- Dec 2007 to Sep 2026
92 permits since 2000 (contractor on 92 permits, authorized agent-others on 1 permit): 78 completed, 5 in progress, 5 never finaled, 4 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. Their ranked record as a contractor is on their contractor page. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Flores Construction, J M K Construction Inc, Mannon Construction
- Architects
- Jeff Chow (2), Eliza Hart, Fannie Camille She, Robert Baum, Steve C. Thompson
- Engineers
- Jeff Chow (5), Wen Chao Huang (2), Donald David, Jaime Arafiles, Nick Favretto, Nikica Favretto
- Designers
- Kamala Mostert
Where they worked
- Single-family 42
- Multi-family (2-family, apartments) 48
- Commercial 2
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 30, 2026 | In progress issued Oct 2026 | 67 Clairview Ct | Di Vine Construction | reroofing with tpo (no torch down). (ref pa#202609308825)Details
reroofing with tpo (no torch down). (ref pa#202609308825) | $15,000 |
| Sep 30, 2026 | In progress issued Oct 2026 | 67 Clairview Ct | Di Vine Construction | sheathing for reroof (202609308823)Details
sheathing for reroof (202609308823) | $500 |
| Aug 4, 2026 | In progress issued Aug 2026 | 2609 Sutter St | Di Vine Construction | unit 3: remodel 2 bathrooms and 1 kitchen like for like. install new insulation in walls in living room, kitchen, dining room, and bathrooms. all work interior. add new subpanel, replace fixtures in kind.Details
unit 3: remodel 2 bathrooms and 1 kitchen like for like. install new insulation in walls in living room, kitchen, dining room, and bathrooms. all work interior. add new subpanel, replace fixtures in kind. | $80,000 |
| Jun 1, 2026 | Completed final sign-off Jun 2026 | 84 Longview Ct | Di Vine Construction | to obtain final inspection for work approved under pa# 202412036015. all work is complete.Details
to obtain final inspection for work approved under pa# 202412036015. all work is complete. | |
| May 27, 2026 | Expired or cancelled cancelled Jun 2026 | 420 Bay St | Di Vine Construction | replace 3 vanity and medicine cabinet in 3 bathroomsDetails
replace 3 vanity and medicine cabinet in 3 bathrooms | $3,000 |
| Feb 4, 2026 | Completed final sign-off Jul 2026 | 66 07th Av | Di Vine Construction | remodel bathroom in kind no wall removal or layout change. tub to tub change.Details
remodel bathroom in kind no wall removal or layout change. tub to tub change. | $15,000 |
| Dec 8, 2025 | In progress issued Dec 2025 | 111 Buena Vista Ave East Av | Di Vine Construction | unit #2: remodel bathroom in kind 7ft x 8ft ( no change to layout.)Details
unit #2: remodel bathroom in kind 7ft x 8ft ( no change to layout.) | $15,000 |
| Aug 19, 2025 | Completed final sign-off Feb 2026 | 2275 15th St | Di Vine Construction | convert closet into full bathroom, add sink to powder, and convert (e) dining room into bedroom on 2nd and 3rd flr.Details
convert closet into full bathroom, add sink to powder, and convert (e) dining room into bedroom on 2nd and 3rd flr. | $30,000 |
| Jul 11, 2025 | In progress issued Jul 2025 | 257 Parker Av | Di Vine Construction | remove paneling and reinstall for new electrical main panel located on left side entryway.Details
remove paneling and reinstall for new electrical main panel located on left side entryway. | $1,000 |
| Jun 23, 2025 | Completed final sign-off Jun 2026 | 84 Longview Ct | Di Vine Construction | add deck at rear of property.Details
add deck at rear of property. | $8,000 |
| Dec 3, 2024 | Expired or cancelled expired Jun 2026 | 84 Longview Ct | Di Vine Construction | re stucco house in kind, over existing sheathingDetails
re stucco house in kind, over existing sheathing | $25,000 |
| Nov 8, 2024 | Completed final sign-off Aug 2025 | 649 Moultrie St | Di Vine Construction | remodel kitchen in kind.Details
