Y D Construction Co. Inc.
- Based in
- Pacifica
- On San Francisco permits
- Jan 2002 to Jul 2025
- Last 24 months
- 1 permit filed
160 permits since 2000: 90 completed, 1 in progress, 36 never finaled, 33 expired or cancelled.
Of the 36 never-finaled permits, 13 are 5 to 10 years old, 23 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
21 stairs permits: 15 completed, 3 never finaled, 3 expired or cancelled. Typically 7 days from filing to permit and 280 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 4, 2019 | Never finaled issued Sep 2019, no final | 133 Blake St | to comply with nov201831161 item #2: repair rear stairs, less than 50%; item #3: replace (e) refridgerator, stove and kitchen appliances.Details
to comply with nov201831161 item #2: repair rear stairs, less than 50%; item #3: replace (e) refridgerator, stove and kitchen appliances. | $5,000 |
| May 2, 2019 | Completed final sign-off Sep 2020 | 1714 Lake St | alteration of proposed deck. removeal of deck stairs and replace with larger deck areaDetails
alteration of proposed deck. removeal of deck stairs and replace with larger deck area | |
| Oct 4, 2017 | Completed final sign-off Nov 2017 | 1511 Golden Gate Av | repair stairs 50% to comply n.o.v. # 201705131, item 2; repair in kindDetails
repair stairs 50% to comply n.o.v. # 201705131, item 2; repair in kind | $1,000 |
| Feb 7, 2017 | Completed final sign-off Feb 2017 | 3735 Anza St | repair stair less than 50%; handrail & side door. to comply with his nov 201604888 dated 5/4/2016, items 3&4.Details
repair stair less than 50%; handrail & side door. to comply with his nov 201604888 dated 5/4/2016, items 3&4. | $1,000 |
| Jan 10, 2017 | Completed final sign-off Mar 2017 | 1327 Stevenson St | repair the rear exterior stair less than 50% for complaint # 201633541, item #3Details
repair the rear exterior stair less than 50% for complaint # 201633541, item #3 | $500 |
| Jan 26, 2015 | Expired or cancelled cancelled Nov 2024 | 278 Monticello St | reconfigure staircase, 1st, 2nd & 3rd floor level to create bedroom, convert to study room, relocate bathroom and kitchen within building envelope in reference to bpa# 201211073748s1 per plan. repair front stucco in-kind. no exterior changes. comply with complaint # 201460542.Details
reconfigure staircase, 1st, 2nd & 3rd floor level to create bedroom, convert to study room, relocate bathroom and kitchen within building envelope in reference to bpa# 201211073748s1 per plan. repair front stucco in-kind. no exterior changes. comply with complaint # 201460542. | $20,000 |
| Dec 16, 2014 | Expired or cancelled cancelled May 2024 | 877 Hayes St | interior remodeling of main unit at 1st and 2nd floors. 1st floor: creation of two addition bedrooms, add one full bathroom remove interior stair. 2nd floor: complete remodel to convert to 5 bedrooms per plans. basement unit: de-commision fire place function. maher n/a.Details
interior remodeling of main unit at 1st and 2nd floors. 1st floor: creation of two addition bedrooms, add one full bathroom remove interior stair. 2nd floor: complete remodel to convert to 5 bedrooms per plans. basement unit: de-commision fire place function. maher n/a. | $35,000 |
| Dec 9, 2014 | Expired or cancelled expired Sep 2020 | 1714 Lake St | repair and replace (e) front brick stairs. replace (e) stucco and siding with new stucco finish. replace (e) siding at left and rear walls with new hardy plank. replace (e) 45 windows size and type to match existing. remove (e) stair side stair per plan shown.Details
repair and replace (e) front brick stairs. replace (e) stucco and siding with new stucco finish. replace (e) siding at left and rear walls with new hardy plank. replace (e) 45 windows size and type to match existing. remove (e) stair side stair per plan shown. | $10,000 |
| Apr 22, 2014 | Completed final sign-off Mar 2019 | 133 Blake St | convert existing 1st floor storage into habitable space (540 sq ft). the addition to include two bedroom & one bathroom & a staircase.Details
convert existing 1st floor storage into habitable space (540 sq ft). the addition to include two bedroom & one bathroom & a staircase. | $30,000 |
| Apr 19, 2013 | Completed final sign-off Jun 2019 | 477 14th St | convert (e) first floor storage into habitable space, the additoin to include two bedrooms, two study rooms & two bathrooms. add new internal stairs from 2nd to 1st floor. sprinklers required under seperate permit, per sffd.Details
convert (e) first floor storage into habitable space, the additoin to include two bedrooms, two study rooms & two bathrooms. add new internal stairs from 2nd to 1st floor. sprinklers required under seperate permit, per sffd. | $50,000 |
