Back to kitchen remodel contractors
Strong Builders Construction Inc.
- Based in
- Belmont
- On San Francisco permits
- Aug 2010 to Sep 2026
- Last 24 months
- 26 permits filed
179 permits since 2000: 112 completed, 18 in progress, 30 never finaled, 19 expired or cancelled.
Of the 30 never-finaled permits, 4 are 3 to 5 years old, 16 are 5 to 10 years old, 10 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
55 kitchen remodel permits: 36 completed, 2 in progress, 15 never finaled, 2 expired or cancelled. Typically 24 days from filing to permit and 194 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 29, 2026 | Completed final sign-off Apr 2026 | 349 Mississippi St | interior renovation of 2 bathrooms + 1 kitchen. work includes demo of existing plumbing fixtures, finishes, lighting & adjustment of non structural walls. new fixtures, finishes, lighting, interior walls, & kitchen island to be installed.Details
interior renovation of 2 bathrooms + 1 kitchen. work includes demo of existing plumbing fixtures, finishes, lighting & adjustment of non structural walls. new fixtures, finishes, lighting, interior walls, & kitchen island to be installed. | $60,000 |
| Oct 20, 2025 | In progress issued May 2026 | 830 Cortland Av | ti w/ +/- 283 sqft partial horizontal extension at (e) gf comnmercial space. demo (e) non-bearing interior partitions, (e) commercial kitchen equipment, millwork, new non-bearing interior partitions, partial horizontal extension, new ada compliant restroom, & new interior finishes throughout.Details
ti w/ +/- 283 sqft partial horizontal extension at (e) gf comnmercial space. demo (e) non-bearing interior partitions, (e) commercial kitchen equipment, millwork, new non-bearing interior partitions, partial horizontal extension, new ada compliant restroom, & new interior finishes throughout. | $180,000 |
| Aug 7, 2025 | In progress issued Aug 2025 | 1740 Broadway | unit#705: interior renovations to bedrooms, kitchen, baths. new windows at e openings, not street facing. no change to areas, uses, or structural.Details
unit#705: interior renovations to bedrooms, kitchen, baths. new windows at e openings, not street facing. no change to areas, uses, or structural. | $100,000 |
| Jun 24, 2025 | Completed final sign-off Sep 2025 | 1155 Leavenworth St | unit 2: in-kind kitchen remodelDetails
unit 2: in-kind kitchen remodel | $15,000 |
| Jul 11, 2024 | Completed final sign-off Feb 2025 | 1740 Broadway | unit 606: relocate bedrooms & new bathrooms. relocate kitchen. interior court windows in kind & mech, eletrical & plumbing. no addition/ structural. no change to st facing exteriorDetails
unit 606: relocate bedrooms & new bathrooms. relocate kitchen. interior court windows in kind & mech, eletrical & plumbing. no addition/ structural. no change to st facing exterior | $50,000 |
| Mar 27, 2024 | Completed final sign-off Oct 2024 | 7555 Geary Bl | unit #201 kitchen and bathroom remodel in kind. new floors for kitchen. painting the apt and new base boardDetails
unit #201 kitchen and bathroom remodel in kind. new floors for kitchen. painting the apt and new base board | $62,000 |
| Sep 8, 2023 | Completed final sign-off Feb 2024 | 7555 Geary Bl | unit 105: bathroom and kitchen remodeling. kitchen : 135 sf. bath: 70 sf.Details
unit 105: bathroom and kitchen remodeling. kitchen : 135 sf. bath: 70 sf. | $18,500 |
| Apr 10, 2023 | Completed final sign-off Nov 2023 | 1740 Broadway | 7/flr- unit #602: interior renovations, renovate kitchen & bath, add new bath, mep no change to fixtures,structurl areas.Details
7/flr- unit #602: interior renovations, renovate kitchen & bath, add new bath, mep no change to fixtures,structurl areas. | $75,000 |
