Richard Rutter
- Listed as
- architect, authorized agent-others, engineer
- Firm
- A. Rule Designs
- Based in
- Alameda
- On San Francisco permits
- Jul 2003 to Aug 2015
32 permits since 2000 (architect on 30 permits, authorized agent-others on 1 permit, engineer on 1 permit): 19 completed, 7 never finaled, 6 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 24, 2015 | Never finaled issued Nov 2015, no final | 335 Powell St | Shawmut Woodworking & Supply Inc | erect electric, projecting, single-faced, indirect, (n) sign. n/a for maher ordinance.Details
erect electric, projecting, single-faced, indirect, (n) sign. n/a for maher ordinance. | $5,000 |
| Aug 24, 2015 | Never finaled issued Nov 2015, no final | 335 Powell St | Shawmut Woodworking & Supply Inc | erect non-electric, projecting, single-faced, non-illuminated (n) sign. n/a for maher ordinanceDetails
erect non-electric, projecting, single-faced, non-illuminated (n) sign. n/a for maher ordinance | $5,000 |
| Aug 24, 2015 | Never finaled issued Nov 2015, no final | 335 Powell St | Shawmut Woodworking & Supply Inc | non-structural sign n/a for maher ordinance.Details
non-structural sign n/a for maher ordinance. | $5,000 |
| Jul 29, 2015 | Never finaled issued Aug 2015, no final | 335 Powell St | Cw Horton General Contractor | mezz. below 2/f- cosmetic renovation of (2) meeting rooms, work includes capret, paint & wall coverings. new light fixtures to replace existing, new lighting controls. no exterior work. n/a ordinance #155-13Details
mezz. below 2/f- cosmetic renovation of (2) meeting rooms, work includes capret, paint & wall coverings. new light fixtures to replace existing, new lighting controls. no exterior work. n/a ordinance #155-13 | $350,000 |
| Jul 24, 2015 | Expired or cancelled cancelled Nov 2024 | 335 Powell St | Cw Horton General Contractor | mezz below 2nd & 2nd flr; cosmetic renovation of (5) existing meeting/convention rooms, work includes carpet, paint wall covering & replacement of (e) light fixtures with new light fix & controls;maher n/aDetails
mezz below 2nd & 2nd flr; cosmetic renovation of (5) existing meeting/convention rooms, work includes carpet, paint wall covering & replacement of (e) light fixtures with new light fix & controls;maher n/a | $600,000 |
| Mar 17, 2015 | Completed final sign-off Dec 2015 | 335 Powell St | Shawmut Woodworking & Supply Inc | structural demo & core & shell work only. new stairs from basement to 1st floor. new elevator from basement to 2nd floor. new "ground" stairs from 1st floor to 2nd floor. t.i. on separate permit. ** maher: compliance with ordinance no# 155-13 not required **Details
structural demo & core & shell work only. new stairs from basement to 1st floor. new elevator from basement to 2nd floor. new "ground" stairs from 1st floor to 2nd floor. t.i. on separate permit. ** maher: compliance with ordinance no# 155-13 not required ** | $1,019,846 |
| Oct 27, 2014 | Completed final sign-off Nov 2014 | 251 Post St | Rudolph Commercial Interiors Inc, Rci | #420- to comply with nov# 201480481 work w/o permit. remove construction that was built without a permit, remove mantrap at #320 entry, remove storage closet in path of exit travel.Details
#420- to comply with nov# 201480481 work w/o permit. remove construction that was built without a permit, remove mantrap at #320 entry, remove storage closet in path of exit travel. | $1,200 |
| Oct 21, 2014 | Completed final sign-off Oct 2014 | 450 Post St | Everest Waterproofing & Restoration Inc. | notice of violation 201489681 dtd 20 aug 2014- work w/o permit, this plan set submitted for permit (n) w.p. membrane on (e) struct support slab; (n) conc walk slab over (n) membrane; (n) curb; maher n/aDetails
notice of violation 201489681 dtd 20 aug 2014- work w/o permit, this plan set submitted for permit (n) w.p. membrane on (e) struct support slab; (n) conc walk slab over (n) membrane; (n) curb; maher n/a | $51,500 |
| Sep 20, 2013 | Completed final sign-off Aug 2014 | 278 Post St | International Waterproofing | relocate (2) doorways farther back in (e) alcove such that leaves do not swing out over public right of way, fire sprinkler under separate permit, encroachment permit being processed by dpw (same dwgs). ** maher: compliance with ordinance no# 155-13 not required **Details
