Block 0181, lot 023
1420 Taylor St
- City’s use
- Multi-Family Residential
- Built
- 1911
- Stories
- 3
- Units
- 14
- Rooms
- 13 bathrooms
- Building
- 9,925 sq ft
- Lot
- 4,055 sq ft
- Zoning
- RM3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
29 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 14, 2025 | Completed final sign-off Jun 2025 | 1420 Taylor St | Bkr Services Inc Dba Bkr Construction Se | unit 10: kitchen remodel in kind- new cabinets and countertops. no change to floor layout. no change to wall layout. no structural work. maintain (e) fire rating and separation.Details
unit 10: kitchen remodel in kind- new cabinets and countertops. no change to floor layout. no change to wall layout. no structural work. maintain (e) fire rating and separation. | $25,000 |
| Sep 15, 2023 | Completed final sign-off Nov 2023 | 1420 Taylor St | Bkr Services Inc Dba Bkr Construction Se | unit 4: upgrade electrical in unit open walls and ceiling upgrade wire and panel remove knob and to be wiring bedroom hall kitchen. repair lath and plaster after install.Details
unit 4: upgrade electrical in unit open walls and ceiling upgrade wire and panel remove knob and to be wiring bedroom hall kitchen. repair lath and plaster after install. | $40,000 |
| May 31, 2023 | Completed final sign-off Oct 2023 | 1420 Taylor St | K N J General Construction | apt c kitchen remodel, new cabinets, countertop and appliances. no structural or removal of wallDetails
apt c kitchen remodel, new cabinets, countertop and appliances. no structural or removal of wall | $17,000 |
| Aug 2, 2022 | Completed final sign-off Oct 2022 | 1420 Taylor St | K N J General Construction | apt 5: kitchen remodeling: new countertop, cabinets appliances, flooring: bath remodeling: replace tub, shower fixtures, vanity and toilet. no structural or removal of wallDetails
apt 5: kitchen remodeling: new countertop, cabinets appliances, flooring: bath remodeling: replace tub, shower fixtures, vanity and toilet. no structural or removal of wall | $30,000 |
| Mar 7, 2022 | Never finaled issued Mar 2022, no final | 1420 Taylor St | K N J General Construction | apt #6: bath remodeling. remove/replace tub, toilet & vanity. no removal of wall.Details
apt #6: bath remodeling. remove/replace tub, toilet & vanity. no removal of wall. | $12,000 |
| Jul 13, 2021 | Never finaled issued Jul 2021, no final | 1420 Taylor St | Architectural Fenestration & Restoration | furnish and install 15 wood windows in kind and like type double hung to existing openings on street facing front of building. wood windows with ogee lugs. no change to opening size.Details
furnish and install 15 wood windows in kind and like type double hung to existing openings on street facing front of building. wood windows with ogee lugs. no change to opening size. | $17,250 |
| Jun 2, 2020 | Completed final sign-off Jan 2021 | 1420 Taylor St | Maven Maintenance Inc | rebuild the south east and north east exterior stair wells in kind, 100% replacementDetails
rebuild the south east and north east exterior stair wells in kind, 100% replacement | $10,000 |
| Aug 13, 2019 | Never finaled issued Aug 2019, no final | 1420 Taylor St | street spaceDetails
street space | ||
| Jun 28, 2019 | Completed final sign-off Oct 2019 | 1420 Taylor St | San Francisco Fire Protection | install 2 new monitoring module to monitor waterflow and tamper switch. ref 201903064549Details
install 2 new monitoring module to monitor waterflow and tamper switch. ref 201903064549 | |
| Jun 10, 2019 | Completed final sign-off Oct 2019 | 1420 Taylor St | K N J General Construction | unit 8. kitchen remodeling -(n) cabinets, countertop, appliance and flooring, 40 sq ft. bath remodeling -replace tub, show fixture, vanity sink. replace wall and floor tiles. no structural work or removal of walls, 40 sq ft.Details
unit 8. kitchen remodeling -(n) cabinets, countertop, appliance and flooring, 40 sq ft. bath remodeling -replace tub, show fixture, vanity sink. replace wall and floor tiles. no structural work or removal of walls, 40 sq ft. | $32,000 |
| Apr 1, 2019 | Completed final sign-off Aug 2019 | 1420 Taylor St | K N J General Construction | apt 9: kitchen remodeling: new cabinets, countertop, aplliances, flooring. bath remodeling: remove/replace tub, shower fixture, vanity, wall and shower floor tiles. *no structural work or removal of walls.Details
apt 9: kitchen remodeling: new cabinets, countertop, aplliances, flooring. bath remodeling: remove/replace tub, shower fixture, vanity, wall and shower floor tiles. *no structural work or removal of walls. | $32,000 |
| Mar 8, 2019 | Never finaled issued Mar 2019, no final | 1420 Taylor St | street spaceDetails
street space | ||
| Mar 6, 2019 | Never finaled issued Mar 2019, no final | 1420 Taylor St | San Francisco Fire Protection | like for like fire alarm replacement facp smk det and pull stations bells will be used as originally installed. installing new low frequency sounders in sleeping areaDetails