remodel kitchen in kind. | $20,000 |
| Jun 21, 2024 | Completed final sign-off Aug 2024 | 865 Dwight St | Di Vine Construction | remodel kitchen in kind 10x12Details
remodel kitchen in kind 10x12 | $15,000 |
| Feb 20, 2024 | Completed final sign-off May 2024 | 19 Walter St | Di Vine Construction | rev to pa# 2022-0429-3312 to infill a window inside a storage on the 1st fl. other detail no change and shall follow previous approved planDetails
rev to pa# 2022-0429-3312 to infill a window inside a storage on the 1st fl. other detail no change and shall follow previous approved plan | |
| Nov 17, 2023 | Completed final sign-off Dec 2023 | 242 27th Av | Di Vine Construction | #1: replace only lower kitchen cabinets. replace 100 sf of drywall. new countertop, sink, and faucet. (e) applicances to remainDetails
#1: replace only lower kitchen cabinets. replace 100 sf of drywall. new countertop, sink, and faucet. (e) applicances to remain | $7,000 |
| Aug 25, 2023 | Never finaled issued Aug 2023, no final | 125 Rivoli St | Di Vine Construction | install hardi plank material in rear of house over existing siding. not visible from street. 600 sf window to stay.Details
install hardi plank material in rear of house over existing siding. not visible from street. 600 sf window to stay. | $15,000 |
| Apr 13, 2023 | Completed final sign-off Apr 2024 | 111 Buena Vista East Av | Di Vine Construction | stucco rear not visible from street. total 1000 sf.Details
stucco rear not visible from street. total 1000 sf. | $20,000 |
| Mar 21, 2023 | Completed final sign-off Nov 2023 | 917 Edinburgh St | Di Vine Construction | remodel kitchen in kind according to plans. add 3 skylights.Details
remodel kitchen in kind according to plans. add 3 skylights. | $35,000 |
| Mar 21, 2023 | Never finaled issued Mar 2023, no final | 1914 Grove St | Di Vine Construction | replace windows 12 in front of the building and the rest of 21 windows are not visible from the st. windows to be double hung wood aluminum clad. 33 total.Details
replace windows 12 in front of the building and the rest of 21 windows are not visible from the st. windows to be double hung wood aluminum clad. 33 total. | $40,000 |
| Feb 16, 2023 | Completed final sign-off May 2025 | 222 Lisbon St | Di Vine Construction | remove deck in rear to comply with nov 202299036. no plans required. infill the door with framing and patch with siding. existing windows to stay for lighting and ventilation.Details
remove deck in rear to comply with nov 202299036. no plans required. infill the door with framing and patch with siding. existing windows to stay for lighting and ventilation. | $5,000 |
| Oct 21, 2022 | Completed final sign-off Nov 2022 | 131 10th Av | Di Vine Construction | to comply with physical inspection report# cc-8552: less item #1 of inspection reportDetails
to comply with physical inspection report# cc-8552: less item #1 of inspection report | $5,000 |
| Oct 19, 2022 | Completed final sign-off Feb 2023 | 70 Terrace Dr | Di Vine Construction | remodel bathroom iin kind. no removal of wallsDetails
remodel bathroom iin kind. no removal of walls | $20,000 |
| Sep 29, 2022 | Completed final sign-off Jun 2023 | 2767 Bryant St | Di Vine Construction | replace (e) rear egress stair in-kind per sfbc 1011.12.3Details
replace (e) rear egress stair in-kind per sfbc 1011.12.3 | $25,000 |
| Aug 10, 2022 | Completed final sign-off Nov 2022 | 131 10th Av | Di Vine Construction | voluntary remove unpermitted bathroom in (e) storage on roof flDetails
voluntary remove unpermitted bathroom in (e) storage on roof fl | $2,000 |
| Jul 7, 2022 | Completed final sign-off Oct 2022 | 580 Belvedere St | Di Vine Construction | install 600sqft of hardi plank over existing siding. replace 6 windows not visible from street.Details
