Bay Area Retrofit
- Based in
- Albany
- On San Francisco permits
- May 2006 to Sep 2026
- Last 24 months
- 7 permits filed
58 permits since 2000: 51 completed, 3 in progress, 1 never finaled, 3 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 17, 2026 | In progress issued Sep 2026 | 1959 21st Av | install (30)hilti 5/8 x 8 1/2 k22 bolts, (20) simpson hdve3 holddowns (50) simpson l90s or equivalent. work is not intended to meet any building code requirements. job also includes 68 linear feet of plywood nailed w/8d commons 3" o.c. on edges and 12" o.c. in field. this work is purely voluntary.Details
install (30)hilti 5/8 x 8 1/2 k22 bolts, (20) simpson hdve3 holddowns (50) simpson l90s or equivalent. work is not intended to meet any building code requirements. job also includes 68 linear feet of plywood nailed w/8d commons 3" o.c. on edges and 12" o.c. in field. this work is purely voluntary. | $36,385 |
| Sep 17, 2026 | In progress issued Sep 2026 | 2063 Broadway | install (20)hilti 5/8 x 8 1/2 k22 bolts, (18) simpson hdve3 holddowns (57) simpson l90 framing anchors or equivalent, (2) simpson wswh strong walls or equivalent. 66 linear fee plywood nailed 3"o.c on edges and 12"o.c in field w/8d commons. work is not intended to meet any building code requirementsDetails
install (20)hilti 5/8 x 8 1/2 k22 bolts, (18) simpson hdve3 holddowns (57) simpson l90 framing anchors or equivalent, (2) simpson wswh strong walls or equivalent. 66 linear fee plywood nailed 3"o.c on edges and 12"o.c in field w/8d commons. work is not intended to meet any building code requirements | $72,906 |
| Jul 7, 2026 | In progress issued Jul 2026 | 2015 Judah St | 2015-2017 judah street: install (20) simpson hbu2 holdowns, (88) linear feet of structural 1 plywood nailed 3" o.c. on edges, 12" o.c. in field (44) hilti 5/8x8 1/2 kbz2 wedge anchors, (1) simpson strong will or equivalent, (75) simspon l90, or equivalent. work is voluntary.Details
2015-2017 judah street: install (20) simpson hbu2 holdowns, (88) linear feet of structural 1 plywood nailed 3" o.c. on edges, 12" o.c. in field (44) hilti 5/8x8 1/2 kbz2 wedge anchors, (1) simpson strong will or equivalent, (75) simspon l90, or equivalent. work is voluntary. | $36,000 |
| May 28, 2026 | Completed final sign-off Jul 2026 | 4044 26th St | install 25 hilti 5/8" wege anchor bolts with 6" embed, 50 linear feet 15/32 structural plywood on cripple walls and 44 simpson l90 or equivalent fo connect floor framing to top plate. this work is not intended to meet building code.Details
install 25 hilti 5/8" wege anchor bolts with 6" embed, 50 linear feet 15/32 structural plywood on cripple walls and 44 simpson l90 or equivalent fo connect floor framing to top plate. this work is not intended to meet building code. | $26,000 |
| Jan 26, 2026 | Expired or cancelled cancelled Feb 2026 | 432 04th Av | install 36 5/8 x 8 1/2 hilti kwikboltz bolts, 72 linear feet of 15/32 plywood, and 18 simpson hpv2 holdowns. plywood nailed 3'' oc on edges, 12' oc in field work is not intended to meet building code or resist lateral forces. all work is interior.Details
install 36 5/8 x 8 1/2 hilti kwikboltz bolts, 72 linear feet of 15/32 plywood, and 18 simpson hpv2 holdowns. plywood nailed 3'' oc on edges, 12' oc in field work is not intended to meet building code or resist lateral forces. all work is interior. | $19,192 |
| Mar 19, 2025 | Completed final sign-off Apr 2025 | 166 Anderson St | install (32) l.f 1/2 inch plywood nailed 6" oc on edge 12" in field. install (4) simpson hdu 2s. install (16) 5/8 x 8 1/2 foundation bolts. install (42) l 90s. install (8) simpson urfp. this is not part of the lateral force resisting system. no calcs submitted no special inspections requiredDetails
install (32) l.f 1/2 inch plywood nailed 6" oc on edge 12" in field. install (4) simpson hdu 2s. install (16) 5/8 x 8 1/2 foundation bolts. install (42) l 90s. install (8) simpson urfp. this is not part of the lateral force resisting system. no calcs submitted no special inspections required | $14,076 |