| Dec 14, 2022 | Completed final sign-off Jan 2024 | 1740 Broadway | 6/f unit 601: interior renovations, non-structural. add one new bathroom, renovate bath, kitchen. replace (5) interior windows, mechanical, electrical, and plumbing. no change to street facing exteriors.Details
6/f unit 601: interior renovations, non-structural. add one new bathroom, renovate bath, kitchen. replace (5) interior windows, mechanical, electrical, and plumbing. no change to street facing exteriors. | $25,000 |
| Mar 28, 2022 | Completed final sign-off Aug 2024 | 412 Lansdale Av | interior renovations: renovate kitchen, renovate 2 baths. new rear deck guardrails and trolis. window replacements.Details
interior renovations: renovate kitchen, renovate 2 baths. new rear deck guardrails and trolis. window replacements. | $100,000 |
| Feb 10, 2022 | Completed final sign-off Nov 2023 | 293 Connecticut St | the purpose of this permit is to provide interior renovation to 2 extg units: 293 connecticut and 1426 18th st including 2 renovated kitchens. renovated bathrooms, new bathrooms and bedrooms, various mep/ structural. no change to condiioned area or street facing exterior.Details
the purpose of this permit is to provide interior renovation to 2 extg units: 293 connecticut and 1426 18th st including 2 renovated kitchens. renovated bathrooms, new bathrooms and bedrooms, various mep/ structural. no change to condiioned area or street facing exterior. | $50,000 |
| Nov 22, 2021 | Completed final sign-off Jul 2022 | 1740 Broadway | apt 201: interior renovations on 2/f. renovate kitchen and bathroom. new heating. new windows at interior lightwell. no structural, no change to areas. no change to facade.Details
apt 201: interior renovations on 2/f. renovate kitchen and bathroom. new heating. new windows at interior lightwell. no structural, no change to areas. no change to facade. | $30,000 |
| Oct 20, 2021 | Completed final sign-off Sep 2022 | 1649 La Salle Av | to comply with nov 202174149 including fire damage, repair roof, walls, floor, ceilings. replace windows/doors, new kitchen and bathroom appliances. renovation work.Details
to comply with nov 202174149 including fire damage, repair roof, walls, floor, ceilings. replace windows/doors, new kitchen and bathroom appliances. renovation work. | $25,000 |
| Sep 16, 2021 | Completed final sign-off May 2023 | 686 28th Av | interior renovation and rear openings. 2 new bathrooms, renovate kitchen, new bedrooms. structural and mep.Details
interior renovation and rear openings. 2 new bathrooms, renovate kitchen, new bedrooms. structural and mep. | $100,000 |
| Dec 24, 2020 | Never finaled issued Aug 2021, no final | 1740 Broadway | #505: interior renovation for new bedrooms & new bathrooms. kitchen renovation. new interior windows. no exterior. no structural.Details
#505: interior renovation for new bedrooms & new bathrooms. kitchen renovation. new interior windows. no exterior. no structural. | $25,000 |
| Oct 24, 2020 | Completed final sign-off Apr 2022 | 1740 Broadway | unit #405: interior renovations. new kitchen and baths. no new area. no structural. no change to street facing elevations. convert studio to 1-bedroom apt.Details
unit #405: interior renovations. new kitchen and baths. no new area. no structural. no change to street facing elevations. convert studio to 1-bedroom apt. | $25,000 |
| Oct 3, 2020 | Never finaled issued Feb 2021, no final | 1740 Broadway | 6 unit renovations in 204/502/503/504/604/703: new bedrooms, kitchen & bathrooms. no structural work. no exterior, no new floor area. maher n/a.Details
6 unit renovations in 204/502/503/504/604/703: new bedrooms, kitchen & bathrooms. no structural work. no exterior, no new floor area. maher n/a. | $300,000 |
| Jul 6, 2020 | Never finaled issued Aug 2020, no final | 1740 Broadway | interior renovations only at 3 extg units: 207,506, & 704. new bathrooms, kitchens, and bathrooms.Details
