John W. Lau
- Listed as
- architect, authorized agent-others, designer, engineer
- Firm
- Dicksen Engineers
- Based in
- San Francisco
- On San Francisco permits
- Mar 2002 to Sep 2026
128 permits since 2000 (engineer on 79 permits, architect on 47 permits, authorized agent-others on 2 permits, designer on 2 permits): 80 completed, 22 in progress, 13 never finaled, 13 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 128.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 28, 2026 | In progress issued Sep 2026 | 3156 Clay St | to comply with correction notice: 202505166622. shear wall revisions to as-built plan following pa 202508082679 (architecture plan). reference permits 202109208781 and 201512306165 (main project)Details
to comply with correction notice: 202505166622. shear wall revisions to as-built plan following pa 202508082679 (architecture plan). reference permits 202109208781 and 201512306165 (main project) | ||
| Sep 2, 2026 | In progress issued Sep 2026 | 842 24th Av | Sgv Group Construction | infill under (e) rear cantilvered habitable space for new 137.5 sf storage room.Details
infill under (e) rear cantilvered habitable space for new 137.5 sf storage room. | $20,000 |
| Jun 23, 2026 | In progress issued Jun 2026 | 24 John St | Level 8 Construction Inc | add (n) bathroom on 2nd floor. add (n) door from bedroom to bathroom, reconfigure (e) bathroom at 2nd floor, add (n) powder/laundry room in basement, remove (e) bearing wall in kitchen on 2nd floorDetails
add (n) bathroom on 2nd floor. add (n) door from bedroom to bathroom, reconfigure (e) bathroom at 2nd floor, add (n) powder/laundry room in basement, remove (e) bearing wall in kitchen on 2nd floor | $125,000 |
| Jun 22, 2026 | Completed final sign-off Aug 2026 | 5654 Mission St | C K Construction | convert (e) ground floor office into chinese tutoring center. replace and relocate storefront door.Details
convert (e) ground floor office into chinese tutoring center. replace and relocate storefront door. | $12,000 |
| May 29, 2026 | In progress issued Jun 2026 | 1961 California St | Ramos General Construction Inc. | 1) convert (e) storage to media room @ ground floor. build (n) bathroom at ground floor.Details
1) convert (e) storage to media room @ ground floor. build (n) bathroom at ground floor. | $20,000 |
| May 21, 2026 | Completed final sign-off Jul 2026 | 4075 20th St | Astorga Construction Inc | revision to pa# 202602095527: omit infill of (e) floor opening at 3rd floor bedroom from scope.Details
revision to pa# 202602095527: omit infill of (e) floor opening at 3rd floor bedroom from scope. | |
| Apr 14, 2026 | In progress issued Apr 2026 | 766 Hayes St | revise p/a 2025-0826-3917 to increase the height of the previously approved retaining wall from 3 feet to 5 feet and construct concrete on grade stairs adjacent to the east property line.Details
revise p/a 2025-0826-3917 to increase the height of the previously approved retaining wall from 3 feet to 5 feet and construct concrete on grade stairs adjacent to the east property line. | $5,000 | |
| Mar 11, 2026 | In progress issued Mar 2026 | 3260 Gough St | Brookshire Inc | unit 101- revision 202509266252 to include in kind remodel of kitchen and bathroom to include modified non structural walls. addition of water heaterDetails
unit 101- revision 202509266252 to include in kind remodel of kitchen and bathroom to include modified non structural walls. addition of water heater | |
| Mar 11, 2026 | In progress issued Mar 2026 | 3260 Gough St | Brookshire Inc | unit 305- revision 202509266256 to include in kind remodel of kitchen and bathroom to include modified non structrual walls.Details
unit 305- revision 202509266256 to include in kind remodel of kitchen and bathroom to include modified non structrual walls. | |
| Mar 11, 2026 | In progress issued Mar 2026 | 3260 Gough St | Brookshire Inc | unit 205- revision 202509266255 to include in kind remodel of kitchen and bathroom to include modified non structrual walls.Details
unit 205- revision 202509266255 to include in kind remodel of kitchen and bathroom to include modified non structrual walls. | |
| Feb 26, 2026 | In progress issued Apr 2026 | 24 John St | Level 8 Construction Inc | "in kind" replacement of reart stair, less than 50% consisting of 1). replace the entire 1st level stair framing, 2) reinforce the framing from 2/f to roof. 3) replace all dry rotted thresholds.Details