| Dec 10, 2024 | Completed final sign-off Jan 2025 | 200 Shields St | install 36 bolts, 72 linear ft of plywood and 60 simpson l90 or equivalent this is not part of the lateral resistingmember. no calcs submitted, no special inspections. 5/8" all thread w/7" min. embed. struc 1 ply, 4" perimeter, 12" field nailing.Details
install 36 bolts, 72 linear ft of plywood and 60 simpson l90 or equivalent this is not part of the lateral resistingmember. no calcs submitted, no special inspections. 5/8" all thread w/7" min. embed. struc 1 ply, 4" perimeter, 12" field nailing. | $38,000 |
| Jun 28, 2024 | Completed final sign-off Aug 2024 | 727 Ashbury St | revision to pa# 202403067232: change in job description from installing strong wall to install steel plate and new door opening. the lateral force resisting membrane. no cals submitted, no special inspections required.Details
revision to pa# 202403067232: change in job description from installing strong wall to install steel plate and new door opening. the lateral force resisting membrane. no cals submitted, no special inspections required. | |
| Mar 6, 2024 | Completed final sign-off Jul 2024 | 727 Ashbury St | install foundation bolts, simpson hardware, plywood and simpson strong wall.Details
install foundation bolts, simpson hardware, plywood and simpson strong wall. | $79,160 |
| Mar 6, 2024 | Completed final sign-off Apr 2024 | 537 10th Av | put in foundation bolts, simpson hardware and nail plywood to criplle walls.Details
put in foundation bolts, simpson hardware and nail plywood to criplle walls. | $21,600 |
| Jan 20, 2023 | Completed final sign-off Mar 2023 | 3925 21st St | install bolts, plywood and simpson hardware in garage.Details
install bolts, plywood and simpson hardware in garage. | $15,000 |
| Jan 20, 2023 | Completed final sign-off Mar 2023 | 2520 Clay St | install concrete,bolts, plywood and simpson hardware- g.l.e 12"x12"Details
install concrete,bolts, plywood and simpson hardware- g.l.e 12"x12" | $30,000 |
| Sep 27, 2022 | Completed final sign-off Dec 2022 | 130 22nd Av | install plywood, bolts, simpson hardware and a simpson strongwall at garage front.Details
install plywood, bolts, simpson hardware and a simpson strongwall at garage front. | $25,000 |
| Sep 27, 2022 | Completed final sign-off Dec 2022 | 218 Divisadero St | install simpson hardware at location shown on planDetails
install simpson hardware at location shown on plan | $25,000 |
| Jul 26, 2022 | Completed final sign-off Aug 2022 | 1580 Treat Av | put in retrofit bolts & nail plywood cripple walls. plus install simpson l90 or equiv.Details
put in retrofit bolts & nail plywood cripple walls. plus install simpson l90 or equiv. | $18,615 |
| May 13, 2021 | Completed final sign-off Aug 2021 | 3233 Noriega St | put 8 feet of plywood on right & left sides of basement walls and (2) 4 foot long section on front & back nailed with 8d common 3" o.c. on edges & 12" o.c. in fieldDetails
put 8 feet of plywood on right & left sides of basement walls and (2) 4 foot long section on front & back nailed with 8d common 3" o.c. on edges & 12" o.c. in field | $10,645 |
| May 13, 2021 | Completed final sign-off Jun 2021 | 1958 24th Av | put 6 feet of 1/2" plywood on front basement wall & 8 feet of plywood on back + 2 sides of basement wall w/ 8d common 3" o.c. on edges & 12" o.c. in field.Details
put 6 feet of 1/2" plywood on front basement wall & 8 feet of plywood on back + 2 sides of basement wall w/ 8d common 3" o.c. on edges & 12" o.c. in field. | $18,000 |
| Jan 13, 2021 | Completed final sign-off Feb 2021 | 1427 35th Av | verifyt and bolts at 2 ft at shear wall location. install plywood and framing clips/angles/hardwall, tear out of existing sheetrock at some cripple walls for voluntary strengthing. plywood 1/2" 5 ply struc 1, nailed at 6" oc at 40% of perimeter. replace sheetrock where needed in finished space. apprDetails