relocate (2) doorways farther back in (e) alcove such that leaves do not swing out over public right of way, fire sprinkler under separate permit, encroachment permit being processed by dpw (same dwgs). ** maher: compliance with ordinance no# 155-13 not required ** | $40,000 |
| May 8, 2013 | Expired or cancelled cancelled Jul 2015 | 652 Kearny St | renew (e) permit app#2007-0717-7007.Details
renew (e) permit app#2007-0717-7007. | ||
| May 8, 2013 | Completed final sign-off Jun 2015 | 652 Kearny St | renew (e) permit app #2008-0130-3579, upgrade toilet to ada requirements - review (e) front entry door to code requirements.Details
renew (e) permit app #2008-0130-3579, upgrade toilet to ada requirements - review (e) front entry door to code requirements. | ||
| Mar 30, 2012 | Never finaled issued Apr 2012, no final | 130 08th St | Gallieria, Inc/Trico Cons | install new public passenger elevator in (e) elevator shaft. remove (e) freight elevator car, (e) terra cotta tile shaft walls. build new 2-hr shaft walls & elevator machine room. barrier removal project.Details
install new public passenger elevator in (e) elevator shaft. remove (e) freight elevator car, (e) terra cotta tile shaft walls. build new 2-hr shaft walls & elevator machine room. barrier removal project. | $350,000 |
| Feb 8, 2012 | Completed final sign-off Jun 2012 | 501 Post St | Marchetti Construction Inc. | #1407:remodel extg guestroom suite to conform with stds for fully accessible guestroom(roll in shower) guest room #1407 only room on this permit. fire/life safety and hvac work separate permits.Details
#1407:remodel extg guestroom suite to conform with stds for fully accessible guestroom(roll in shower) guest room #1407 only room on this permit. fire/life safety and hvac work separate permits. | $80,000 |
| Feb 8, 2012 | Completed final sign-off Jun 2012 | 501 Post St | Marchetti Construction Inc. | #1103:remodel extg guestroom suite to conform with stds for hearing impared guest room.guest room #1103, only room on this permit. fire /lifesafty and hvac work. separate permit.Details
#1103:remodel extg guestroom suite to conform with stds for hearing impared guest room.guest room #1103, only room on this permit. fire /lifesafty and hvac work. separate permit. | $25,000 |
| Dec 19, 2011 | Expired or cancelled cancelled Jan 2026 | 981 Howard St | 2nd floor-construct 5 small metal fabrication shops on (e) 2nd floor auto shop space, upgrade (e) toilet room to current accessibility standards, 20% ruleDetails
2nd floor-construct 5 small metal fabrication shops on (e) 2nd floor auto shop space, upgrade (e) toilet room to current accessibility standards, 20% rule | $16,000 | |
| Jun 8, 2011 | Never finaled issued Jul 2011, no final | 335 Powell St | Marchetti Construction Inc. | remodel to selected portions of (e) hotel fitness center: remove 2 massage rooms/convert that space to weight training; install custom mill work free standing portal & pair glass entry doors; remodel (e) storage area to treatment room - paint, floor, wall covering. fire /life safety udner separateDetails
remodel to selected portions of (e) hotel fitness center: remove 2 massage rooms/convert that space to weight training; install custom mill work free standing portal & pair glass entry doors; remodel (e) storage area to treatment room - paint, floor, wall covering. fire /life safety udner separate | $160,000 |
| Apr 6, 2011 | Completed final sign-off Apr 2012 | 335 Powell St | Metropolis Metal Works | barrier removal project - install new handrails on original 1913 marble stairway at post st hotel entryDetails
barrier removal project - install new handrails on original 1913 marble stairway at post st hotel entry | $41,000 |
| Oct 26, 2010 | Expired or cancelled withdrawn Aug 2012 | 174 Shotwell St | install a new roll up vehicle door in the (e) rear wall of an (e) building. install new rate of rise heat detector on wall above new rollup door - inside & outside of opening. under separate dpw permit - install new level landing in (e) sidewalk @ (e) entry door.Details
