Back to kitchen remodel contractors
Y D Construction Co. Inc.
- Based in
- Pacifica
- On San Francisco permits
- Jan 2002 to Jul 2025
- Last 24 months
- 1 permit filed
160 permits since 2000: 90 completed, 1 in progress, 36 never finaled, 33 expired or cancelled.
Of the 36 never-finaled permits, 13 are 5 to 10 years old, 23 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
44 kitchen remodel permits: 29 completed, 9 never finaled, 6 expired or cancelled. Typically 8 days from filing to permit and 251 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 5, 2023 | Completed final sign-off Aug 2024 | 278 Monticello St | to comply w/dbi nov# 201460542 and planning enf case #2015-013642enf. revision to pa# 201211073748 & 20140909595. front setback landscape aterations. front facade alterations per plans. 2/f: reconfigure kitchen layout, new partition and pony wall between dining & living room per plans. 3/f: new reduDetails
to comply w/dbi nov# 201460542 and planning enf case #2015-013642enf. revision to pa# 201211073748 & 20140909595. front setback landscape aterations. front facade alterations per plans. 2/f: reconfigure kitchen layout, new partition and pony wall between dining & living room per plans. 3/f: new redu | |
| Mar 14, 2022 | Completed final sign-off Jun 2022 | 762 Edinburgh St | kitchen remodel. no wall removal. same locationDetails
kitchen remodel. no wall removal. same location | $10,000 |
| Sep 21, 2021 | Never finaled issued Sep 2021, no final | 1955 21st Av | replace kitchen cabinets onlyDetails
replace kitchen cabinets only | $5,000 |
| Jul 27, 2021 | Completed final sign-off Jul 2023 | 130 Stanyan St | 2nd fl: infill lightwell at south side and remodel kitchen, new windows at front with aluminum clad wood in (e) openings with casements/fixed.Details
2nd fl: infill lightwell at south side and remodel kitchen, new windows at front with aluminum clad wood in (e) openings with casements/fixed. | $45,000 |
| Jul 8, 2020 | Never finaled issued Jul 2020, no final | 3848 California St | inkind kitchen & bathroom remodel (no changes to floor plan of walls). total (2) kitchen & (4) bathroom for both unitsDetails
inkind kitchen & bathroom remodel (no changes to floor plan of walls). total (2) kitchen & (4) bathroom for both units | $60,000 |
| Oct 15, 2019 | Completed final sign-off Jun 2020 | 210 04th Av | kitchen and bathroom remodel in kind.Details
kitchen and bathroom remodel in kind. | $15,000 |
| Sep 4, 2019 | Never finaled issued Sep 2019, no final | 133 Blake St | to comply with nov201831161 item #2: repair rear stairs, less than 50%; item #3: replace (e) refridgerator, stove and kitchen appliances.Details
to comply with nov201831161 item #2: repair rear stairs, less than 50%; item #3: replace (e) refridgerator, stove and kitchen appliances. | $5,000 |
| Aug 8, 2019 | Never finaled issued Aug 2019, no final | 766 Chestnut St | 2 kitchens and two full bathrooms and two half bathrooms. remodel on 2nd and 3rd floor in kind same locationDetails
2 kitchens and two full bathrooms and two half bathrooms. remodel on 2nd and 3rd floor in kind same location | $30,000 |
| Jun 27, 2019 | Completed final sign-off Mar 2020 | 2100 Larkin St | (2) kitchen remodel, each unit 10'x10', no wall relocationDetails
(2) kitchen remodel, each unit 10'x10', no wall relocation | $16,000 |
| Jun 19, 2019 | Completed final sign-off Mar 2020 | 1378 Vallejo St | kitchen remodel - fixtures & finishes & cabinets only. no structural work. no framing modification.Details