verifyt and bolts at 2 ft at shear wall location. install plywood and framing clips/angles/hardwall, tear out of existing sheetrock at some cripple walls for voluntary strengthing. plywood 1/2" 5 ply struc 1, nailed at 6" oc at 40% of perimeter. replace sheetrock where needed in finished space. appr | $13,500 |
| Aug 29, 2019 | Completed final sign-off Sep 2019 | 123 Precita Av | install plywood and framing slips/angles/hardware. tear out of existing sheetrock for voluntary strengthening. 1/2" stru 1 plywood 6" nailing in rear perimeterDetails
install plywood and framing slips/angles/hardware. tear out of existing sheetrock for voluntary strengthening. 1/2" stru 1 plywood 6" nailing in rear perimeter | $24,000 |
| May 1, 2019 | Completed final sign-off May 2019 | 599 24th Av | placing plywood at cripple wallsDetails
placing plywood at cripple walls | $7,000 |
| Jun 27, 2018 | Completed final sign-off Feb 2019 | 2590 38th Av | voluntary seismic retrofit per attached emgineering plansDetails
voluntary seismic retrofit per attached emgineering plans | $32,732 |
| May 1, 2018 | Completed final sign-off May 2018 | 949 Broderick St | install approx 30' of plywood bracing, bolts, shear transperties at e/w front and back crawl space crpple walls ply edge nailing max 6" o.c., 1/2' mech bolts @ 2'o.c. at ply and l20/l90/h10 type floor framing connectorsDetails
install approx 30' of plywood bracing, bolts, shear transperties at e/w front and back crawl space crpple walls ply edge nailing max 6" o.c., 1/2' mech bolts @ 2'o.c. at ply and l20/l90/h10 type floor framing connectors | $13,970 |
| May 5, 2017 | Completed final sign-off May 2017 | 334 Holladay Av | non engineered/voluntary cripple wall/foundation strenghting. installing approx 46' of 5 ply struc plywood-nailing 6" o.c max at edge 12" oc at field. 5/8" wedge anchor bolts. ply installed on north/east/south/west walls perimeter. all work at ground level/interior only. no exterior work.Details
non engineered/voluntary cripple wall/foundation strenghting. installing approx 46' of 5 ply struc plywood-nailing 6" o.c max at edge 12" oc at field. 5/8" wedge anchor bolts. ply installed on north/east/south/west walls perimeter. all work at ground level/interior only. no exterior work. | $13,800 |
| Sep 9, 2016 | Completed final sign-off Dec 2016 | 4280 22nd St | voluntary sub structure strengthening in accordance with appendix ch a3 install plywood bracing,bolts,shear transfer ties.Details
voluntary sub structure strengthening in accordance with appendix ch a3 install plywood bracing,bolts,shear transfer ties. | $15,000 |
| Jul 11, 2016 | Completed final sign-off Apr 2017 | 2090 10th Av | voluntary strengthening of the ground floor including cantilevered steel column at garage door opening and plywood shear walls.Details
voluntary strengthening of the ground floor including cantilevered steel column at garage door opening and plywood shear walls. | $22,000 |
| Sep 15, 2015 | Completed final sign-off Oct 2015 | 181 Majestic Av | voluntary upgrade, install plywood bracing @ crawl space, max 6" edge nailing & 12" field nailing, 5/8 anchar bolts w/3" square bearing plates foundation anchors ((ufp 10) & floor framing clips, north, east south & west walls of crawl space approx 24' ply.Details
voluntary upgrade, install plywood bracing @ crawl space, max 6" edge nailing & 12" field nailing, 5/8 anchar bolts w/3" square bearing plates foundation anchors ((ufp 10) & floor framing clips, north, east south & west walls of crawl space approx 24' ply. | $6,500 |
| Apr 17, 2015 | Completed final sign-off May 2015 | 810 Joost Av | structural strengthening only, install plywood on cripple walls 1/2 structurral on part of permit 6" on edge & 12" o.c. in field ,install foundation.Details