"in kind" replacement of reart stair, less than 50% consisting of 1). replace the entire 1st level stair framing, 2) reinforce the framing from 2/f to roof. 3) replace all dry rotted thresholds. | $35,000 |
| Feb 19, 2026 | In progress filed Feb 2026, not yet issued | 135 Kissling St | install new 1 hour rated parapet wall at rear wall between 135 kissling rear building and 1526-1532 folsom.Details
install new 1 hour rated parapet wall at rear wall between 135 kissling rear building and 1526-1532 folsom. | $6,000 | |
| Feb 17, 2026 | Completed final sign-off Mar 2026 | 4390 17th St | Sgv Group Construction | ref pa # 2025-1219-2280: shoring plan for replacement of (e) brick foundation w/a reinforced concrete foundationDetails
ref pa # 2025-1219-2280: shoring plan for replacement of (e) brick foundation w/a reinforced concrete foundation | $5,000 |
| Feb 9, 2026 | Completed final sign-off Jul 2026 | 4075 20th St | Astorga Construction Inc | 1)remove e bearing wall between kicthen and dining room. 2)relocate e laundry room to 3rd floor. 3)infill e floor opening at 3rd floor. 4)renovate e bathroom at 3rd floor.Details
1)remove e bearing wall between kicthen and dining room. 2)relocate e laundry room to 3rd floor. 3)infill e floor opening at 3rd floor. 4)renovate e bathroom at 3rd floor. | $100,000 |
| Dec 12, 2025 | Completed final sign-off Apr 2026 | 595 Buckingham Wy | Dcs Plumbing Llc | unit 561-ground floor- ti for (n) office (classroom)Details
unit 561-ground floor- ti for (n) office (classroom) | $60,000 |
| Nov 3, 2025 | Completed final sign-off Feb 2026 | 106 Aptos Av | Pacific Coast Construction | 1)add new bathroom at 2nd floor. 2) convert 257 sq ft to habitable space at rear of garage.Details
1)add new bathroom at 2nd floor. 2) convert 257 sq ft to habitable space at rear of garage. | $75,000 |
| Oct 28, 2025 | Completed final sign-off Jan 2026 | 1831 Fulton St | Kangrong Construction Corporation | 4th/f: convert e) laundry/closet into a nursery, add a walk0in closet & laundry closet in the primary bedroom.Details
4th/f: convert e) laundry/closet into a nursery, add a walk0in closet & laundry closet in the primary bedroom. | $24,000 |
| Oct 10, 2025 | Completed final sign-off Apr 2026 | 80 Melrose Av | Casa De Rj | revision to 201910245452 (renewal/recommencement under 202411145008): reconfiguring inteior stair from upper to lower floorDetails
revision to 201910245452 (renewal/recommencement under 202411145008): reconfiguring inteior stair from upper to lower floor | |
| Sep 26, 2025 | Completed final sign-off Nov 2025 | 250 Detroit St | revision 202309237440 and ref 2024042204430- reconfigure rear deck to max height of 1 '-10" from gradeDetails
revision 202309237440 and ref 2024042204430- reconfigure rear deck to max height of 1 '-10" from grade | ||
| Sep 26, 2025 | Completed final sign-off Feb 2026 | 432 Buchanan St | voluntary replacement of (e) foundationsDetails
voluntary replacement of (e) foundations | $15,000 | |
| Sep 23, 2025 | In progress issued Jan 2026 | 2150 Hyde St | Donald Wu | to abate nov 202307274 items 5 and 6- remove illegal deck and restore in kind (e) deck over driveway facing front. proposed repair of existing roof over driveway.Details
to abate nov 202307274 items 5 and 6- remove illegal deck and restore in kind (e) deck over driveway facing front. proposed repair of existing roof over driveway. | $10,000 |
| Sep 9, 2025 | Completed final sign-off Nov 2025 | 1526 Folsom St | Grand Industries Inc | revision to 202504164523. dowel concrete stem to e foundationDetails
revision to 202504164523. dowel concrete stem to e foundation | |
| Aug 22, 2025 | Completed final sign-off Jan 2026 | 305 Carl St | rear bldg: add curb to (e) foundation and new footing at perimeterDetails
rear bldg: add curb to (e) foundation and new footing at perimeter | $15,000 | |
| Aug 21, 2025 | In progress issued Dec 2025 | 257 Hale St | Axa Construction | remove int. stair and fill in floor. remodel (e) bath as primary bath, add closet. add second bath. add slider door trim (n) kitchen to patio. enlarge (e) opening to living room and add (n) opening from hallway to kitchen . repair ext. siding at rear. add family room at g/f. remove skylight & infillDetails
remove int. stair and fill in floor. remodel (e) bath as primary bath, add closet. add second bath. add slider door trim (n) kitchen to patio. enlarge (e) opening to living room and add (n) opening from hallway to kitchen . repair ext. siding at rear. add family room at g/f. remove skylight & infill | $50,000 |