install 600sqft of hardi plank over existing siding. replace 6 windows not visible from street. | $20,000 |
| Apr 29, 2022 | Completed final sign-off May 2024 | 19 Walter St | Di Vine Construction | revision to bpa#202010277542. 1st floor add a electrical room & a hallDetails
revision to bpa#202010277542. 1st floor add a electrical room & a hall | $5,000 |
| Apr 12, 2022 | Completed final sign-off Apr 2022 | 224 17th Av | Di Vine Construction | to obtain final inspection for work approved under pa# 202008171937. all work is complete.Details
to obtain final inspection for work approved under pa# 202008171937. all work is complete. | |
| Sep 17, 2021 | Completed final sign-off Sep 2024 | 47 Jordan Av | Di Vine Construction | to replace an existing non-forming deck with a new small deck in the setback. to fill in a bay window and add 11 sq ft.Details
to replace an existing non-forming deck with a new small deck in the setback. to fill in a bay window and add 11 sq ft. | $20,000 |
| Sep 15, 2021 | Completed final sign-off Sep 2024 | 47 Jordan Av | J M K Construction Inc, Di Vine Construction | rooms down to lower floor of e crawlspace and basement to add media room, office, guest room to create patio area outside at the level of basement for bike storage.Details
rooms down to lower floor of e crawlspace and basement to add media room, office, guest room to create patio area outside at the level of basement for bike storage. | $75,000 |
| Aug 11, 2021 | Completed final sign-off Feb 2025 | 2616 Sutter St | Di Vine Construction | front bldg: 1) 3 windows replace in-kind at front facade. 2)replace building front facade finish material from stucco to hardie board siding. 3) new canopy at front main entrance, 4) rear deck and stairs replace in-kind.Details
front bldg: 1) 3 windows replace in-kind at front facade. 2)replace building front facade finish material from stucco to hardie board siding. 3) new canopy at front main entrance, 4) rear deck and stairs replace in-kind. | $50,000 |
| Jul 21, 2021 | Completed final sign-off Mar 2022 | 1265 02nd Av | Di Vine Construction | unit 2: rev to 202104279426: 3/f: add 1 skylight above kitchen.Details
unit 2: rev to 202104279426: 3/f: add 1 skylight above kitchen. | $5,000 |
| Apr 27, 2021 | Completed final sign-off Mar 2022 | 1265 02nd Av | Di Vine Construction | #2: 3rd floor: 1)remodel 2 bathrooms. 2)kitchen remodel. 3)remove walls between kitchen and dining/living room.Details
#2: 3rd floor: 1)remodel 2 bathrooms. 2)kitchen remodel. 3)remove walls between kitchen and dining/living room. | $50,000 |
| Apr 7, 2021 | Completed final sign-off Mar 2022 | 2078 31st Av | Di Vine Construction | 2nd floor : (1) bathroom remodel (2) new closet for (e) bedroom to accomodate one (n) 3-fixture bathroom. (3) new skylightsDetails
2nd floor : (1) bathroom remodel (2) new closet for (e) bedroom to accomodate one (n) 3-fixture bathroom. (3) new skylights | $40,000 |
| Jan 27, 2021 | Never finaled issued Jan 2021, no final | 553 Sanchez St | Di Vine Construction | bathroom remodel in kind | $8,000 |
| Oct 27, 2020 | Completed final sign-off May 2024 | 19 Walter St | Di Vine Construction | interior remodel: 1st floor - infill lightwell on south side. create interior stairase to 2nd flr. add family room, master bedroom, & one 4 fixture bathroom. 2nd flr: infill lightwell on south side. relocate the existing kitchen, dining room, living room. remodel existing 2 bedrooms.Details
interior remodel: 1st floor - infill lightwell on south side. create interior stairase to 2nd flr. add family room, master bedroom, & one 4 fixture bathroom. 2nd flr: infill lightwell on south side. relocate the existing kitchen, dining room, living room. remodel existing 2 bedrooms. | $75,000 |