interior renovations only at 3 extg units: 207,506, & 704. new bathrooms, kitchens, and bathrooms. | $100,000 |
| Feb 3, 2020 | Never finaled issued Feb 2020, no final | 1740 Broadway | unit 602: run new duct pipe for unit #602 thru unit 603. kitchen vent & bathroom vent & laundry vent, & booster fan & install flu pipe for future tankless water heater. duct work and piping work only. verify in final by field inspectorDetails
unit 602: run new duct pipe for unit #602 thru unit 603. kitchen vent & bathroom vent & laundry vent, & booster fan & install flu pipe for future tankless water heater. duct work and piping work only. verify in final by field inspector | $1,200 |
| Aug 28, 2019 | Completed final sign-off Oct 2022 | 1348 Sacramento St | construct (2) new adu's per ordinance no. 162-16. no change to occupancy or egress. remove non structural walls. new kitchen & bath. excavate less than 50 cubic yards of soil.Details
construct (2) new adu's per ordinance no. 162-16. no change to occupancy or egress. remove non structural walls. new kitchen & bath. excavate less than 50 cubic yards of soil. | $120,000 |
| Aug 23, 2019 | Completed final sign-off Dec 2019 | 7555 Geary Bl | unit 304 comply with nov 201978131. kitchen remodel, bathroom remodel, painting. no interior walls demolished.Details
unit 304 comply with nov 201978131. kitchen remodel, bathroom remodel, painting. no interior walls demolished. | $25,000 |
| Jul 24, 2019 | Completed final sign-off Jun 2020 | 720 Jones St | unit 21 - 1 bedrm/1ba to 2bedrm/1bath. new kitchen cabinets, new dishwashers and washer/dryer. new plumbing fixtures. new lighting @ existing j-box locations. no change to mechanical. no exterior work. no fire alarm, sprinkler or structural workDetails
unit 21 - 1 bedrm/1ba to 2bedrm/1bath. new kitchen cabinets, new dishwashers and washer/dryer. new plumbing fixtures. new lighting @ existing j-box locations. no change to mechanical. no exterior work. no fire alarm, sprinkler or structural work | $65,000 |
| Jun 11, 2019 | Completed final sign-off Feb 2020 | 1740 Broadway | interior renovation at one extg unit on 3rd floor. remodel kitchen and bath. new bath. no change to exterior or structure. n/a for maherDetails
interior renovation at one extg unit on 3rd floor. remodel kitchen and bath. new bath. no change to exterior or structure. n/a for maher | $50,000 |
| Mar 15, 2019 | Completed final sign-off Jul 2020 | 720 Jones St | renovation of 3 apartments units: 03c,26,&30. unit 03c at basement add bedroom and remodel kitchen & bath. unit 26 on 2nd floor & 30 on 3rd floor: remodel kitchen and bath. new cabinets, new plmg fixturesDetails
renovation of 3 apartments units: 03c,26,&30. unit 03c at basement add bedroom and remodel kitchen & bath. unit 26 on 2nd floor & 30 on 3rd floor: remodel kitchen and bath. new cabinets, new plmg fixtures | $45,000 |
| Jan 30, 2019 | Never finaled issued Oct 2019, no final | 1408 California St | renovation of units 305, 308, on 3rd level, 409 4th level, 505 on 5th level, 4 total units. unit 305 is conversion from 2 to 3 bedroom, conversion from studio to 1 bedroom at units 308,409. 1 bdrm to 2 at 504.n kitchen cabinets, n plumbing fixt, new lighting, @ e j boxes, n dshwshDetails
renovation of units 305, 308, on 3rd level, 409 4th level, 505 on 5th level, 4 total units. unit 305 is conversion from 2 to 3 bedroom, conversion from studio to 1 bedroom at units 308,409. 1 bdrm to 2 at 504.n kitchen cabinets, n plumbing fixt, new lighting, @ e j boxes, n dshwsh | $170,000 |
| Nov 19, 2018 | Never finaled issued Nov 2018, no final | 1740 Broadway | interior renovations at (4) existing units #206, 302, 304, 306. new kitchens & baths. no change to street facing exteriors. no structural work. no change to areas.Details
