Amir Shahmirza
- Listed as
- architect, authorized agent-others, engineer
- Firm
- Asi Consulting Engineers
- Based in
- Millbrae
- On San Francisco permits
- Oct 2005 to Aug 2024
40 permits since 2000 (engineer on 37 permits, architect on 2 permits, authorized agent-others on 1 permit): 29 completed, 1 in progress, 5 never finaled, 5 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 19, 2024 | In progress issued Dec 2024 | 959 Powell St | Blu World Construction | repair fire damaged framing. repair all floors where all wall and ceiling interior finishes, damaged windows and doors and damaged plumbing fixtures removed due to fire, smoke and water damage. comply with nov 202305188Details
repair fire damaged framing. repair all floors where all wall and ceiling interior finishes, damaged windows and doors and damaged plumbing fixtures removed due to fire, smoke and water damage. comply with nov 202305188 | $900,000 |
| Feb 9, 2024 | Completed final sign-off Sep 2024 | 1794 Newcomb Av | Ward-Tek Inc. | in kind repairs due to fire and water damage. remove/replace damaged roof sheathing, plywood and roof assembly. remove/replace interior finishes, frywall, insulation, in kind. replace floor joists on first floor. replace damaged electrical and plumbing fixtures. no exterior work.Details
in kind repairs due to fire and water damage. remove/replace damaged roof sheathing, plywood and roof assembly. remove/replace interior finishes, frywall, insulation, in kind. replace floor joists on first floor. replace damaged electrical and plumbing fixtures. no exterior work. | $700,000 |
| Jan 4, 2024 | Completed final sign-off Sep 2025 | 821 Ingerson Av | Service Master Restoration Svcs/Sharjo | to comply with nov 202306858. r/r damaged wall interior & exterior finishes, floor finish & ceiling finish in kind. r/r damaged windows & door in kind. r/r roof frame in kind. r/r damage mep and go new. repair fire damage to north & west side walls of structure.Details
to comply with nov 202306858. r/r damaged wall interior & exterior finishes, floor finish & ceiling finish in kind. r/r damaged windows & door in kind. r/r roof frame in kind. r/r damage mep and go new. repair fire damage to north & west side walls of structure. | $10,000 |
| Nov 20, 2023 | Completed final sign-off Aug 2025 | 724 Irving St | Hargens Inc. | fire repair remove and replace interior wall and ceiling finishes damaged by fire. repair damaged walls and roof framing over 1st fl. storage room repair, damaged 2nd fl. joist above commercial retail area. restroom upgrade for accessibility.Details
fire repair remove and replace interior wall and ceiling finishes damaged by fire. repair damaged walls and roof framing over 1st fl. storage room repair, damaged 2nd fl. joist above commercial retail area. restroom upgrade for accessibility. | $50,000 |
| Apr 20, 2023 | Never finaled issued May 2023, no final | 1271 20th Av | Alonzo Construction | 3/f:demo plaster & replace w/plywood/sheetrock, remodel 1-kitchen,1-full bath & 1/2 bath, add 1-sink & shower, upgrade elec & plumbing, new furnace, replace all windows; 2/f: same as 3/f reno & basement- strengtening (e)walkway adding plywood, add 2-2x10 to extg joistDetails
3/f:demo plaster & replace w/plywood/sheetrock, remodel 1-kitchen,1-full bath & 1/2 bath, add 1-sink & shower, upgrade elec & plumbing, new furnace, replace all windows; 2/f: same as 3/f reno & basement- strengtening (e)walkway adding plywood, add 2-2x10 to extg joist | $288,000 |
| Oct 21, 2022 | Completed final sign-off Aug 2023 | 25 Justin Dr | Robert Bernhard Coatings/Rbc Inc | repairs to fire damage: main level kitchen and bathroom garage level bathroom rebuild. comply with nov 202297306Details
repairs to fire damage: main level kitchen and bathroom garage level bathroom rebuild. comply with nov 202297306 | $300,000 |
| Oct 6, 2021 | Completed final sign-off Sep 2022 | 908 Cabrillo St | Buzzer 9 Development Inc | adding cement footing to middle spine of house non-stuctural closet framing on second story rev to pa#2021-0607-1791Details
adding cement footing to middle spine of house non-stuctural closet framing on second story rev to pa#2021-0607-1791 | $5,000 |
| Jun 16, 2021 | Expired or cancelled expired Apr 2025 | 440 Davis Ct | Ati Restoration Llc | unit 1118: fire damage repair. install metal stud framing, electrical, plumbing to be installed to 9e) drain, insulation, drywalls and finish work.Details
