Block 1188, lot 002B
1914 Grove St
- City’s use
- Multi-Family Residential
- Built
- 1922
- Stories
- 3
- Units
- 2
- Rooms
- 3 bathrooms
- Building
- 2,950 sq ft
- Lot
- 2,748 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
6 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 21, 2023 | Never finaled issued Mar 2023, no final | 1914 Grove St | Di Vine Construction | replace windows 12 in front of the building and the rest of 21 windows are not visible from the st. windows to be double hung wood aluminum clad. 33 total.Details
replace windows 12 in front of the building and the rest of 21 windows are not visible from the st. windows to be double hung wood aluminum clad. 33 total. | $40,000 |
| Jul 30, 2018 | Expired or cancelled cancelled Jan 2026 | 1914 Grove St | unit 1914: legalize bar sink ( ref pa# 201510139422 physical inspection report #cc-7681.)Details
unit 1914: legalize bar sink ( ref pa# 201510139422 physical inspection report #cc-7681.) | $4,000 | |
| Oct 13, 2015 | Never finaled issued Oct 2015, no final | 1914 Grove St | to comply with physical inspection report cc-7681Details
to comply with physical inspection report cc-7681 | $1,000 | |
| Sep 30, 2014 | Completed final sign-off Sep 2015 | 1914 Grove St | replace side stairs and deck, upgrade guardrails, stair treads, stringer brackets. add new cross brace at east property line.Details
replace side stairs and deck, upgrade guardrails, stair treads, stringer brackets. add new cross brace at east property line. | $15,000 | |
| Jan 29, 2013 | Completed final sign-off Feb 2013 | 1914 Grove St | Bay Area Retrofit | voluntary foundation strengthening. install approx 77 lf of struct. 1 plywood with gaming clips/angles hardware, 5/8" wedge anchor bolts. shear transfer ties l90 - a23 or kc metal equiv. spacing nail 6" max o.c. & 12" in field. plywood and other hardware to be installed on n.e. s.w. walls.Details
voluntary foundation strengthening. install approx 77 lf of struct. 1 plywood with gaming clips/angles hardware, 5/8" wedge anchor bolts. shear transfer ties l90 - a23 or kc metal equiv. spacing nail 6" max o.c. & 12" in field. plywood and other hardware to be installed on n.e. s.w. walls. | $15,000 |
| Aug 14, 2006 | Completed final sign-off Aug 2006 | 1914 Grove St | Anthony's Roofing Co. | reroofingDetails
reroofing | $7,500 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Anthony's Roofing Co., Bay Area Retrofit, Di Vine Construction
- Architects
- Frank William Bloomfield
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover two-family buildings like this one.