Benjamin Tarcher
- Listed as
- architect, engineer
- Firm
- Ben Tarcher Architects
- Based in
- Fairfax
- On San Francisco permits
- Aug 2005 to Aug 2025
14 permits since 2000 (architect on 11 permits, engineer on 3 permits): 7 completed, 4 in progress, 1 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 20, 2025 | In progress filed Aug 2025, not yet issued | 426 Castro St | legalize e) awning "rossi's deli"Details
legalize e) awning "rossi's deli" | ||
| Mar 18, 2025 | In progress issued Mar 2025 | 132 Jasper Pl | Hbm Construction Inc | revision to permit 202502069841. reframe dry-rot and damaged walls in bathroom and bedroom. add washer/dryer into living room.Details
revision to permit 202502069841. reframe dry-rot and damaged walls in bathroom and bedroom. add washer/dryer into living room. | $5,000 |
| Nov 14, 2024 | Completed final sign-off Dec 2024 | 3620 Balboa St | re-tile rest room only, addition of ada signage on doors and grab bars added as per plan, new toilet, new sink, new mirror, new light fixtures. new paint.Details
re-tile rest room only, addition of ada signage on doors and grab bars added as per plan, new toilet, new sink, new mirror, new light fixtures. new paint. | $16,000 | |
| Jun 5, 2024 | In progress filed Jun 2024, not yet issued | 1601 Fulton St | prop h: to comply with awning amnesty program. legalize existing awning installed without permit. "nopa corner market"Details
prop h: to comply with awning amnesty program. legalize existing awning installed without permit. "nopa corner market" | ||
| May 30, 2024 | Completed final sign-off Sep 2024 | 3544 Balboa St | to comply w/ awning amnesty program for a non-illuminated sign "balboa dental" 16' x 22" & an e) awning "superior palace seafood restauranr" 29' x 36"Details
to comply w/ awning amnesty program for a non-illuminated sign "balboa dental" 16' x 22" & an e) awning "superior palace seafood restauranr" 29' x 36" | ||
| May 30, 2024 | Completed final sign-off Sep 2024 | 6134 Geary Bl | permiting of e) sign & awning to comply w/ awning amnesty program. to comply w/ nov 202200773Details
permiting of e) sign & awning to comply w/ awning amnesty program. to comply w/ nov 202200773 | ||
| May 30, 2024 | Completed final sign-off Sep 2024 | 6134 Geary Bl | to comply w/ awning amnesty program " joe's coffee shop"Details
to comply w/ awning amnesty program " joe's coffee shop" | ||
| Sep 12, 2023 | In progress issued Aug 2025 | 2951 San Bruno Av | Hbm Construction Inc | units #5 & #7 (3rd floor) and units #1 & #4 (2nd floor): split living room in half. add new walls. add 2 new doors in living rooms. 16 new windowsDetails
units #5 & #7 (3rd floor) and units #1 & #4 (2nd floor): split living room in half. add new walls. add 2 new doors in living rooms. 16 new windows | $7,000 |
| Nov 13, 2019 | Expired or cancelled expired Mar 2022 | 953 Harrison St | Ordway Construction Inc. | ada restrooms/upgrade from e non ada restrooms, some parking re-stripingDetails
ada restrooms/upgrade from e non ada restrooms, some parking re-striping | $25,000 |
| Feb 2, 2017 | Never finaled issued Sep 2017, no final | 575 04th St | Shun Construction Inc., Baba Builders Co | new ti for retail space. new small office, storage, retail, break room, ada restroom, cir, total useable area 4430 sq ft maher not reqDetails
new ti for retail space. new small office, storage, retail, break room, ada restroom, cir, total useable area 4430 sq ft maher not req | $80,000 |
| May 25, 2016 | Completed final sign-off Sep 2016 | 815 Clement St | Tony Chang | response comment from health department inspection. remodel kitchen per health dept comments. remodel main entry door to meet ada accessible. remodel restroom to meet ada accessibleDetails
response comment from health department inspection. remodel kitchen per health dept comments. remodel main entry door to meet ada accessible. remodel restroom to meet ada accessible | $15,000 |
| Jan 3, 2008 | Completed final sign-off Jun 2008 | 50 Post St | space#10 level 1. remodel interior of old food retail space to yogurt retail shop. redoing some plumbing, electrical, & flooring.Details
space#10 level 1. remodel interior of old food retail space to yogurt retail shop. redoing some plumbing, electrical, & flooring. | $62,000 | |
| Mar 1, 2006 | Completed final sign-off Oct 2006 | 1201 19th Av | All Applied Construction Inc | kitchen remodel and restripe small portion of parking. may include some ramp access from parking to entrance. new kitchen equipment, flooring, partition walls, wall materioal as required by health code, plumbing code, mech, elec. fire suppression system under sep permitDetails
kitchen remodel and restripe small portion of parking. may include some ramp access from parking to entrance. new kitchen equipment, flooring, partition walls, wall materioal as required by health code, plumbing code, mech, elec. fire suppression system under sep permit | $50,000 |
| Aug 10, 2005 | Expired or cancelled expired Aug 2007 | 660 Howard St | Ken Leung Construction Inc | change of stair support system revision to:200408131584Details
change of stair support system revision to:200408131584 |