as req/indicated.Details
1/f remodel: new livable space study room, family rm, full bathroom & bar sink (new area approx 722 sq ft), relocate duckt work, laundry rm & mech equip. 2/f: update (e) stairs to code, install (n) cable railing system, increase size of (e) openings. struc/plbg/mech/elec as req/indicated. | $84,000 |
| Jun 15, 2015 | Completed final sign-off Jul 2015 | 2123 Pierce St | partial replacement of property line fence & new concrete wall base. n/a ordinance #155-13Details
partial replacement of property line fence & new concrete wall base. n/a ordinance #155-13 | $5,000 | |
| May 18, 2015 | Completed final sign-off Sep 2015 | 45 Ora Wy | T T General Construction | 1st floor/unit a101: kitchen remodel/bath remodel: new interior finishes @ bedroom & living room, minor partition changesDetails
1st floor/unit a101: kitchen remodel/bath remodel: new interior finishes @ bedroom & living room, minor partition changes | $30,000 |
| Apr 24, 2015 | Completed final sign-off Jul 2021 | 1578 Shafter Av | 3 stories rear addition to accomodate: 1st floor: study / family room & an open garage & a half bath. 2nf floor: 2 bedrooms & a bathroom. 3rd floor: master bedroom / bathroom, staircase. total addition 788 sq. ft.Details
3 stories rear addition to accomodate: 1st floor: study / family room & an open garage & a half bath. 2nf floor: 2 bedrooms & a bathroom. 3rd floor: master bedroom / bathroom, staircase. total addition 788 sq. ft. | $196,000 | |
| Feb 4, 2015 | Completed final sign-off Sep 2020 | 807 Lombard St | Throne Builders Inc | replacement & alteration to (e) roof deck. replace (e) 7 feet high wind screen for new 6 feet wind screen (42" solid, 30" glass).Details
replacement & alteration to (e) roof deck. replace (e) 7 feet high wind screen for new 6 feet wind screen (42" solid, 30" glass). | $30,000 |
| Dec 29, 2014 | Completed final sign-off Aug 2015 | 1001 Ashbury St | Throne Builders Inc | revision to pa #201404233991 to change glass railings to parapet around roof deck.Details
revision to pa #201404233991 to change glass railings to parapet around roof deck. | |
| Nov 21, 2014 | Never finaled issued Apr 2015, no final | 2400 Green St | remove (e) roof deck & trellis, add new roof deck & required structure.Details
remove (e) roof deck & trellis, add new roof deck & required structure. | $30,000 | |
| Oct 17, 2014 | Completed final sign-off Apr 2015 | 2757 Harrison St | seismic retrofit storiees 1&2, remodeling at 1st flr, (n) powder room, general storage room & filing room, enlargement/replacement of a rear window (match to existing). maher n/aDetails
seismic retrofit storiees 1&2, remodeling at 1st flr, (n) powder room, general storage room & filing room, enlargement/replacement of a rear window (match to existing). maher n/a | $46,000 | |
| Sep 8, 2014 | Expired or cancelled cancelled Feb 2015 | 375 Douglass St | Throne Builders Inc | replacement of rotten columns & possibly a beam, possible replacement of footings (2)Details
replacement of rotten columns & possibly a beam, possible replacement of footings (2) | $3,000 |
| Sep 8, 2014 | Completed final sign-off Apr 2015 | 200 Downey St | Peter Comaroto | replacement at entire foundation, enlarge area, re-construct first floor framing (remove interior bearing wall); voluntary seismic retrofit of 1st flr.Details
replacement at entire foundation, enlarge area, re-construct first floor framing (remove interior bearing wall); voluntary seismic retrofit of 1st flr. | $70,000 |
| Aug 18, 2014 | Completed final sign-off May 2023 | 2070 Ellis St | Extol Construction | proposal for a rear horiz + vert addition (890 sf) to an (e) residence.1st flr: (n) foundation @ rear + structural reinforcement. 2nd flr: (n) stair case, change nursery to home office. 3rd flr: new 2 bedrooms, 1 bathroom,roof deck. 750 sf living, 140 sf roof deck.Details
proposal for a rear horiz + vert addition (890 sf) to an (e) residence.1st flr: (n) foundation @ rear + structural reinforcement. 2nd flr: (n) stair case, change nursery to home office. 3rd flr: new 2 bedrooms, 1 bathroom,roof deck. 750 sf living, 140 sf roof deck. | $175,000 |
