Permit GraphShortlistSan Francisco building permits since 2000

S & J Constructions Inc

Contractor license
1029506
State license record
Based in
San Carlos
On San Francisco permits
Jan 2019 to Sep 2025
Last 24 months
1 permit filed

6 permits since 2000: 6 completed.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywideThis contractor’s finished permits

Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.

Most recent permits

AllKitchen remodel 4Bathroom remodel 4
FiledOutcomeAddressWork described on the permitDeclared cost
Sep 19, 2025Completed
final sign-off Feb 2026
1959 21st Avbathroom remodel like for like, and 1 window replacement to temper glazing, non street visible. u<=0.30
Details
Permit
202509195767
Status
complete
Filed
Sep 19, 2025
Permit issued
Sep 19, 2025
Final sign-off
Feb 25, 2026
Declared cost
$10,000
Address
1959 21st Av

bathroom remodel like for like, and 1 window replacement to temper glazing, non street visible. u<=0.30

Open the permit page

$10,000
Jul 7, 2023Completed
final sign-off Oct 2023
1959 21st Avreplace (e) furnace and water heater on the ground floor. replace (e) window at kitchen in-kind (window is not facing public way).
Details
Permit
202307071675
Status
complete
Filed
Jul 7, 2023
Permit issued
Jul 7, 2023
Final sign-off
Oct 31, 2023
Declared cost
$10,000
Address
1959 21st Av

replace (e) furnace and water heater on the ground floor. replace (e) window at kitchen in-kind (window is not facing public way).

Open the permit page

$10,000
Apr 5, 2023Completed
final sign-off Oct 2023
1959 21st Avkitchen remodel and change subpanel box with more breaker spaces. no changes in floor layout.
Details
Permit
202304055109
Status
complete
Filed
Apr 5, 2023
Permit issued
Apr 5, 2023
Final sign-off
Oct 6, 2023
Declared cost
$25,000
Address
1959 21st Av

kitchen remodel and change subpanel box with more breaker spaces. no changes in floor layout.

Open the permit page

$25,000
Feb 16, 2022Completed
final sign-off Jul 2022
5924 Fulton Stremodel (e) kitchen & bathroom in kind. add ceiling lights (h.e. lighting). replace (e) windows in-kind at kitchen, bathroom & bedroom facing the rear yard. relocate (e) subpanel at g/f to the 2/f. total (3) windows. replacement max u-factor = 0.40
Details
Permit
202202168144
Status
complete
Filed
Feb 16, 2022
Permit issued
Feb 16, 2022
Final sign-off
Jul 13, 2022
Declared cost
$35,000
Address
5924 Fulton St

remodel (e) kitchen & bathroom in kind. add ceiling lights (h.e. lighting). replace (e) windows in-kind at kitchen, bathroom & bedroom facing the rear yard. relocate (e) subpanel at g/f to the 2/f. total (3) windows. replacement max u-factor = 0.40

Open the permit page

$35,000
Feb 4, 2021Completed
final sign-off Feb 2022
3532 Divisadero Stadd a wine cellar cooling refrigeration at ground fl storage rm for wine storage. add lighting & insulation to the rm. remodel 1 full bath and one half bath at 3rd fl. extend the closet out of bedrm area.
Details
Permit
202102044051
Status
complete
Filed
Feb 4, 2021
Permit issued
Apr 8, 2021
Final sign-off
Feb 24, 2022
Declared cost
$30,000
Address
3532 Divisadero St

add a wine cellar cooling refrigeration at ground fl storage rm for wine storage. add lighting & insulation to the rm. remodel 1 full bath and one half bath at 3rd fl. extend the closet out of bedrm area.

Open the permit page

$30,000
Jan 11, 2019Completed
final sign-off Apr 2019
5922 Fulton Stremodel bathroom, upgrade kitchen cabinets doors. upgrade all electrical and relocated existing sub panel. 3 existing window @ rear yard. on the upper unit. work not visible from public right of way.
Details
Permit
201901110176
Status
complete
Filed
Jan 11, 2019
Permit issued
Jan 15, 2019
Final sign-off
Apr 4, 2019
Declared cost
$35,000
Address
5922 Fulton St

remodel bathroom, upgrade kitchen cabinets doors. upgrade all electrical and relocated existing sub panel. 3 existing window @ rear yard. on the upper unit. work not visible from public right of way.

Open the permit page

$35,000