Permit GraphShortlistSan Francisco building permits since 2000

Block 2113, lot 016

1959 21st Ave

City’s use
Single Family Residential
Built
1938
Stories
1
Units
1
Rooms
2 bedrooms, 1 bathroom
Building
1,125 sq ft
Lot
3,000 sq ft
Zoning
RH1
Construction type
D

From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map

Permits filed here

6 permits filed for this property since 2000.

CompletedIn progressNever finaledExpired or cancelled
FiledOutcomeAddressContractorWork described on the permitDeclared cost
Sep 17, 2026Completed
final sign-off Nov 2026
1959 21st AvBay Area Retrofitinstall (30)hilti 5/8 x 8 1/2 k22 bolts, (20) simpson hdve3 holddowns (50) simpson l90s or equivalent. work is not intended to meet any building code requirements. job also includes 68 linear feet of plywood nailed w/8d commons 3" o.c. on edges and 12" o.c. in field. this work is purely voluntary.
Details
Permit
202609178284
Permit issued
Sep 17, 2026
Final sign-off
Nov 9, 2026

install (30)hilti 5/8 x 8 1/2 k22 bolts, (20) simpson hdve3 holddowns (50) simpson l90s or equivalent. work is not intended to meet any building code requirements. job also includes 68 linear feet of plywood nailed w/8d commons 3" o.c. on edges and 12" o.c. in field. this work is purely voluntary.

Open the permit page

$36,385
Sep 19, 2025Completed
final sign-off Feb 2026
1959 21st AvS & J Constructions Incbathroom remodel like for like, and 1 window replacement to temper glazing, non street visible. u<=0.30
Details
Permit
202509195767
Permit issued
Sep 19, 2025
Final sign-off
Feb 25, 2026

bathroom remodel like for like, and 1 window replacement to temper glazing, non street visible. u<=0.30

Open the permit page

$10,000
Feb 24, 2025Completed
final sign-off May 2025
1959 21st AvRedwood Roofing Core-roofing: remove and replace roofing material / existing roofing material (in-kind)
Details
Permit
202502240893
Permit issued
Feb 24, 2025
Final sign-off
May 14, 2025

re-roofing: remove and replace roofing material / existing roofing material (in-kind)

Open the permit page

$15,000
Jul 7, 2023Completed
final sign-off Oct 2023
1959 21st AvS & J Constructions Increplace (e) furnace and water heater on the ground floor. replace (e) window at kitchen in-kind (window is not facing public way).
Details
Permit
202307071675
Permit issued
Jul 7, 2023
Final sign-off
Oct 31, 2023

replace (e) furnace and water heater on the ground floor. replace (e) window at kitchen in-kind (window is not facing public way).

Open the permit page

$10,000
Apr 5, 2023Completed
final sign-off Oct 2023
1959 21st AvS & J Constructions Inckitchen remodel and change subpanel box with more breaker spaces. no changes in floor layout.
Details
Permit
202304055109
Permit issued
Apr 5, 2023
Final sign-off
Oct 6, 2023

kitchen remodel and change subpanel box with more breaker spaces. no changes in floor layout.

Open the permit page

$25,000
Apr 15, 2002Completed
final sign-off Sep 2002
1959 21st AvVision Constructionremodel bathroom- upstairs, hallway. no structural work. change water line.
Details
Permit
200204153918
Permit issued
Apr 15, 2002
Final sign-off
Sep 23, 2002

remodel bathroom- upstairs, hallway. no structural work. change water line.

Open the permit page

$5,000

Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

Contractors
S & J Constructions Inc (3), Bay Area Retrofit, Redwood Roofing Co, Vision Construction
Authorized agents
Dong Liang

Find contractors for work like this

Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.