| Jul 9, 2014 | Completed final sign-off Jul 2017 | 2757 Harrison St | replace (e) brick foundation with new foundation.Details
replace (e) brick foundation with new foundation. | $37,000 | |
| Apr 23, 2014 | Completed final sign-off Aug 2015 | 1001 Ashbury St | Throne Builders Inc | interior remodel, new roof deck and foundation workDetails
interior remodel, new roof deck and foundation work | $310,000 |
| Dec 18, 2013 | Completed final sign-off Feb 2014 | 1405 Gough St | Throne Builders Inc | to comply with item 7 & item 9 nov #201390111 - replace rear failing deck staircaseDetails
to comply with item 7 & item 9 nov #201390111 - replace rear failing deck staircase | $12,000 |
| Nov 6, 2013 | Completed final sign-off Dec 2013 | 326 Pierce St | Throne Builders Inc | cap extg foundation at lighwell for approximately 30 ftDetails
cap extg foundation at lighwell for approximately 30 ft | $3,500 |
| Oct 11, 2013 | Completed final sign-off Feb 2014 | 1417 Dolores St | new slab, new grade beam, new steel beam at garageDetails
new slab, new grade beam, new steel beam at garage | $23,000 | |
| Oct 11, 2013 | Completed final sign-off Jan 2014 | 11 Otsego Av | Cristian Rotoro | 1)new hall access to bedrooms, kitchen remodeling, closet remodeling, new bathroom layout. 2)front porch to be restored to original. 3)replace extg staircase at rear deck. new railings. 4)partial foundation repair.Details
1)new hall access to bedrooms, kitchen remodeling, closet remodeling, new bathroom layout. 2)front porch to be restored to original. 3)replace extg staircase at rear deck. new railings. 4)partial foundation repair. | $27,000 |
| Oct 11, 2013 | Completed final sign-off Feb 2015 | 226 Laidley St | new living space @ lower level consisting bathroom, family room, office, & laundry room, new foundation.Details
new living space @ lower level consisting bathroom, family room, office, & laundry room, new foundation. | $95,000 | |
| Aug 16, 2013 | Completed final sign-off Jul 2014 | 43 Powers Av | T T General Construction | voluntary seismic upgrade to 1/f & 2/f and new foundation.Details
voluntary seismic upgrade to 1/f & 2/f and new foundation. | $60,000 |
| Mar 29, 2013 | Completed final sign-off Jun 2013 | 326 Pierce St | Throne Builders Inc | replace extg non conforming staircase due to dry rot with new inkind strair case due to space constraints. not visible from street.Details
replace extg non conforming staircase due to dry rot with new inkind strair case due to space constraints. not visible from street. | $25,000 |
| Nov 15, 2012 | Completed final sign-off Feb 2020 | 561 Valley St | Ren Lei Construction Co, Throne Builders Inc | rear addition, new decks, new bedrooms, foundation work, new living space.Details
rear addition, new decks, new bedrooms, foundation work, new living space. | $575,000 |
| Apr 18, 2012 | Completed final sign-off Sep 2012 | 1750 Taylor St | Bjlgc Inc | unit #902 - remodel existing master bath & add a closet, add a bathtub at guest bath & remodel, enlarge guestroom & remodel kitchen.Details
unit #902 - remodel existing master bath & add a closet, add a bathtub at guest bath & remodel, enlarge guestroom & remodel kitchen. | $125,000 |
| Jun 23, 2011 | Completed final sign-off Jul 2012 | 1041 Lake St | Diamond Home Restoration | new dormer addition at the east side of the building at 3'-0" from property line. expansion will allow to remodel a (e) bathroom at 4th level. also 7 new skylights located more than 5'-0" from property line. new 1-hour fire wall and roof in the proposed dormer.Details
new dormer addition at the east side of the building at 3'-0" from property line. expansion will allow to remodel a (e) bathroom at 4th level. also 7 new skylights located more than 5'-0" from property line. new 1-hour fire wall and roof in the proposed dormer. | $40,000 |
