Frank William Bloomfield
- Listed as
- architect, engineer
- Firm
- Mobley Bloomfield
- Based in
- San Francisco
- On San Francisco permits
- May 2011 to May 2021
17 permits since 2000 (architect on 16 permits, engineer on 1 permit): 13 completed, 2 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 12, 2021 | Completed final sign-off Apr 2022 | 141 Escolta Wy | C & M Woodworking Inc Dba C & M General | 1st fl: interior remodel of e) garge area. (n) storage & laundry at rear of garage. (n) rear exterior sliding door. (n) hvac system to replace (e) furnace. (n) lighting in garage + storage. bolt house to foundation along right side and read side of house.Details
1st fl: interior remodel of e) garge area. (n) storage & laundry at rear of garage. (n) rear exterior sliding door. (n) hvac system to replace (e) furnace. (n) lighting in garage + storage. bolt house to foundation along right side and read side of house. | $30,000 |
| Dec 10, 2018 | Completed final sign-off Mar 2020 | 1937 Chestnut St | North Bay Construction | rev to pa# 201809251296; replace (e) arched window at north facade on 4th fl. with new sliding door to match (e) sliding doors on 4th fl. north facadeDetails
rev to pa# 201809251296; replace (e) arched window at north facade on 4th fl. with new sliding door to match (e) sliding doors on 4th fl. north facade | $1,000 |
| Oct 15, 2018 | Completed final sign-off Jul 2019 | 571 Page St | Brendan Waters Construction Inc | demo (e) wall between kitchen & living room. demo bathroom, partial kithcne remode, (n) bathroom, replace window in bath & powder room same size as (e) windows, replace exterior doors in kitchen,& bedrooms, replace interior doors througout (n) wood flooring & (n) lighting throug out,Details
demo (e) wall between kitchen & living room. demo bathroom, partial kithcne remode, (n) bathroom, replace window in bath & powder room same size as (e) windows, replace exterior doors in kitchen,& bedrooms, replace interior doors througout (n) wood flooring & (n) lighting throug out, | $120,000 |
| Sep 25, 2018 | Completed final sign-off Mar 2020 | 1937 Chestnut St | North Bay Construction | 3rd flr-demo wall betwn dning and kitchen. remodel kitch, bath & pwder rm, (n) drway from kitch to (e) hall. add (n) windows in kitch stair landing. replace (e) int doors. (n) stair to replace (e) stair from 3rd to 4th flr. (n) lts. 4th flr-demo wall betwn livrm & bedrm 2. remodel kitch, 2 bathsDetails
3rd flr-demo wall betwn dning and kitchen. remodel kitch, bath & pwder rm, (n) drway from kitch to (e) hall. add (n) windows in kitch stair landing. replace (e) int doors. (n) stair to replace (e) stair from 3rd to 4th flr. (n) lts. 4th flr-demo wall betwn livrm & bedrm 2. remodel kitch, 2 baths | $300,000 |
| May 26, 2017 | Never finaled issued Dec 2017, no final | 1311 Palou Av | Building By Design | 1313a palou avenue: renovation of (e) unit on 1st floor, lower level - demo (e) bath at rear of house. demo all interior walls. remodel (e) kitchen, remodel 1 existing bath and add 1 new bathroom. new bedroom, new office, new deck area under (e) deck aboveDetails
1313a palou avenue: renovation of (e) unit on 1st floor, lower level - demo (e) bath at rear of house. demo all interior walls. remodel (e) kitchen, remodel 1 existing bath and add 1 new bathroom. new bedroom, new office, new deck area under (e) deck above | $110,000 |
| Dec 9, 2016 | Completed final sign-off Mar 2017 | 178 Valley St | C & M Woodworking Inc Dba C & M General | revision to pa 2015-0904-6184 s-1, revise heating system from in-floor hydronic to forced air unitDetails
revision to pa 2015-0904-6184 s-1, revise heating system from in-floor hydronic to forced air unit | |
| Nov 1, 2016 | Completed final sign-off Jul 2017 | 1150 Lombard St | Terence Mcmahon Construction | unit 38 - kitchen & bathroom int remodel. demo (e) kitchen cabinets, ma bath cabinets, doorway from dining to kitchen. wider doorway form dining to ktichen, new wall in maste shower, new doorway into master closet 2, fill-in doorway from study to master bedroom, refinish (e) flrs, recessed lighting.Details
unit 38 - kitchen & bathroom int remodel. demo (e) kitchen cabinets, ma bath cabinets, doorway from dining to kitchen. wider doorway form dining to ktichen, new wall in maste shower, new doorway into master closet 2, fill-in doorway from study to master bedroom, refinish (e) flrs, recessed lighting. | $90,000 |
| Jul 5, 2016 | Completed final sign-off Aug 2018 | 428 Jersey St | Madden Construction | demolish (e) mudroom, bathroom and deck at rear of house. new horizontal extension in rear yard. (n) bathroom, kitchen, deck and utility room at rear yard. (n) support beam to replace (e) at garage level.Details
