Block 0852, lot 014
260 Rose St
The city’s assessor roll has no record for this parcel.
Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
14 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 1, 2012 | Completed final sign-off Mar 2012 | 260 Rose St | Bay Area Retrofit | voluntary strengthening per attached plans. all work done in basement/crawlspace foundation, foundation onlyDetails
voluntary strengthening per attached plans. all work done in basement/crawlspace foundation, foundation only | $10,000 |
| Jul 30, 2009 | Completed final sign-off Aug 2009 | 291 Page St | Raymond Peng Construction | revision to permit #200510286856 showing as build location of new location of washer/dryer rooms; & omit french doors not installed in final project (e) window to remain.Details
revision to permit #200510286856 showing as build location of new location of washer/dryer rooms; & omit french doors not installed in final project (e) window to remain. | |
| Jul 22, 2009 | Completed final sign-off Jul 2009 | 291 Page St | Raymond Peng Construction | replacement in kind front entry stair. ref# 2008.09.03.0644 and 2005.10.28.6856 for dwelling unit merger.Details
replacement in kind front entry stair. ref# 2008.09.03.0644 and 2005.10.28.6856 for dwelling unit merger. | $5,000 |
| Jul 17, 2009 | Completed final sign-off Aug 2009 | 287 Page St | Structure Construction | ref pa# 2008/09/03/0644. front stair repair & handrail installation. less than 50%.Details
ref pa# 2008/09/03/0644. front stair repair & handrail installation. less than 50%. | $500 |
| May 8, 2009 | Never finaled issued May 2009, no final | 291 Page St | street spaceDetails
street space | ||
| Nov 17, 2008 | Never finaled issued Nov 2008, no final | 287 Page St | street space permitDetails
street space permit | ||
| Sep 3, 2008 | Completed final sign-off Aug 2009 | 287 Page St | Raymond Peng Construction | this subject lot consists of a three unit building which fronts page st + a one unit cottage which fronts rose st. the project is to merge units 289 + 291 in the page st. building into one unit. the page st building will change from 3 to 2 units or an r-1 to an r-3 occupancy. renewal to complete pa#Details
this subject lot consists of a three unit building which fronts page st + a one unit cottage which fronts rose st. the project is to merge units 289 + 291 in the page st. building into one unit. the page st building will change from 3 to 2 units or an r-1 to an r-3 occupancy. renewal to complete pa# | $65,000 |
| Jan 25, 2007 | Never finaled issued Jan 2007, no final | 287 Page St | street spaceDetails
street space | ||
| Jun 29, 2006 | Never finaled issued Jun 2006, no final | 287 Page St | street space permit only.Details
street space permit only. | ||
| Jun 8, 2006 | Completed final sign-off Oct 2008 | 287 Page St | Structure Construction | remove (e) brick footing at perimeter of building. replace w/ new concrete slab on grade & perimeter footing. add new bath, mech. space, & laundry. new walls only as shown on plan a.2. no changes to footprint or envelopeDetails
remove (e) brick footing at perimeter of building. replace w/ new concrete slab on grade & perimeter footing. add new bath, mech. space, & laundry. new walls only as shown on plan a.2. no changes to footprint or envelope | $110,000 |
| Oct 28, 2005 | Expired or cancelled expired Mar 2009 | 287 Page St | Structure Construction | merge units 289 and 291 ain page st bldg into one. building will change from 3 to 2 units or r-1 to r-3 occupancyDetails
merge units 289 and 291 ain page st bldg into one. building will change from 3 to 2 units or r-1 to r-3 occupancy | $85,000 |
| Sep 22, 2005 | Never finaled issued Sep 2005, no final | 291 Page St | S'top Home Service Roofing Co. Inc. | reroofingDetails
reroofing | $16,880 |
| Sep 7, 2005 | Expired or cancelled expired Oct 2018 | 260 Rose St | kitchen and bath remodel. replace tub,sink, fridge,oven,toiletDetails
kitchen and bath remodel. replace tub,sink, fridge,oven,toilet | $20,000 | |
| Jun 18, 2002 | Completed final sign-off Jul 2002 | 291 Page St | Ceremony Remodel & Design | repair in kind less than 20% repair. abate n.o.v. 200229380.repair treads on front & rear stairs.Details
repair in kind less than 20% repair. abate n.o.v. 200229380.repair treads on front & rear stairs. | $600 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Raymond Peng Construction (3), Structure Construction (3), Bay Area Retrofit, Ceremony Remodel & Design, S'top Home Service Roofing Co. Inc.
- Architects
- Wade Skeels
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.