kitchen remodel - fixtures & finishes & cabinets only. no structural work. no framing modification. | $9,000 |
| May 30, 2019 | Completed final sign-off Jul 2019 | 167 Fair Oaks St | unit #11: kitchen and bathroom remodel. . to comply with complaint #201577411. legalize replacement of 6 windows at the rear of building. same size, same location. max u factor 0.32Details
unit #11: kitchen and bathroom remodel. . to comply with complaint #201577411. legalize replacement of 6 windows at the rear of building. same size, same location. max u factor 0.32 | $15,000 |
| Aug 16, 2018 | Completed final sign-off Nov 2018 | 2507 16th Av | 2nd flr. remodel kitchen & bath and add 1 bath on 2nd fl.Details
2nd flr. remodel kitchen & bath and add 1 bath on 2nd fl. | $30,000 |
| Oct 10, 2017 | Completed final sign-off Aug 2018 | 2505 Gough St | revision to pa 2016-0414-4780 relocate 2 full bath & 1 powder on 1st fl per plan; add study room & computer room on 1st fl per plan. reconfigure bathroom & kitchen layout on 2nd floor per planDetails
revision to pa 2016-0414-4780 relocate 2 full bath & 1 powder on 1st fl per plan; add study room & computer room on 1st fl per plan. reconfigure bathroom & kitchen layout on 2nd floor per plan | $10,000 |
| Aug 1, 2017 | Never finaled issued Nov 2017, no final | 100 Shotwell St | interior remodeling (e) dwelling unit on 2/f, #100. new bathroom & replace kitchen in kind. new closet in bedrooms. n/a ordinance #155-13Details
interior remodeling (e) dwelling unit on 2/f, #100. new bathroom & replace kitchen in kind. new closet in bedrooms. n/a ordinance #155-13 | $25,000 |
| Jun 5, 2017 | Completed final sign-off Aug 2017 | 1086 Post St | work in unit 210: kitchen remodel only. include electrical permit to address complaint #201781131. comply with nov #201768251Details
work in unit 210: kitchen remodel only. include electrical permit to address complaint #201781131. comply with nov #201768251 | $4,000 |
| May 19, 2017 | Completed final sign-off Feb 2018 | 1311 Stevenson St | remodel kitchen and bathroom, no wall removed, change water heater.Details
remodel kitchen and bathroom, no wall removed, change water heater. | $12,000 |
| Mar 29, 2017 | Never finaled issued Mar 2017, no final | 1115 Church St | kitchen remodel, no wall remove.Details
kitchen remodel, no wall remove. | $10,000 |
| Nov 3, 2016 | Completed final sign-off Dec 2019 | 2576 Folsom St | 1st fl add 3 bedrooms, 1 study, 1 entertmt, 1 computer rm, 3 full bath. 2nd fl add 2 bdrm, 1 office, 2 full baths, 1 powder, relocate e kitchen,living rm, 3rd fl relocate e kitchn, remodel 2 e baths, add 2 bedrooms, 1 gamerm, 1 study rm, eliminate curb cutDetails
1st fl add 3 bedrooms, 1 study, 1 entertmt, 1 computer rm, 3 full bath. 2nd fl add 2 bdrm, 1 office, 2 full baths, 1 powder, relocate e kitchen,living rm, 3rd fl relocate e kitchn, remodel 2 e baths, add 2 bedrooms, 1 gamerm, 1 study rm, eliminate curb cut | $60,000 |
| Jun 21, 2016 | Completed final sign-off Jan 2018 | 969 Dolores St | replace kitchen cabinets and counter top only. to comply with nov #201565131.Details
replace kitchen cabinets and counter top only. to comply with nov #201565131. | $3,000 |
| May 26, 2016 | Expired or cancelled expired Dec 2021 | 1624 Bay St | 2/f: add 2 bedrooms, 1 full bath & nook, remodel (e) kitchen. 3/f: add 1 bedroom, office, 1 full bath, 1 powder, 1 study room and family room, relocate (e) bedroom & laundry, replace skylight in kind. less than 75% demo. n/a ordinance #155-13Details
