Block 1579, lot 017G
3540 Balboa St
- City’s use
- Multi-Family Residential
- Built
- 1975
- Stories
- 2
- Units
- 10
- Rooms
- 15 bathrooms
- Building
- 10,566 sq ft
- Lot
- 6,747 sq ft
- Zoning
- NC2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
7 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 17, 2026 | Completed final sign-off Aug 2026 | 3540 Balboa St | Hbm Construction Inc | unit 8- remodel kitchen to include replace cabinets, countertops and lighting. no wall removal or layout change.Details
unit 8- remodel kitchen to include replace cabinets, countertops and lighting. no wall removal or layout change. | $10,000 |
| Jan 8, 2025 | Completed final sign-off Jan 2025 | 3540 Balboa St | Src Roofing | re-roofing tear off (e) roof. install new modified roofing. no hot works. peel + seal approx 30sqftDetails
re-roofing tear off (e) roof. install new modified roofing. no hot works. peel + seal approx 30sqft | $18,000 |
| May 30, 2024 | Completed final sign-off Sep 2024 | 3544 Balboa St | to comply w/ awning amnesty program for a non-illuminated sign "balboa dental" 16' x 22" & an e) awning "superior palace seafood restauranr" 29' x 36"Details
to comply w/ awning amnesty program for a non-illuminated sign "balboa dental" 16' x 22" & an e) awning "superior palace seafood restauranr" 29' x 36" | ||
| May 30, 2024 | Completed final sign-off Oct 2024 | 3540 Balboa St | Crime Watch Security Sys Llc | upgrade (e) fire alarm system to comply with sffc section 1103.7.6.1Details
upgrade (e) fire alarm system to comply with sffc section 1103.7.6.1 | $27,750 |
| Nov 2, 2009 | Completed final sign-off Nov 2009 | 3546 Balboa St | T W Eng Construction Co | voluntary restroom modifications to e restaurant. removal of toilet partitions at e mens room, patch tile. add wireless dr buzzer at main entrance. widen door opening. replace e toilet with ada compliant toilet.Details
voluntary restroom modifications to e restaurant. removal of toilet partitions at e mens room, patch tile. add wireless dr buzzer at main entrance. widen door opening. replace e toilet with ada compliant toilet. | $5,000 |
| Mar 3, 2009 | Completed final sign-off Mar 2009 | 3546 Balboa St | T W Eng Construction Co | grd fl-barrier removal to (e) restrms in restaurant-widen openings, repl door closer, install grab bars, insulating pipes, relocating mirrors/paper dispensers/seat cover dispenser. relocate urinal & lavatory to correct hghts. limit of work is restrm & vestibule only. no changes in reminder of bldgDetails
grd fl-barrier removal to (e) restrms in restaurant-widen openings, repl door closer, install grab bars, insulating pipes, relocating mirrors/paper dispensers/seat cover dispenser. relocate urinal & lavatory to correct hghts. limit of work is restrm & vestibule only. no changes in reminder of bldg | $6,000 |
| Apr 29, 2002 | Expired or cancelled expired Aug 2002 | 3540 Balboa St | sidewalk repairDetails
sidewalk repair |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.