interior renovations at (4) existing units #206, 302, 304, 306. new kitchens & baths. no change to street facing exteriors. no structural work. no change to areas. | $50,000 |
| Aug 16, 2018 | Completed final sign-off Dec 2018 | 1348 Sacramento St | kitchen remodel, bathroom remodel, electrical upgrade.Details
kitchen remodel, bathroom remodel, electrical upgrade. | $23,000 |
| Jul 10, 2018 | Never finaled issued Jul 2018, no final | 1740 Broadway | interior renovations to (4) units - new kitchen & bathrooms. new interior windows - mech, electrical, plumbing. no change to exterior, structural, use, common areas. no new areaDetails
interior renovations to (4) units - new kitchen & bathrooms. new interior windows - mech, electrical, plumbing. no change to exterior, structural, use, common areas. no new area | $150,000 |
| Jul 6, 2018 | Expired or cancelled cancelled Dec 2018 | 1348 Sacramento St | apt. #3 remodel. bathroom and kitchen remodel. electrical and plumbing upgrade. drywall and painting.Details
apt. #3 remodel. bathroom and kitchen remodel. electrical and plumbing upgrade. drywall and painting. | $18,000 |
| May 21, 2018 | Never finaled issued May 2018, no final | 1740 Broadway | unit 403: exploratory of (e) kitchen, bathroom & closets: 150sf.Details
unit 403: exploratory of (e) kitchen, bathroom & closets: 150sf. | $3,000 |
| Feb 15, 2018 | Never finaled issued Feb 2018, no final | 2656 Van Ness Av | renovation of unit #2 on teh 2nd flr, including new bedroom, new bathroom, new laundry. renovated kitchen & bath, new lighting, new heating, no exterior changes maher naDetails
renovation of unit #2 on teh 2nd flr, including new bedroom, new bathroom, new laundry. renovated kitchen & bath, new lighting, new heating, no exterior changes maher na | $35,000 |
| Nov 20, 2017 | Completed final sign-off Jun 2018 | 2656 Van Ness Av | renovation of apt #9 on 2nd flr. includes new bedroom, new laundry, renovate kitchen and bath, new lighting, revised heating. no exterior work. maher naDetails
renovation of apt #9 on 2nd flr. includes new bedroom, new laundry, renovate kitchen and bath, new lighting, revised heating. no exterior work. maher na | $50,000 |
| Nov 16, 2017 | Completed final sign-off Mar 2018 | 720 Jones St | unit #34 - renovation in apartment. new kitchen, new tiles in bathroom. no exterior changes. no change of wall , same location and replace in kind. maher n/aDetails
unit #34 - renovation in apartment. new kitchen, new tiles in bathroom. no exterior changes. no change of wall , same location and replace in kind. maher n/a | $12,000 |
| Nov 6, 2017 | Completed final sign-off Jun 2018 | 2656 Van Ness Av | renovation apt 14 2nd fl includes new bedroom, new laundry, new bath, reonvated kitchen, renovated bath, new lighting, revised heating, no exterior changesDetails
renovation apt 14 2nd fl includes new bedroom, new laundry, new bath, reonvated kitchen, renovated bath, new lighting, revised heating, no exterior changes | $45,000 |
| Aug 4, 2017 | Completed final sign-off Feb 2018 | 979 Teresita Bl | legalize (e) gr fl bathrm, remodel (e) kitchen & install (n) master bathrm; interior demo walls, (n) partitions, (n) & replacement lighting & plumbing fixtures. (n) finishes, patch & paint & repair of (e) foundation at west wall; exterior - remove (e) window & replace with (n) in same location on sDetails
legalize (e) gr fl bathrm, remodel (e) kitchen & install (n) master bathrm; interior demo walls, (n) partitions, (n) & replacement lighting & plumbing fixtures. (n) finishes, patch & paint & repair of (e) foundation at west wall; exterior - remove (e) window & replace with (n) in same location on s | $20,000 |
