Bishwendu Paul
- Listed as
- architect, authorized agent-others, engineer
- Firm
- Earthquake & Struct. Inc.
- Based in
- Oakland
- On San Francisco permits
- Oct 2004 to May 2025
40 permits since 2000 (engineer on 37 permits, architect on 2 permits, authorized agent-others on 2 permits): 34 completed, 3 in progress, 1 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 29, 2025 | In progress issued Jun 2025 | 3697 25th St | M N Construction | revision of structural drawings to pa #202104128307Details
revision of structural drawings to pa #202104128307 | |
| May 27, 2025 | In progress issued May 2025 | 1301 Guerrero St | M N Construction | new 8'x8' dormer with four windows. new spiral staircase. relocate bathroom in former attic (new 3rd story). 2 new skylights. repair south foundation and framing of south garage.Details
new 8'x8' dormer with four windows. new spiral staircase. relocate bathroom in former attic (new 3rd story). 2 new skylights. repair south foundation and framing of south garage. | $75,000 |
| Jun 3, 2024 | In progress issued Jun 2024 | 1301 Guerrero St | M N Construction | structural repair of garage at rear of building-dryrot-repair.Details
structural repair of garage at rear of building-dryrot-repair. | $10,000 |
| Oct 1, 2021 | Completed final sign-off Mar 2024 | 3759 16th St | M & L Construction | repair & rpelace exteriors stairs in-kind type .Details
repair & rpelace exteriors stairs in-kind type . | $10,000 |
| Sep 15, 2020 | Completed final sign-off Apr 2022 | 266 Bemis St | Westgate Renovators Inc, Mrcc | dryrot repair to garage door header, change vinyl siding to stucco siding, guardrail change to 42" high rail of same kind, no changes to door/windowDetails
dryrot repair to garage door header, change vinyl siding to stucco siding, guardrail change to 42" high rail of same kind, no changes to door/window | $120,000 |
| Jun 6, 2019 | Completed final sign-off Aug 2019 | 1275 Sacramento St | Teutonic Construction Inc | remove partion walls and enlarge classroom #211, replace (e) finishes & modify existing window opening to door in classroom #208. convert storage to ada restroom.Details
remove partion walls and enlarge classroom #211, replace (e) finishes & modify existing window opening to door in classroom #208. convert storage to ada restroom. | $125,000 |
| Sep 5, 2018 | Completed final sign-off Jan 2019 | 95 05th Av | Teutonic Construction Inc | additional structural beam/joint for new hot tubDetails
additional structural beam/joint for new hot tub | $5,000 |
| Jan 24, 2018 | Completed final sign-off Oct 2019 | 2849 Fillmore St | soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4. to comply with 201714223.Details
soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4. to comply with 201714223. | $125,000 | |
| Oct 13, 2017 | Completed final sign-off Feb 2019 | 425 Duboce Av | seismic retrofit to basement/1st fl level with 1 car garage. shearwall, anchorbolts and foundation retrofitDetails
seismic retrofit to basement/1st fl level with 1 car garage. shearwall, anchorbolts and foundation retrofit | $118,000 | |
| Aug 17, 2017 | Completed final sign-off Mar 2019 | 878 Dolores St | soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4 | $118,000 | |
| Jan 23, 2017 | Completed final sign-off May 2017 | 371 Noe St | E F Mcginness And Sons | replace in kind and upgrade of deteriorated concrete stairway at front entry and planter area at front of bldg.Details
replace in kind and upgrade of deteriorated concrete stairway at front entry and planter area at front of bldg. | $12,000 |
| Jun 7, 2016 | Completed final sign-off Dec 2016 | 1976 California St | Hakewill Construction Co. Inc. | structural retrofit of existing concrete entry stairs and garage facade, rebuild in kind; maher n/aDetails
structural retrofit of existing concrete entry stairs and garage facade, rebuild in kind; maher n/a | $40,000 |
| Apr 19, 2016 | Completed final sign-off Oct 2017 | 519 24th Av | Klaus Kubler Construction | soft story retrofit per sfbc chapter 34b, asce 41-06, alter/relocate of water supply entry to allow for new foundation, install new main water shut off.Details
soft story retrofit per sfbc chapter 34b, asce 41-06, alter/relocate of water supply entry to allow for new foundation, install new main water shut off. | $150,000 |
| Feb 4, 2015 | Completed final sign-off Sep 2015 | 773 Rhode Island St | On The Level Concrete | new foundation retaining wall under pinning to extg foundation at the s.e. corner of the basement(crawl space)Details
new foundation retaining wall under pinning to extg foundation at the s.e. corner of the basement(crawl space) | $28,000 |