| Oct 8, 2020 | Completed final sign-off Oct 2021 | 645 Velasco Av | Di Vine Construction | a.d.u. on 1st floor per ordinance 162-16 include add one kitchen, living room, one 3-fixture bathroom and two bedroomsDetails
a.d.u. on 1st floor per ordinance 162-16 include add one kitchen, living room, one 3-fixture bathroom and two bedrooms | $20,000 |
| Aug 17, 2020 | Completed final sign-off Feb 2021 | 98 Midcrest Wy | Di Vine Construction | remove exterior drywall and install insulation. partition dry wall walls to stay. in kind 700 sf dining lv 2 bdrmDetails
remove exterior drywall and install insulation. partition dry wall walls to stay. in kind 700 sf dining lv 2 bdrm | $15,000 |
| Aug 17, 2020 | Completed final sign-off Apr 2022 | 224 17th Av | Di Vine Construction | remodel in kind kitchen, full bathroom and half bathroom. replace 6 windows in kind in rear of house not visible from street. install hardi board siding in rear over e sidingDetails
remodel in kind kitchen, full bathroom and half bathroom. replace 6 windows in kind in rear of house not visible from street. install hardi board siding in rear over e siding | $35,000 |
| Jul 10, 2020 | Completed final sign-off Oct 2020 | 2769 Bryant St | Di Vine Construction | remodel kitchen in kind. electrical & plumbing to bring up to code most drywall to stay. work to be @3rd floor.Details
remodel kitchen in kind. electrical & plumbing to bring up to code most drywall to stay. work to be @3rd floor. | $15,000 |
| Jun 22, 2020 | Completed final sign-off Feb 2021 | 98 Midcrest Wy | Di Vine Construction | one bathroom remodel in-kind on 2nd floor. replace toilet, sink, shower tiles. all in kind.Details
one bathroom remodel in-kind on 2nd floor. replace toilet, sink, shower tiles. all in kind. | $5,000 |
| Nov 21, 2019 | Completed final sign-off Oct 2020 | 635 08th Av | Di Vine Construction | replace 2nd exit stair at light court in kindDetails
replace 2nd exit stair at light court in kind | $20,000 |
| Sep 25, 2019 | Completed final sign-off Oct 2021 | 645 Velasco Av | Di Vine Construction | removal and replacement of (e) finishes due to water, smoke & fire damage. non-structural work. all work in kind.Details
removal and replacement of (e) finishes due to water, smoke & fire damage. non-structural work. all work in kind. | $2,000 |
| Sep 10, 2019 | Completed final sign-off Jan 2020 | 2767 Bryant St | Di Vine Construction | replace front windows; windows to be marvin ext clad interior wood remodel. windows to be double hung. total of 16 windows. replace in kind 6 windows in rear. replace 100 sf of siding in kind.Details
replace front windows; windows to be marvin ext clad interior wood remodel. windows to be double hung. total of 16 windows. replace in kind 6 windows in rear. replace 100 sf of siding in kind. | $10,000 |
| Aug 30, 2019 | Completed final sign-off Dec 2019 | 18 Marsilly St | Di Vine Construction | repair front wood steps in-kind < 50%. no other work.Details
repair front wood steps in-kind < 50%. no other work. | $5,000 |
| Aug 14, 2019 | Completed final sign-off Nov 2019 | 130 23rd Av | Di Vine Construction | unit 2: remodel in-kind: full bathroom, 1/2 bathroom. replace kitchen counter top, cainbets to stay. replce kitchen sink.Details
unit 2: remodel in-kind: full bathroom, 1/2 bathroom. replace kitchen counter top, cainbets to stay. replce kitchen sink. | $12,000 |
| Apr 19, 2019 | Completed final sign-off Sep 2019 | 1265 02nd Av | Di Vine Construction | replace siding in-kind in front of house. install (11) windows, (6) in rear, (5) in front; replace in-kind of original approved windows.Details
replace siding in-kind in front of house. install (11) windows, (6) in rear, (5) in front; replace in-kind of original approved windows. | $20,000 |
| Jan 25, 2019 | Completed final sign-off Apr 2019 | 706 Foerster St | Di Vine Construction | remodel full bathroom in kind.Details