| Aug 7, 2025 | In progress issued Mar 2026 | 60 Farallones St | Brighter Legacy Builders Inc. | fire damage, repair @ 1st flr; renovate (e) bathroom & kitchen @ 2nd flr; add new bathroom @ 2nd flr, expand (e) deck by 165 sf.Details
fire damage, repair @ 1st flr; renovate (e) bathroom & kitchen @ 2nd flr; add new bathroom @ 2nd flr, expand (e) deck by 165 sf. | $150,000 |
| Aug 5, 2025 | In progress issued Aug 2025 | 2666 Greenwich St | Alvarez Construction & Tile, Inc | kitchen remodel: create wider opening at kitchen, new electrical and plumbing per drawings.Details
kitchen remodel: create wider opening at kitchen, new electrical and plumbing per drawings. | $80,000 |
| Jul 24, 2025 | Completed final sign-off Mar 2026 | 4221 Geary Bl | revision to pa #202008312971 (s1). change to interior layout.Details
revision to pa #202008312971 (s1). change to interior layout. | ||
| Jun 30, 2025 | Completed final sign-off Aug 2025 | 2469 Diamond St | convert portion of garage to 198sf of habitable space. replace front door to open grill gate. convert (e) office to powder room on 2nd floor.Details
convert portion of garage to 198sf of habitable space. replace front door to open grill gate. convert (e) office to powder room on 2nd floor. | $20,000 | |
| Jun 27, 2025 | In progress issued Jul 2025 | 425 25th Av | Structoris Inc. | unit(s) 1-4: reinforce framing due to building settlements and dry rot. no exterior changes interiorDetails
unit(s) 1-4: reinforce framing due to building settlements and dry rot. no exterior changes interior | $150,000 |
| May 16, 2025 | In progress issued May 2025 | 3156 Clay St | Cuan Construction | recommencement and completion of work approved under bpa#: 201512306165, 202103126506 and 202109208781Details
recommencement and completion of work approved under bpa#: 201512306165, 202103126506 and 202109208781 | $162,000 |
| Apr 16, 2025 | Completed final sign-off Nov 2025 | 1526 Folsom St | infill (e) roll up garage door at rear of building not visible from street. infill (e) main door at rear of building. ref 2024-010981 sub subdivision refDetails
infill (e) roll up garage door at rear of building not visible from street. infill (e) main door at rear of building. ref 2024-010981 sub subdivision ref | $10,000 | |
| Apr 7, 2025 | In progress filed Apr 2025, not yet issued | 2287 24th Av | 1st: adding new stairs to connect first fl to 2nd fl. new skylightDetails
1st: adding new stairs to connect first fl to 2nd fl. new skylight | $45,000 | |
| Feb 20, 2025 | Completed final sign-off Jun 2025 | 1790 Fulton St | J Construction Solutions | ground floor ti for a (e) barbershopDetails
ground floor ti for a (e) barbershop | $20,000 |
| Feb 11, 2025 | In progress issued Jan 2026 | 1747 Buchanan St | 328 Construction | ref ti permit 202410163077. restaurant tenant improvement (mep), type 1 kitchen hood.Details
ref ti permit 202410163077. restaurant tenant improvement (mep), type 1 kitchen hood. | $50,000 |
| Feb 7, 2025 | Completed final sign-off Apr 2025 | 4675 Mission St | Bejarano Construction 9inc | revision to 202304286710 (revision of 202205194661): to revise the cooking equipment layout (stock pots & congee range)Details
revision to 202304286710 (revision of 202205194661): to revise the cooking equipment layout (stock pots & congee range) | |
| Dec 23, 2024 | In progress issued Dec 2024 | 2259 41st Av | Level 8 Construction Inc | revision pa # 2024-0621-5030 consisting on enlarging (e) window at lower family room to 7'0" wide using glassing railing at deckDetails
revision pa # 2024-0621-5030 consisting on enlarging (e) window at lower family room to 7'0" wide using glassing railing at deck | $10,000 |
| Dec 10, 2024 | Completed final sign-off Apr 2025 | 418 Anderson St | Rinaldi Construction | reaplace (e) failing 3'6" max high concrete retaining wall along front of property w/wood retaining wall.Details
reaplace (e) failing 3'6" max high concrete retaining wall along front of property w/wood retaining wall. | $20,000 |
| Oct 22, 2024 | In progress issued Sep 2026 | 209 Wawona St | Jwl 888 Construction Inc | reconfigure/remodel 1st floor plan. relocate the office, bathroom, kitchen at 1st floor. reconfigure 2nd floor plan with 2 new bathrooms and new master bedroom at 2nd floor. a 2 story addition to the rear and side of the building of approx. 702 sq ft.Details