| Dec 23, 2014 | Completed final sign-off Feb 2015 | 469 Douglass St | selective underpinning to existing brick foundation in vicinity of side door to street level basement behind garage in sw corner.Details
selective underpinning to existing brick foundation in vicinity of side door to street level basement behind garage in sw corner. | $3,000 | |
| Sep 11, 2014 | Completed final sign-off May 2015 | 3618 22nd St | Royal Lyon Construction | soft story seismic strengthening o ftarget story per sf ordinance 66-13, sfbc chater 34b, 2012 iebc appendix a-4.Details
soft story seismic strengthening o ftarget story per sf ordinance 66-13, sfbc chater 34b, 2012 iebc appendix a-4. | $86,200 |
| Jun 27, 2014 | Completed final sign-off Jun 2015 | 230 Gough St | Donald S. Maclean, Inc | sub-basement sidewalk replacement. structural steel, structural concrete, & concrete sidewalk wear surface. no exterior or interior work to building.Details
sub-basement sidewalk replacement. structural steel, structural concrete, & concrete sidewalk wear surface. no exterior or interior work to building. | $31,000 |
| Apr 9, 2014 | Completed final sign-off Apr 2014 | 62 Webster St | Royal Lyon Construction | rev. to pa#201306200049 install 2 cbx 8.2 metal chanel instead of 3. install 1 x 1 footing and 4 x 4 post to support the existing joist.Details
rev. to pa#201306200049 install 2 cbx 8.2 metal chanel instead of 3. install 1 x 1 footing and 4 x 4 post to support the existing joist. | |
| Nov 14, 2013 | Completed final sign-off Mar 2015 | 1362 South Van Ness Av | Teutonic Construction Inc | brick foundation replacement and retrofit: voluntary crawl space shear strengthening.Details
brick foundation replacement and retrofit: voluntary crawl space shear strengthening. | $62,000 |
| Oct 21, 2013 | Completed final sign-off Jan 2014 | 89 Martha Av | John Patrick Murphy Construction | replace old failing unreinforced brick retaining wall at rear of property. build 25' long concrete retaining wall to engineer specsDetails
replace old failing unreinforced brick retaining wall at rear of property. build 25' long concrete retaining wall to engineer specs | $14,000 |
| Jul 25, 2013 | Completed final sign-off Nov 2013 | 1981 Pacific Av | Brautovich Construction Inc. | in kind replacement of entry stairs, replace existing brick porch surface with tile.Details
in kind replacement of entry stairs, replace existing brick porch surface with tile. | $10,000 |
| Jan 17, 2013 | Completed final sign-off Aug 2013 | 184 Yerba Buena Av | revision to pa# 201209149779. repair wet rot/replace support/replace deck rot repair while replacing windows (4) noticed rot removed stucco & noticed wet rot of support & dect rot. looking to repair & replace damaged wood - in kind, same location. cec 151-c.Details
revision to pa# 201209149779. repair wet rot/replace support/replace deck rot repair while replacing windows (4) noticed rot removed stucco & noticed wet rot of support & dect rot. looking to repair & replace damaged wood - in kind, same location. cec 151-c. | ||
| Jan 7, 2013 | Completed final sign-off Jan 2014 | 764 24th Av | Red Plum Studio | infill addition - new bathroom & family room @ ground floor.Details
infill addition - new bathroom & family room @ ground floor. | $45,000 |
| Jun 12, 2012 | Completed final sign-off Feb 2013 | 85 Buena Vista Tr | Teutonic Construction Inc | renovation of existing ground floor level garage & bedroom area, including new bathroom & laundry area, structural, mechanical, electrical & plumbing upgrades. install new washer & dryer at third floor level. remove (e) conc. stair @ rear yard & replace with new expanded stair & landing.Details
renovation of existing ground floor level garage & bedroom area, including new bathroom & laundry area, structural, mechanical, electrical & plumbing upgrades. install new washer & dryer at third floor level. remove (e) conc. stair @ rear yard & replace with new expanded stair & landing. | $200,000 |
| Apr 6, 2012 | Completed final sign-off Sep 2012 | 977 Dolores St | Brautovich Construction Inc. | voluntary foundation upgrade and structural strengthening.Details
voluntary foundation upgrade and structural strengthening. | $40,000 |
| Sep 12, 2011 | Completed final sign-off Jan 2012 | 85 Buena Vista Tr | Teutonic Construction Inc | enlarge existing 2nd floor maste bathroom by 23". no exterior work.Details
enlarge existing 2nd floor maste bathroom by 23". no exterior work. | $15,000 |
| Mar 11, 2011 | Completed final sign-off Sep 2011 | 917 Broderick St | T D S Construction | small bedroom on left side of (e) living rm, put up 1 wall, 1 door. put door to join room with (e) closet - enlarge window on primary facade. create 1/2 bathrm in (e) closet, create breakfast nook by opening kitchen wall & adding wall in (e) office to create small pantryDetails