2/f: add 2 bedrooms, 1 full bath & nook, remodel (e) kitchen. 3/f: add 1 bedroom, office, 1 full bath, 1 powder, 1 study room and family room, relocate (e) bedroom & laundry, replace skylight in kind. less than 75% demo. n/a ordinance #155-13 | $120,000 |
| May 9, 2016 | Completed final sign-off Jan 2017 | 180 Bernard St | remodel 2 kitchens and internal painting, no alteration of wall, window & doorDetails
remodel 2 kitchens and internal painting, no alteration of wall, window & door | $8,000 |
| Apr 14, 2016 | Completed final sign-off Aug 2018 | 2505 Gough St | work on unit #1 at 1st & 2nd only.1) infill space within bldg. envelope at rear on 1st fl. 2)relocate extg powder on 1st fl.3)add gym, office, storage, 2 baths, 3 br on 1st fl. 4) relo extg kitchen on 2nd fl.5)add 2 full bathrms & one bedrm on 2nd fl. also, horiz. add'n 1st fl. sprinkler deferred.Details
work on unit #1 at 1st & 2nd only.1) infill space within bldg. envelope at rear on 1st fl. 2)relocate extg powder on 1st fl.3)add gym, office, storage, 2 baths, 3 br on 1st fl. 4) relo extg kitchen on 2nd fl.5)add 2 full bathrms & one bedrm on 2nd fl. also, horiz. add'n 1st fl. sprinkler deferred. | $50,000 |
| May 14, 2015 | Completed final sign-off Jul 2015 | 2066 Mcallister St | unit # 2066 - kitchen area: add wall to creat formal dining rom. maher naDetails
unit # 2066 - kitchen area: add wall to creat formal dining rom. maher na | $2,000 |
| Mar 16, 2015 | Completed final sign-off Jul 2017 | 367 Ivy St | unit #6: kitchen remodel & added partitions to create 2 new bedrooms. maher - not req'd. install new front elevation window to meet egress requirements and replace 2 middle bedroom windows to meet egressDetails
unit #6: kitchen remodel & added partitions to create 2 new bedrooms. maher - not req'd. install new front elevation window to meet egress requirements and replace 2 middle bedroom windows to meet egress | $5,000 |
| Jan 26, 2015 | Expired or cancelled cancelled Nov 2024 | 278 Monticello St | reconfigure staircase, 1st, 2nd & 3rd floor level to create bedroom, convert to study room, relocate bathroom and kitchen within building envelope in reference to bpa# 201211073748s1 per plan. repair front stucco in-kind. no exterior changes. comply with complaint # 201460542.Details
reconfigure staircase, 1st, 2nd & 3rd floor level to create bedroom, convert to study room, relocate bathroom and kitchen within building envelope in reference to bpa# 201211073748s1 per plan. repair front stucco in-kind. no exterior changes. comply with complaint # 201460542. | $20,000 |
| Jan 20, 2015 | Expired or cancelled expired Apr 2017 | 693 Sutter St | revision appl. 2013.1126.2876 to revise layout of bedrooms, baths and kitchen. add more bedroom for 12 units per plan. remove 5 bath from apporved plan for 5 units per plan. fire sprinkler work separate permit.Details
revision appl. 2013.1126.2876 to revise layout of bedrooms, baths and kitchen. add more bedroom for 12 units per plan. remove 5 bath from apporved plan for 5 units per plan. fire sprinkler work separate permit. | $75,000 |
| Oct 17, 2014 | Never finaled issued Oct 2014, no final | 1753 Fulton St | general remodeling of all 6 dwelling units; add 1 bath @ each unit. relocation of kitchen. mandatory soft story upgrade., maher n/aDetails
general remodeling of all 6 dwelling units; add 1 bath @ each unit. relocation of kitchen. mandatory soft story upgrade., maher n/a | $190,000 |
| Sep 9, 2014 | Completed final sign-off Aug 2024 | 278 Monticello St | comply with nov #201460542. revision to app#201211073748. 2nd floor:relocate kitchen.per city planning dra-0596-no bedrooms or bathrooms on ground floor. 4 bedrooms and 3.5 baths permitted on 2nd & 3rd floor, combined.Details