reconfigure/remodel 1st floor plan. relocate the office, bathroom, kitchen at 1st floor. reconfigure 2nd floor plan with 2 new bathrooms and new master bedroom at 2nd floor. a 2 story addition to the rear and side of the building of approx. 702 sq ft. | $403,000 |
| Aug 13, 2024 | Completed final sign-off Jul 2025 | 400 02nd Av | Level 8 Construction Inc | revision to 202302152035, 202307031405. replace beam along interior line, replace foundation and e interior post.Details
revision to 202302152035, 202307031405. replace beam along interior line, replace foundation and e interior post. | $15,000 |
| Aug 9, 2024 | Completed final sign-off Oct 2025 | 4221 Geary Bl | Luzt Construction Inc | rev 202008312971- reinforce beam and framing at ground floorDetails
rev 202008312971- reinforce beam and framing at ground floor | $5,000 |
| Apr 22, 2024 | Expired or cancelled expired Nov 2025 | 250 Detroit St | Sarris Construction | additional work to permit 202309267440: relocate (e) internal staircase. add bathroom at upper floor bedroom. change (e) bathroom to half bath at upper level. new wood windows at all existing and new openings.Details
additional work to permit 202309267440: relocate (e) internal staircase. add bathroom at upper floor bedroom. change (e) bathroom to half bath at upper level. new wood windows at all existing and new openings. | $40,000 |
| Mar 22, 2024 | In progress filed Mar 2024, not yet issued | 446 34th Av | Mullins General Construction & Fine Pain | revision to pa# 202105210842 foundation revision new footingsDetails
revision to pa# 202105210842 foundation revision new footings | |
| Mar 1, 2024 | Expired or cancelled withdrawn Jul 2025 | 2150 Hyde St | revision to pa# 202307182380 and to comply w/nov# 202307274, replace deck of unit#1 on the 2/f, build a new roof for a side entry porch next to the reconstructed reduced-size deck.Details
revision to pa# 202307182380 and to comply w/nov# 202307274, replace deck of unit#1 on the 2/f, build a new roof for a side entry porch next to the reconstructed reduced-size deck. | $40,000 | |
| Feb 12, 2024 | Completed final sign-off Aug 2024 | 3967 22nd St | Sjn Construction Llc | revision to 202303274443: remove wall btw median rm & guess rm, and wall btw master & walking closet. added wall for laundry rm, removal of entry closet. rebuild staircase no exterior changesDetails
revision to 202303274443: remove wall btw median rm & guess rm, and wall btw master & walking closet. added wall for laundry rm, removal of entry closet. rebuild staircase no exterior changes | |
| Dec 8, 2023 | Completed final sign-off Apr 2024 | 127 Knockash Hl | Level 8 Construction Inc | revision to 202310239223 & 202307061548, beam size change.Details
revision to 202310239223 & 202307061548, beam size change. | |
| Nov 27, 2023 | Completed final sign-off May 2024 | 7333 Geary Bl | Sincere Construction Company Inc | revision to 201709158713. revise the design of the soft story retrofit permitDetails
revision to 201709158713. revise the design of the soft story retrofit permit | |
| Nov 6, 2023 | In progress filed Nov 2023, not yet issued | 2500 San Bruno Av | Wesco General Contracting Inc | to remedy diability access issues identified in the category checklist compliance form in complying w/ accessible business entrance program per ordinace 51-16 abe# 201912310532, install power door operator. repair sidewalkDetails
to remedy diability access issues identified in the category checklist compliance form in complying w/ accessible business entrance program per ordinace 51-16 abe# 201912310532, install power door operator. repair sidewalk | $6,000 |
| Oct 25, 2023 | Completed final sign-off May 2024 | 177 Belgrave Av | Brookshire Inc | revision to bpa 202204081882, minor structural revision, no change to approved work on public property, no change to architectural designDetails
revision to bpa 202204081882, minor structural revision, no change to approved work on public property, no change to architectural design | |
| Sep 22, 2023 | Completed final sign-off Feb 2024 | 3354 20th St | change of use from massage to outpatient health center (maximun 2 night stay) replace (e) window on 20th st with egress windowDetails
change of use from massage to outpatient health center (maximun 2 night stay) replace (e) window on 20th st with egress window | $1,000 | |
