Back to kitchen remodel contractors
Trainor Commercial Construction Inc.
- Based in
- Petaluma
- On San Francisco permits
- Dec 2003 to Apr 2026
- Last 24 months
- 6 permits filed
192 permits since 2000: 106 completed, 9 in progress, 69 never finaled, 8 expired or cancelled.
Of the 69 never-finaled permits, 10 are 3 to 5 years old, 37 are 5 to 10 years old, 22 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
7 kitchen remodel permits: 7 completed. Typically 48 days from filing to permit and 203 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 26, 2023 | Completed final sign-off Mar 2024 | 499 Jackson St | 5/f: construction of new non-structural partitions, stair guardrails, doors, frames, handware, millwork, ceilings, finishes, mep included. demo portion of interior structure wall to enlarge (e) opening. kitchenette area-no catering. life safety under separate permit.Details
5/f: construction of new non-structural partitions, stair guardrails, doors, frames, handware, millwork, ceilings, finishes, mep included. demo portion of interior structure wall to enlarge (e) opening. kitchenette area-no catering. life safety under separate permit. | $500,000 |
| Jun 30, 2022 | Completed final sign-off Jul 2023 | 499 Jackson St | ground floor and basement change of use. new partitions, finishes, mep and kitchen equip for specialty grocery retail sales, minor food prep. new single occupancy restroom at ground floor and basement.Details
ground floor and basement change of use. new partitions, finishes, mep and kitchen equip for specialty grocery retail sales, minor food prep. new single occupancy restroom at ground floor and basement. | $350,000 |
| Aug 29, 2020 | Completed final sign-off Mar 2021 | 335 Powell St | demolish (e) lobby bistro bar, portion of boh kitchen, millwork & finishes. renovate (e) lobby bistro bar, new non-rated partitions, seating, millwork, lighting & finishes. electrical modifications for new millwork & kitchen equipment. new type2 hood & ducting. modify plumbing & ada pot & restroomsDetails
demolish (e) lobby bistro bar, portion of boh kitchen, millwork & finishes. renovate (e) lobby bistro bar, new non-rated partitions, seating, millwork, lighting & finishes. electrical modifications for new millwork & kitchen equipment. new type2 hood & ducting. modify plumbing & ada pot & restrooms | $158,000 |
| Mar 7, 2017 | Completed final sign-off Jan 2018 | 225 Powell St | mep and kitchen scope only for 201611223371 for renovation of existing restaurantDetails
mep and kitchen scope only for 201611223371 for renovation of existing restaurant | $750,000 |
| Nov 22, 2016 | Completed final sign-off Jan 2018 | 225 Powell St | interior renovation of e restaurant & kitchen at gr fl and basement. work includes selective demo & reconstruction of walls, floors, ceilings and finishes. no exterior work. fire life safety work under sep permitDetails
interior renovation of e restaurant & kitchen at gr fl and basement. work includes selective demo & reconstruction of walls, floors, ceilings and finishes. no exterior work. fire life safety work under sep permit | $116,000 |
| Nov 4, 2016 | Completed final sign-off Jun 2017 | 37 29th St | unit a, 3rd floor - no change in use or configuration, interior water damage repair to (e) residential unit. remove & replace: forced air heater, electrical system, lighting system, bathroom fixtures, kitchen cabinets & fixtures, interior flooring finishes & interior flooring finishes & interiorDetails
unit a, 3rd floor - no change in use or configuration, interior water damage repair to (e) residential unit. remove & replace: forced air heater, electrical system, lighting system, bathroom fixtures, kitchen cabinets & fixtures, interior flooring finishes & interior flooring finishes & interior | $145,000 |
| Oct 19, 2016 | Completed final sign-off Jun 2017 | 37 29th St | unit #b: no changes in use or configuration, interior water damage repair to extg residential unit. remove and repair forced air heater, water heater, electrical system, lighting system, bathroom fixtures, kitchen cabinets and fixtures, interior flooring and finishes, and interior drywall and doors.Details
unit #b: no changes in use or configuration, interior water damage repair to extg residential unit. remove and repair forced air heater, water heater, electrical system, lighting system, bathroom fixtures, kitchen cabinets and fixtures, interior flooring and finishes, and interior drywall and doors. | $118,640 |