remodel full bathroom in kind. | $15,000 |
| Oct 1, 2018 | Completed final sign-off Dec 2018 | 117 10th Av | Di Vine Construction | install new tile in master bathroom shower. remove existing tile and replace in-kind.Details
install new tile in master bathroom shower. remove existing tile and replace in-kind. | $8,000 |
| Aug 16, 2018 | Completed final sign-off Sep 2018 | 1958 Larkin St | Di Vine Construction | to comply wiht nov# 201876441. repair stairs less than 50%. repair in kind. all work at the rear.Details
to comply wiht nov# 201876441. repair stairs less than 50%. repair in kind. all work at the rear. | $5,000 |
| May 31, 2018 | Completed final sign-off Jun 2018 | 743 Avalon Av | Di Vine Construction | to obtain final inspection for work approved under pa#2015 0818 4510 all work is complete.Details
to obtain final inspection for work approved under pa#2015 0818 4510 all work is complete. | |
| Mar 27, 2018 | Completed final sign-off May 2018 | 580 Belvedere St | Di Vine Construction | replace 5 new construction window at front of house. windows to be clad exterior and wood interior. fixed/casements.Details
replace 5 new construction window at front of house. windows to be clad exterior and wood interior. fixed/casements. | $10,000 |
| Mar 21, 2018 | Completed final sign-off Jul 2018 | 1422 Quesada Av | Di Vine Construction | fire damage repair. replace 300sq ft of siding, 5 windows, insulation and sheetrock all exposed walls, demoed by restoration company. all windows not visible from st. everything replace in kind. bedroom emergency/reuse window to maintain.Details
fire damage repair. replace 300sq ft of siding, 5 windows, insulation and sheetrock all exposed walls, demoed by restoration company. all windows not visible from st. everything replace in kind. bedroom emergency/reuse window to maintain. | $35,000 |
| Feb 7, 2018 | Completed final sign-off Jul 2018 | 239 Edinburgh St | Di Vine Construction | 1st floor - add a powder, laundry room per plan; replace partial foundation per plan; 2nd floor - add powder room per plan. remodel (e) full bath & kitchen per plan. new deckDetails
1st floor - add a powder, laundry room per plan; replace partial foundation per plan; 2nd floor - add powder room per plan. remodel (e) full bath & kitchen per plan. new deck | $30,000 |
| Jan 18, 2018 | Completed final sign-off Feb 2018 | 2861 Washington St | Di Vine Construction | to obtain final imnspection for work approved uder pa#201606089358. all work is completeDetails
to obtain final imnspection for work approved uder pa#201606089358. all work is complete | |
| Dec 14, 2017 | Completed final sign-off Jun 2019 | 420 Burrows St | Di Vine Construction | add a bathroom, laundry room, media room, retreat & office on 1st floor per plan.Details
add a bathroom, laundry room, media room, retreat & office on 1st floor per plan. | $40,000 |
| Sep 26, 2017 | Completed final sign-off Aug 2026 | 906 Vallejo St | Flores Construction, Di Vine Construction | roof penthouse over stairs. replace the existing stairs in-kind. provide enclosure at existing stairsDetails
roof penthouse over stairs. replace the existing stairs in-kind. provide enclosure at existing stairs | $75,000 |
| Sep 1, 2017 | Completed final sign-off Apr 2018 | 16 Marsily St | Di Vine Construction | revision to pa #201708255880 - demo plaster in living room & install new drywall. replace windows (2) in kitchen. no street view, u-factor 0.32 max, no change to walls.Details
revision to pa #201708255880 - demo plaster in living room & install new drywall. replace windows (2) in kitchen. no street view, u-factor 0.32 max, no change to walls. | $4,000 |
| Aug 25, 2017 | Completed final sign-off Apr 2018 | 16 Marsily St | Di Vine Construction | remodel full kitchen in kind, no structural work at main floorDetails
