Back to bathroom remodel contractors
Trainor Commercial Construction Inc.
- Based in
- Petaluma
- On San Francisco permits
- Dec 2003 to Apr 2026
- Last 24 months
- 6 permits filed
192 permits since 2000: 106 completed, 9 in progress, 69 never finaled, 8 expired or cancelled.
Of the 69 never-finaled permits, 10 are 3 to 5 years old, 37 are 5 to 10 years old, 22 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 3 completed, 1 in progress. Typically 34 days from filing to permit and 203 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 16, 2024 | In progress issued Oct 2024 | 335 Powell St | conversion of a hotel suite on 12flr london suite into conference roos and converting an exsiting bathroom into an ada compliant all gender restroom. mep design built.Details
conversion of a hotel suite on 12flr london suite into conference roos and converting an exsiting bathroom into an ada compliant all gender restroom. mep design built. | $194,000 |
| Nov 4, 2016 | Completed final sign-off Jun 2017 | 37 29th St | unit a, 3rd floor - no change in use or configuration, interior water damage repair to (e) residential unit. remove & replace: forced air heater, electrical system, lighting system, bathroom fixtures, kitchen cabinets & fixtures, interior flooring finishes & interior flooring finishes & interiorDetails
unit a, 3rd floor - no change in use or configuration, interior water damage repair to (e) residential unit. remove & replace: forced air heater, electrical system, lighting system, bathroom fixtures, kitchen cabinets & fixtures, interior flooring finishes & interior flooring finishes & interior | $145,000 |
| Oct 19, 2016 | Completed final sign-off Jun 2017 | 37 29th St | unit #b: no changes in use or configuration, interior water damage repair to extg residential unit. remove and repair forced air heater, water heater, electrical system, lighting system, bathroom fixtures, kitchen cabinets and fixtures, interior flooring and finishes, and interior drywall and doors.Details
unit #b: no changes in use or configuration, interior water damage repair to extg residential unit. remove and repair forced air heater, water heater, electrical system, lighting system, bathroom fixtures, kitchen cabinets and fixtures, interior flooring and finishes, and interior drywall and doors. | $118,640 |
| Apr 1, 2014 | Completed final sign-off Oct 2014 | 767 Market St | t.i. for new retail store on ground floor and basement. work includes new partitions, fixutres, finishes, bathrooms, mep, exterior work under separate permit. fire protection under seperate permit. elevator and escalator approved under app#201403060063.Details
t.i. for new retail store on ground floor and basement. work includes new partitions, fixutres, finishes, bathrooms, mep, exterior work under separate permit. fire protection under seperate permit. elevator and escalator approved under app#201403060063. | $1,100,000 |