| Jan 31, 2013 | Completed final sign-off Nov 2013 | 153 Duboce Av | ground floor improvement. new interior stair from 2nd to 1st floor. add 3 new bedrooms, 2 new baths, connecting to 1st floor rear storage and converting to habitable spaceDetails
ground floor improvement. new interior stair from 2nd to 1st floor. add 3 new bedrooms, 2 new baths, connecting to 1st floor rear storage and converting to habitable space | $60,000 |
| Dec 5, 2012 | Completed final sign-off Jul 2014 | 1618 Mcallister St | interior remodel. excavate the basement to add 2 1/2 baths and 5 bedrooms. add a stair to connect to 1st floor. replace existing brick foundationDetails
interior remodel. excavate the basement to add 2 1/2 baths and 5 bedrooms. add a stair to connect to 1st floor. replace existing brick foundation | $60,000 |
| Sep 25, 2012 | Completed final sign-off Jul 2014 | 1618 Mcallister St | 1st fl-remodel (e) kitchen, add 1 bathroom, 2nd fl-remodel (e) kitchen, add 1 bathroom, relocate (e) attic stairs, attic fl-convert (e) attic into habitable space, addition to inlcude 1 bedroom, 2 bathrooms, 1 music room & 1 study. add 6 dormersDetails
1st fl-remodel (e) kitchen, add 1 bathroom, 2nd fl-remodel (e) kitchen, add 1 bathroom, relocate (e) attic stairs, attic fl-convert (e) attic into habitable space, addition to inlcude 1 bedroom, 2 bathrooms, 1 music room & 1 study. add 6 dormers | $80,000 |
| Aug 6, 2012 | Completed final sign-off Mar 2013 | 176 Parker Av | int remodel-1st flr (e) garage: 2 new bedrooms & 2 bathrooms, add new int stairs. 2nd flr:relocate (e) kitchen, convert (e) closet into bath, convert (e) kitchen into bedroom, convert nook into studyroom. 3rd flr:convert (e) closet into bath, relcoate (e) kitchen, convert (e) kitchen into bedroom.Details
int remodel-1st flr (e) garage: 2 new bedrooms & 2 bathrooms, add new int stairs. 2nd flr:relocate (e) kitchen, convert (e) closet into bath, convert (e) kitchen into bedroom, convert nook into studyroom. 3rd flr:convert (e) closet into bath, relcoate (e) kitchen, convert (e) kitchen into bedroom. | $20,000 |
| May 27, 2010 | Completed final sign-off Aug 2010 | 5907 California St | correction to complaint #201036298: to remove kitchen & shower in a commercial space, to remove illegal built/platform & stairway; remove drop ceiling, mezzanine.Details
correction to complaint #201036298: to remove kitchen & shower in a commercial space, to remove illegal built/platform & stairway; remove drop ceiling, mezzanine. | $2,000 |
| Dec 1, 2009 | Completed final sign-off May 2010 | 569 28th St | comply with n.o.v. 200925722. replace rotted bridge & stairs at front of house.Details
comply with n.o.v. 200925722. replace rotted bridge & stairs at front of house. | $10,000 |
| Sep 22, 2009 | Never finaled issued Sep 2009, no final | 976 Dolores St | repair side stair, second floor stringer and deck floor less than 50% of the stairDetails
repair side stair, second floor stringer and deck floor less than 50% of the stair | $1,500 |
| Sep 15, 2009 | Completed final sign-off Jul 2010 | 233 Harold Av | 1st fl: replace entire foundation and slab. add 3 bedroom, 2 full bath rooms, study and family room at 1st floor. construct (n) laundr rm and 1/2 bath room directly underneath bedrm at 2nd fl. remodel 2 baths and kitchen at 2nd fl. new interior staircase.Details
1st fl: replace entire foundation and slab. add 3 bedroom, 2 full bath rooms, study and family room at 1st floor. construct (n) laundr rm and 1/2 bath room directly underneath bedrm at 2nd fl. remodel 2 baths and kitchen at 2nd fl. new interior staircase. | $100,000 |
| Aug 4, 2008 | Never finaled issued Aug 2008, no final | 2264 Francisco St | remove and replace 2 4x4 posts at first floor.replace treads as needed at various locations. all work at side stairs.Details
remove and replace 2 4x4 posts at first floor.replace treads as needed at various locations. all work at side stairs. | $3,500 |
| May 2, 2008 | Completed final sign-off Sep 2008 | 561 28th St | correction for inspection report no 3r-5165 and one bathroom remodeling. 1) install handrail at front and rear stair. 2)to replace post foundation and one concrete step. 3)remodel bathroom at unit #561.Details
correction for inspection report no 3r-5165 and one bathroom remodeling. 1) install handrail at front and rear stair. 2)to replace post foundation and one concrete step. 3)remodel bathroom at unit #561. | $27,000 |
| Jun 29, 2006 | Completed final sign-off Feb 2008 | 47 Goettingen St | proposed horizontal 2 story addition at rear of existing 2 story bldg. single family dwelling per plans. replace front damaged stairs in kind.Details
proposed horizontal 2 story addition at rear of existing 2 story bldg. single family dwelling per plans. replace front damaged stairs in kind. | $150,000 |