comply with nov #201460542. revision to app#201211073748. 2nd floor:relocate kitchen.per city planning dra-0596-no bedrooms or bathrooms on ground floor. 4 bedrooms and 3.5 baths permitted on 2nd & 3rd floor, combined. | $30,000 |
| Feb 4, 2014 | Completed final sign-off Oct 2014 | 3163 Sacramento St | revision to appl #201401176595 - interior remodel-#3165: kitchen remodel, reconfigure (e) bathroom, add new bathroom. remove (e) wall at kitchen. #3167: bathroom remodel.Details
revision to appl #201401176595 - interior remodel-#3165: kitchen remodel, reconfigure (e) bathroom, add new bathroom. remove (e) wall at kitchen. #3167: bathroom remodel. | $5,000 |
| Oct 18, 2013 | Expired or cancelled expired Sep 2020 | 1714 Lake St | lower floor addition:add 1056 sq ft at lower floor(2 bedroom, 3 bath, laundry, entertainment room). 1st floor remodel: kitchen and bathroom remodel. 2nd floor remodel:bathroom.Details
lower floor addition:add 1056 sq ft at lower floor(2 bedroom, 3 bath, laundry, entertainment room). 1st floor remodel: kitchen and bathroom remodel. 2nd floor remodel:bathroom. | $85,000 |
| Oct 3, 2013 | Completed final sign-off Mar 2015 | 3187 Mission St | interior remodel, unit 1:relocate/remodel e kitchen, convert portion of e living rm into bedroom 3, new bath in bedrm 2. remodel e bath. unit 2: remodel e kitchen, new bath, add bath, relocate e bath. unit 3: remodel e kitchen, new 1/2 bath, convert e bath into den, add full bathDetails
interior remodel, unit 1:relocate/remodel e kitchen, convert portion of e living rm into bedroom 3, new bath in bedrm 2. remodel e bath. unit 2: remodel e kitchen, new bath, add bath, relocate e bath. unit 3: remodel e kitchen, new 1/2 bath, convert e bath into den, add full bath | $20,000 |
| Oct 9, 2012 | Expired or cancelled expired May 2018 | 1326 Larkin St | add 2 full baths, half bath, sitting rm, exercise rm, legalize (e) 2 bedrms, study,storage rooms & replace (e)foundation @ 1st flr #1326. add 1 full bath & half bath,sitting,study rm & relocate kitchen @2nd flr #1326. add 1 full bath,1 bedrm,2 study rms,sitting & relocate kitchen @ 3rd flr #1328.Details
add 2 full baths, half bath, sitting rm, exercise rm, legalize (e) 2 bedrms, study,storage rooms & replace (e)foundation @ 1st flr #1326. add 1 full bath & half bath,sitting,study rm & relocate kitchen @2nd flr #1326. add 1 full bath,1 bedrm,2 study rms,sitting & relocate kitchen @ 3rd flr #1328. | $150,000 |
| Sep 25, 2012 | Completed final sign-off Jul 2014 | 1618 Mcallister St | 1st fl-remodel (e) kitchen, add 1 bathroom, 2nd fl-remodel (e) kitchen, add 1 bathroom, relocate (e) attic stairs, attic fl-convert (e) attic into habitable space, addition to inlcude 1 bedroom, 2 bathrooms, 1 music room & 1 study. add 6 dormersDetails
1st fl-remodel (e) kitchen, add 1 bathroom, 2nd fl-remodel (e) kitchen, add 1 bathroom, relocate (e) attic stairs, attic fl-convert (e) attic into habitable space, addition to inlcude 1 bedroom, 2 bathrooms, 1 music room & 1 study. add 6 dormers | $80,000 |
| Aug 6, 2012 | Completed final sign-off Mar 2013 | 176 Parker Av | int remodel-1st flr (e) garage: 2 new bedrooms & 2 bathrooms, add new int stairs. 2nd flr:relocate (e) kitchen, convert (e) closet into bath, convert (e) kitchen into bedroom, convert nook into studyroom. 3rd flr:convert (e) closet into bath, relcoate (e) kitchen, convert (e) kitchen into bedroom.Details