demolish (e) mudroom, bathroom and deck at rear of house. new horizontal extension in rear yard. (n) bathroom, kitchen, deck and utility room at rear yard. (n) support beam to replace (e) at garage level. | $120,000 |
| Apr 14, 2016 | Completed final sign-off Jul 2017 | 41 Bessie St | Schwed Construction | demo (e) entry stair & porch in front yard, replace (e) stair & porch in front yard, replace (e) stucco at front facade, replace (e) windows & entry door at front facade, replace (e) garage door at front facade, replace (e) terracotta tile at front facade, replace (e) porch light.Details
demo (e) entry stair & porch in front yard, replace (e) stair & porch in front yard, replace (e) stucco at front facade, replace (e) windows & entry door at front facade, replace (e) garage door at front facade, replace (e) terracotta tile at front facade, replace (e) porch light. | $15,000 |
| Sep 4, 2015 | Completed final sign-off Mar 2017 | 178 Valley St | C & M Woodworking Inc Dba C & M General | demo (e) deck, rear facade, side stair & deck. demo (e) slab on grade @ ground floor. new horizontal extension @ rear yard. excavate (e) 1st floor to provide 8'-6" ceiling height. add new family room, bedroom, bathroom, laundry room, utility room. new interior stair. new patio.Details
demo (e) deck, rear facade, side stair & deck. demo (e) slab on grade @ ground floor. new horizontal extension @ rear yard. excavate (e) 1st floor to provide 8'-6" ceiling height. add new family room, bedroom, bathroom, laundry room, utility room. new interior stair. new patio. | $300,000 |
| Jan 13, 2015 | Completed final sign-off Sep 2015 | 131 Peralta Av | remove & replace existing sheetrock, install flooring, remodel kitchen & bathroom, install direct vent gas stove.Details
remove & replace existing sheetrock, install flooring, remodel kitchen & bathroom, install direct vent gas stove. | $37,000 | |
| Sep 30, 2014 | Completed final sign-off Sep 2015 | 1914 Grove St | replace side stairs and deck, upgrade guardrails, stair treads, stringer brackets. add new cross brace at east property line.Details
replace side stairs and deck, upgrade guardrails, stair treads, stringer brackets. add new cross brace at east property line. | $15,000 | |
| Jun 20, 2014 | Expired or cancelled expired Nov 2020 | 1632 Broderick St | Jfieco | remove existing extractor sump pump. bring plumbing up to code, new sheetrock, tile, fixutures in bathroom, new closet, lighting in adjacent storageDetails
remove existing extractor sump pump. bring plumbing up to code, new sheetrock, tile, fixutures in bathroom, new closet, lighting in adjacent storage | $15,000 |
| May 20, 2014 | Expired or cancelled expired Oct 2017 | 1354 Natoma St | comply w/nov 3201459911 - demolish (e) 2 x framing, sheetrock & shower, new half bath, wood floor, electrical, new entry door & window & new side garage door, all work at ground floor.Details
comply w/nov 3201459911 - demolish (e) 2 x framing, sheetrock & shower, new half bath, wood floor, electrical, new entry door & window & new side garage door, all work at ground floor. | $8,000 | |
| May 28, 2013 | Completed final sign-off Aug 2013 | 241 Carl St | demo flor tile in bathroom & powder room, demo countertops in kitchen, install (n) exhaust vent to roof for kitchen hood, install (n) sink & faucet to replace (e) in kitchen & bathroom, install (n) high efficacy lighting in bathroom & kitchen.Details
demo flor tile in bathroom & powder room, demo countertops in kitchen, install (n) exhaust vent to roof for kitchen hood, install (n) sink & faucet to replace (e) in kitchen & bathroom, install (n) high efficacy lighting in bathroom & kitchen. | $3,000 | |
| Dec 2, 2011 | Completed final sign-off Jan 2012 | 715 Cole St | demolish existing deck areas at second floor landing. install new guard rail at each end of second floor landing after deck areas are removed.Details
demolish existing deck areas at second floor landing. install new guard rail at each end of second floor landing after deck areas are removed. | $1,000 | |
| May 19, 2011 | Never finaled issued Jul 2011, no final | 41 Bessie St | Madden Construction | demo extg deck in rear yard, add new stair with landing in rear yard, new french doors at garage level, new picture window and door at second floor, replace extg windows same size at 2nd floor,new posts & girder to replace extg posts & girder in kind, new siding to replace extg siding at 2nd flr,Details
demo extg deck in rear yard, add new stair with landing in rear yard, new french doors at garage level, new picture window and door at second floor, replace extg windows same size at 2nd floor,new posts & girder to replace extg posts & girder in kind, new siding to replace extg siding at 2nd flr, | $40,000 |