unit 1118: fire damage repair. install metal stud framing, electrical, plumbing to be installed to 9e) drain, insulation, drywalls and finish work. | $40,000 |
| Jun 7, 2021 | Completed final sign-off Sep 2022 | 908 Cabrillo St | Buzzer 9 Development Inc | fire repair. replace damaged interior finishes w/ new, typical to 1st and 2nd flrs. replace damaged walls on 2nd flr. replace damaged roof rafters.Details
fire repair. replace damaged interior finishes w/ new, typical to 1st and 2nd flrs. replace damaged walls on 2nd flr. replace damaged roof rafters. | $150,000 |
| Oct 2, 2020 | Expired or cancelled expired Jul 2026 | 1270 La Playa | Gendros Construction, Wei Dang Builders Inc. | comply w/nov#202013641. repair of fire in 3f & repair at all floors where all inerior finishes including walls & ceilings are removed due to smoke & water damage. (e) framing on 1f where framing has been exposed have been strengthened accordingly. all other units at every fl has smoke & water damageDetails
comply w/nov#202013641. repair of fire in 3f & repair at all floors where all inerior finishes including walls & ceilings are removed due to smoke & water damage. (e) framing on 1f where framing has been exposed have been strengthened accordingly. all other units at every fl has smoke & water damage | $2,000,000 |
| Feb 20, 2020 | Completed final sign-off Jun 2020 | 458 Castro St | S C Anderson Group International Inc. | partial compliance of nov #201901751. demolition of fire damage stairs at exterior rear of bldg. demolition of fire damaged roof per plan. frame to shrink wrap temporary roof for weather protection.Details
partial compliance of nov #201901751. demolition of fire damage stairs at exterior rear of bldg. demolition of fire damaged roof per plan. frame to shrink wrap temporary roof for weather protection. | $60,000 |
| Mar 18, 2019 | Completed final sign-off Oct 2019 | 2034 Irving St | American Technologies Inc | to comply with nov #201810861, fire damage repair over existing lightwell.Details
to comply with nov #201810861, fire damage repair over existing lightwell. | $75,000 |
| Jun 18, 2018 | Completed final sign-off Jan 2019 | 1420 Taylor St | Maven Maintenance Inc | comply with nov #201832531. remove and replace exterior and interior finishes siding in kind. no exreior work visible from street.Details
comply with nov #201832531. remove and replace exterior and interior finishes siding in kind. no exreior work visible from street. | $100,000 |
| May 16, 2017 | Completed final sign-off Jun 2017 | 3120 Mission St | California Concrete | pipe installation and slab repair for installation of a fire sprinkler.Details
pipe installation and slab repair for installation of a fire sprinkler. | $5,000 |
| Jan 5, 2017 | Completed final sign-off Nov 2017 | 5731 Mission St | Britannia Construction, Inc. | amend to pa 2016-1129-3624 for interior fire damage repair to include plans per field inspector. no changes in work, for cosmetic repairs only.Details
amend to pa 2016-1129-3624 for interior fire damage repair to include plans per field inspector. no changes in work, for cosmetic repairs only. | |
| Dec 20, 2016 | Completed final sign-off Sep 2018 | 143 San Jose Av | Kashaneh Construction | add new bathroom at basement, 1st, 2nd and 3rd floors, remove and replace damaged roof rafter. strengthening 1st fl framing.Details
add new bathroom at basement, 1st, 2nd and 3rd floors, remove and replace damaged roof rafter. strengthening 1st fl framing. | $250,000 |
| Oct 7, 2016 | Completed final sign-off Apr 2017 | 345 09th St | Zone 4 Power Inc | provide handicap accessible entrance, add accessible door, material to match existing windows, transam to remain. n/a ordinance #155-13Details
provide handicap accessible entrance, add accessible door, material to match existing windows, transam to remain. n/a ordinance #155-13 | $10,000 |
| Aug 22, 2016 | Completed final sign-off Sep 2018 | 143 San Jose Av | to comply with nov #201630771. fire damage repair, remove and replace extg. porch faming, damaged interior finishes and damaged extg doors. add half bath at basement and minor changes to first floor plan.Details
to comply with nov #201630771. fire damage repair, remove and replace extg. porch faming, damaged interior finishes and damaged extg doors. add half bath at basement and minor changes to first floor plan. | $500,000 | |