int remodel-1st flr (e) garage: 2 new bedrooms & 2 bathrooms, add new int stairs. 2nd flr:relocate (e) kitchen, convert (e) closet into bath, convert (e) kitchen into bedroom, convert nook into studyroom. 3rd flr:convert (e) closet into bath, relcoate (e) kitchen, convert (e) kitchen into bedroom. | $20,000 |
| Sep 7, 2011 | Never finaled issued Mar 2013, no final | 2910 Franklin St | lower existing basement 2ft approx, convert into habitable space. add 4 bedrrooms, 1 family rm, 3 full baths. 1st floor remodel kitchen, 3 new baths. 2nd fl remodel, add kitchen remodel, add 1 bath.Details
lower existing basement 2ft approx, convert into habitable space. add 4 bedrrooms, 1 family rm, 3 full baths. 1st floor remodel kitchen, 3 new baths. 2nd fl remodel, add kitchen remodel, add 1 bath. | $30,000 |
| Jun 10, 2011 | Never finaled issued Jun 2011, no final | 165 Farallones St | kitchen remodel, change cabinets and counter top.Details
kitchen remodel, change cabinets and counter top. | $5,000 |
| May 27, 2010 | Completed final sign-off Aug 2010 | 5907 California St | correction to complaint #201036298: to remove kitchen & shower in a commercial space, to remove illegal built/platform & stairway; remove drop ceiling, mezzanine.Details
correction to complaint #201036298: to remove kitchen & shower in a commercial space, to remove illegal built/platform & stairway; remove drop ceiling, mezzanine. | $2,000 |
| May 4, 2010 | Completed final sign-off Aug 2010 | 126 Sylvan Dr | 2nd floor remodel: adding a new full bath, remodel existing bathroom & kitchen, addign a new closet.Details
2nd floor remodel: adding a new full bath, remodel existing bathroom & kitchen, addign a new closet. | $28,000 |
| Oct 22, 2009 | Completed final sign-off Feb 2010 | 1491 39th Av | remodel (e) kitchen on 1st floor, no moving or adding wallsDetails
remodel (e) kitchen on 1st floor, no moving or adding walls | $8,000 |
| Sep 15, 2009 | Completed final sign-off Jul 2010 | 233 Harold Av | 1st fl: replace entire foundation and slab. add 3 bedroom, 2 full bath rooms, study and family room at 1st floor. construct (n) laundr rm and 1/2 bath room directly underneath bedrm at 2nd fl. remodel 2 baths and kitchen at 2nd fl. new interior staircase.Details
1st fl: replace entire foundation and slab. add 3 bedroom, 2 full bath rooms, study and family room at 1st floor. construct (n) laundr rm and 1/2 bath room directly underneath bedrm at 2nd fl. remodel 2 baths and kitchen at 2nd fl. new interior staircase. | $100,000 |
| Oct 22, 2008 | Completed final sign-off Mar 2009 | 265 Sadowa St | add one family rm, one bedrm & two baths at g/f, remodel existing kitchen & bath, relocate existing furnace & water heath.Details
add one family rm, one bedrm & two baths at g/f, remodel existing kitchen & bath, relocate existing furnace & water heath. | $25,000 |
| Jul 22, 2008 | Expired or cancelled expired Jul 2012 | 125 Margaret Av | remove kitchen & bathroom. remove plumbing & electrical revert to last use & comply with n.o.v. 200860537.Details
remove kitchen & bathroom. remove plumbing & electrical revert to last use & comply with n.o.v. 200860537. | $4,000 |
| Mar 30, 2007 | Completed final sign-off May 2007 | 1050 North Point St | kitchen counter stove hood, sink, 5'6" long totally counter.Details
kitchen counter stove hood, sink, 5'6" long totally counter. | $10,000 |
| Feb 28, 2003 | Completed final sign-off Jun 2003 | 145 Venus St | comply nov 200337189. remove kitchen, legalize rooms and basement.Details
comply nov 200337189. remove kitchen, legalize rooms and basement. | $5,000 |