remodel full kitchen in kind, no structural work at main floor | $20,000 |
| Jul 27, 2017 | Completed final sign-off Dec 2017 | 229 17th Av | Di Vine Construction | remodel in kind (1) kitchen and (1-1/2) bathroomsDetails
remodel in kind (1) kitchen and (1-1/2) bathrooms | $25,000 |
| Jul 13, 2017 | Completed final sign-off Oct 2017 | 758 44th Av | Di Vine Construction | remodel full bathroom in kind @ upper unit.Details
remodel full bathroom in kind @ upper unit. | $19,000 |
| Jun 13, 2017 | Completed final sign-off Jan 2018 | 2861 Washington St | Di Vine Construction | install 3000 sq ft of hardi plank material to rear south west wall not expose to street view.Details
install 3000 sq ft of hardi plank material to rear south west wall not expose to street view. | $40,000 |
| Aug 15, 2016 | Completed final sign-off Sep 2016 | 582 Belvedere St | Di Vine Construction | install 720 square feet of hardie plank siding to the south side wall visible form the street - repair inkind.Details
install 720 square feet of hardie plank siding to the south side wall visible form the street - repair inkind. | $8,000 |
| Aug 10, 2016 | Completed final sign-off Apr 2017 | 18 Marsilly St | Di Vine Construction | new connecting stair from 2nd floor to ground flr. ground floor to have new windows, doors, new full bathroom, bedroom & closetDetails
new connecting stair from 2nd floor to ground flr. ground floor to have new windows, doors, new full bathroom, bedroom & closet | $100,000 |
| Jun 8, 2016 | Never finaled issued Jun 2016, no final | 2861 Washington St | Di Vine Construction | remodel 2-1/2 bathroom in-kind.Details
remodel 2-1/2 bathroom in-kind. | $30,000 |
| Jun 8, 2016 | Completed final sign-off May 2017 | 143 10th Av | Di Vine Construction | install 900sf of hardi plank siding over (e) siding in rear yard.Details
install 900sf of hardi plank siding over (e) siding in rear yard. | $15,000 |
| Feb 2, 2016 | Completed final sign-off Jul 2016 | 2208 Mission St | Di Vine Construction | remodel in-kind 1 full bathroom.Details
remodel in-kind 1 full bathroom. | $8,000 |
| Aug 18, 2015 | Completed final sign-off Jun 2018 | 743 Avalon Av | Di Vine Construction | repair in-kind remove terrazo steps and replace with tile. work less than 50%.Details
repair in-kind remove terrazo steps and replace with tile. work less than 50%. | $7,500 |
| May 1, 2015 | Completed final sign-off Jan 2016 | 349 Teresita Bl | Mannon Construction, Di Vine Construction | bathroom remodel at 1st and 2nd floor: replace fixtures, bath fan, add heater, electrical, wall & floor tiles, replace door. no new wall and no existing wall relocation. lighting in bathroom remodel shall comply with cec 150.0(k)5.Details
bathroom remodel at 1st and 2nd floor: replace fixtures, bath fan, add heater, electrical, wall & floor tiles, replace door. no new wall and no existing wall relocation. lighting in bathroom remodel shall comply with cec 150.0(k)5. | $30,000 |
| Apr 21, 2015 | Completed final sign-off Sep 2015 | 363 Joost Av | Di Vine Construction | repair minimal dryrot in northwest corner. install insulation in northwest walls master bedroom. east wall in small bedroom. repair 7 doors.Details
repair minimal dryrot in northwest corner. install insulation in northwest walls master bedroom. east wall in small bedroom. repair 7 doors. | $5,000 |
| Feb 27, 2015 | Completed final sign-off Apr 2015 | 677 28th Av | Di Vine Construction | replace 420 sq ft of siding at rear of house. hardi plank material to be used. not visible from street.Details
replace 420 sq ft of siding at rear of house. hardi plank material to be used. not visible from street. | $5,000 |
| Jan 20, 2015 | Completed final sign-off Apr 2015 | 2435 26th Av | Di Vine Construction | remodel in kind existin gkitchen and breakfast nook.Details