| Jul 25, 2017 | Completed final sign-off Mar 2018 | 520 Geary St | #204: renovation to include new bedrm, new laundry. relocate kitchen & bath, new partitions, lighting, no exterior changes. this unit is on the 2nd fl. life safety deferred if required.Details
#204: renovation to include new bedrm, new laundry. relocate kitchen & bath, new partitions, lighting, no exterior changes. this unit is on the 2nd fl. life safety deferred if required. | $30,000 |
| Jul 20, 2017 | Completed final sign-off Oct 2017 | 403 Main St | remodel kitchen & bath.Details
remodel kitchen & bath. | $16,000 |
| Apr 21, 2017 | Never finaled issued Jun 2017, no final | 1408 California St | renovation of apts 401 and 405, 5th lvl. new bedroom, laundry, renovate kitchen and bath, revised lighting, heating. no exterior workDetails
renovation of apts 401 and 405, 5th lvl. new bedroom, laundry, renovate kitchen and bath, revised lighting, heating. no exterior work | $65,000 |
| Apr 13, 2017 | Never finaled issued Jun 2017, no final | 720 Jones St | apt #51: renovation of #51, 5th floor: addition of 1 bedroom, laundry, renovate kitchen & bath, new lighting. maher n/aDetails
apt #51: renovation of #51, 5th floor: addition of 1 bedroom, laundry, renovate kitchen & bath, new lighting. maher n/a | $30,000 |
| Apr 6, 2017 | Never finaled issued Jun 2017, no final | 720 Jones St | apt #32, 3rd floor renovation - additoin of bedroom, laundry, renovation of bath, kitchen, lighting. no exterior changes. n/a maher ordinanceDetails
apt #32, 3rd floor renovation - additoin of bedroom, laundry, renovation of bath, kitchen, lighting. no exterior changes. n/a maher ordinance | $30,000 |
| Mar 30, 2017 | Completed final sign-off Feb 2018 | 2237 19th Av | legalize (e) unauthorized dwelling unit under ordinance no.43-14. vertical separation 2 story unit with kitchen, dining and living room on ground floor, 1 bedroom and 1 full bathroom on 2nd floor, total of 834 gross sf.Details
legalize (e) unauthorized dwelling unit under ordinance no.43-14. vertical separation 2 story unit with kitchen, dining and living room on ground floor, 1 bedroom and 1 full bathroom on 2nd floor, total of 834 gross sf. | $8,300 |
| Jan 26, 2017 | Completed final sign-off Sep 2017 | 1408 California St | unit 202 - renovation of kitchen and bath, addition of bedroom, relocation of partitions, lighting revisions, no exterior work. maher naDetails
unit 202 - renovation of kitchen and bath, addition of bedroom, relocation of partitions, lighting revisions, no exterior work. maher na | $35,000 |
| Dec 20, 2016 | Completed final sign-off Oct 2017 | 1408 California St | #501: renovation of apartment in the 4th level:renovation of kitchen, bath, installation of new laundry closet. lighting and heating revisions. structural header revision. n/a for maher.Details
#501: renovation of apartment in the 4th level:renovation of kitchen, bath, installation of new laundry closet. lighting and heating revisions. structural header revision. n/a for maher. | $30,000 |
| Oct 18, 2016 | Completed final sign-off Feb 2017 | 570 Mangels Av | kitchen remodel: install 10 recessed lights, outlets, no structural work.Details
kitchen remodel: install 10 recessed lights, outlets, no structural work. | $8,500 |
| Jun 29, 2016 | Completed final sign-off Jan 2020 | 1127 Wisconsin St | excavate (e) basement to create living space. horizontal addition of 8'-4" @ rear of bldg @ each level. remodel entire (2) unit bldg including (2) kitchen remodels & (5) bathroom remodels.Details
excavate (e) basement to create living space. horizontal addition of 8'-4" @ rear of bldg @ each level. remodel entire (2) unit bldg including (2) kitchen remodels & (5) bathroom remodels. | $250,000 |
| Feb 18, 2016 | Completed final sign-off Jun 2016 | 2227 Market St | kitchen & bathroom remodel, upgrade plumbing & electricalDetails