small bedroom on left side of (e) living rm, put up 1 wall, 1 door. put door to join room with (e) closet - enlarge window on primary facade. create 1/2 bathrm in (e) closet, create breakfast nook by opening kitchen wall & adding wall in (e) office to create small pantry | $20,000 |
| Sep 23, 2010 | Never finaled issued Oct 2010, no final | 1500 Owens St | Dome Construction Corp | modification of existing parapet guardrail for code compliance. the exisitng rail is too low.Details
modification of existing parapet guardrail for code compliance. the exisitng rail is too low. | $30,000 |
| Sep 8, 2010 | Completed final sign-off Apr 2011 | 11 High St | A M Rocca Inc. | repair common area decks per attached plans, repair in kind (7 total).Details
repair common area decks per attached plans, repair in kind (7 total). | $110,000 |
| Jun 24, 2010 | Completed final sign-off Aug 2010 | 1230 Washington St | foundation repair, underpinning, structural stengthening of crawl space, cripple walls.Details
foundation repair, underpinning, structural stengthening of crawl space, cripple walls. | $40,000 | |
| Sep 4, 2009 | Completed final sign-off Jun 2010 | 907 Fulton St | remodel existing kitchen and bath. convert closet and pantry to new bath, add closet in existing bedroom, convert living rm to bedroom and add new closet. add new electric wiring throughout apt. relocate and replace existing water heater and furnace.Details
remodel existing kitchen and bath. convert closet and pantry to new bath, add closet in existing bedroom, convert living rm to bedroom and add new closet. add new electric wiring throughout apt. relocate and replace existing water heater and furnace. | $40,000 | |
| Sep 3, 2009 | Completed final sign-off Nov 2009 | 60 Darrell Pl | Brautovich Construction Inc. | voluntary structural strengthening (e) basement and crawlspace.Details
voluntary structural strengthening (e) basement and crawlspace. | $12,000 |
| Apr 17, 2009 | Completed final sign-off Dec 2009 | 903 Fulton St | reconstruct existing exterior stair in the same configuration and construction as the existing stair.Details
reconstruct existing exterior stair in the same configuration and construction as the existing stair. | $7,500 | |
| Mar 27, 2009 | Completed final sign-off Jul 2009 | 426 Elizabeth St | to comply w/ 3-r report #cc-5429, replace missing post in garage, repair exterior stairway, repair rear deck at 428 elizabeth st.Details
to comply w/ 3-r report #cc-5429, replace missing post in garage, repair exterior stairway, repair rear deck at 428 elizabeth st. | $30,000 | |
| Jan 12, 2009 | Completed final sign-off May 2009 | 479 29th St | rear cottage:dry rot & termite repair. replace 1 beam with new beam at 1st fl. replace 4 posts with four new posts at basement. 2 new footing below 2 new posts.replace wall studs, sill, and top plate at dry rot and termite damaged studs. replace exterior dryrotted siding.Details
rear cottage:dry rot & termite repair. replace 1 beam with new beam at 1st fl. replace 4 posts with four new posts at basement. 2 new footing below 2 new posts.replace wall studs, sill, and top plate at dry rot and termite damaged studs. replace exterior dryrotted siding. | $3,000 | |
| Aug 28, 2008 | Completed final sign-off Dec 2008 | 1981 Pacific Av | John Michael Brautovich | structural strengthening in garage areaDetails
structural strengthening in garage area | $20,000 |
| Dec 4, 2007 | Expired or cancelled expired Mar 2009 | 397 Park St | retaining wall removed and rebuilt. same heigh & location as existing structure. retaining wall max. 6'6" tall with 6' fence on top.Details
retaining wall removed and rebuilt. same heigh & location as existing structure. retaining wall max. 6'6" tall with 6' fence on top. | $20,000 | |
| Nov 6, 2006 | Completed final sign-off Oct 2007 | 80 Surrey St | Pete Humphrey Carpentry Inc | change in size of follor joists enabled by reduction of span by addition of load bearing wall . change in joist direction. minor clarifications of strapping post caps. revision to appl#200507208138.Details
change in size of follor joists enabled by reduction of span by addition of load bearing wall . change in joist direction. minor clarifications of strapping post caps. revision to appl#200507208138. | |
| Jan 25, 2005 | Completed final sign-off Dec 2005 | 383 27th St | James A Mc Grath Dba: Teutonic | replace/repair (e) foundation, voluntary upgradeDetails
replace/repair (e) foundation, voluntary upgrade | $35,000 |
| Oct 19, 2004 | Expired or cancelled expired Jan 2006 | 3036 Market St | to add full bathroom to third floor to service bedrooms. (e) dormer not to exceed 8'0"x8'0". addititDetails
to add full bathroom to third floor to service bedrooms. (e) dormer not to exceed 8'0"x8'0". additit | $12,000 |