remodel in kind existin gkitchen and breakfast nook. | $20,000 |
| Oct 27, 2014 | Completed final sign-off Feb 2015 | 451 Crestmont Dr | Di Vine Construction | remodel in kind two full bathrooms, 1 bathroom 7'x11', 2nd bathroom 8'x7'Details
remodel in kind two full bathrooms, 1 bathroom 7'x11', 2nd bathroom 8'x7' | $12,000 |
| Sep 18, 2014 | Completed final sign-off Apr 2015 | 259 Crescent Av | Di Vine Construction | remodel kitchen within space of (e) kitchen.Details
remodel kitchen within space of (e) kitchen. | $21,500 |
| Jul 31, 2014 | Completed final sign-off Aug 2014 | 675 28th Av | Di Vine Construction | reivision to permit # 201403070143 work has been completed and inspected under this permit as follows:3rd flr (677 - 28th ave)& 1st flr (garage&wrkshop) have had the work completed&finaled by the elect.,plmbng&bldg.inspectors.all work at 2nd flr(675-28th ave)has been compltd &inspcted exceptDetails
reivision to permit # 201403070143 work has been completed and inspected under this permit as follows:3rd flr (677 - 28th ave)& 1st flr (garage&wrkshop) have had the work completed&finaled by the elect.,plmbng&bldg.inspectors.all work at 2nd flr(675-28th ave)has been compltd &inspcted except | |
| Apr 28, 2014 | Completed final sign-off Aug 2014 | 675 28th Av | Di Vine Construction | revision to app#201403070143 to raise footing to rear wall.Details
revision to app#201403070143 to raise footing to rear wall. | $1,500 |
| Mar 7, 2014 | Completed final sign-off Sep 2014 | 675 28th Av | Di Vine Construction | legalize 1/2 bath in 1/f, remodel 2 (e) kitchens and 2 (e) baths, add 1 closet at each unit. voluntary structural and seismic upgrade and new partitions walls for storage on 1/f. replace (e) windows, 9 vinyl windows at rear & 10 wood windows at front. convert dining room to bedroom at 2nd & 3rd fl.Details
legalize 1/2 bath in 1/f, remodel 2 (e) kitchens and 2 (e) baths, add 1 closet at each unit. voluntary structural and seismic upgrade and new partitions walls for storage on 1/f. replace (e) windows, 9 vinyl windows at rear & 10 wood windows at front. convert dining room to bedroom at 2nd & 3rd fl. | $60,000 |
| Aug 8, 2013 | Completed final sign-off Aug 2013 | 1812 Scott St | Di Vine Construction | replace in kind a total of 11 window sets with double pane glass, visible from street. double hung windows with og detail. u-factor for windows not to exceed 0.40. no rough opening changes.Details
replace in kind a total of 11 window sets with double pane glass, visible from street. double hung windows with og detail. u-factor for windows not to exceed 0.40. no rough opening changes. | $2,000 |
| Dec 11, 2012 | Never finaled issued Dec 2012, no final | 143 10th Av | Di Vine Construction | to obtain final inspection for pa# 201110046065. all work completedDetails
to obtain final inspection for pa# 201110046065. all work completed | |
| Oct 3, 2012 | Completed final sign-off Oct 2012 | 95 Hancock St | Di Vine Construction | repair inkind 130 sf at front of house, siding damage and reinstall window. replace some studs. repair in kind.Details
repair inkind 130 sf at front of house, siding damage and reinstall window. replace some studs. repair in kind. | $3,200 |
| Jul 25, 2012 | Completed final sign-off Jul 2012 | 242 27th Av | Di Vine Construction | replace (e) fence total of 14 ft. total 7 ft height 6ft 1x8 boards, 1 ft lattice for wind barrier. 4x4 post to expand 7ft w/ 3x2 concrete @ rear of property.Details
replace (e) fence total of 14 ft. total 7 ft height 6ft 1x8 boards, 1 ft lattice for wind barrier. 4x4 post to expand 7ft w/ 3x2 concrete @ rear of property. | $2,000 |
| Jul 24, 2012 | Completed final sign-off Mar 2013 | 117 10th Av | Di Vine Construction | dry rot repair @ rear of house. garage floor 100 sq ft. 1st floor 100 sf. 2nd floor 100 sf.Details