kitchen & bathroom remodel, upgrade plumbing & electrical | $24,000 |
| Jan 11, 2016 | Never finaled issued Jan 2016, no final | 2227 Market St | remodel bathroom & kitchen, no walls or ceilings opened. remove appliances, kitchen cabginets, vinity cabinets, toilet, light fixtures, tile from the floor, vinyl from kitchen floor & install with new.Details
remodel bathroom & kitchen, no walls or ceilings opened. remove appliances, kitchen cabginets, vinity cabinets, toilet, light fixtures, tile from the floor, vinyl from kitchen floor & install with new. | $6,000 |
| Jul 24, 2015 | Never finaled issued Jul 2015, no final | 4130 Cesar Chavez St | unit 41: remodel kitchen/bathroom, includes shower valve replacement, add laundry on entrance closet, ventless dryer.Details
unit 41: remodel kitchen/bathroom, includes shower valve replacement, add laundry on entrance closet, ventless dryer. | $15,000 |
| Sep 15, 2014 | Expired or cancelled expired Oct 2021 | 2018 Webster St | renovation to (e) 4 story bldg add basement/garage level & a horiz add. up to the rear yard line for the 2/f & 3/f w/a 4/f deck each unit to have (n) kitchen.Details
renovation to (e) 4 story bldg add basement/garage level & a horiz add. up to the rear yard line for the 2/f & 3/f w/a 4/f deck each unit to have (n) kitchen. | $750,000 |
| May 19, 2014 | Never finaled issued Jun 2014, no final | 570 Hayes St | remodel of unit #1 on 2nd floor, including addition of 2nd bathroom, new partitions, new bath and kitchen fixtures. no change to envelope.Details
remodel of unit #1 on 2nd floor, including addition of 2nd bathroom, new partitions, new bath and kitchen fixtures. no change to envelope. | $120,000 |
| May 19, 2014 | Completed final sign-off Oct 2015 | 570 Hayes St | remodel of unit #3 on 3rd floor, including addition of 2nd bathroom, new partitions, new bath and kitchen fixtures. no change to envelope.Details
remodel of unit #3 on 3rd floor, including addition of 2nd bathroom, new partitions, new bath and kitchen fixtures. no change to envelope. | $60,000 |
| Feb 22, 2013 | Completed final sign-off Sep 2013 | 1439 12th Av | revision to appl #2009.0930.7980 to continue to complete a work kitchen cabinet replacement only. reduce a scope of work form original permit with kitchen cabinet & counters & flooring replacement only.Details
revision to appl #2009.0930.7980 to continue to complete a work kitchen cabinet replacement only. reduce a scope of work form original permit with kitchen cabinet & counters & flooring replacement only. | |
| Aug 1, 2012 | Completed final sign-off Sep 2012 | 1327 44th Av | revision to pa#201207205361, remove the drywall behind kitchen and replace, install r-13 insulation.Details
revision to pa#201207205361, remove the drywall behind kitchen and replace, install r-13 insulation. | $900 |
| Jul 20, 2012 | Completed final sign-off Sep 2012 | 1327 44th Av | replace dedicate circuit 2 amp in the bathroom area, replace kitchen counter top, replace around 5 cabinets with countertop, not entire kitchen.Details
replace dedicate circuit 2 amp in the bathroom area, replace kitchen counter top, replace around 5 cabinets with countertop, not entire kitchen. | $2,438 |
| Nov 9, 2011 | Completed final sign-off Jan 2012 | 899 Pine St | work in unit #1303: kitchen remodel (work includes replacement of cabinets, countertop, sink & drywall. 5/8" type'x' gypsum borad at dry wall location if disturbed). bathroom remodel (work includes tiles, tub & sink). no wall relocation.Details
work in unit #1303: kitchen remodel (work includes replacement of cabinets, countertop, sink & drywall. 5/8" type'x' gypsum borad at dry wall location if disturbed). bathroom remodel (work includes tiles, tub & sink). no wall relocation. | $6,100 |