| Apr 26, 2011 | Completed final sign-off Jul 2012 | 1242 Francisco St | Aspect Builders Llc. | remodeling in response to nov 200909541 installation of guardrail 36" high at existing roof deck in compliance with permi 431271. issued 1-16-1978. e perimeter guardrail to stay as is. replacement of 2 dome sklights by new combination of flat skylights and glasswalk skylight. some structuralDetails
remodeling in response to nov 200909541 installation of guardrail 36" high at existing roof deck in compliance with permi 431271. issued 1-16-1978. e perimeter guardrail to stay as is. replacement of 2 dome sklights by new combination of flat skylights and glasswalk skylight. some structural | $12,000 |
| Apr 5, 2011 | Never finaled issued Jun 2011, no final | 751 Cole St | 1st fl:relocate furnace,conversion of basmt into new fam rm,bath,laundry,new windows. 2nd flr:remove some partitn walls,fireplace & staircase. remodel kitchen,bedrm & bath. new bath,replace 2 windows. 3rd fl:remodel kitchen,bedrm. new bath. 4th fl:convert fam rm into ma bedrm,1/2 to full bath.Details
1st fl:relocate furnace,conversion of basmt into new fam rm,bath,laundry,new windows. 2nd flr:remove some partitn walls,fireplace & staircase. remodel kitchen,bedrm & bath. new bath,replace 2 windows. 3rd fl:remodel kitchen,bedrm. new bath. 4th fl:convert fam rm into ma bedrm,1/2 to full bath. | $138,000 | |
| Feb 18, 2011 | Never finaled issued Jun 2011, no final | 2567 Union St | Aspect Builders Llc. | new roof deck with glass guardrail; new staircase for deck access; partial remodel of 3rd floor to include master bathroom & closet; new corner window at front facade.Details
new roof deck with glass guardrail; new staircase for deck access; partial remodel of 3rd floor to include master bathroom & closet; new corner window at front facade. | $40,000 |
| Feb 18, 2011 | Never finaled issued Feb 2011, no final | 753 Cole St | revision to appl #200712271409: (3) new skylights, removal of originally proposed (3) dormers. scope of work reduced.Details
revision to appl #200712271409: (3) new skylights, removal of originally proposed (3) dormers. scope of work reduced. | ||
| Jul 9, 2010 | Never finaled issued Jul 2010, no final | 511 Harrison St | revision to permit #209905158511. changes to sheet a-1 only. remove non-structural windows & doors & place new doors (ada doors) & light windows flush with wall.Details
revision to permit #209905158511. changes to sheet a-1 only. remove non-structural windows & doors & place new doors (ada doors) & light windows flush with wall. | $5,000 | |
| May 19, 2010 | Completed final sign-off Dec 2010 | 104 Collins St | Kohlmyer | interior kitchen remodel, new surround at fireplace, shower door at hall bath and 1st fl bath, new wood floors in kitchen and family room, new anchor bolts at e foundation, new closet in e storage gr fl, new plywood at crawl space 2, new interior doors to replace eDetails
interior kitchen remodel, new surround at fireplace, shower door at hall bath and 1st fl bath, new wood floors in kitchen and family room, new anchor bolts at e foundation, new closet in e storage gr fl, new plywood at crawl space 2, new interior doors to replace e | $50,000 |
| May 19, 2010 | Never finaled issued May 2010, no final | 2567 Union St | Aspect Builders Llc. | rev. to renewal pa# 2008.10.30.5522 and 2006.11.02.6765. same scope of work except for a new kitch.kayout, replacing wdws for a new french dr, reduce slightly size a new roof deck and struc. modifications.Details
rev. to renewal pa# 2008.10.30.5522 and 2006.11.02.6765. same scope of work except for a new kitch.kayout, replacing wdws for a new french dr, reduce slightly size a new roof deck and struc. modifications. | |
| May 12, 2010 | Completed final sign-off Oct 2010 | 1490 38th Av | garage remodeling-adding 683 sq ft of additional livable space. new family room, new guest bedroom, new full bathroom, laundry area, mud room & storage. underpinning & restraining foundation work. new concrete slab, rebuilt (e) staircase due to dry rot conditionDetails