dry rot repair @ rear of house. garage floor 100 sq ft. 1st floor 100 sf. 2nd floor 100 sf. | $10,000 |
| Jul 13, 2012 | Completed final sign-off Oct 2012 | 2257 Chestnut St | Di Vine Construction | relocate kitchen equipment/exhaust hood and service counter. remodel prep kitchen and open existing side door to access restroom. in reference to app#2004-02-17-6504 ti & mechanical.Details
relocate kitchen equipment/exhaust hood and service counter. remodel prep kitchen and open existing side door to access restroom. in reference to app#2004-02-17-6504 ti & mechanical. | $30,000 |
| Jul 6, 2012 | Expired or cancelled cancelled Jul 2012 | 242 10th Av | Di Vine Construction | repair in kind stairs in front of the house, less than 50%Details
repair in kind stairs in front of the house, less than 50% | $2,000 |
| Jul 6, 2012 | Completed final sign-off Oct 2012 | 2871 22nd St | Di Vine Construction | repair in kind stairs in front of the house, less than 50%Details
repair in kind stairs in front of the house, less than 50% | $4,000 |
| Jul 6, 2012 | Completed final sign-off Oct 2012 | 100 Edgewood Av | Di Vine Construction | repair dry rot at rear of house, replace windows as needed to match (e) appearance, windows at rear of houseDetails
repair dry rot at rear of house, replace windows as needed to match (e) appearance, windows at rear of house | $10,000 |
| May 11, 2012 | Completed final sign-off Jul 2012 | 3041 Mission St | Di Vine Construction | retail improvement of unconditional 1st floor space of approx 1500 sf of an existing building. no change of work at exterior storefront. to improve existing vacant retail space by adding electrical outlets, lighting fixtures. scope includes addition of new electrical outlets. lt fixt/gyp bd ceilingDetails
retail improvement of unconditional 1st floor space of approx 1500 sf of an existing building. no change of work at exterior storefront. to improve existing vacant retail space by adding electrical outlets, lighting fixtures. scope includes addition of new electrical outlets. lt fixt/gyp bd ceiling | $5,000 |
| Feb 10, 2012 | Completed final sign-off Apr 2013 | 145 10th Av | Di Vine Construction | replace kitchen cabinets & redo 1 full bath.Details
replace kitchen cabinets & redo 1 full bath. | $36,000 |
| Oct 4, 2011 | Completed final sign-off Mar 2013 | 143 10th Av | Di Vine Construction | install new full bathroom, remodel existing bath and kitchen in upper unit. repair rear stairway in kindDetails
install new full bathroom, remodel existing bath and kitchen in upper unit. repair rear stairway in kind | $38,000 |
| Aug 8, 2011 | Completed final sign-off Nov 2011 | 105 Appleton Av | Di Vine Construction | kitchen remodel, replace cabinets with new.Details
kitchen remodel, replace cabinets with new. | $20,000 |
| Mar 28, 2011 | Expired or cancelled cancelled Apr 2012 | 143 10th Av | Di Vine Construction | replace 1 kitchen cabinet and redo 1 full bath. new lighting to comply with cec150(k), no change to int. doors or walls. 1 window in kind @ rear porch, 1 door replacement in kind @ portch.Details
replace 1 kitchen cabinet and redo 1 full bath. new lighting to comply with cec150(k), no change to int. doors or walls. 1 window in kind @ rear porch, 1 door replacement in kind @ portch. | $36,000 |
| Feb 16, 2011 | Completed final sign-off Dec 2011 | 2927 Folsom St | Di Vine Construction | add a handrail for 3 steps for entrance for apt. to comply with his nov#201082048 dated 12/8/2010Details
add a handrail for 3 steps for entrance for apt. to comply with his nov#201082048 dated 12/8/2010 | $500 |
| Dec 3, 2007 | Completed final sign-off Feb 2008 | 2770 Sacramento St | Di Vine Construction | replace in kind front stairs.Details
replace in kind front stairs. | $20,000 |