Back to bathroom remodel contractors
S & J Constructions Inc
- Based in
- San Carlos
- On San Francisco permits
- Jan 2019 to Sep 2025
- Last 24 months
- 1 permit filed
6 permits since 2000: 6 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 4 completed. Typically 2 days from filing to permit and 153 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 19, 2025 | Completed final sign-off Feb 2026 | 1959 21st Av | bathroom remodel like for like, and 1 window replacement to temper glazing, non street visible. u<=0.30Details
bathroom remodel like for like, and 1 window replacement to temper glazing, non street visible. u<=0.30 | $10,000 |
| Feb 16, 2022 | Completed final sign-off Jul 2022 | 5924 Fulton St | remodel (e) kitchen & bathroom in kind. add ceiling lights (h.e. lighting). replace (e) windows in-kind at kitchen, bathroom & bedroom facing the rear yard. relocate (e) subpanel at g/f to the 2/f. total (3) windows. replacement max u-factor = 0.40Details
remodel (e) kitchen & bathroom in kind. add ceiling lights (h.e. lighting). replace (e) windows in-kind at kitchen, bathroom & bedroom facing the rear yard. relocate (e) subpanel at g/f to the 2/f. total (3) windows. replacement max u-factor = 0.40 | $35,000 |
| Feb 4, 2021 | Completed final sign-off Feb 2022 | 3532 Divisadero St | add a wine cellar cooling refrigeration at ground fl storage rm for wine storage. add lighting & insulation to the rm. remodel 1 full bath and one half bath at 3rd fl. extend the closet out of bedrm area.Details
add a wine cellar cooling refrigeration at ground fl storage rm for wine storage. add lighting & insulation to the rm. remodel 1 full bath and one half bath at 3rd fl. extend the closet out of bedrm area. | $30,000 |
| Jan 11, 2019 | Completed final sign-off Apr 2019 | 5922 Fulton St | remodel bathroom, upgrade kitchen cabinets doors. upgrade all electrical and relocated existing sub panel. 3 existing window @ rear yard. on the upper unit. work not visible from public right of way.Details
remodel bathroom, upgrade kitchen cabinets doors. upgrade all electrical and relocated existing sub panel. 3 existing window @ rear yard. on the upper unit. work not visible from public right of way. | $35,000 |