Block 2824, lot 001
98 Midcrest Way
- City’s use
- Single Family Residential
- Built
- 1953
- Stories
- 1
- Units
- 1
- Rooms
- 2 bedrooms, 2 bathrooms
- Building
- 1,493 sq ft
- Lot
- 4,094 sq ft
- Zoning
- RH1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
7 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 17, 2020 | Completed final sign-off Feb 2021 | 98 Midcrest Wy | Di Vine Construction | remove exterior drywall and install insulation. partition dry wall walls to stay. in kind 700 sf dining lv 2 bdrmDetails
remove exterior drywall and install insulation. partition dry wall walls to stay. in kind 700 sf dining lv 2 bdrm | $15,000 |
| Aug 15, 2020 | Completed final sign-off Feb 2021 | 98 Midcrest Wy | (e) family room into bedroom 2/f, add closet & skylight @ foyer, install ceiling insulation @ living, dining & kitchen, new glass guardrail @ interior stair 2/f, replace decking/guarrail rear of building, extend 2 feet deck on side & rear of buildingDetails
(e) family room into bedroom 2/f, add closet & skylight @ foyer, install ceiling insulation @ living, dining & kitchen, new glass guardrail @ interior stair 2/f, replace decking/guarrail rear of building, extend 2 feet deck on side & rear of building | $30,000 | |
| Jun 22, 2020 | Completed final sign-off Feb 2021 | 98 Midcrest Wy | Di Vine Construction | one bathroom remodel in-kind on 2nd floor. replace toilet, sink, shower tiles. all in kind.Details
one bathroom remodel in-kind on 2nd floor. replace toilet, sink, shower tiles. all in kind. | $5,000 |
| Jan 13, 2012 | Completed final sign-off May 2012 | 98 Midcrest Wy | Coll Construction, Inc. | interior remodel on ground floor - conversion of (e) lower floor into (n) master suite, (n) bedroom, (n) bath, (n) electrical, lighting ,outlet, misc wiring , (n) plbg for master bath, (n) windows & doors @ rear lower floor, not visible.Details
interior remodel on ground floor - conversion of (e) lower floor into (n) master suite, (n) bedroom, (n) bath, (n) electrical, lighting ,outlet, misc wiring , (n) plbg for master bath, (n) windows & doors @ rear lower floor, not visible. | $25,000 |
| Oct 19, 2011 | Completed final sign-off Dec 2011 | 98 Midcrest Wy | Coll Construction, Inc. | remove all existing siding dryrot and replace with new. replace damage windows with new paint, all new siding.Details
remove all existing siding dryrot and replace with new. replace damage windows with new paint, all new siding. | $2,500 |
| Sep 28, 2006 | Completed final sign-off Dec 2006 | 98 Midcrest Wy | 21st Century Home Improvt | remove and replace 7 vinyl windows, in kind. rear only min u factor 0.67Details
remove and replace 7 vinyl windows, in kind. rear only min u factor 0.67 | $8,000 |
| Mar 30, 2004 | Expired or cancelled expired Feb 2005 | 98 Midcrest Wy | Capital Design Builders | add stairs to existing rear decks replace retaining wallDetails
add stairs to existing rear decks replace retaining wall | $3,500 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.