like for like fire alarm replacement facp smk det and pull stations bells will be used as originally installed. installing new low frequency sounders in sleeping area | $13,000 |
| Jan 9, 2019 | Completed final sign-off Jul 2019 | 1420 Taylor St | K N J General Construction | apt 11: kitchen remodeling: new cabinets, countertops, appliances and flooring. bath remodeling: remove/replace tub, shower fixture, vanity, wall and shower, floor tiles * no structural work or removal of walls.Details
apt 11: kitchen remodeling: new cabinets, countertops, appliances and flooring. bath remodeling: remove/replace tub, shower fixture, vanity, wall and shower, floor tiles * no structural work or removal of walls. | $32,000 |
| Oct 2, 2018 | Never finaled issued Oct 2018, no final | 1420 Taylor St | street spaceDetails
street space | ||
| Jul 30, 2018 | Completed final sign-off Jan 2019 | 1420 Taylor St | Maven Maintenance Inc | apt a: remodel studio apt in-kind; install new install new electric panel, tile shower stall, replace bathroom fixtures. replace light fixtures.Details
apt a: remodel studio apt in-kind; install new install new electric panel, tile shower stall, replace bathroom fixtures. replace light fixtures. | $25,000 |
| Jun 21, 2018 | Never finaled issued Jun 2018, no final | 1420 Taylor St | street spaceDetails
street space | ||
| Jun 18, 2018 | Completed final sign-off Jan 2019 | 1420 Taylor St | Maven Maintenance Inc | comply with nov #201832531. remove and replace exterior and interior finishes siding in kind. no exreior work visible from street.Details
comply with nov #201832531. remove and replace exterior and interior finishes siding in kind. no exreior work visible from street. | $100,000 |
| Mar 28, 2018 | Completed final sign-off Sep 2018 | 1420 Taylor St | Maven Maintenance Inc | to comply with n.o.v. 201832531. repair to address fire. demolish plaster and or drywall in front two parlors. in unit b, 3, 5, 9. demolish flooring in front two parlos of unit b, 3, 5, 9. demolish drywall in hallway of unit c. demolish plaster in ceiling of entry hallway. covers demo only. repairDetails
to comply with n.o.v. 201832531. repair to address fire. demolish plaster and or drywall in front two parlors. in unit b, 3, 5, 9. demolish flooring in front two parlos of unit b, 3, 5, 9. demolish drywall in hallway of unit c. demolish plaster in ceiling of entry hallway. covers demo only. repair | $10,000 |
| Oct 24, 2016 | Never finaled issued Oct 2016, no final | 1420 Taylor St | street spaceDetails
street space | ||
| Jul 21, 2016 | Completed final sign-off Mar 2017 | 1420 Taylor St | Maven Maintenance Inc | repair stair(s) & landings in-kind, as needed due to dry rot. for ground, second, and third.Details
repair stair(s) & landings in-kind, as needed due to dry rot. for ground, second, and third. | $25,000 |
| Apr 20, 2016 | Never finaled issued Apr 2016, no final | 1420 Taylor St | street spaceDetails
street space | ||
| Nov 12, 2015 | Never finaled issued Nov 2015, no final | 1420 Taylor St | Douglas J Burrows | revision/additional work related to pa #201510159751 - repair dryrot with like kind, dryrot on subfloor & studs (4) (temp shore), replac eentire subfloor (40sq); one floor joist.Details
revision/additional work related to pa #201510159751 - repair dryrot with like kind, dryrot on subfloor & studs (4) (temp shore), replac eentire subfloor (40sq); one floor joist. | $4,000 |
| Oct 23, 2015 | Never finaled issued Oct 2015, no final | 1420 Taylor St | street spaceDetails
street space | ||
| Oct 15, 2015 | Completed final sign-off Jan 2016 | 1420 Taylor St | Douglas J Burrows | demo of subfloor, floor, plumb, fitures, vent fan, required plumbing. installation of new subfloor, floor plumbing fixtures, vent fan and required plumbing. install new tile tub enclosure and related water proofing, new bathroom retrofit window - in kindDetails
demo of subfloor, floor, plumb, fitures, vent fan, required plumbing. installation of new subfloor, floor plumbing fixtures, vent fan and required plumbing. install new tile tub enclosure and related water proofing, new bathroom retrofit window - in kind | $12,000 |
| May 2, 2007 | Never finaled issued May 2007, no final | 1420 Taylor St | street spaceDetails
street space | ||
| Oct 11, 2005 | Never finaled issued Oct 2005, no final | 1420 Taylor St | streetspaceDetails
streetspace | ||
| Oct 7, 2002 | Never finaled issued Oct 2002, no final | 1420 Taylor St | sidewalk permitDetails
sidewalk permit | ||
| Apr 2, 2001 | Expired or cancelled expired Aug 2001 | 1420 Taylor St | street spaceDetails
street space |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- K N J General Construction (6), Maven Maintenance Inc (5), Bkr Services Inc Dba Bkr Construction Se (2), Douglas J Burrows (2), San Francisco Fire Protection (2), Architectural Fenestration & Restoration
- Engineers
- Amir Shahmirza, Harold Howell
- Authorized agent-otherss
- Justin Kemp
- Designers
- Oleg Vygrug
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.