install a new roll up vehicle door in the (e) rear wall of an (e) building. install new rate of rise heat detector on wall above new rollup door - inside & outside of opening. under separate dpw permit - install new level landing in (e) sidewalk @ (e) entry door. | $10,000 | |
| Nov 12, 2009 | Never finaled issued Nov 2009, no final | 335 Powell St | Cw Horton General Contractor | construct new guest accessible ice machine room of public corridor-31st floor, tower. new 1 hr non structural partitions and 30 min door/closer, wall, ceiling & floor finishes. plumb & elect in connection with relocation of (e) ice machine. fire/life safety and fire sprinkler under seperate permit.Details
construct new guest accessible ice machine room of public corridor-31st floor, tower. new 1 hr non structural partitions and 30 min door/closer, wall, ceiling & floor finishes. plumb & elect in connection with relocation of (e) ice machine. fire/life safety and fire sprinkler under seperate permit. | $10,000 |
| Oct 19, 2009 | Completed final sign-off Apr 2010 | 335 Powell St | Cw Horton General Contractor | st francis hotel. remodel reception lobby and tower elevator lobby. voluntary accessibility upgrade of geray st entry doors located approx. 25 feet from street. wall finishes change. paint clgs, new ltg to replace less than 50% existing at reception lobby. new power operated doors at geary entryDetails
st francis hotel. remodel reception lobby and tower elevator lobby. voluntary accessibility upgrade of geray st entry doors located approx. 25 feet from street. wall finishes change. paint clgs, new ltg to replace less than 50% existing at reception lobby. new power operated doors at geary entry | $200,000 |
| Jun 22, 2009 | Completed final sign-off Mar 2010 | 335 Powell St | Marchetti Construction Inc. | mechanical work only. clock bar - existing hvac alterations project. install new 5 ton-heat pump hvac unit. new ducted outside air. new ducted return air, add new fire damper at tenant space demising wall. use (e) hotel condenser water piping.Details
mechanical work only. clock bar - existing hvac alterations project. install new 5 ton-heat pump hvac unit. new ducted outside air. new ducted return air, add new fire damper at tenant space demising wall. use (e) hotel condenser water piping. | $60,000 |
| Jan 6, 2009 | Completed final sign-off Apr 2010 | 335 Powell St | barrier removal project, mezzanine mens public toilet, mezzanine woments public toilet, & mens public toilet, borgiarm, make lavs accessible, urinals accessible, w.c. stall in each accessible, new lig, new fl, wall fins. new partitions for stalls. no alt to fire/life safety.Details
barrier removal project, mezzanine mens public toilet, mezzanine woments public toilet, & mens public toilet, borgiarm, make lavs accessible, urinals accessible, w.c. stall in each accessible, new lig, new fl, wall fins. new partitions for stalls. no alt to fire/life safety. | $131,250 | |
| Nov 17, 2008 | Completed final sign-off Jun 2009 | 335 Powell St | Cw Horton General Contractor | cosmetic remodel of 4 (e) public toilet rms.on mezzanine &2nd fl. main bldg. -st.francis hotel.new lav counter tops, faucets,stone flrs, wainscots flrs, (n) fluorescent lights fixt.paint & wall covering.no alts to fire alarm or fire sprinkler system. no hvac or water heater system alteration.Details
cosmetic remodel of 4 (e) public toilet rms.on mezzanine &2nd fl. main bldg. -st.francis hotel.new lav counter tops, faucets,stone flrs, wainscots flrs, (n) fluorescent lights fixt.paint & wall covering.no alts to fire alarm or fire sprinkler system. no hvac or water heater system alteration. | $175,000 |
| Nov 3, 2008 | Completed final sign-off Jan 2009 | 335 Powell St | Marchetti Construction Inc. | remodel 15 (e) accessible guestrm bathrooms in main bldg. 1 & 59 series guestrooms. new grab bars, new vanity counter tops, new stone floors & shower surrounds, new flourscent lights, new faucets, tub & shower valves. (e) hvac, hot water generation no work. fire, life safety no workDetails
remodel 15 (e) accessible guestrm bathrooms in main bldg. 1 & 59 series guestrooms. new grab bars, new vanity counter tops, new stone floors & shower surrounds, new flourscent lights, new faucets, tub & shower valves. (e) hvac, hot water generation no work. fire, life safety no work | $150,000 |