structural strengthening only, install plywood on cripple walls 1/2 structurral on part of permit 6" on edge & 12" o.c. in field ,install foundation. | $14,000 |
| Feb 9, 2015 | Completed final sign-off Apr 2015 | 4404 17th St | install new steel postDetails
install new steel post | $19,000 |
| Jan 23, 2015 | Completed final sign-off Feb 2015 | 628 Lyon St | bolts, plywood framing anchors hold downs on (e) walls. voluntary strengthening. no adding or moving walls/ no concrete footings. call district inspector prior to start of work.Details
bolts, plywood framing anchors hold downs on (e) walls. voluntary strengthening. no adding or moving walls/ no concrete footings. call district inspector prior to start of work. | $18,000 |
| Jan 23, 2015 | Expired or cancelled cancelled Jan 2026 | 4404 17th St | voluntary strengtheningDetails
voluntary strengthening | $19,000 |
| Oct 27, 2014 | Completed final sign-off Nov 2014 | 3476 Clay St | voluntary underfloor strenghtening per attached engineered plans. installing steel columns to front rear of extg foundation.Details
voluntary underfloor strenghtening per attached engineered plans. installing steel columns to front rear of extg foundation. | $10,000 |
| Oct 27, 2014 | Completed final sign-off Nov 2014 | 3476 Clay St | voluntary ladder strengtheningDetails
voluntary ladder strengthening | $6,500 |
| Sep 26, 2014 | Completed final sign-off Oct 2014 | 45 Maywood Dr | voluntary subfloor non enginered lateral strengthening. using approx 28' struc 1 5 ply (1/2") simpson-l90,70,50,h10,5/8", non mechanical anchor bolts hihi or ufp10's. foundation angles/clips, nailing 6" ,12" in field. work due on n/e/s/w/ walls all work is subfloor.Details
voluntary subfloor non enginered lateral strengthening. using approx 28' struc 1 5 ply (1/2") simpson-l90,70,50,h10,5/8", non mechanical anchor bolts hihi or ufp10's. foundation angles/clips, nailing 6" ,12" in field. work due on n/e/s/w/ walls all work is subfloor. | $6,500 |
| Jul 23, 2014 | Completed final sign-off Nov 2014 | 1556 Church St | voluntary strengthening per attached plans.Details
voluntary strengthening per attached plans. | $12,000 |
| Mar 19, 2014 | Completed final sign-off Apr 2014 | 1423 South Van Ness Av | install plywood, bolts & transfer ties to (e) foundation for stregthening, approx 24', 5 ply struc, 1 plywood on north wall, 24' on southwall, 24' on west wall using 5/8" anchor bolts (mechanical) nailed @ 6" o.c., edge nailing, 8" o.c. field nailing. all work done in basement/ground floor.Details
install plywood, bolts & transfer ties to (e) foundation for stregthening, approx 24', 5 ply struc, 1 plywood on north wall, 24' on southwall, 24' on west wall using 5/8" anchor bolts (mechanical) nailed @ 6" o.c., edge nailing, 8" o.c. field nailing. all work done in basement/ground floor. | $25,000 |
| Sep 19, 2013 | Completed final sign-off Jul 2015 | 140 Taraval St | insall plywood approx 60 framing clips/angles,hardware,tear out of some exisitng sheet rock @ some cripple walls for voluntary strenghtening using 5 ply struc.1 plywood nailing mx 6" work done on n/e s/w walls all work done in lower level /basement/crawl space pnly 5/8 " strong bold used for nailinDetails
insall plywood approx 60 framing clips/angles,hardware,tear out of some exisitng sheet rock @ some cripple walls for voluntary strenghtening using 5 ply struc.1 plywood nailing mx 6" work done on n/e s/w walls all work done in lower level /basement/crawl space pnly 5/8 " strong bold used for nailin | $13,000 |
| Sep 3, 2013 | Completed final sign-off Feb 2014 | 461 Noe St | sfbc chapter 34b lateral strenthening seismic upgrade in accordance with 2012 1 ebc appendix chp a1 to comply with sf ord 66-13. mandatory seismic retrofit program for wood framed building. shearwall,framing,connectors,footing, collectors, ties. confined to areas below 1st framed floorDetails