| Sep 21, 2023 | Completed final sign-off Feb 2025 | 2465 Filbert St | P3 Builders | renovation of unit 4 - removing 6 (e) wall between living room & study. reconfigure (e) entry to unitDetails
renovation of unit 4 - removing 6 (e) wall between living room & study. reconfigure (e) entry to unit | $25,000 |
| Jul 19, 2023 | Never finaled filed Jul 2023, never issued | 376 Castro St | to comply w/ sf accessible business entrance program 51-16 & 102-18, abe # 202307197901. replace entry doorDetails
to comply w/ sf accessible business entrance program 51-16 & 102-18, abe # 202307197901. replace entry door | $15,000 | |
| Jul 3, 2023 | Completed final sign-off Jul 2025 | 400 02nd Av | Level 8 Construction Inc | revision to pa# 202302152035, replace foundation @ property line & along interior of building.Details
revision to pa# 202302152035, replace foundation @ property line & along interior of building. | $20,000 |
| May 26, 2023 | Completed final sign-off Nov 2023 | 2465 Filbert St | P3 Builders | unit 4: replace (2) 24 x 36" single hung window on side property line w/ (2) 1-hr rated 24 x 55" fixed windowDetails
unit 4: replace (2) 24 x 36" single hung window on side property line w/ (2) 1-hr rated 24 x 55" fixed window | $15,000 |
| May 17, 2023 | Never finaled filed May 2023, never issued | 2150 Hyde St | comply w/ nov 201883441 to remove unpermitted structures on the rooftop of the building, and restore to previous legal condition per current code and regulationsDetails
comply w/ nov 201883441 to remove unpermitted structures on the rooftop of the building, and restore to previous legal condition per current code and regulations | $30,000 | |
| Mar 27, 2023 | Completed final sign-off Aug 2024 | 3967 22nd St | Sjn Construction Llc | vertical & horizontal addition to incude two story addition @ (e)patio area,add dormer to 2nd story facing west,remove wall @ entry/living room,new extension @ entry @ front,remodel 2nd story bath & kitchen.Details
vertical & horizontal addition to incude two story addition @ (e)patio area,add dormer to 2nd story facing west,remove wall @ entry/living room,new extension @ entry @ front,remodel 2nd story bath & kitchen. | $250,000 |
| Mar 10, 2023 | Completed final sign-off Apr 2023 | 897 Elizabeth St | Home Improvement Company | front building: revisions to 202201216378: 301 hoffman: change laundry rm to powder room, 899 elizabeth: remove stair at rear. add washer and dryer at kitchen. add a juliette balcony at rear door.Details
front building: revisions to 202201216378: 301 hoffman: change laundry rm to powder room, 899 elizabeth: remove stair at rear. add washer and dryer at kitchen. add a juliette balcony at rear door. | |
| Feb 24, 2023 | Completed final sign-off Oct 2023 | 225 03rd Av | B R S Construction | kitchen remodel & expansion, convert e bedroom #2 to dining room, remove e bearing wall @ kitchen & 2nd flr bedroomDetails
kitchen remodel & expansion, convert e bedroom #2 to dining room, remove e bearing wall @ kitchen & 2nd flr bedroom | $150,000 |
| Feb 15, 2023 | Completed final sign-off Jul 2025 | 400 02nd Av | Level 8 Construction Inc | to comply with nov 202302165 to repair dry rot at ground flr & provide temporary shoring.Details
to comply with nov 202302165 to repair dry rot at ground flr & provide temporary shoring. | $30,000 |
| Jan 27, 2023 | Completed final sign-off Jan 2023 | 3515 20th St | Cal Builder Pro Inc | revision to pa # 202301170210, build non-structural soffit above sushi bar location.Details
revision to pa # 202301170210, build non-structural soffit above sushi bar location. | |
| Dec 29, 2022 | Completed final sign-off May 2023 | 1499 Clayton St | Kangrong Construction Corporation | lower level: add kitchenette. main level: remodel kitchen and bathroom, replace 2 windows, the same sizes (not facing street). upper level: add 1 skylight and remodel closet.Details
lower level: add kitchenette. main level: remodel kitchen and bathroom, replace 2 windows, the same sizes (not facing street). upper level: add 1 skylight and remodel closet. | $58,000 |
| Dec 15, 2022 | Never finaled issued Feb 2023, no final | 1625 48th Av | interior remodel only: 2nd fl to remodel (e) living rm to be (n) bedroom with a new full bath & walk in closet. 3rd fl to combinr (e) master bedroom & (e) study rm to be a new family rmDetails
interior remodel only: 2nd fl to remodel (e) living rm to be (n) bedroom with a new full bath & walk in closet. 3rd fl to combinr (e) master bedroom & (e) study rm to be a new family rm | $15,000 | |