| Sep 5, 2008 | Completed final sign-off Jun 2009 | 335 Powell St | Cw Horton General Contractor | remodel 6 suites-31st flr (tower) except for some major work in (e) h.c accessible guestroom bath (3180), other work is cosmetic in nature, new wall coverings, paint, carpet, light fixtures, stone finishes, counters in bathrooms, etc. no alteration to hvac or hot water systems, fire, life safety sepDetails
remodel 6 suites-31st flr (tower) except for some major work in (e) h.c accessible guestroom bath (3180), other work is cosmetic in nature, new wall coverings, paint, carpet, light fixtures, stone finishes, counters in bathrooms, etc. no alteration to hvac or hot water systems, fire, life safety sep | $900,000 |
| Jul 11, 2008 | Expired or cancelled expired Feb 2010 | 26 07th St | Imbimbo Concrete Inc | removal & replacement of sidewalk delivery door & install new concrete beam in basement (damaged).Details
removal & replacement of sidewalk delivery door & install new concrete beam in basement (damaged). | $31,000 |
| Sep 7, 2006 | Completed final sign-off Feb 2007 | 335 Powell St | Marchetti Construction Inc. | no wk involving existing ada guestrooms.remodel 2 existing guestroom suites,cosmetic only.no alter to bldg structure,hvac or fire/life safety.scope of wk incl faucets/shower controls chg out/bathroom light fixture chg. wall coverings,flr materals,paint,trim,redo marble.no street space use.Details
no wk involving existing ada guestrooms.remodel 2 existing guestroom suites,cosmetic only.no alter to bldg structure,hvac or fire/life safety.scope of wk incl faucets/shower controls chg out/bathroom light fixture chg. wall coverings,flr materals,paint,trim,redo marble.no street space use. | $465,000 |
| Aug 18, 2006 | Completed final sign-off Feb 2007 | 335 Powell St | Marchetti Construction Inc. | remodel (cosmetic only), (9) selected guestrm bathrms on 3rd, 11th and 12th floors. shower valve & sink faucet change out, new vanity cab, new marble floor tile & shower surround, new flourescent light fixtures, new mirror & toilet accessories, new paint, wall paper, reverse some (e) door swings.Details
remodel (cosmetic only), (9) selected guestrm bathrms on 3rd, 11th and 12th floors. shower valve & sink faucet change out, new vanity cab, new marble floor tile & shower surround, new flourescent light fixtures, new mirror & toilet accessories, new paint, wall paper, reverse some (e) door swings. | $99,000 |
| Jun 27, 2006 | Completed final sign-off Jun 2006 | 335 Powell St | Marchetti Construction Inc. | this application to renew the following expired appli#3:200404141301 fire sprinkler, 200404262213-simplex fire alarm, 200507147652 sivios heg supplemental-restaurant michael mina st. francs hotel, final by blds. insp.Details
this application to renew the following expired appli#3:200404141301 fire sprinkler, 200404262213-simplex fire alarm, 200507147652 sivios heg supplemental-restaurant michael mina st. francs hotel, final by blds. insp. | |
| Jun 27, 2006 | Completed final sign-off Jun 2006 | 335 Powell St | Marchetti Construction Inc. | this application to renew the following expired appl#3:2003112133238-selective demolition, 2004060287420-aaa fire protection, 200406287422 aaa fire protection=restaurat michaelmina, st francisco otel final by bldg insp.Details
this application to renew the following expired appl#3:2003112133238-selective demolition, 2004060287420-aaa fire protection, 200406287422 aaa fire protection=restaurat michaelmina, st francisco otel final by bldg insp. | |
| Jul 14, 2005 | Expired or cancelled expired Jul 2006 | 335 Powell St | Marchetti Construction Inc. | supplemental dwgs provided for (e) permit. (e) app#200403168783 (g.bldg permit) engineer & architectDetails
supplemental dwgs provided for (e) permit. (e) app#200403168783 (g.bldg permit) engineer & architect | |
| Jul 15, 2003 | Completed final sign-off Jun 2004 | 666 Filbert St | selective interiior demolition only.-remove slab n. elev pit in bsmt , remove (e) tilet room /partioDetails
selective interiior demolition only.-remove slab n. elev pit in bsmt , remove (e) tilet room /partio | $25,000 |