sfbc chapter 34b lateral strenthening seismic upgrade in accordance with 2012 1 ebc appendix chp a1 to comply with sf ord 66-13. mandatory seismic retrofit program for wood framed building. shearwall,framing,connectors,footing, collectors, ties. confined to areas below 1st framed floor | $60,000 |
| Jun 13, 2013 | Completed final sign-off Jul 2013 | 1218 02nd Av | voluntary lateral strenghening install plywood & framing chips/angles/hardware. using 5 ply-struc 1 plywood, 5/8" anchor bolts, nial spacing ac max. approx 86' and approx 20' fnd/ftg (foundation) repair. all work confined to basement/under floor/crawl space.Details
voluntary lateral strenghening install plywood & framing chips/angles/hardware. using 5 ply-struc 1 plywood, 5/8" anchor bolts, nial spacing ac max. approx 86' and approx 20' fnd/ftg (foundation) repair. all work confined to basement/under floor/crawl space. | $18,617 |
| Apr 10, 2013 | Completed final sign-off Apr 2013 | 611 Ulloa St | voluntary latereral strengthening, all walls ne, sw included in scope of work. install approx 62' of strus 1-5 plywd, 5/8 anchor bolts 6" oc. shear transfer ties, foundation anchors @so wall, foundation only. all work done at ground floor.Details
voluntary latereral strengthening, all walls ne, sw included in scope of work. install approx 62' of strus 1-5 plywd, 5/8 anchor bolts 6" oc. shear transfer ties, foundation anchors @so wall, foundation only. all work done at ground floor. | $8,500 |
| Jan 29, 2013 | Completed final sign-off Feb 2013 | 1914 Grove St | voluntary foundation strengthening. install approx 77 lf of struct. 1 plywood with gaming clips/angles hardware, 5/8" wedge anchor bolts. shear transfer ties l90 - a23 or kc metal equiv. spacing nail 6" max o.c. & 12" in field. plywood and other hardware to be installed on n.e. s.w. walls.Details
voluntary foundation strengthening. install approx 77 lf of struct. 1 plywood with gaming clips/angles hardware, 5/8" wedge anchor bolts. shear transfer ties l90 - a23 or kc metal equiv. spacing nail 6" max o.c. & 12" in field. plywood and other hardware to be installed on n.e. s.w. walls. | $15,000 |
| Sep 28, 2012 | Completed final sign-off Oct 2012 | 1271 02nd Av | revisions to pa# 2012-0918-0046 issued 9/18/12-install 16ft of foundation upgradeDetails
revisions to pa# 2012-0918-0046 issued 9/18/12-install 16ft of foundation upgrade | |
| Sep 18, 2012 | Never finaled issued Sep 2012, no final | 1271 02nd Av | install plywood and framing clips, angles, hardware for "voluntary strengthening" using 5 ply structural 1 plywood, nailed 6" max @ edge & 12" field - 5/8" anchor bolts, spacing 2', min. 6" embed. approx 12 l.f. of ply @ back west wall.Details
install plywood and framing clips, angles, hardware for "voluntary strengthening" using 5 ply structural 1 plywood, nailed 6" max @ edge & 12" field - 5/8" anchor bolts, spacing 2', min. 6" embed. approx 12 l.f. of ply @ back west wall. | $4,900 |
| Jun 21, 2012 | Completed final sign-off Jul 2012 | 154 Laidley St | voluntary foundation upgrade. revision to existing permit 201206182842 (no plans) install moment column and connections to floor framing above carportDetails
voluntary foundation upgrade. revision to existing permit 201206182842 (no plans) install moment column and connections to floor framing above carport | $10,500 |
| Jun 18, 2012 | Completed final sign-off Jul 2012 | 154 Laidley St | voluntary foundation upgrade,install approx 12' of 1/2" struc 1 - 5 ply plywd to east wall (crawlsp) nailed w/8d commons max 6" o.c. on edge & 12 oc in field. install simpson ufpio's on east (crawlspace)wall & w.(crawlspace)wall.install steel angles to w.wall (crawlspace),install l'90 to n,e,s wallDetails
voluntary foundation upgrade,install approx 12' of 1/2" struc 1 - 5 ply plywd to east wall (crawlsp) nailed w/8d commons max 6" o.c. on edge & 12 oc in field. install simpson ufpio's on east (crawlspace)wall & w.(crawlspace)wall.install steel angles to w.wall (crawlspace),install l'90 to n,e,s wall | $9,000 |
