Block 3595, lot 035
428 Capp St
- City’s use
- Multi-Family Residential
- Built
- 1906
- Stories
- 2
- Units
- 1
- Rooms
- 4 bedrooms, 2 bathrooms
- Building
- 2,712 sq ft
- Lot
- 6,125 sq ft
- Zoning
- RH3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
7 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 14, 2017 | Never finaled issued Sep 2017, no final | 428 Capp St | U L Roofing Inc | reroofing.Details
reroofing. | $8,000 |
| Apr 1, 2011 | Completed final sign-off Nov 2011 | 428 Capp St | Serrano Construction | revision to permit app#201012096416. no sprinklers required, reduction to scope of work, remove requirement for sprinklers at rear unitDetails
revision to permit app#201012096416. no sprinklers required, reduction to scope of work, remove requirement for sprinklers at rear unit | |
| Dec 9, 2010 | Never finaled issued Dec 2010, no final | 428 Capp St | Serrano Construction | revision to app#200803187436 s1/r1. replacement of extg garage door by new glass door. replace extg windows and doors. new 1/2 bath, new full bath,new foundation ,new wet bar/kitchen, 3 closetsDetails
revision to app#200803187436 s1/r1. replacement of extg garage door by new glass door. replace extg windows and doors. new 1/2 bath, new full bath,new foundation ,new wet bar/kitchen, 3 closets | |
| May 6, 2009 | Never finaled issued May 2009, no final | 428 Capp St | remodel of e kitchen in place. replace e millwork, new finishes at downstairs bath and family rm. 2nd fl remodel and relocate e bathroom and bedroom under e roof area. new skylights (8 in total) remove 2 windows at rear. materials to match e. voluntary strengthening at 2nd floor.compt 200998509.Details
remodel of e kitchen in place. replace e millwork, new finishes at downstairs bath and family rm. 2nd fl remodel and relocate e bathroom and bedroom under e roof area. new skylights (8 in total) remove 2 windows at rear. materials to match e. voluntary strengthening at 2nd floor.compt 200998509. | $112,000 | |
| Mar 18, 2008 | Completed final sign-off Nov 2011 | 428 Capp St | Serrano Construction | remodel & legalize (e) rear unit. replace & relocate (e) bathroom, new wetbar/kitchen, new walk-in closet, 4 new skylight, 3 new closets, replace (e) garage door by (n) tempered glass sliding door,replace (e) door by (n)window to match (e), new roof & interior walls, foundation reinforcement.Details
remodel & legalize (e) rear unit. replace & relocate (e) bathroom, new wetbar/kitchen, new walk-in closet, 4 new skylight, 3 new closets, replace (e) garage door by (n) tempered glass sliding door,replace (e) door by (n)window to match (e), new roof & interior walls, foundation reinforcement. | $120,000 |
| Dec 20, 2007 | Expired or cancelled expired Mar 2009 | 428 Capp St | rear unit: roof rafters replacement, interior remodeling,bathroom relocation, garage door replacement for a new window & glaze door, kitchen upgrade, new skylights, new closets, replacement of a windows. addition of new interior walls & new foundations.Details
rear unit: roof rafters replacement, interior remodeling,bathroom relocation, garage door replacement for a new window & glaze door, kitchen upgrade, new skylights, new closets, replacement of a windows. addition of new interior walls & new foundations. | $125,000 | |
| Aug 21, 2007 | Expired or cancelled withdrawn Jan 2009 | 428 Capp St | relocation of interior stairs-new grade beam at stairs. kitchen remodel-new 3 footings. expansion of living space attic- 2 new load bearing beams. 2 bathroom relocation + 1 new powder room + 1 new master bathroom, new dormer.Details
relocation of interior stairs-new grade beam at stairs. kitchen remodel-new 3 footings. expansion of living space attic- 2 new load bearing beams. 2 bathroom relocation + 1 new powder room + 1 new master bathroom, new dormer. | $180,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Serrano Construction (3), U L Roofing Inc
- Architects
- Sean Thomas Condry
- Engineers
- Sean Thomas Condry (3)
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.