| Dec 9, 2022 | Never finaled issued Mar 2023, no final | 294 Tocoloma Av | convert level 1 powder room to full size bath. add master bath in master bedroom & walk in closet. add skylight in master bathroom & closet. replace garage door to be a 2 car garage doorDetails
convert level 1 powder room to full size bath. add master bath in master bedroom & walk in closet. add skylight in master bathroom & closet. replace garage door to be a 2 car garage door | $40,000 | |
| Apr 8, 2022 | Never finaled filed Apr 2022, never issued | 358 Day St | to comply with nov# 202173478. interior remodel of all floors. addition of dormers front & rear facade remodel.Details
to comply with nov# 202173478. interior remodel of all floors. addition of dormers front & rear facade remodel. | $175,000 | |
| Mar 3, 2020 | Completed final sign-off Aug 2021 | 3700 Cabrillo St | Jian's Builder Corp | replace (e) exterior metal fire escape and ladders with new in like kind in accordance with sfbc 1011.12.3 & cbc2019-403.1Details
replace (e) exterior metal fire escape and ladders with new in like kind in accordance with sfbc 1011.12.3 & cbc2019-403.1 | $30,000 |
| Feb 21, 2020 | Never finaled issued Jun 2022, no final | 615 Belvedere St | Payesko Constructioin Inc | partial lightwell infill at 2nd fl. revision to pa 201905160786Details
partial lightwell infill at 2nd fl. revision to pa 201905160786 | $20,000 |
| Dec 24, 2019 | Never finaled issued Aug 2021, no final | 2126 40th Av | adu per ordinance 95-17, supplement to pa #201609097348 & 201908280126, to extend teh g/f of the bldg 12'to the rear as originally approved in the 311 notificatin date in2017, the g/f to be converted to a new adu per ordinance no 95-17, new landslope improvement w/ in req front set back.Details
adu per ordinance 95-17, supplement to pa #201609097348 & 201908280126, to extend teh g/f of the bldg 12'to the rear as originally approved in the 311 notificatin date in2017, the g/f to be converted to a new adu per ordinance no 95-17, new landslope improvement w/ in req front set back. | $90,000 | |
| Oct 16, 2019 | Completed final sign-off Jan 2020 | 890 34th Av | Wong Construction Inc | rev to pa# 201709158629; replace a special moment frame to an ordinary moment frameDetails
rev to pa# 201709158629; replace a special moment frame to an ordinary moment frame | |
| Jan 28, 2019 | Completed final sign-off Jan 2019 | 5826 Geary Bl | Wong Construction Inc | rev to pa# 201707273061; to eliminate level landing and modify sidewalk permit requirements and construct automatic door opener per instruction on dwp inspector.Details
rev to pa# 201707273061; to eliminate level landing and modify sidewalk permit requirements and construct automatic door opener per instruction on dwp inspector. | |
| May 9, 2018 | Expired or cancelled expired Oct 2025 | 1349 Taraval St | D & A Builders Inc | revision to approved pa #201508033190, to revise stair, add 2nd egress stair & elevator to connect each floor in common area. vertical addition under separated permit application #201805098696s.Details
revision to approved pa #201508033190, to revise stair, add 2nd egress stair & elevator to connect each floor in common area. vertical addition under separated permit application #201805098696s. | $50,000 |
| May 9, 2018 | Expired or cancelled expired Oct 2025 | 1345 Taraval St | revision to approved pa #201508033190, to add 4th floor new residential unit, elevator & stair in common area under separated permit application #201805098711s.Details
revision to approved pa #201508033190, to add 4th floor new residential unit, elevator & stair in common area under separated permit application #201805098711s. | $100,000 | |
| Sep 15, 2017 | Completed final sign-off Jun 2019 | 319 02nd Av | soft story retrofit per sfebc chapter 4d per engineering criteria 2016 cebc appendix a-4.Details
soft story retrofit per sfebc chapter 4d per engineering criteria 2016 cebc appendix a-4. | $125,000 | |
| Sep 15, 2017 | Completed final sign-off May 2024 | 7333 Geary Bl | soft story retrofit per sfebc chapter 4d per engineering criteria 2016 cebc appendix a-4. n/a for maher.Details
soft story retrofit per sfebc chapter 4d per engineering criteria 2016 cebc appendix a-4. n/a for maher. | $125,000 | |
| Sep 11, 2017 | Completed final sign-off Jul 2018 | 718 14th St | Pars Design & Construction | remodel (e) bar restaurantDetails
