The Whiting-Turner Contracting Company
- Based in
- Sacramento
- On San Francisco permits
- Jan 2002 to Jul 2025
- Last 24 months
- 6 permits filed
140 permits since 2000: 113 completed, 25 never finaled, 2 expired or cancelled.
Of the 25 never-finaled permits, 15 are 5 to 10 years old, 10 are over 10 years old. 8 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
9 stairs permits: 8 completed, 1 never finaled. Typically 10 days from filing to permit and 342 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 21, 2025 | Completed final sign-off Jun 2025 | 111 Pine St | demo communicating stairs from l2 to l3. slab infill at l3.restroom finishes upgrade for ada complianceDetails
demo communicating stairs from l2 to l3. slab infill at l3.restroom finishes upgrade for ada compliance | $77,960 |
| Nov 3, 2023 | Completed final sign-off Jan 2025 | 982 Mission St | remodel of bldg & voluntary lateral force-resisting system alteration. accessibility upgrades.new ada ramp railing w/ relocating (e) stair exit door at lev 1.add rail at mezz.adding (n) wall out-of-plane & diaphram load transfer from diaphragm to braced frames. strengthen (e) collector connectn.Details
remodel of bldg & voluntary lateral force-resisting system alteration. accessibility upgrades.new ada ramp railing w/ relocating (e) stair exit door at lev 1.add rail at mezz.adding (n) wall out-of-plane & diaphram load transfer from diaphragm to braced frames. strengthen (e) collector connectn. | $1,792,526 |
| May 31, 2023 | Completed final sign-off Aug 2025 | 2238 Geary Bl | revision to pa# 202103126502, 202108307889, 202112204733, n lighting along pathway from stair to elevator machine rm, relocate pit light on sheet e-201, add lighting in elevator machine rm to elevators 1-6, install n disconnect panel & n pullbox w/individual lockable disconnect, enclose cab lightingDetails
revision to pa# 202103126502, 202108307889, 202112204733, n lighting along pathway from stair to elevator machine rm, relocate pit light on sheet e-201, add lighting in elevator machine rm to elevators 1-6, install n disconnect panel & n pullbox w/individual lockable disconnect, enclose cab lighting | $15,000 |
| Jul 26, 2021 | Never finaled filed Jul 2021, never issued | 645 05th St | podium: alter site for pa# 201903215872. to remove basement levels 3 & 4; add parking & future tenant support area; (3) fsae stairs extended into basement 1 & 2; delete perimeter stairs serving level 4; add future tenant support areas b2 - level 1 reduce parking; add mech shafts; delete permiemeterDetails
podium: alter site for pa# 201903215872. to remove basement levels 3 & 4; add parking & future tenant support area; (3) fsae stairs extended into basement 1 & 2; delete perimeter stairs serving level 4; add future tenant support areas b2 - level 1 reduce parking; add mech shafts; delete permiemeter | |
| Dec 30, 2014 | Completed final sign-off Dec 2015 | 1600 Owens St | revision to 200711097802-s2 to revise the stair 3 pressurization duct at gr floor and relocate fire smoke damperDetails
revision to 200711097802-s2 to revise the stair 3 pressurization duct at gr floor and relocate fire smoke damper | |
| Jun 12, 2014 | Completed final sign-off Dec 2015 | 1600 Owens St | 6th flr: widen 2 stairway doors @ 6th flr, revision to application 201311131749. compliance with ord 155-13 not requiredDetails
6th flr: widen 2 stairway doors @ 6th flr, revision to application 201311131749. compliance with ord 155-13 not required | |
| Nov 25, 2013 | Completed final sign-off Apr 2014 | 1400 Owens St | install temporary construction office trailers with electrical and plumbing corrections, entrance ramp, entrance stair.Details
install temporary construction office trailers with electrical and plumbing corrections, entrance ramp, entrance stair. | $25,000 |
| Jun 19, 2012 | Completed final sign-off Jul 2013 | 303 02nd St | revision to pa# 2011-0215-0295- existing stairs (north lobby) to remain. no changes under this permitDetails
revision to pa# 2011-0215-0295- existing stairs (north lobby) to remain. no changes under this permit | |
| May 9, 2012 | Completed final sign-off Jun 2013 | 201 03rd St | revision to 201201303193. remove existing stair enclosure in plaza. patch and repair concrete as neededDetails
revision to 201201303193. remove existing stair enclosure in plaza. patch and repair concrete as needed | $50,000 |