| May 15, 2012 | Completed final sign-off Aug 2012 | 1033 York St | voluntary strengthening. plywood shear wall, steel moment column, framing connection upgrades in garage in lower level storage areas per attached engineered plans/drawings. work does not comply with 2010 sfbc, sec. 16.11 for required lateral force upgrade.Details
voluntary strengthening. plywood shear wall, steel moment column, framing connection upgrades in garage in lower level storage areas per attached engineered plans/drawings. work does not comply with 2010 sfbc, sec. 16.11 for required lateral force upgrade. | $23,000 |
| Feb 27, 2012 | Completed final sign-off Apr 2012 | 2709 21st St | install plywood,struct 1-5 ply 1/2", framing clips/angles hardwr & bolts 5/8" anchor bolts (mech)shear transfer ties,plywood nailing 6" oc max @edge 12" oc on field. install done in crawl space @ foundation level, install @ n/e/s/w & w walls,tear out some cripple wall for voluntary fnd strengtheningDetails
install plywood,struct 1-5 ply 1/2", framing clips/angles hardwr & bolts 5/8" anchor bolts (mech)shear transfer ties,plywood nailing 6" oc max @edge 12" oc on field. install done in crawl space @ foundation level, install @ n/e/s/w & w walls,tear out some cripple wall for voluntary fnd strengthening | $21,000 |
| Feb 27, 2012 | Completed final sign-off Apr 2012 | 1226 Ulloa St | install struct 1-5 ply 1/2" plywood (appx 70') on n/s/e/w walls, framing clips/angles,bolts 5/8" anchor bolts (mech)shear transfer ties (l90, a23, or kc metal equiv)plywood nailing 6" oc max @edge 12" oc on field. install done in crawl sapce/basemnt on all walls n/e/s/w for voluntary fnd strengthenDetails
install struct 1-5 ply 1/2" plywood (appx 70') on n/s/e/w walls, framing clips/angles,bolts 5/8" anchor bolts (mech)shear transfer ties (l90, a23, or kc metal equiv)plywood nailing 6" oc max @edge 12" oc on field. install done in crawl sapce/basemnt on all walls n/e/s/w for voluntary fnd strengthen | $20,000 |
| Feb 1, 2012 | Completed final sign-off Mar 2012 | 260 Rose St | voluntary strengthening per attached plans. all work done in basement/crawlspace foundation, foundation onlyDetails
voluntary strengthening per attached plans. all work done in basement/crawlspace foundation, foundation only | $10,000 |
| Aug 9, 2011 | Completed final sign-off Sep 2011 | 2828 Green St | install plywood, struc 1 5 ply 1/2 approx. 46' @ east walls. nailing @ 6" max spacing/o.c. 6" max. 5/8" anchor bolts @ 2" o.c. @ shearwalls. shear transfer ties, l90's, a'2 or kc metal equalvent. foundation anchors (ufp10s) around remainder of perimeter where no cripple are present.Details
install plywood, struc 1 5 ply 1/2 approx. 46' @ east walls. nailing @ 6" max spacing/o.c. 6" max. 5/8" anchor bolts @ 2" o.c. @ shearwalls. shear transfer ties, l90's, a'2 or kc metal equalvent. foundation anchors (ufp10s) around remainder of perimeter where no cripple are present. | $9,100 |
| Jul 13, 2011 | Completed final sign-off Aug 2011 | 525 Laidley St | voluntary seismic strengthening. install concrete grade beam and steel moment column in garage with connection to 2nd fl diaphragm. see plans for hardware specs. - not per code requirements.Details
voluntary seismic strengthening. install concrete grade beam and steel moment column in garage with connection to 2nd fl diaphragm. see plans for hardware specs. - not per code requirements. | $10,500 |
| Jan 11, 2011 | Completed final sign-off Jan 2011 | 1271 02nd Av | install moment column and grade beam near front of garage. revision to app#201101037769. voluntary strengthening at front only.Details
install moment column and grade beam near front of garage. revision to app#201101037769. voluntary strengthening at front only. | $6,000 |