remodel (e) bar restaurant | $125,000 |
| Sep 11, 2017 | Expired or cancelled cancelled Jan 2026 | 1550 Wallace Av | barrier removal for the building including (n) ada toilets & railing on (e) interior rampDetails
barrier removal for the building including (n) ada toilets & railing on (e) interior ramp | $30,000 | |
| Jul 31, 2017 | Completed final sign-off Jan 2020 | 1119 Stanyan St | Jw Structures | proposed kitchen remodel includeing removing (e) bearing wall; add (n) bathroom at (e) bedroom. infill (e) 25 sf light well to expand & remodel (e) bathroomDetails
proposed kitchen remodel includeing removing (e) bearing wall; add (n) bathroom at (e) bedroom. infill (e) 25 sf light well to expand & remodel (e) bathroom | $300,000 |
| Jun 28, 2017 | Completed final sign-off Nov 2018 | 349 Tara St | A K Home Improvement Inc | proposed kitchen remodel. proposed renovation 165 sq ft along rear of garage to be converted to a bedroom w/full bath. change rear windows at living room to doors. move (e) fau unit under (e) living room to crawl space.Details
proposed kitchen remodel. proposed renovation 165 sq ft along rear of garage to be converted to a bedroom w/full bath. change rear windows at living room to doors. move (e) fau unit under (e) living room to crawl space. | $75,000 |
| May 25, 2017 | Never finaled issued Jun 2018, no final | 1625 48th Av | renovation of existing roof deck, extend parapets to 6 feet high bove finished floor, install decking and pergola on roof deck.Details
renovation of existing roof deck, extend parapets to 6 feet high bove finished floor, install decking and pergola on roof deck. | $20,000 | |
| Feb 16, 2017 | Never finaled issued May 2017, no final | 2050 Van Ness Av | Golden Gate Power | increase (e) railing to full height walls. change swing of entry doors from 'out' to 'in' to restaurant/bar.Details
increase (e) railing to full height walls. change swing of entry doors from 'out' to 'in' to restaurant/bar. | $36,000 |
| Feb 9, 2017 | Completed final sign-off Oct 2018 | 248 09th St | tenant improvment work to proposed new restaurant and bar at a pre approved restaurant space on gr fl maher not reqDetails
tenant improvment work to proposed new restaurant and bar at a pre approved restaurant space on gr fl maher not req | $120,000 | |
| Dec 29, 2016 | Completed final sign-off Sep 2017 | 31 Ruth St | Car Construction | remodel kitchen add 96 sf deck at upper level. add 246 concrete patio at lower levelDetails
remodel kitchen add 96 sf deck at upper level. add 246 concrete patio at lower level | $40,000 |
| Nov 17, 2016 | Completed final sign-off Jul 2024 | 735 Clementina St | Terence Mcmahon Construction | legalize existing unpermitted single family dwelling convert from warehouse. upgrade bathroom, kitchen, new interior finishes. improvements to roof deck, add stair to penthouse on roof. n/a maher ordinanceDetails
legalize existing unpermitted single family dwelling convert from warehouse. upgrade bathroom, kitchen, new interior finishes. improvements to roof deck, add stair to penthouse on roof. n/a maher ordinance | $187,000 |
| Oct 25, 2016 | Completed final sign-off Sep 2017 | 1375 Donner Av | D Construction Inc | to document and legalize existing condition of a 2 stories grow site. convert 2 storage room into grow room. install mechanical and electrical equipmentDetails
to document and legalize existing condition of a 2 stories grow site. convert 2 storage room into grow room. install mechanical and electrical equipment | $100,000 |
| Aug 30, 2016 | Completed final sign-off Oct 2017 | 2700 Taraval St | split (e) single family to 2 units. upper unit will be 1350 sq ft & lower unit will be 570 sq ft. spiral stairs from upper unit to rear yard. remodel (e) upper unit bathroomDetails
split (e) single family to 2 units. upper unit will be 1350 sq ft & lower unit will be 570 sq ft. spiral stairs from upper unit to rear yard. remodel (e) upper unit bathroom | $80,000 | |
| Jul 27, 2016 | Completed final sign-off Oct 2016 | 3737 Broderick St | interior remodel of 3rd fl bdrm, convert e walkin closet into new bath, remodel e bathroo, add new closet in bedroomDetails
interior remodel of 3rd fl bdrm, convert e walkin closet into new bath, remodel e bathroo, add new closet in bedroom | $10,000 | |
| Jul 15, 2016 | Completed final sign-off Mar 2018 | 251 Andover St | Ruzicka Construction Inc | revision to app#201607011422. remove extg bearing wall at kitchen, remove extg fire place and reconfigure stair to lower floor. add shear walls at garage, and new window at lower rear wall.Details
