Sergio S. Sanchez
- Listed as
- authorized agent-others, contractor
- Firm
- S & J Constructions Inc
- Based in
- San Carlos
- On San Francisco permits
- Jan 2019 to Sep 2025
6 permits since 2000 (contractor on 6 permits, authorized agent-others on 1 permit): 6 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 19, 2025 | Completed final sign-off Feb 2026 | 1959 21st Av | S & J Constructions Inc | bathroom remodel like for like, and 1 window replacement to temper glazing, non street visible. u<=0.30Details
bathroom remodel like for like, and 1 window replacement to temper glazing, non street visible. u<=0.30 | $10,000 |
| Jul 7, 2023 | Completed final sign-off Oct 2023 | 1959 21st Av | S & J Constructions Inc | replace (e) furnace and water heater on the ground floor. replace (e) window at kitchen in-kind (window is not facing public way).Details
replace (e) furnace and water heater on the ground floor. replace (e) window at kitchen in-kind (window is not facing public way). | $10,000 |
| Apr 5, 2023 | Completed final sign-off Oct 2023 | 1959 21st Av | S & J Constructions Inc | kitchen remodel and change subpanel box with more breaker spaces. no changes in floor layout.Details
kitchen remodel and change subpanel box with more breaker spaces. no changes in floor layout. | $25,000 |
| Feb 16, 2022 | Completed final sign-off Jul 2022 | 5924 Fulton St | S & J Constructions Inc | remodel (e) kitchen & bathroom in kind. add ceiling lights (h.e. lighting). replace (e) windows in-kind at kitchen, bathroom & bedroom facing the rear yard. relocate (e) subpanel at g/f to the 2/f. total (3) windows. replacement max u-factor = 0.40Details
remodel (e) kitchen & bathroom in kind. add ceiling lights (h.e. lighting). replace (e) windows in-kind at kitchen, bathroom & bedroom facing the rear yard. relocate (e) subpanel at g/f to the 2/f. total (3) windows. replacement max u-factor = 0.40 | $35,000 |
| Feb 4, 2021 | Completed final sign-off Feb 2022 | 3532 Divisadero St | S & J Constructions Inc | add a wine cellar cooling refrigeration at ground fl storage rm for wine storage. add lighting & insulation to the rm. remodel 1 full bath and one half bath at 3rd fl. extend the closet out of bedrm area.Details
add a wine cellar cooling refrigeration at ground fl storage rm for wine storage. add lighting & insulation to the rm. remodel 1 full bath and one half bath at 3rd fl. extend the closet out of bedrm area. | $30,000 |
| Jan 11, 2019 | Completed final sign-off Apr 2019 | 5922 Fulton St | S & J Constructions Inc | remodel bathroom, upgrade kitchen cabinets doors. upgrade all electrical and relocated existing sub panel. 3 existing window @ rear yard. on the upper unit. work not visible from public right of way.Details
remodel bathroom, upgrade kitchen cabinets doors. upgrade all electrical and relocated existing sub panel. 3 existing window @ rear yard. on the upper unit. work not visible from public right of way. | $35,000 |