| Aug 1, 2016 | Never finaled issued Oct 2016, no final | 160 Saint Elmo Wy | Har Bro Of No. California | repair damaged deck to sinking concrete piers due to soil errosion.Details
repair damaged deck to sinking concrete piers due to soil errosion. | $2,500 |
| Mar 16, 2016 | Never finaled issued Apr 2016, no final | 1409 43rd Av | Britannia Construction, Inc. | fire, smoke, and water damage repair in-kind. voluntary structural strengthening per plan.Details
fire, smoke, and water damage repair in-kind. voluntary structural strengthening per plan. | $176,000 |
| Oct 22, 2015 | Completed final sign-off Aug 2016 | 204 Dore St | Har Bro Of No. California | to comply with nov# 201571471. fire damaged exterior side wall in kind, remove & replace damaged interior door. n/a ordinance #155-13.Details
to comply with nov# 201571471. fire damaged exterior side wall in kind, remove & replace damaged interior door. n/a ordinance #155-13. | $150,000 |
| Sep 25, 2015 | Completed final sign-off Sep 2019 | 163 Maynard St | Spiteri Builders Corp. | repair fire damaged to comply with nov# 201544391 dated 4/30/2015, repair damaged roof area in kind, remove & replace damaged wall, kitchen counter and interior stairs at rear side.Details
repair fire damaged to comply with nov# 201544391 dated 4/30/2015, repair damaged roof area in kind, remove & replace damaged wall, kitchen counter and interior stairs at rear side. | $285,000 |
| Jun 11, 2015 | Completed final sign-off Feb 2016 | 3835 19th St | Har Bro Of No. California | to comply w/nov #201523061 for item #3 - 3rd floor fire damaged repair (item #3) in unit # 302 and #303 per plan.Details
to comply w/nov #201523061 for item #3 - 3rd floor fire damaged repair (item #3) in unit # 302 and #303 per plan. | $80,000 |
| Jun 1, 2015 | Expired or cancelled expired Jun 2017 | 740 Earl St | revision to pa #2015.0205.7625 - alteration of foundation, n/a maher ordinance.foundation revision per plan - as built.Details
revision to pa #2015.0205.7625 - alteration of foundation, n/a maher ordinance.foundation revision per plan - as built. | $5,000 | |
| Dec 4, 2014 | Expired or cancelled expired Oct 2016 | 100 Broad St | Mark Scott Construction Inc, D'angeles Construction | repair car damage area and legalizing existing bedrooms and install new windows at front and side of the building on ground floor.Details
repair car damage area and legalizing existing bedrooms and install new windows at front and side of the building on ground floor. | $13,000 |
| Aug 19, 2014 | Expired or cancelled expired Jun 2017 | 288 24th Av | Mark Scott Construction Inc | fire damaged repair, repair scab s (2) 2x6 to existing roof rafter & add some sheathing to existing wall.Details
fire damaged repair, repair scab s (2) 2x6 to existing roof rafter & add some sheathing to existing wall. | $90,000 |
| Aug 13, 2014 | Completed final sign-off Apr 2016 | 1121 Clement St | Chubby Construction, A Plus Builder | fire damaged, fire & water damaged repair. erpair area at 1st, 2nd & 3rd floor. restaurant layout will be deferred submittal.all exterior street visible work shall be replaced in kind.Details
fire damaged, fire & water damaged repair. erpair area at 1st, 2nd & 3rd floor. restaurant layout will be deferred submittal.all exterior street visible work shall be replaced in kind. | $600,000 |
| Jun 2, 2014 | Completed final sign-off Apr 2015 | 1375 Shafter Av | Mark Scott Construction Inc | fire damaged repair in kindDetails
fire damaged repair in kind | $16,211 |
| Mar 31, 2014 | Completed final sign-off Mar 2015 | 1408 46th Av | Har Bro Of No. California | to comply with nov# 201447351 dated 1/14/2014, bomb explosion, remove & replace damaged walls and roof rafter, add 2 new post & foundation.Details
to comply with nov# 201447351 dated 1/14/2014, bomb explosion, remove & replace damaged walls and roof rafter, add 2 new post & foundation. | $35,000 |
| Feb 21, 2014 | Never finaled issued Feb 2014, no final | 4099 Judah St | Har Bro Of No. California | temporary shoring for removal of lath and plaster in unit 1408 and garage ceiling. walls and ceilings affected by explosion. exploratory demo only as required by city inspector.Details
temporary shoring for removal of lath and plaster in unit 1408 and garage ceiling. walls and ceilings affected by explosion. exploratory demo only as required by city inspector. | $8,000 |