garage remodeling-adding 683 sq ft of additional livable space. new family room, new guest bedroom, new full bathroom, laundry area, mud room & storage. underpinning & restraining foundation work. new concrete slab, rebuilt (e) staircase due to dry rot condition | $87,000 | |
| Dec 30, 2009 | Never finaled filed Dec 2009, never issued | 1418 34th Av | new 3rd floor addition to include new master bedroom, master bath, and internal staircaise, bay windows and walk in closet. interior remodel at 2nd fl. new staircase, some work bedrooms 2 and 3Details
new 3rd floor addition to include new master bedroom, master bath, and internal staircaise, bay windows and walk in closet. interior remodel at 2nd fl. new staircase, some work bedrooms 2 and 3 | $137,000 | |
| Oct 8, 2009 | Completed final sign-off Mar 2010 | 1919 Union St | 1 hour rating detail- ceiling requested by field inspector. pa# 2008.06.02.3381 for referenceDetails
1 hour rating detail- ceiling requested by field inspector. pa# 2008.06.02.3381 for reference | ||
| Jul 20, 2009 | Completed final sign-off Jan 2010 | 1921 Union St | structural upgrade. replace windows in kind at front. replace at rear (e) 2 windows in master bedroom for new 4 panel windows 10'wide, close (e) windows at bath due to structural req; patch as req. match to (e) materials. repair replace framing due to dryrot. repair & apply new roof material @ frontDetails
structural upgrade. replace windows in kind at front. replace at rear (e) 2 windows in master bedroom for new 4 panel windows 10'wide, close (e) windows at bath due to structural req; patch as req. match to (e) materials. repair replace framing due to dryrot. repair & apply new roof material @ front | $40,000 | |
| May 15, 2009 | Expired or cancelled expired Nov 2010 | 511 Harrison St | 1st floor office remodel only: new storage and public restrooms and remodel existing ada restrooms. no change of existing occupancy classification.Details
1st floor office remodel only: new storage and public restrooms and remodel existing ada restrooms. no change of existing occupancy classification. | $82,000 | |
| May 6, 2009 | Never finaled issued May 2009, no final | 428 Capp St | remodel of e kitchen in place. replace e millwork, new finishes at downstairs bath and family rm. 2nd fl remodel and relocate e bathroom and bedroom under e roof area. new skylights (8 in total) remove 2 windows at rear. materials to match e. voluntary strengthening at 2nd floor.compt 200998509.Details
remodel of e kitchen in place. replace e millwork, new finishes at downstairs bath and family rm. 2nd fl remodel and relocate e bathroom and bedroom under e roof area. new skylights (8 in total) remove 2 windows at rear. materials to match e. voluntary strengthening at 2nd floor.compt 200998509. | $112,000 | |
| Mar 9, 2009 | Completed final sign-off May 2010 | 45 Lake St | Sean T Condry | foundation : new property line retaining wall at existing adjacent lightwell to replace (e) brick foundation and retaining wall.Details
foundation : new property line retaining wall at existing adjacent lightwell to replace (e) brick foundation and retaining wall. | $8,000 |
| Feb 27, 2009 | Completed final sign-off Jun 2009 | 481 Dolores St | replace in kind extg rear staircase.Details
replace in kind extg rear staircase. | $22,000 | |
| Feb 24, 2009 | Expired or cancelled withdrawn Oct 2010 | 751 Cole St | 1st fl: remove partition walls,beams&posts at grg;relocate fau;2nd fl: remove partitionwalls, fire plc, int.stair,kitchen, bath remodel,(n)full bath & laundry; 3rdfl: remove partition walls, int.dtairs,bedrm remodel,(n) fullbath & laundry; 4thfl: remove walls, fam.rm,(n)bath,(n)sauna;seismic upgradeDetails
1st fl: remove partition walls,beams&posts at grg;relocate fau;2nd fl: remove partitionwalls, fire plc, int.stair,kitchen, bath remodel,(n)full bath & laundry; 3rdfl: remove partition walls, int.dtairs,bedrm remodel,(n) fullbath & laundry; 4thfl: remove walls, fam.rm,(n)bath,(n)sauna;seismic upgrade | $93,000 | |