| Jan 3, 2011 | Completed final sign-off Jan 2011 | 1271 02nd Av | install plywood and framing clips/angles/hardware for voluntary strengthening, plywood 5-ly struc 1-wailing 6" max @ edge 12" , field -5/8" anchor bolt, all work @ ggrnd level fnd, approx 24' of plywood on left wall (mech) engineer plans for front/rear /rotation to be submitted as a revisionDetails
install plywood and framing clips/angles/hardware for voluntary strengthening, plywood 5-ly struc 1-wailing 6" max @ edge 12" , field -5/8" anchor bolt, all work @ ggrnd level fnd, approx 24' of plywood on left wall (mech) engineer plans for front/rear /rotation to be submitted as a revision | $5,000 |
| May 20, 2010 | Completed final sign-off Jun 2010 | 21 Homewood Ct | install plywd. & framing clips/angles/hardware for voluntary strengthening. plywd. type; 1/2" struc-1 5-ply approx. 60' to be installed around foundation perimeter as access allows. nailing-6" o.c. max. & 12" in field. bolting 2' o.c. @ plywd.Details
install plywd. & framing clips/angles/hardware for voluntary strengthening. plywd. type; 1/2" struc-1 5-ply approx. 60' to be installed around foundation perimeter as access allows. nailing-6" o.c. max. & 12" in field. bolting 2' o.c. @ plywd. | $8,000 |
| May 12, 2010 | Completed final sign-off May 2010 | 155 22nd Av | install plywood, framimg clips, angles, hardware for voluntary structural strengthening. max 6" o.c. nailing @ edge 12" in field. location of plywood on all 4 walls as access allows. approx. 59' long of plywood. bolts added @ 2'o.c. at new plywood panels, work at ground/first floor.Details
install plywood, framimg clips, angles, hardware for voluntary structural strengthening. max 6" o.c. nailing @ edge 12" in field. location of plywood on all 4 walls as access allows. approx. 59' long of plywood. bolts added @ 2'o.c. at new plywood panels, work at ground/first floor. | $6,000 |
| Dec 2, 2009 | Expired or cancelled expired Feb 2013 | 3936 20th St | install approx 12' plywood,framing angles/clis & foundation anchors in crawl space at west side of house. nailing at 3" oc edge, 12" oc field. foundation anchors, ufpio's, framing angles, l90's, h10, a33 or equiv.Details
install approx 12' plywood,framing angles/clis & foundation anchors in crawl space at west side of house. nailing at 3" oc edge, 12" oc field. foundation anchors, ufpio's, framing angles, l90's, h10, a33 or equiv. | $5,000 |
| Nov 6, 2009 | Completed final sign-off Dec 2009 | 51 Scott St | install plywood panels, framing clips, angles, hardware, tear out sheetrock at some cripple walls for voluntary strenghthening cripple walls at all perimeter, height values from about 1' to 4'. plywood 1/2 " structural 55 ply, 3' oc edge nail and 8" field nailing with 8 d 131 diam nails.Details
install plywood panels, framing clips, angles, hardware, tear out sheetrock at some cripple walls for voluntary strenghthening cripple walls at all perimeter, height values from about 1' to 4'. plywood 1/2 " structural 55 ply, 3' oc edge nail and 8" field nailing with 8 d 131 diam nails. | $10,000 |
| Nov 27, 2006 | Completed final sign-off Dec 2006 | 141 Majestic Av | retrofit done by bay area retrofit, earthquake retrofit, seismic strengthening. partial seismic strengthening allowed by exception in code section 3403.2Details
retrofit done by bay area retrofit, earthquake retrofit, seismic strengthening. partial seismic strengthening allowed by exception in code section 3403.2 | $10,700 |
| May 26, 2006 | Completed final sign-off Jun 2006 | 83 29th St | voluntary lateral upgrade. install 1/2 " struct-1 plywood w 8d@4" oc edg and 12" oc field. approx 12' at front wall, 6'@ rear wall. 12" @ ea side wall. all walls are existing walls. no plans, calcs, spec inspecDetails
voluntary lateral upgrade. install 1/2 " struct-1 plywood w 8d@4" oc edg and 12" oc field. approx 12' at front wall, 6'@ rear wall. 12" @ ea side wall. all walls are existing walls. no plans, calcs, spec inspec | $10,000 |