| Nov 25, 2013 | Completed final sign-off May 2015 | 175 Farallones St | Mark Scott Construction Inc | fire damage less than 50% repair of exterior stair & it's deck in kind.Details
fire damage less than 50% repair of exterior stair & it's deck in kind. | $40,278 |
| May 2, 2013 | Completed final sign-off Nov 2013 | 2857 Mission St | Bay Metro Corporation | revision to pa#'s 2004-0209-5913, 2004-0524-4643, 2013-0502-5952, 2013-0502-5956-change coffee shop (b) back to original use retail (m). repair fire damage & bathroom upgradesDetails
revision to pa#'s 2004-0209-5913, 2004-0524-4643, 2013-0502-5952, 2013-0502-5956-change coffee shop (b) back to original use retail (m). repair fire damage & bathroom upgrades | $30,000 |
| Nov 6, 2012 | Never finaled issued Dec 2012, no final | 1552 Ocean Av | Har Bro Of No. California | ab-004. priority processing by mayor's office. to erect 1 story retail & restaurant commercial building.Details
ab-004. priority processing by mayor's office. to erect 1 story retail & restaurant commercial building. | $400,000 |
| Oct 31, 2012 | Completed final sign-off Mar 2016 | 204 Valencia St | April Electrical & Constructor, Kells Construction Inc., A W Construction Company | asi scope of work is limited to repair in kind due to fire damage only. does not include seismic upgrade. up grade of any extg condition and to comply with #201224641Details
asi scope of work is limited to repair in kind due to fire damage only. does not include seismic upgrade. up grade of any extg condition and to comply with #201224641 | $100,000 |
| Jul 31, 2012 | Completed final sign-off Jan 2013 | 1109 Elm St | Partee Construction Co | revision to appl #2012.0524.1170 - width of rear exit deck changed ti 2'-4".Details
revision to appl #2012.0524.1170 - width of rear exit deck changed ti 2'-4". | |
| Jun 9, 2010 | Completed final sign-off May 2011 | 705 Banks St | Har Bro Of No. California | fire repair/ remove and replace drywall, minor framing repair, new elec, plumbing repair, new hvac, new kitchen . new garage door, remove walls in garage and convert back to parking space.Details
fire repair/ remove and replace drywall, minor framing repair, new elec, plumbing repair, new hvac, new kitchen . new garage door, remove walls in garage and convert back to parking space. | $80,000 |
| Feb 12, 2010 | Completed final sign-off Nov 2010 | 268 Frederick St | Har Bro Of No. California | repair fire damage, repair of existing fire damage membrane. scope of work does not include seismic upgrade of existing bldg. voluntary strengthening of framing is done by adding plywood at perimeter walls, moment frame & pad footing @ ground floor.Details
repair fire damage, repair of existing fire damage membrane. scope of work does not include seismic upgrade of existing bldg. voluntary strengthening of framing is done by adding plywood at perimeter walls, moment frame & pad footing @ ground floor. | $200,000 |
| Jun 22, 2009 | Completed final sign-off Jun 2009 | 475 Brannan St | Howard S. Wright Constructors Lp | 3rd floor install 2 fire smoke dampers.Details
3rd floor install 2 fire smoke dampers. | $1,500 |
| May 15, 2009 | Completed final sign-off Nov 2009 | 12 Washburn St | Har Bro Of No. California | fire repair, new electric, some plumbing, minor framing repair, new drywall, new kitchen cabinets, roof repair, window replacement, stucco repair, siding replacement. all work in kind, no change to floor planDetails
fire repair, new electric, some plumbing, minor framing repair, new drywall, new kitchen cabinets, roof repair, window replacement, stucco repair, siding replacement. all work in kind, no change to floor plan | $45,000 |
| Oct 11, 2005 | Completed final sign-off Jun 2006 | 301 Marina Bl | Har Bro Of No. California | reconfigure (e)bathroom @2/f,replace fire damaged,(e)non conforming stair with 5'diameter spiral staircase from 3/f to (e)roof deck (350.6 sq.ft.).reconfigure (e)bathroom into 2 bathrooms @3/f,repair (e)parapet wall & upgrade to 36"high roofdeck guardrail @ roof level.replace fire damaged (e)roofDetails
reconfigure (e)bathroom @2/f,replace fire damaged,(e)non conforming stair with 5'diameter spiral staircase from 3/f to (e)roof deck (350.6 sq.ft.).reconfigure (e)bathroom into 2 bathrooms @3/f,repair (e)parapet wall & upgrade to 36"high roofdeck guardrail @ roof level.replace fire damaged (e)roof | $120,000 |