| Feb 19, 2009 | Completed final sign-off May 2010 | 45 Lake St | 1/f: install french doors/wndw in family rm. 2/f: demo kchn & bdrm construct new kchn, dng & living rms with nw wndw on south elevation. 3/f:demo bdrm and bathm. construct new bdrms & bthrms with nw wndws on south elevation. demo all floor as indicated, structural work @ floor framing,Details
1/f: install french doors/wndw in family rm. 2/f: demo kchn & bdrm construct new kchn, dng & living rms with nw wndw on south elevation. 3/f:demo bdrm and bathm. construct new bdrms & bthrms with nw wndws on south elevation. demo all floor as indicated, structural work @ floor framing, | $120,000 | |
| Feb 12, 2009 | Completed final sign-off Jun 2011 | 28 Parker Av | unit #303-interior remodel only-relocation of kitchen at living room area, (e) kitchen to become a new office and (e) closet to convert into new bathroom. removal of non bearing walls. built new partition walls to create new closet/laundry areas. installation of a new gas fireplaceDetails
unit #303-interior remodel only-relocation of kitchen at living room area, (e) kitchen to become a new office and (e) closet to convert into new bathroom. removal of non bearing walls. built new partition walls to create new closet/laundry areas. installation of a new gas fireplace | $49,000 | |
| Feb 12, 2009 | Expired or cancelled expired Jun 2011 | 28 Parker Av | unit #103-interior remodel only-relocation of kitchen at living room area, (e) kitchen to become a new office and (e) closet to convert into new bathroom. removal of non bearing walls. built new partition walls to create new closet/laundry areas. installation of a new gas fireplaceDetails
unit #103-interior remodel only-relocation of kitchen at living room area, (e) kitchen to become a new office and (e) closet to convert into new bathroom. removal of non bearing walls. built new partition walls to create new closet/laundry areas. installation of a new gas fireplace | $49,000 | |
| Feb 12, 2009 | Completed final sign-off Jun 2011 | 28 Parker Av | unit #203-interior remodel only-relocation of kitchen at living room area, (e) kitchen to become a new office and (e) closet to convert into new bathroom. removal of non bearing walls. built new partition walls to create new closet/laundry areas. installation of a new gas fireplaceDetails
unit #203-interior remodel only-relocation of kitchen at living room area, (e) kitchen to become a new office and (e) closet to convert into new bathroom. removal of non bearing walls. built new partition walls to create new closet/laundry areas. installation of a new gas fireplace | $49,000 | |
| Dec 16, 2008 | Completed final sign-off May 2010 | 28 Parker Av | Level 8 Construction Inc | unit 104 - interior remodel: relocation of kitchen at living room area. (e) kitchen become a new bedroom #2 and (e) closet to convert into new bathroom. removal of non-bearing walls. built a new partition walls to create new closet/laundry areas. installation of new gas fireplace.Details
unit 104 - interior remodel: relocation of kitchen at living room area. (e) kitchen become a new bedroom #2 and (e) closet to convert into new bathroom. removal of non-bearing walls. built a new partition walls to create new closet/laundry areas. installation of new gas fireplace. | $49,000 |
| Dec 16, 2008 | Completed final sign-off Jun 2010 | 28 Parker Av | Level 8 Construction Inc | apt 204 - interior remodel: relocation of kitchen at living room area. (e) kitchen become a new bedroom #2 and (e) closet to convert into new bathroom. removal of non-bearing walls. built a (n) partition walls to create new closet/laundry areas. install a new gas fireplace.Details
apt 204 - interior remodel: relocation of kitchen at living room area. (e) kitchen become a new bedroom #2 and (e) closet to convert into new bathroom. removal of non-bearing walls. built a (n) partition walls to create new closet/laundry areas. install a new gas fireplace. | $49,000 |