revision to app#201607011422. remove extg bearing wall at kitchen, remove extg fire place and reconfigure stair to lower floor. add shear walls at garage, and new window at lower rear wall. | $30,000 |
| Jun 24, 2016 | Completed final sign-off Jul 2016 | 1958 Vallejo St | Saturn Construction Co | revision to 201506048048 consisting of a (n) guard rail 3' high- 3' from perimeter parapet wall @ roof.Details
revision to 201506048048 consisting of a (n) guard rail 3' high- 3' from perimeter parapet wall @ roof. | |
| Jun 24, 2016 | Expired or cancelled withdrawn Nov 2019 | 746 Lyon St | Paul Hughes Gen Contractor | revision to pa 201512044198, extend site retaining wall to 3' from rear property line.Details
revision to pa 201512044198, extend site retaining wall to 3' from rear property line. | $8,000 |
| Jun 23, 2016 | Completed final sign-off Nov 2016 | 2400 Harrison St | Kenji Hasegawa | interior remodel of (e) restaurant @ dining room; maher n/aDetails
interior remodel of (e) restaurant @ dining room; maher n/a | $70,000 |
| May 11, 2016 | Completed final sign-off Dec 2016 | 495 09th Av | replace (e) chain-link fence gate with roll up door at same locationDetails
replace (e) chain-link fence gate with roll up door at same location | $20,000 | |
| Jan 29, 2016 | Completed final sign-off Jan 2017 | 886 Alabama St | comply with nov 201571831; 201566151; 201563571. convert 1st floor into habitable space with sair connecting to 2nd floor; interior renovation @ 2nd floor unit 886 (work at 1st & 2nd floor only)Details
comply with nov 201571831; 201566151; 201563571. convert 1st floor into habitable space with sair connecting to 2nd floor; interior renovation @ 2nd floor unit 886 (work at 1st & 2nd floor only) | $70,000 | |
| Jan 28, 2016 | Completed final sign-off Jul 2019 | 407 30th St | revision to pa 201505115997; rear yard landscaping & retaining wall.Details
revision to pa 201505115997; rear yard landscaping & retaining wall. | ||
| Dec 31, 2015 | Completed final sign-off Dec 2017 | 1750 Folsom St | Scott Cassell Construction | convert (e) production-distribution facility into greenhouse nursery with light manufacturing.Details
convert (e) production-distribution facility into greenhouse nursery with light manufacturing. | $125,000 |
| Dec 29, 2015 | Completed final sign-off Feb 2018 | 1385 Harrison St | revision to pa 201106017171; revise 2 nursery rooms @ the rear to light manufacturing/development lab; maher n/aDetails
revision to pa 201106017171; revise 2 nursery rooms @ the rear to light manufacturing/development lab; maher n/a | ||
| Oct 28, 2015 | Completed final sign-off Dec 2015 | 1283 06th Av | Archteype Design Builder | revision to 201506259816. add repair beam at kitchenDetails
revision to 201506259816. add repair beam at kitchen | $8,500 |
| Sep 25, 2015 | Expired or cancelled withdrawn Feb 2016 | 669 Mississippi St | install new mech ventilation system for the greenhouse. ref pa 2015 040 2 02629 maher naDetails
install new mech ventilation system for the greenhouse. ref pa 2015 040 2 02629 maher na | $9,000 | |
| Aug 17, 2015 | Completed final sign-off Oct 2016 | 1040 Bryant St | Paul West Heating Inc | convert (e) meat distribution to green house (u-occupancy).Details
convert (e) meat distribution to green house (u-occupancy). | $75,000 |
| Apr 7, 2015 | Completed final sign-off Apr 2016 | 528 Divisadero St | front facade changeDetails
front facade change | $15,000 | |
| Feb 26, 2015 | Completed final sign-off Apr 2015 | 610 26th Av | replace (e) wood barrier in storage room with 1-hr rated fire wall, replace (e) window at storage room with door.Details
replace (e) wood barrier in storage room with 1-hr rated fire wall, replace (e) window at storage room with door. | $5,000 | |
| Sep 22, 2014 | Expired or cancelled expired Jan 2019 | 4540 03rd St | comply w/nov 201394662 - to rebuild fire damage on upper floor @ 4540 -3rd st & accessory sturcture @ mckinnon st.Details
comply w/nov 201394662 - to rebuild fire damage on upper floor @ 4540 -3rd st & accessory sturcture @ mckinnon st. | $400,000 | |
| Sep 22, 2014 | Never finaled issued Mar 2016, no final | 4532 03rd St | comply w/nov 201394662 - to rebuild fire damage on upper floor.Details
comply w/nov 201394662 - to rebuild fire damage on upper floor. | $200,000 |