Block 2802, lot 047
811 Alvarado St
- City’s use
- Multi-Family Residential
- Built
- 1900
- Stories
- 2
- Units
- 6
- Rooms
- 6 bathrooms
- Building
- 4,200 sq ft
- Lot
- 2,950 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
6 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 15, 2025 | Completed final sign-off Sep 2025 | 811 Alvarado St | Hbm Construction Inc | unit a and unit b -unit remodel:renew kitchen and bath. add partition wall.Details
unit a and unit b -unit remodel:renew kitchen and bath. add partition wall. | $85,000 |
| Jul 12, 2016 | Completed final sign-off Oct 2016 | 811 Alvarado St | Ecowave Inc | intall two electric heaters. install (n) r-15 wall insulation. replace in-kind window replacement non-street facing. replace all drywall where removed to insulate with 5/8in type-x drywall.Details
intall two electric heaters. install (n) r-15 wall insulation. replace in-kind window replacement non-street facing. replace all drywall where removed to insulate with 5/8in type-x drywall. | $2,000 |
| Mar 14, 2016 | Completed final sign-off Oct 2016 | 811 Alvarado St | remodel (e) bathroom & kitchen. repalce (3) windows not facing the street. max u-factor >0.32.Details
remodel (e) bathroom & kitchen. repalce (3) windows not facing the street. max u-factor >0.32. | $25,000 | |
| Mar 21, 2014 | Never finaled issued Mar 2014, no final | 811 Alvarado St | Ecowave Inc | revision to app. 201401216730. keep one exising window at living room - window not visible from street. keep portion of existing interior living room wall. change location of door to laundry room. structural revisions per existing conditions encounters during construction. working at unit e.Details
revision to app. 201401216730. keep one exising window at living room - window not visible from street. keep portion of existing interior living room wall. change location of door to laundry room. structural revisions per existing conditions encounters during construction. working at unit e. | $3,500 |
| Jan 21, 2014 | Completed final sign-off Jul 2014 | 811 Alvarado St | interior alteration at existing ground floor apartment, unit 807b, provide new bedroom within existing unit, remodel existing kitchen, install new windows in southwest rear wall.(not visible from street) provide new laundry room, remodel existing bathroom. working at unit e.Details
interior alteration at existing ground floor apartment, unit 807b, provide new bedroom within existing unit, remodel existing kitchen, install new windows in southwest rear wall.(not visible from street) provide new laundry room, remodel existing bathroom. working at unit e. | $40,000 | |
| Jan 7, 2014 | Completed final sign-off May 2014 | 811 Alvarado St | Qse Construction | voluntary foundation building and wall sheathing. upgrade with new 5/8 x18" long epoxy anchor bolts at 32" o.c. full height masonry at 16" at center and 5 ply wood sheathing.Details
voluntary foundation building and wall sheathing. upgrade with new 5/8 x18" long epoxy anchor bolts at 32" o.c. full height masonry at 16" at center and 5 ply wood sheathing. | $8,122 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Ecowave Inc (2), Hbm Construction Inc, Qse Construction
- Architects
- Ben Tarcher, Stanley Teng
- Engineers
- Charles Li
- Authorized agent-otherss
- Stan Teng
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.