| Dec 11, 2008 | Never finaled issued Dec 2008, no final | 2637 22nd St | new roof deck, replace (e) roof joists and roofing at deck area, new staircase connecting 3rd floor to roof deck. stair partially opened. new glass guardrail 5' away from proeprty line. new stackable washer/dryer under stair closet. work to be performed at unit 2637.total 461 sf staircase,roof deckDetails
new roof deck, replace (e) roof joists and roofing at deck area, new staircase connecting 3rd floor to roof deck. stair partially opened. new glass guardrail 5' away from proeprty line. new stackable washer/dryer under stair closet. work to be performed at unit 2637.total 461 sf staircase,roof deck | $38,000 | |
| Dec 11, 2008 | Completed final sign-off Jun 2010 | 28 Parker Av | Level 8 Construction Inc | apt #304 - interior remodel only - relocation of ktichen at lviing room area. (e) kitchen to become a new bedroom #2 and (e) closet to convert into new bath. removal of a non-bearing wall built new partition walls to create new closet/laundry. installation of a new gas fire place.Details
apt #304 - interior remodel only - relocation of ktichen at lviing room area. (e) kitchen to become a new bedroom #2 and (e) closet to convert into new bath. removal of a non-bearing wall built new partition walls to create new closet/laundry. installation of a new gas fire place. | $49,000 |
| Nov 19, 2008 | Expired or cancelled expired Jun 2011 | 28 Parker Av | Level 8 Construction Inc | unit #202-interior remodel only-relocation of kitchen at living room area. (e) kitchen to become a new bedroom #2, (e) closet to convert into new bathroom. removal of a non-bearing walls. built new partition walls to create new closet/laundry areas. installation of a new gas fireplaceDetails
unit #202-interior remodel only-relocation of kitchen at living room area. (e) kitchen to become a new bedroom #2, (e) closet to convert into new bathroom. removal of a non-bearing walls. built new partition walls to create new closet/laundry areas. installation of a new gas fireplace | $49,000 |
| Nov 19, 2008 | Expired or cancelled expired Jun 2011 | 28 Parker Av | Level 8 Construction Inc | unit #302-interior remodel only-relocation of kitchen at living room area, (e) kitchen to become a new bedroom #2 and (e) closet to convert into new bathrooom. removal of a non-bearing walls. built new parition walls to create new closet/laundry areas. installation of a new gas fireplaceDetails
unit #302-interior remodel only-relocation of kitchen at living room area, (e) kitchen to become a new bedroom #2 and (e) closet to convert into new bathrooom. removal of a non-bearing walls. built new parition walls to create new closet/laundry areas. installation of a new gas fireplace | $49,000 |
| Nov 18, 2008 | Completed final sign-off Jun 2010 | 28 Parker Av | Wins Construction Inc. | unit #301-interior remodel only-relocation of kitchen at living room area, (e) kitchen to become a new bedroom 2, (e) closet to convert into new bathroom. removal of non-bearing walls, built new partition walls to create new closet/laundry areas. installation of new gas fireplaceDetails
unit #301-interior remodel only-relocation of kitchen at living room area, (e) kitchen to become a new bedroom 2, (e) closet to convert into new bathroom. removal of non-bearing walls, built new partition walls to create new closet/laundry areas. installation of new gas fireplace | $69,000 |
| Nov 18, 2008 | Completed final sign-off Jun 2010 | 28 Parker Av | Level 8 Construction Inc | unit #201-interior remodel only-relocation of kitchen at living room area. (e) kitchen to become new home office, (e) closet to convert into new bathroom. removal of non-bearing wall, built new partition walls to create new closet/laundry areas. installation of new gas fireplaceDetails
unit #201-interior remodel only-relocation of kitchen at living room area. (e) kitchen to become new home office, (e) closet to convert into new bathroom. removal of non-bearing wall, built new partition walls to create new closet/laundry areas. installation of new gas fireplace | $49,000 |